CN111456770A - 地铁施工移动式隧道管片支撑装置 - Google Patents

地铁施工移动式隧道管片支撑装置 Download PDF

Info

Publication number
CN111456770A
CN111456770A CN202010284064.4A CN202010284064A CN111456770A CN 111456770 A CN111456770 A CN 111456770A CN 202010284064 A CN202010284064 A CN 202010284064A CN 111456770 A CN111456770 A CN 111456770A
Authority
CN
China
Prior art keywords
rod
fixed
threaded
rods
rectangular frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202010284064.4A
Other languages
English (en)
Other versions
CN111456770B (zh
Inventor
陈涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Chengjian Fangqiao Construction Technology Co ltd
Original Assignee
Huanghe Science and Technology College
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huanghe Science and Technology College filed Critical Huanghe Science and Technology College
Priority to CN202010284064.4A priority Critical patent/CN111456770B/zh
Publication of CN111456770A publication Critical patent/CN111456770A/zh
Application granted granted Critical
Publication of CN111456770B publication Critical patent/CN111456770B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/40Devices or apparatus specially adapted for handling or placing units of linings or supporting units for tunnels or galleries
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/08Lining with building materials with preformed concrete slabs

Abstract

本发明公开了一种地铁施工移动式隧道管片支撑装置,涉及盾构施工技术领域。本发明包括矩形框架,矩形框架一相对侧面均固定有两个固定杆;四个固定杆之间滑动配合有两个横向支撑机构;矩形框架一相对侧面且位于矩形框架顶部和底部均开有两个滑槽;四个滑槽之间滑动配合有四个移动杆;四个移动杆之间滑动配合有两个竖向支撑机构。本发明通过矩形框架、横向支撑机构、移动杆和竖向支撑机构的结构设计,可以通过手动调节第一螺纹杆和第二螺纹杆对隧道侧面和顶部的管片进行支撑,使用灵活方便,可循环多次利用,减少了人力物力的消耗,有效的降低了施工成本,提高了施工效率。

Description

地铁施工移动式隧道管片支撑装置
本专利申请为分案申请,母案申请号为2018114807527,母案申请日为2018年12月05日。
技术领域
本发明属于盾构施工技术领域,特别是涉及一种地铁施工移动式隧道管片支撑装置。
背景技术
盾构法修建隧道具有施工速度快、工程质量高、施工安全性好等优点,在地铁区间隧道、公路隧道、水工隧道、城市地下管廊等隧道工程的应用越来越广泛。
现有的隧道施工一般在两个独立平行的地铁隧道之间开设有横向通道,同时在开口隧道处用支架对管片进行临时支撑,防止隧道塌陷,现有的管片支撑架一般是在隧道内部施工焊接,拆卸安装极为不便,消耗了大量的人力物力,降低了隧道施工效率。
发明内容
本发明的目的在于提供一种管片支撑装置,解决了现有的支撑架现场施工焊接,拆卸安装不便,费时费力的问题。
为解决上述技术问题,本发明是通过以下技术方案实现的:
本发明为一种管片支撑装置,包括矩形框架,所述矩形框架一相对侧面均固定有两个固定杆;四个所述固定杆之间滑动配合有两个横向支撑机构;所述矩形框架一相对侧面且位于矩形框架顶部和底部均开有两个滑槽;四个所述滑槽之间滑动配合有四个移动杆;四个所述移动杆之间滑动配合有两个竖向支撑机构;
所述横向支撑机构包括第一螺纹杆;所述第一螺纹杆两端均螺纹配合有第一螺纹管;所述第一螺纹管一端固定有第一推杆;所述第一推杆两端均转动连接有连杆;
所述竖向支撑机构包括第二螺纹杆;所述第二螺纹杆两端均螺纹配合有第二螺纹管;所述第二螺纹管一端固定有第二推杆;所述第二推杆两端侧面均固定有两个支撑杆。
进一步地,所述固定杆一表面开有两个圆孔;所述圆孔内表面开有环形槽;所述环形槽内表面转动连接有旋转座;所述旋转座一表面固定有与连杆相配合的第一套件。
进一步地,所述移动杆两端均固定有与滑槽相配合的滑块;所述移动杆一表面固定有两个与支撑杆相配合的第二套件。
进一步地,所述连杆一端开有球体转动槽;所述球体转动槽内表面转动连接有球体转动件;所述球体转动件周侧面固定连接有第一支撑板。
进一步地,其中两所述支撑杆一端开有轨槽;另两个所述支撑杆一端固定有第二支撑板。
进一步地,所述第一螺纹杆周侧面固定有第一转动把手;所述第二螺纹杆周侧面固定有第二转动把手。
进一步地,所述固定杆周侧面开有螺纹孔;所述螺纹孔与环形槽连通;所述螺纹孔内表面螺纹配合有紧固螺栓。
本发明具有以下有益效果:
1、本发明通过矩形框架、横向支撑机构、移动杆和竖向支撑机构的结构设计,可以通过手动调节第一螺纹杆和第二螺纹杆对隧道侧面和顶部的管片进行支撑,使用灵活方便,可循环多次利用,减少了人力物力的消耗,有效的降低了施工成本,提高了施工效率。
2、本发明通过连杆、第一套件、移动杆和第二套件的结构设计,对侧面和顶面的盾构管片支撑点位置进行调节,可用于不同大小隧道的管片进行支撑,提高了本支撑架的实用性。
当然,实施本发明的任一产品并不一定需要同时达到以上所述的所有优点。
附图说明
为了更清楚地说明本发明实施例的技术方案,下面将对实施例描述所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本发明的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。
图1为本发明管片支撑装置的结构示意图;
图2为矩形框架的结构示意图;
图3为旋转座的结构示意图;
图4为横向支撑机构的结构示意图;
图5为球体转动件的结构示意图;
图6为移动杆的结构示意图;
图7为竖向支撑机构的结构示意图;
附图中,各标号所代表的部件列表如下:
1-矩形框架,2-横向支撑机构,3-移动杆,4-竖向支撑机构,101-固定杆,102-滑槽,103-圆孔,104-环形槽,105-旋转座,106-第一套件,107-紧固螺栓,201-第一螺纹杆,202-第一螺纹管,203-第一推杆,204-连杆,205-球体转动槽,206-球体转动件,207-第一支撑板,208-第一转动把手,301-滑块,302-第二套件,401-第二螺纹杆,402-第二螺纹管,403-第二推杆,404-支撑杆,405-轨槽,406-第二支撑板,407-第二转动把手。
具体实施方式
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有作出创造性劳动前提下所获得的所有其它实施例,都属于本发明保护的范围。
请参阅图1-7所示,本发明为一种管片支撑装置,包括矩形框架1,矩形框架1一相对侧面均固定有两个固定杆101;四个固定杆101之间滑动配合有两个横向支撑机构2;矩形框架1一相对侧面且位于矩形框架1顶部和底部均开有两个滑槽102;四个滑槽102之间滑动配合有四个移动杆3;四个移动杆3之间滑动配合有两个竖向支撑机构4;横向支撑机构2包括第一螺纹杆201;第一螺纹杆201两端周侧面分别开有旋向相反的螺纹;第一螺纹杆201两端均螺纹配合有第一螺纹管202;第一螺纹管202一端固定有第一推杆203;第一推杆203两端均转动连接有连杆204;竖向支撑机构4包括第二螺纹杆401;第二螺纹杆401两端周侧面分别开有旋向相反的螺纹;第二螺纹杆401两端均螺纹配合有第二螺纹管402;第二螺纹管402一端固定有第二推杆403;第二推杆403两端侧面均固定有两个支撑杆404。
其中,固定杆101一表面开有两个圆孔103;圆孔103内表面开有环形槽104;环形槽104内表面转动连接有旋转座105;旋转座105一表面固定有与连杆204相配合的第一套件106。
其中,移动杆3两端均固定有与滑槽102相配合的滑块301;移动杆3一表面固定有两个与支撑杆404相配合的第二套件302。
其中,连杆204一端开有球体转动槽205;球体转动槽205内表面转动连接有球体转动件206;球体转动件206周侧面固定连接有第一支撑板207。
其中,其中两支撑杆404一端开有轨槽405;轨槽405用于与运输车轨道滑动移动;另两个支撑杆404一端固定有第二支撑板406。
其中,第一螺纹杆201周侧面固定有第一转动把手208;第二螺纹杆401周侧面固定有第二转动把手407。
其中,固定杆101周侧面开有螺纹孔;螺纹孔与环形槽104连通;螺纹孔内表面螺纹配合有紧固螺栓107。
本实施例的一个具体应用为:对盾构管片进行支撑时,将通过轨槽405与隧道内运输车轨道滑动,使支撑架沿着轨道移动,便于运输,推动移动杆,使两个竖向支撑机构4的第二支撑板406对不同大小的管片进行支撑,转动第二转动把手407,第二转动把手407带动第二螺纹杆401转动,由于第二螺纹杆401两端周侧面分别开有旋向相反的螺纹,第二螺纹杆401转动时将第二螺纹管402分别向两端顶出,第二螺纹管402推动第二推杆403;第二套件302对支撑杆404进行限位使第二支撑板406对顶部的管片进行支撑,拧松紧固螺栓107同时转动旋转座105;使两个横向支撑机构2的第一支撑板207对不同大小的管片进行支撑;第一套件106对连杆204进行限位;转动第一转动把手208,第一转动把手208带动第一螺纹杆201转动,由于第一螺纹杆201两端周侧面分别开有旋向相反的螺纹,第一螺纹杆201转动时将第二螺纹管202分别向两端顶出,第二螺纹管202推动第一推杆203;使第一支撑板207对相册的管片进行支撑。
在本说明书的描述中,参考术语“一个实施例”、“示例”、“具体示例”等的描述意指结合该实施例或示例描述的具体特征、结构、材料或者特点包含于本发明的至少一个实施例或示例中。在本说明书中,对上述术语的示意性表述不一定指的是相同的实施例或示例。而且,描述的具体特征、结构、材料或者特点可以在任何的一个或多个实施例或示例中以合适的方式结合。
以上公开的本发明优选实施例只是用于帮助阐述本发明。优选实施例并没有详尽叙述所有的细节,也不限制该发明仅为所述的具体实施方式。显然,根据本说明书的内容,可作很多的修改和变化。本说明书选取并具体描述这些实施例,是为了更好地解释本发明的原理和实际应用,从而使所属技术领域技术人员能很好地理解和利用本发明。本发明仅受权利要求书及其全部范围和等效物的限制。

Claims (2)

1.管片支撑装置,包括矩形框架(1),其特征在于:所述矩形框架(1)一相对侧面均固定有两个固定杆(101);四个所述固定杆(101)之间滑动配合有两个横向支撑机构(2);所述矩形框架(1)一相对侧面且位于矩形框架(1)顶部和底部均开有两个滑槽(102);四个所述滑槽(102)之间滑动配合有四个移动杆(3);四个所述移动杆(3)之间滑动配合有两个竖向支撑机构(4);所述横向支撑机构(2)包括第一螺纹杆(201);所述第一螺纹杆(201)两端均螺纹配合有第一螺纹管(202);所述第一螺纹管(202)一端固定有第一推杆(203);所述第一推杆(203)两端均转动连接有连杆(204);所述竖向支撑机构(4)包括第二螺纹杆(401);所述第二螺纹杆(401)两端均螺纹配合有第二螺纹管(402);所述第二螺纹管(402)一端固定有第二推杆(403);所述第二推杆(403)两端侧面均固定有两个支撑杆(404),所述固定杆(101)一表面开有两个圆孔(103);所述圆孔(103)内表面开有环形槽(104);所述环形槽(104)内表面转动连接有旋转座(105);所述旋转座(105)一表面固定有与连杆(204)相配合的第一套件(106),,所述连杆(204)一端开有球体转动槽(205);所述球体转动槽(205)内表面转动连接有球体转动件(206);所述球体转动件(206)周侧面固定连接有第一支撑板(207),两所述支撑杆(404)一端开有轨槽(405);另两个所述支撑杆(404)一端固定有第二支撑板(406),所述移动杆(3)两端均固定有与滑槽(102)相配合的滑块(301);所述移动杆(3)一表面固定有两个与支撑杆(404)相配合的第二套件(302),根据权利要求1所述的一种管片支撑装置,其特征在于,所述第一螺纹杆(201)周侧面固定有第一转动把手(208);所述第二螺纹杆(401)周侧面固定有第二转动把手(407)。
2.根据权利要求1所述的一种管片支撑装置,其特征在于,所述固定杆(101)周侧面开有螺纹孔;所述螺纹孔与环形槽(104)连通;所述螺纹孔内表面螺纹配合有紧固螺栓(107)。
CN202010284064.4A 2018-12-05 2018-12-05 地铁施工移动式隧道管片支撑装置 Active CN111456770B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010284064.4A CN111456770B (zh) 2018-12-05 2018-12-05 地铁施工移动式隧道管片支撑装置

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN202010284064.4A CN111456770B (zh) 2018-12-05 2018-12-05 地铁施工移动式隧道管片支撑装置
CN201811480752.7A CN109469497B (zh) 2018-12-05 2018-12-05 地铁施工移动式隧道管片支撑架

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN201811480752.7A Division CN109469497B (zh) 2018-12-05 2018-12-05 地铁施工移动式隧道管片支撑架

Publications (2)

Publication Number Publication Date
CN111456770A true CN111456770A (zh) 2020-07-28
CN111456770B CN111456770B (zh) 2021-12-14

Family

ID=65675699

Family Applications (3)

Application Number Title Priority Date Filing Date
CN201811480752.7A Active CN109469497B (zh) 2018-12-05 2018-12-05 地铁施工移动式隧道管片支撑架
CN202010284064.4A Active CN111456770B (zh) 2018-12-05 2018-12-05 地铁施工移动式隧道管片支撑装置
CN202010284016.5A Active CN111485923B (zh) 2018-12-05 2018-12-05 地下施工用移动式隧道管片支撑架

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN201811480752.7A Active CN109469497B (zh) 2018-12-05 2018-12-05 地铁施工移动式隧道管片支撑架

Family Applications After (1)

Application Number Title Priority Date Filing Date
CN202010284016.5A Active CN111485923B (zh) 2018-12-05 2018-12-05 地下施工用移动式隧道管片支撑架

Country Status (1)

Country Link
CN (3) CN109469497B (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111485923A (zh) * 2018-12-05 2020-08-04 黄河科技学院 地下施工用移动式隧道管片支撑架
CN112780317A (zh) * 2021-03-04 2021-05-11 北京市政建设集团有限责任公司 洞内支撑顶紧装置

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111894636B (zh) * 2020-08-11 2022-03-25 中铁电气化局集团有限公司 盾构区间隧道联络通道管片支撑结构
CN112228104B (zh) * 2020-11-02 2022-11-15 中交二航局成都城市建设工程有限公司 一种隧道管片拆除装置和方法
CN113738397B (zh) * 2021-10-18 2023-10-27 重庆交通大学 一种装配式类矩形盾构隧道管片拼装结构
CN114165262B (zh) * 2021-11-18 2024-02-27 中交一公局集团有限公司 一种用于地铁隧道管片支撑装置及安装方法

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3210769A1 (de) * 1982-03-24 1983-09-29 Günter 4630 Bochum Marzi Flaechendeckendes ausbauverfahren, flaechenausbau und ausbaumaschine
CN101100944A (zh) * 2006-07-07 2008-01-09 同济大学 新型隧道开口施工管片变形控制与防淹装置及操作方法
JP2010138561A (ja) * 2008-12-10 2010-06-24 Hitachi Zosen Corp セグメント組立装置
CN202031607U (zh) * 2010-09-15 2011-11-09 深圳市华森机电技术有限公司 管片安装设备
CN103321646A (zh) * 2013-07-01 2013-09-25 上海隧道工程股份有限公司 地面出入式盾构掘进机
CN104612718A (zh) * 2015-02-12 2015-05-13 中国水利水电第十四工程局有限公司 一种用于重叠盾构隧道施工的支撑台车及支撑台车系统
CN205936639U (zh) * 2016-08-23 2017-02-08 李树杰 一种地铁施工移动式隧道管片支撑架
CN207960499U (zh) * 2018-03-20 2018-10-12 黄河科技学院 一种土钉墙快速成孔装置
CN108798707A (zh) * 2017-04-27 2018-11-13 湖南五新隧道智能装备股份有限公司 一种衬砌台车及其立模和脱模方法
CN108915738A (zh) * 2018-07-12 2018-11-30 西安科技大学 一种隧道掌子面临时支撑装置

Family Cites Families (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3160472B2 (ja) * 1994-08-11 2001-04-25 三菱重工業株式会社 矩形シールド掘削機のセグメント組立用エレクタ装置
JP3637166B2 (ja) * 1996-11-07 2005-04-13 三菱重工業株式会社 セグメントの真円保持装置
CN101614304B (zh) * 2009-08-05 2011-01-12 北京市政建设集团有限责任公司 热力盾构隧道热力管道固定传力支架
JP6253094B2 (ja) * 2014-02-20 2017-12-27 川崎重工業株式会社 シールド掘進機の後部作業デッキ
FR3025829B1 (fr) * 2014-09-15 2020-05-08 Bouygues Travaux Publics Procede et installation de creusement mecanise d'un rameau de communication entre deux tunnels de circulation ou entre deux puits verticaux.
CN204899950U (zh) * 2015-08-26 2015-12-23 中铁一局集团有限公司 地铁施工用移动式隧道管片支撑架
CN205638476U (zh) * 2016-05-27 2016-10-12 中国电建集团铁路建设有限公司 一种用于隧道施工的管片钢支撑
CN107060788A (zh) * 2016-09-19 2017-08-18 中铁隧道集团有限公司 一种隧道联络通道开挖装置
CN107356382B (zh) * 2017-06-22 2019-04-16 上海隧道工程有限公司 一种管片力学试验装置
CN107420119B (zh) * 2017-08-30 2023-03-31 中铁工程装备集团有限公司 一种盾构机管片快速卸载装置
CN108561155A (zh) * 2018-04-18 2018-09-21 中铁二院工程集团有限责任公司 拼装预制二次衬砌的山岭隧道结构及预制二次衬砌拼装台车
CN108590695B (zh) * 2018-05-30 2023-05-23 中山大学 联络通道盾构施工方法及联络通道
CN109469497B (zh) * 2018-12-05 2020-07-07 张辉 地铁施工移动式隧道管片支撑架

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3210769A1 (de) * 1982-03-24 1983-09-29 Günter 4630 Bochum Marzi Flaechendeckendes ausbauverfahren, flaechenausbau und ausbaumaschine
CN101100944A (zh) * 2006-07-07 2008-01-09 同济大学 新型隧道开口施工管片变形控制与防淹装置及操作方法
JP2010138561A (ja) * 2008-12-10 2010-06-24 Hitachi Zosen Corp セグメント組立装置
CN202031607U (zh) * 2010-09-15 2011-11-09 深圳市华森机电技术有限公司 管片安装设备
CN103321646A (zh) * 2013-07-01 2013-09-25 上海隧道工程股份有限公司 地面出入式盾构掘进机
CN104612718A (zh) * 2015-02-12 2015-05-13 中国水利水电第十四工程局有限公司 一种用于重叠盾构隧道施工的支撑台车及支撑台车系统
CN205936639U (zh) * 2016-08-23 2017-02-08 李树杰 一种地铁施工移动式隧道管片支撑架
CN108798707A (zh) * 2017-04-27 2018-11-13 湖南五新隧道智能装备股份有限公司 一种衬砌台车及其立模和脱模方法
CN207960499U (zh) * 2018-03-20 2018-10-12 黄河科技学院 一种土钉墙快速成孔装置
CN108915738A (zh) * 2018-07-12 2018-11-30 西安科技大学 一种隧道掌子面临时支撑装置

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
李红霞等: "某隧道工程超深基坑支护技术", 《建筑科学》 *
闫富有: "《地下工程施工》", 31 August 2018, 黄河水利出版社 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111485923A (zh) * 2018-12-05 2020-08-04 黄河科技学院 地下施工用移动式隧道管片支撑架
CN111485923B (zh) * 2018-12-05 2021-12-28 河南省诚建检验检测技术股份有限公司 地下施工用移动式隧道管片支撑架
CN112780317A (zh) * 2021-03-04 2021-05-11 北京市政建设集团有限责任公司 洞内支撑顶紧装置

Also Published As

Publication number Publication date
CN111456770B (zh) 2021-12-14
CN109469497A (zh) 2019-03-15
CN111485923A (zh) 2020-08-04
CN111485923B (zh) 2021-12-28
CN109469497B (zh) 2020-07-07

Similar Documents

Publication Publication Date Title
CN111456770B (zh) 地铁施工移动式隧道管片支撑装置
CN110924444A (zh) 一种城市基础设施修建用窨井暂时性封口设备
CN215906996U (zh) 一种钢结构建筑连接件
CN213709181U (zh) 一种高架桥装配式防落网
CN115254266A (zh) 一种抗高压耐磨挤压辊及其安装方法
CN208748564U (zh) 一种快速安装的新型广告道闸
CN211976306U (zh) 一种通风设备用的安装架
DE861232C (de) Eiserner Ringausbau, insbesondere fuer Blindschaechte
CN211006303U (zh) 一种降低整体高度的双层桥梁结构
CN219380982U (zh) 一种预制梁封头模板调节装置
CN220828401U (zh) 一种便于清洁安装的铝型材
CN215907372U (zh) 一种可拆卸式异形建筑立面脚手架搭设转换架
CN208473350U (zh) 一种移动式土木支撑框架
CN218715341U (zh) 一种可周转可变坡装配式临时护栏
CN220285754U (zh) 一种高铁隧道用快速施工支架
CN216173974U (zh) 一种土木工程用砂石分选装置
CN214149793U (zh) 一种钢结构连接处松动检测结构
CN219344283U (zh) 一种市政工程施工用临时护栏结构
CN212581275U (zh) 拆卸式建筑施工电梯附墙连接结构
CN216341423U (zh) 一种建筑工程施工用的警示安全护栏
CN216786712U (zh) 一种桥枕用轨撑
CN213867467U (zh) 一种交通安全标志用固定装置
CN220470824U (zh) 一种具有限位结构的管线支架
CN219388930U (zh) 一种土建风道的对接结构
CN220163912U (zh) 一种市政工程用运转设备

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20211126

Address after: Room 501, No.237, Hushang Road, Fenghuangshan street, Chengxiang District, Putian City, Fujian Province

Applicant after: Putian Chengxiang Zhendachen Trading Co.,Ltd.

Address before: 450000 Lian Yun Road, 27 District, Zhengzhou, Henan Province, No. 123

Applicant before: HUANGHE S & T College

GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20240319

Address after: No. 8 Feiyang Road, Maji Industrial Park, Ma'an Street, Liuhe District, Nanjing City, Jiangsu Province, 211525

Patentee after: Nanjing Chengjian Fangqiao Construction Technology Co.,Ltd.

Country or region after: Zhong Guo

Address before: Room 501, No.237, Hushang Road, Fenghuangshan street, Chengxiang District, Putian City, Fujian Province

Patentee before: Putian Chengxiang Zhendachen Trading Co.,Ltd.

Country or region before: Zhong Guo