CN105668410A - 一种整体平移式吊车梁的安装方法 - Google Patents

一种整体平移式吊车梁的安装方法 Download PDF

Info

Publication number
CN105668410A
CN105668410A CN201410647885.4A CN201410647885A CN105668410A CN 105668410 A CN105668410 A CN 105668410A CN 201410647885 A CN201410647885 A CN 201410647885A CN 105668410 A CN105668410 A CN 105668410A
Authority
CN
China
Prior art keywords
crane girder
crane beam
sliding beam
assembled
screw block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410647885.4A
Other languages
English (en)
Inventor
蔡夏莲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201410647885.4A priority Critical patent/CN105668410A/zh
Publication of CN105668410A publication Critical patent/CN105668410A/zh
Pending legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本发明公开了一种整体平移式吊车梁的安装方法,包括以下步骤:a.将制造好的各构件进行现场拼装成整体式吊车梁;b.在两个吊车梁立柱相对应的位置分别搭设临时支架,临时支架通过滑动横梁与吊车梁立柱连接;c.将千斤顶基座安装到临时立柱一侧的滑动横梁端部;d.将拼装后的吊车梁吊离地面;e.将拼装后的吊车梁吊至临时支架顶部上方就位并缓慢落钩;f.将千斤顶前端固装的垫板顶装到滑动横梁侧面;g.在吊车梁的两端以及中间分别安装揽绳;h.将吊车梁安装到位。本发明提高了生产的安全性,提高了工作效率,占用内场空间较小,适应环境能力强,吊装工作量减少,缩短了施工周期,减少构件在运输中产生的局部变形,提高了施工质量。

Description

一种整体平移式吊车梁的安装方法
技术领域
本发明涉及吊车梁的安装方法,具体涉及一种整体平移式吊车梁的安装方法。
背景技术
现代大型工业厂房建设中,钢结构的吊车梁及其辅助系统被广泛应用。传统安装方法为:单榀吊车梁(一般为工字形截面)、制动桁架或走道板等构件分别在工厂预制,然后将各构件运输到现场。在钢柱安装完成后,将各轴线的单榀吊车梁分别进行吊装,直接吊至钢柱牛腿处,然后经过校正、与柱连接固定后,再开始吊装各个制动桁架、走道板等构件,最后在高空将各个制动桁架、走道板与对应的每榀吊车梁分别进行焊接或者用螺栓连接固定。传统安装方法的安装位置均为高处,且系统构件多,这样势必使作业人员施工安全度降低,且高处作业的效率也低;另外,在工业厂房中,吊车梁的安装由于空间环境的影响无法直接通过汽车吊,而现有厂房内部已经安装好的厂房吊车上的吊装小车不能到达吊装位置,所以急需一种安装方式解决现有的问题。
发明内容
为克服上述现有技术的不足,本发明的目的在于提供一种整体平移式吊车梁的安装方法,该种安装方法提高了施工的安全性,对施工环境适应性强,能够有效保障施工的质量和进度。
为实现上述目的,本发明的技术方案是:一种整体平移式吊车梁的安装方法,包括以下步骤:
a.将制造好的各构件进行现场拼装成整体式吊车梁,所述整体式吊车梁包括吊车梁和辅助桁架相互平行设置,吊车梁的上部通过制定板螺栓和制动板固定连接,辅助桁架上部通过焊接与制动板固定连接,吊车梁和辅助桁架的下部都通过水平支撑架固定连接,吊车梁的横截面上固定有连接板,相邻的吊车梁通过连接板连接在一起,吊车梁上部的铰板与钢柱连接在一起;
b.在两个吊车梁立柱相对应的位置分别搭设临时支架,临时支架通过滑动横梁与吊车梁立柱连接,其中滑动横梁上表面与临时立柱上端面在同一水平面上;
c.将千斤顶基座安装到临时立柱一侧的滑动横梁端部,固定千斤顶,在千斤顶的顶杆前端固装垫板;
d.将拼装后的整体式吊车梁吊离地面,然后移动拼装后的整体式吊车梁使其中心对准安装位置的中心;
e.缓慢将拼装后的吊车梁吊至临时支架顶部上方,并缓慢的向下移动拼装后的整体式吊车梁使其对准滑动横梁的中心线,就位并缓慢落钩;
f.将千斤顶前端固装的垫板顶装到滑动横梁侧面;
g.在吊车梁的两端以及中间分别安装揽绳,揽绳两端部分别连接倒链,一端倒链连接地锚,另一端倒链连接厂房柱;
h.将揽绳上的倒链与滑动横梁上的千斤顶同步对吊车梁施加外力,将吊车梁安装到位。
本发明采用上述技术方案的有益效果是:本发明将大部分高处作业的内容转为地面作业,为作业人员营造了一个安全的环境,实现了有效的安全防护,并提高了工作效率,促进了施工质量;本发明采用搭设临时支架、滑动横梁以及千斤顶相互配合的方法,占用厂房内场空间较小,适应施工环境能力强,方便在厂房内场地空间较小的情况下保障顺利进行施工。本发明改变了单个构件逐个吊安装的传统方法,将各构件均在工厂制作,然后运输到现场并拼装成整体式构件,一次性完成吊车梁系统的吊安装工作,工序简化、吊装工作量减少,提高了安装效率,大大缩短了施工周期。本发明减少了现场高空焊接吊装的工作量,有利于提高吊车梁系统的工业化制作质量及安装效率;高空作业量的减少又有益于工人的人身安全,提高了生产的安全性,整体组合式吊车梁还增大了构件整体刚度,可减少构件在运输过程中产生的局部变形,提高了施工质量。
具体实施方式
下面结合实施例对本发明作进一步的说明,但不构成对本发明的任何限制。
为实现上述目的,本发明的技术方案是:一种整体平移式吊车梁的安装方法,包括以下步骤:
a.将制造好的各构件进行现场拼装成整体式吊车梁,所述整体式吊车梁包括吊车梁和辅助桁架相互平行设置,吊车梁的上部通过制定板螺栓和制动板固定连接,辅助桁架上部通过焊接与制动板固定连接,吊车梁和辅助桁架的下部都通过水平支撑架固定连接,吊车梁的横截面上固定有连接板,相邻的吊车梁通过连接板连接在一起,吊车梁上部的铰板与钢柱连接在一起;
b.在两个吊车梁立柱相对应的位置分别搭设临时支架,临时支架通过滑动横梁与吊车梁立柱连接,其中滑动横梁上表面与临时立柱上端面在同一水平面上;
c.将千斤顶基座安装到临时立柱一侧的滑动横梁端部,固定千斤顶,在千斤顶的顶杆前端固装垫板;
d.将拼装后的整体式吊车梁吊离地面,然后移动拼装后的整体式吊车梁使其中心对准安装位置的中心;
e.缓慢将拼装后的吊车梁吊至临时支架顶部上方,并缓慢的向下移动拼装后的整体式吊车梁使其对准滑动横梁的中心线,就位并缓慢落钩;
f.将千斤顶前端固装的垫板顶装到滑动横梁侧面;
g.在吊车梁的两端以及中间分别安装揽绳,揽绳两端部分别连接倒链,一端倒链连接地锚,另一端倒链连接厂房柱;
h.将揽绳上的倒链与滑动横梁上的千斤顶同步对吊车梁施加外力,将吊车梁安装到位。
以上显示和描述了本发明的基本原理和主要特征。本行业的技术人员应该了解,本发明不受上述实施例的限制,上述实施例和说明书中描述的只是说明本发明的原理,在不脱离本发明精神和范围的前提下,本发明还会有各种变化和改进,这些变化和改进都落入要求保护的本发明范围内。本发明要求保护范围由所附的权利要求书及其等效物界定。

Claims (1)

1.一种整体平移式吊车梁的安装方法,其特征在于:包括以下步骤:
a.将制造好的各构件进行现场拼装成整体式吊车梁,所述整体式吊车梁包括吊车梁和辅助桁架相互平行设置,吊车梁的上部通过制定板螺栓和制动板固定连接,辅助桁架上部通过焊接与制动板固定连接,吊车梁和辅助桁架的下部都通过水平支撑架固定连接,吊车梁的横截面上固定有连接板,相邻的吊车梁通过连接板连接在一起,吊车梁上部的铰板与钢柱连接在一起;
b.在两个吊车梁立柱相对应的位置分别搭设临时支架,临时支架通过滑动横梁与吊车梁立柱连接,其中滑动横梁上表面与临时立柱上端面在同一水平面上;
c.将千斤顶基座安装到临时立柱一侧的滑动横梁端部,固定千斤顶,在千斤顶的顶杆前端固装垫板;
d.将拼装后的整体式吊车梁吊离地面,然后移动拼装后的整体式吊车梁使其中心对准安装位置的中心;
e.缓慢将拼装后的吊车梁吊至临时支架顶部上方,并缓慢的向下移动拼装后的整体式吊车梁使其对准滑动横梁的中心线,就位并缓慢落钩;
f.将千斤顶前端固装的垫板顶装到滑动横梁侧面;
g.在吊车梁的两端以及中间分别安装揽绳,揽绳两端部分别连接倒链,一端倒链连接地锚,另一端倒链连接厂房柱;
h.将揽绳上的倒链与滑动横梁上的千斤顶同步对吊车梁施加外力,将吊车梁安装到位。
CN201410647885.4A 2014-11-17 2014-11-17 一种整体平移式吊车梁的安装方法 Pending CN105668410A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410647885.4A CN105668410A (zh) 2014-11-17 2014-11-17 一种整体平移式吊车梁的安装方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410647885.4A CN105668410A (zh) 2014-11-17 2014-11-17 一种整体平移式吊车梁的安装方法

Publications (1)

Publication Number Publication Date
CN105668410A true CN105668410A (zh) 2016-06-15

Family

ID=56944206

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410647885.4A Pending CN105668410A (zh) 2014-11-17 2014-11-17 一种整体平移式吊车梁的安装方法

Country Status (1)

Country Link
CN (1) CN105668410A (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106869324A (zh) * 2017-02-17 2017-06-20 中国十七冶集团有限公司 行车梁模块化安装方法
CN111591889A (zh) * 2020-04-08 2020-08-28 中船第九设计研究院工程有限公司 一种平移式吊车梁的安装方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0827903A (ja) * 1994-07-12 1996-01-30 Tokyu Koken Kk 全天候型建方工法
JP2004300773A (ja) * 2003-03-31 2004-10-28 Tokyo Tekko Co Ltd 鉄筋コンクリート柱の構築方法及び構築構造
CN101759098A (zh) * 2008-11-28 2010-06-30 中冶成工上海五冶建设有限公司 吊车梁架施工方法
CN102372228A (zh) * 2010-08-19 2012-03-14 中冶天工集团有限公司 大跨度吊车梁平移安装方法
CN202214125U (zh) * 2011-06-24 2012-05-09 中国二十冶集团有限公司 具有辅助桁架吊车梁的组合吊装装置

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0827903A (ja) * 1994-07-12 1996-01-30 Tokyu Koken Kk 全天候型建方工法
JP2004300773A (ja) * 2003-03-31 2004-10-28 Tokyo Tekko Co Ltd 鉄筋コンクリート柱の構築方法及び構築構造
CN101759098A (zh) * 2008-11-28 2010-06-30 中冶成工上海五冶建设有限公司 吊车梁架施工方法
CN102372228A (zh) * 2010-08-19 2012-03-14 中冶天工集团有限公司 大跨度吊车梁平移安装方法
CN202214125U (zh) * 2011-06-24 2012-05-09 中国二十冶集团有限公司 具有辅助桁架吊车梁的组合吊装装置

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106869324A (zh) * 2017-02-17 2017-06-20 中国十七冶集团有限公司 行车梁模块化安装方法
CN106869324B (zh) * 2017-02-17 2019-04-09 中国十七冶集团有限公司 行车梁模块化安装方法
CN111591889A (zh) * 2020-04-08 2020-08-28 中船第九设计研究院工程有限公司 一种平移式吊车梁的安装方法

Similar Documents

Publication Publication Date Title
CN105401714A (zh) 一种附着式升降脚手架及升降方法
CN108033367B (zh) 一种钢柱筒架交替支撑式钢平台与塔吊同步提升装置及其提升方法
CN201417657Y (zh) 室内变压器的安装装置
CN102493666A (zh) 一种超大超重构件高空平移安装施工方法
CN104291222B (zh) 一种超高层建筑核心筒内部硬质防护与行吊集成系统
CN203173749U (zh) 液压复式起重机塔架组装整体式竖向自顶升装置
CN103628411B (zh) 山区高空附塔悬臂式提梁桁吊系统
CN205100531U (zh) 一种升降脚手架架体总成
CN201458583U (zh) 一种可升降、可拆卸的吊装平台
CN104989111A (zh) 钢结构高层吊装施工方法
CN103967263A (zh) 新型液压自动爬升卸料平台
CN105668410A (zh) 一种整体平移式吊车梁的安装方法
CN108331335A (zh) 一种钢木组合预拼分离式液压自爬升架
CN102372228B (zh) 大跨度吊车梁平移安装方法
CN204126297U (zh) 一种钢桁架屋顶的临时支撑架
CN203867198U (zh) 高层钢结构转换层桁架的滑移设备
CN108590171A (zh) 一种钢木组合预拼分离式自爬升架体模板施工方法
CN202138937U (zh) 电动吊篮
CN204402001U (zh) 用于钢结构屋面内板安装的可移动式操作平台系统
CN203684097U (zh) 山区高空附塔悬臂式提梁桁吊系统
CN102733612B (zh) 电动葫芦轨道安装方法
CN104806001A (zh) 电梯井导轨滑升安全操作平台及施工方法
CN206859704U (zh) 火力发电厂锅炉钢结构上叠梁吊装就位机构
CN110359756A (zh) 750kV升压站构架安装方法
CN204690594U (zh) 一种用于分幅式钢箱梁横梁安装的可滑移式的简易门架

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20160615

WD01 Invention patent application deemed withdrawn after publication