CN113982100A - 复杂环境下钢通廊整体滑移安装方法 - Google Patents
复杂环境下钢通廊整体滑移安装方法 Download PDFInfo
- Publication number
- CN113982100A CN113982100A CN202111332320.3A CN202111332320A CN113982100A CN 113982100 A CN113982100 A CN 113982100A CN 202111332320 A CN202111332320 A CN 202111332320A CN 113982100 A CN113982100 A CN 113982100A
- Authority
- CN
- China
- Prior art keywords
- built
- newly
- corridor
- platform
- mounting platform
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/16—Tools or apparatus
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H5/00—Buildings or groups of buildings for industrial or agricultural purposes
- E04H5/02—Buildings or groups of buildings for industrial purposes, e.g. for power-plants or factories
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
本发明公开了一种复杂环境下钢通廊整体滑移安装方法,其作业步骤为:①于新建通廊前、后、左、右立柱的底部安装滑动支座;②架设安装平台于妨碍新建通廊安装的原建通廊的上方;③于安装平台的后端焊接操作平台,操作平台上设有手拉葫芦;④于安装平台前端用普通吊机将新建通廊吊装到安装平台的前部上;⑤利用手拉葫芦的倒链拖拽并通过滑动支座于安装平台上的滑动而将新建通廊向后拉移就位。本发明改变了传统的通廊安装方法,新建通廊整体安装的工期缩短了,避免施工中使用超大吊车,降低了施工难度,节约了成本。
Description
技术领域
本发明涉及钢结构工程施工技术,具体为一种复杂环境下钢通廊整体滑移安装方法。
背景技术
在冶金行业原料输送领域,为了扩大产能,很多企业需要对原有的生产系统进行改造,由于场地障碍物多的限制,需要在原有生产区域见缝插针新建转运站及钢结构通廊等。
现有的施工场地环境复杂,如工程通廊需建造在原有的钢结构通廊上方,吊装高度大,距离远,传统施工方法为将通廊分片进行散装或用超大型吊机进行整体吊装,通廊散装施工周期长,无法满足现场改造的时间要求,而采用超大型吊车整体吊装通廊,则费用太高,不经济。
发明内容
针对现有技术的不足,本发明所要解决的技术问题是提出了一种周期短、费用低的复杂环境下钢通廊整体滑移安装方法。
能够解决上述技术问题的复杂环境下钢通廊整体滑移安装方法,其技术方案是将新建通廊整体吊装到搭建的安装平台上,利用手拉葫芦将新建通廊于安装平台上移动就位,其作业步骤为:
1、于新建通廊前、后、左、右的立柱的底部安装滑动支座。
2、根据新建通廊的安装位置架设安装平台,所述安装平台架空于妨碍新建通廊安装的原建通廊的上方。
3、于安装平台的后端焊接操作平台,所述操作平台上设置手拉葫芦。
4、于安装平台前端,用普通吊机将新建通廊吊装到安装平台的前部上。
5、利用手拉葫芦的倒链的拖拽并通过滑动支座于安装平台上的滑动而将新建通廊向后拉移就位。
进一步,根据新建通廊前、后、左、右立柱和滑动支座的位置关系,于安装平台上焊接有在滑移过程中对新建通廊起前、后导向作用的限位钢板。
本发明的有益效果:
本发明复杂环境下钢通廊整体滑移安装方法,通过新建通廊的整体安装,改变了传统的安装方法,避免使用超大型吊车,降低了施工难度,缩短了施工周期,节省了吊车台班,节约了成本。
附图说明
图1为本发明一种实施方式的安装示意图(俯视)。
图2为图1实施方式的侧面图。
图3为图1实施方式中新建通廊滑移就位的示意图。
图号标识:1、新建通廊;1-1、立柱;2、安装平台;3、原有通廊;4、滑动支座;5、操作平台;6、手拉葫芦;7、普通吊机;8、限位钢板;9、框架。
具体实施方式
下面结合附图所示实施方式对本发明的技术方案作进一步说明。
本发明复杂环境下钢通廊整体滑移安装方法,是在生产场地将新建通廊1整体吊装到搭建于原有通廊3上方的安装平台2上,并利用手拉葫芦6将新建通廊1于安装平台2上移动就位,其作业步骤为:
1、于新建通廊1四角处的前、后、左、右立柱1-1的底侧部安装上滑动支座4,所述滑动支座4的安装高度稍低于立柱1-1的底端,于前、后、左、右立柱1-1的顶部焊接吊耳。
2、根据新建通廊1于在生产场地的安装位置,采用框架9架设安装平台2,所述安装平台2的架设高度高于妨碍新建通廊1安装的原建通廊1,所属于原建通廊1处于框架9的框体内。
3、根据新建通廊1四角立柱1-1和滑动支座4的位置关系,于安装平台2上焊接有在滑移过程中对新建通廊1起前、后导向作用的左、右限位钢板8。
4、于安装平台2的后端通过支架焊接有操作平台5,所述操作平台5上通过挂耳安装有手拉葫芦6。
5、于安装平台2的前端,用普通吊机7将新建通廊1整个吊装到安装平台2的前部上。
6、将拉葫芦6的倒链连接新建通廊1,利用手拉葫芦6的倒链的拖拽并通过滑动支座4于安装平台2上的滑动(立柱1-1的底端不与安装平台2接触)以及限位钢板8对左、右立柱1-1的导向而将新建通廊1向后缓慢拉移到安装位置。
7、拆下滑动支座4和限位钢板8,落位新建通廊1于安装平台2上而完成新建通廊1的就位。
Claims (2)
1.复杂环境下钢通廊整体滑移安装方法,是将新建通廊(1)整体吊装到搭建的安装平台(2)上,利用手拉葫芦(6)将新建通廊(1)于安装平台(2)上移动就位,其作业步骤为:
①、于新建通廊(1)前、后、左、右的立柱(1-1)的底部安装滑动支座(4);
②、根据新建通廊(1)的安装位置架设安装平台(2),所述安装平台(2)架空于妨碍新建通廊(1)安装的障碍物的上方;
③、于安装平台(2)的后端焊接操作平台(5),所述操作平台(5)上设置手拉葫芦(6);
④、于安装平台(2)前端,用普通吊机(7)将新建通廊(1)吊装到安装平台(2)的前部上;
⑤、利用手拉葫芦(6)的倒链的拖拽并通过滑动支座(4)于安装平台(2)上的滑动而将新建通廊(1)向后拉移就位。
2.根据权利要求1所述的复杂环境下钢通廊整体滑移安装方法,其特征在于:根据新建通廊(1)前、后、左、右立柱(1-1)和滑动支座(4)的位置关系,于安装平台(2)上焊接在滑移过程中对新建通廊(1)起前、后导向作用的限位钢板(8)。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202111332320.3A CN113982100B (zh) | 2021-11-11 | 2021-11-11 | 复杂环境下钢通廊整体滑移安装方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202111332320.3A CN113982100B (zh) | 2021-11-11 | 2021-11-11 | 复杂环境下钢通廊整体滑移安装方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN113982100A true CN113982100A (zh) | 2022-01-28 |
CN113982100B CN113982100B (zh) | 2023-03-28 |
Family
ID=79747902
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202111332320.3A Active CN113982100B (zh) | 2021-11-11 | 2021-11-11 | 复杂环境下钢通廊整体滑移安装方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN113982100B (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115353022A (zh) * | 2022-09-01 | 2022-11-18 | 大连中远海运重工有限公司 | 大型压缩机在模块内滑移安装方法 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20100300013A1 (en) * | 2009-05-29 | 2010-12-02 | Shizuo Imaoka | Module structure and plant construction method |
CN105113803A (zh) * | 2015-08-21 | 2015-12-02 | 中国五冶集团有限公司 | 一种山区廊道桁架高空滑移吊装装置及其实现方法 |
CN205894099U (zh) * | 2016-06-13 | 2017-01-18 | 河北亿安工程技术股份有限公司 | 一种应用于地下管廊的移动式滑动模板装置 |
CN109723218A (zh) * | 2018-12-26 | 2019-05-07 | 中国一冶集团有限公司 | 一种受限区域内需穿过上方障碍物的通廊吊装方法 |
CN110029807A (zh) * | 2019-05-23 | 2019-07-19 | 中国二十二冶集团有限公司 | 用于安装钢结构通廊彩板的装置 |
CN112377672A (zh) * | 2020-06-19 | 2021-02-19 | 中国二十二冶集团有限公司 | 旧厂房除尘管道改造安装方法及其专用的管道移动吊装装置 |
CN112908624A (zh) * | 2021-01-26 | 2021-06-04 | 宣化钢铁集团有限责任公司 | 一种变压器更换方法及装置 |
-
2021
- 2021-11-11 CN CN202111332320.3A patent/CN113982100B/zh active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20100300013A1 (en) * | 2009-05-29 | 2010-12-02 | Shizuo Imaoka | Module structure and plant construction method |
CN105113803A (zh) * | 2015-08-21 | 2015-12-02 | 中国五冶集团有限公司 | 一种山区廊道桁架高空滑移吊装装置及其实现方法 |
CN205894099U (zh) * | 2016-06-13 | 2017-01-18 | 河北亿安工程技术股份有限公司 | 一种应用于地下管廊的移动式滑动模板装置 |
CN109723218A (zh) * | 2018-12-26 | 2019-05-07 | 中国一冶集团有限公司 | 一种受限区域内需穿过上方障碍物的通廊吊装方法 |
CN110029807A (zh) * | 2019-05-23 | 2019-07-19 | 中国二十二冶集团有限公司 | 用于安装钢结构通廊彩板的装置 |
CN112377672A (zh) * | 2020-06-19 | 2021-02-19 | 中国二十二冶集团有限公司 | 旧厂房除尘管道改造安装方法及其专用的管道移动吊装装置 |
CN112908624A (zh) * | 2021-01-26 | 2021-06-04 | 宣化钢铁集团有限责任公司 | 一种变压器更换方法及装置 |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115353022A (zh) * | 2022-09-01 | 2022-11-18 | 大连中远海运重工有限公司 | 大型压缩机在模块内滑移安装方法 |
Also Published As
Publication number | Publication date |
---|---|
CN113982100B (zh) | 2023-03-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2021120687A1 (zh) | 空间网架整体降拆施工方法以及辅助支撑机构 | |
CN108411922B (zh) | 钢支撑的拆除方法 | |
CN113982100B (zh) | 复杂环境下钢通廊整体滑移安装方法 | |
CN103615118A (zh) | 一种大型拱形结构的提升安装方法 | |
CN115405110B (zh) | 一种适用于大型钢结构屋盖的提升滑移系统及其施工方法 | |
CN201521115U (zh) | 一种梁柱式支架 | |
CN213356779U (zh) | 超重钢柱平移运输安装装置 | |
CN214527884U (zh) | 一种室内高空管道安装电动提升装置 | |
CN209923780U (zh) | 一种节段预制盖梁的悬空支撑 | |
CN211004170U (zh) | 一种用于超长型管廊陆地模块吊装的框架式吊排 | |
CN215979397U (zh) | 一种用于曲线侧墙浇筑的模版台车面板系统 | |
CN212036620U (zh) | 一种组装式堆场货架 | |
CN220502591U (zh) | 一种移动式阳极板准备架 | |
CN217378638U (zh) | 一种预制箱通和箱涵安装的拼缝调节装置 | |
CN110318460B (zh) | 一种倒阶梯状异型钢结构的施工方法 | |
CN215561946U (zh) | 用于安装调整拱座预埋钢板的门洞式支架 | |
CN115341070B (zh) | 炉体平移更换式电炉结构及炉体更换方法 | |
CN215369949U (zh) | 一种中板架体预留门式通道 | |
CN215592405U (zh) | 工具式门架提升设备 | |
CN217442248U (zh) | 烧结机机头上部骨架及设备整体安装结构 | |
CN219138539U (zh) | 液压升降停车设备、并列式液压升降停车设备 | |
CN219732724U (zh) | 一种大跨度公共建筑内顶部马道施工用可升降吊篮 | |
CN113279764B (zh) | 一种复杂钢套筒与盾构机分体平移的施工方法 | |
CN219259386U (zh) | 一种用于大口径管道安装的轨道梁组 | |
CN221236745U (zh) | 一种钢结构电缆槽台车 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |