CN111101715A - 一种混凝土窗台压顶组合式施工方法及结构 - Google Patents
一种混凝土窗台压顶组合式施工方法及结构 Download PDFInfo
- Publication number
- CN111101715A CN111101715A CN202010031593.3A CN202010031593A CN111101715A CN 111101715 A CN111101715 A CN 111101715A CN 202010031593 A CN202010031593 A CN 202010031593A CN 111101715 A CN111101715 A CN 111101715A
- Authority
- CN
- China
- Prior art keywords
- coping
- concrete
- windowsill
- cast
- section
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/16—Tools or apparatus
- E04G21/18—Adjusting tools; Templates
- E04G21/1841—Means for positioning building parts or elements
- E04G21/185—Means for positioning building parts or elements for anchoring elements or elements to be incorporated in the structure
Abstract
本发明公开了一种混凝土窗台压顶组合式施工方法及结构,该方法是在墙体砌筑至窗台压顶标高处时分别向两侧放入端部预制段压顶,端部预制段压顶放入后即可进行窗台压顶上部墙体砌筑,待砌体完成后将端部预制段压顶的外端凿毛成斜坡接口并清理干净,然后在两侧的端部预制段压顶之间安装现浇段压顶的钢筋模板,进行现浇段压顶的混凝土浇筑,待混凝土达到设计强度后,则使两侧的端部预制段压顶和现浇段压顶连接形成整体式窗台压顶。本发明在墙体砌筑至窗台标高时不需要暂停压顶上部墙体砌筑施工,在砌筑时放入端部预制段压顶即可进行压顶上部的墙体砌筑,很好的解决了传统施工方法中的砌体中间停滞问题。
Description
技术领域
本发明涉及一种混凝土窗台压顶组合式施工方法及结构,属于建筑施工技术领域。
背景技术
传统混凝土窗台压顶施工中,通常采用直接浇筑的施工方法,该施工方法需在墙体砌筑至窗台压顶标高时暂停砌筑,再安装钢筋、模板进行混凝土浇筑,待窗台压顶浇筑后再向上部砌体施工。此施工方法对施工进度制约较大,且现场工人操作时为了提高功效,经常发生工序倒置问题,即在墙体砌筑时预留压顶伸入槽,后期再行混凝土浇筑,导致砖墙在施工时局部悬挑受力,容易产生不均匀开裂及沉降,且后期浇筑混凝土时伸入墙体段浇筑施工难度大,极易导致混凝土浇筑不饱满、蜂窝满面、后期渗漏等问题。
发明内容
本发明的目的在于提供一种施工方便、效率高、质量可靠的混凝土窗台压顶组合式施工方法及结构,以克服现有技术中存在的不足。
为了实现上述目的,本发明采用了如下技术方案:一种混凝土窗台压顶组合式施工方法及结构,在墙体砌筑至窗台压顶标高处时分别向两侧放入端部预制段压顶,端部预制段压顶放入后即可进行窗台压顶上部墙体砌筑,待砌体完成后将端部预制段压顶的外端凿毛成斜坡接口并清理干净,然后在两侧的端部预制段压顶之间安装现浇段压顶的钢筋模板,进行现浇段压顶的混凝土浇筑,待混凝土达到设计强度后,则使两侧的端部预制段压顶和现浇段压顶连接形成整体式窗台压顶。
上述方法中,浇筑现浇段压顶的混凝土时,在斜坡接口处进行振捣密实,混凝土浇筑完后及时进行浇水养护,保证成品质量。
同时,本发明还提供一种基于上述混凝土窗台压顶组合式施工方法构建的混凝土窗台压顶组合式施工结构,该结构由嵌入墙体两侧的端部预制段压顶以及浇筑在两侧端部预制段压顶之间的现浇段压顶构成,所述的端部预制段压顶与现浇段压顶之间通过斜坡接口连接形成一体式结构。
进一步,所述斜坡接口为凿毛形成的45度斜面。
进一步,所述端部预制段压顶内预埋有连接筋,所述的连接筋与现浇段压顶内的钢筋固定连接。
由于采用了上述技术方案,本发明的具有以下优点:
首先,该施工方法操作简便,端部预制段压顶构件尺寸小,重量轻,非常便于现场工作操作。
其次,加快了施工进度,相较于传统做法,本发明在墙体砌筑至窗台标高时不需要暂停压顶上部墙体砌筑施工,在砌筑时放入端部预制段压顶即可进行压顶上部的墙体砌筑,很好的解决了传统施工方法中的砌体中间停滞问题。
另外,杜绝了现场施工工序倒置及其所引发的一系列质量问题,极大的提高了施工效率。
因此,本发明的这种混凝土窗台组合式施工方法适用于房屋建筑工程中所有混凝土窗台压顶,适用范围广。
附图说明
图1为本发明的结构示意图;
图2为本发明中端部预制段压顶的结构示意图。
附图标记说明:1-端部预制段压顶、2-连接筋、3-斜坡接口、4-现浇段压顶。
具体实施方式
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。
本发明的实施例:请参阅图1及图2,一种混凝土窗台压顶组合式施工方法及结构,该结构由嵌入墙体两侧的端部预制段压顶1以及浇筑在两侧端部预制段压顶1之间的现浇段压顶4构成,所述的端部预制段压顶1与现浇段压顶4之间通过斜坡接口3连接形成一体式结构。所述斜坡接口3为凿毛形成的45度斜面。所述端部预制段压顶1内预埋有连接筋2,所述的连接筋2与现浇段压顶4内的钢筋固定连接。
施工时,在墙体砌筑至窗台压顶标高处时分别向两侧放入端部预制段压顶1,端部预制段压顶1放入后即可进行窗台压顶上部墙体砌筑,待砌体完成后将端部预制段压顶1的外端凿毛成斜坡接口3并清理干净,然后在两侧的端部预制段压顶1之间安装现浇段压顶4的钢筋模板,进行现浇段压顶4的混凝土浇筑,待混凝土达到设计强度后,则使两侧的端部预制段压顶1和现浇段压顶4连接形成整体式窗台压顶。
浇筑现浇段压顶4的混凝土时,在斜坡接口3处进行振捣密实,混凝土浇筑完后及时进行浇水养护,保证成品质量。
Claims (5)
1.一种混凝土窗台压顶组合式施工方法,其特征在于:在墙体砌筑至窗台压顶标高处时分别向两侧放入端部预制段压顶(1),端部预制段压顶(1)放入后即可进行窗台压顶上部墙体砌筑,待砌体完成后将端部预制段压顶(1)的外端凿毛成斜坡接口(3)并清理干净,然后在两侧的端部预制段压顶(1)之间安装现浇段压顶(4)的钢筋模板,进行现浇段压顶(4)的混凝土浇筑,待混凝土达到设计强度后,则使两侧的端部预制段压顶(1)和现浇段压顶(4)连接形成整体式窗台压顶。
2.根据权利要求1所述的混凝土窗台压顶组合式施工方法,其特征在于:浇筑现浇段压顶(4)的混凝土时,在斜坡接口(3)处进行振捣密实,混凝土浇筑完后及时进行浇水养护,保证成品质量。
3.一种基于权利要求1或2所述的混凝土窗台压顶组合式施工方法构建的混凝土窗台压顶组合式施工结构,其特征在于:该结构由嵌入墙体两侧的端部预制段压顶(1)以及浇筑在两侧端部预制段压顶(1)之间的现浇段压顶(4)构成,所述的端部预制段压顶(1)与现浇段压顶(4)之间通过斜坡接口(3)连接形成一体式结构。
4.根据权利要求3所述的混凝土窗台压顶组合式施工结构,其特征在于:所述斜坡接口(3)为凿毛形成的45度斜面。
5.根据权利要求3所述的混凝土窗台压顶组合式施工结构,其特征在于:所述端部预制段压顶(1)内预埋有连接筋(2),所述的连接筋(2)与现浇段压顶(4)内的钢筋固定连接。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010031593.3A CN111101715A (zh) | 2020-01-13 | 2020-01-13 | 一种混凝土窗台压顶组合式施工方法及结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010031593.3A CN111101715A (zh) | 2020-01-13 | 2020-01-13 | 一种混凝土窗台压顶组合式施工方法及结构 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN111101715A true CN111101715A (zh) | 2020-05-05 |
Family
ID=70426356
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010031593.3A Pending CN111101715A (zh) | 2020-01-13 | 2020-01-13 | 一种混凝土窗台压顶组合式施工方法及结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111101715A (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114541922A (zh) * | 2022-03-31 | 2022-05-27 | 中冶建工集团有限公司 | 基于水泥空心砌块的组合式窗台压顶施工方法 |
CN114837344A (zh) * | 2022-03-16 | 2022-08-02 | 五冶集团上海有限公司 | 一种窗台压顶混凝土预制块 |
CN114892843A (zh) * | 2022-06-08 | 2022-08-12 | 中建一局集团建设发展有限公司 | 一种砌筑墙体窗洞口压梁预制块组砌施工方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20060242921A1 (en) * | 2005-04-14 | 2006-11-02 | Massie Michael C | Masonry cavity wall construction and method of making same |
CN203834683U (zh) * | 2014-05-14 | 2014-09-17 | 中国水电顾问集团贵阳勘测设计研究院有限公司 | 一种板梁与墙体的连接结构 |
CN203961624U (zh) * | 2014-07-11 | 2014-11-26 | 中国建筑第四工程局有限公司 | 一种预制式窗台压顶 |
CN105134009A (zh) * | 2015-09-11 | 2015-12-09 | 中建七局第二建筑有限公司 | 框架结构填充墙窗台压顶混凝土结构与施工方法 |
-
2020
- 2020-01-13 CN CN202010031593.3A patent/CN111101715A/zh active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20060242921A1 (en) * | 2005-04-14 | 2006-11-02 | Massie Michael C | Masonry cavity wall construction and method of making same |
CN203834683U (zh) * | 2014-05-14 | 2014-09-17 | 中国水电顾问集团贵阳勘测设计研究院有限公司 | 一种板梁与墙体的连接结构 |
CN203961624U (zh) * | 2014-07-11 | 2014-11-26 | 中国建筑第四工程局有限公司 | 一种预制式窗台压顶 |
CN105134009A (zh) * | 2015-09-11 | 2015-12-09 | 中建七局第二建筑有限公司 | 框架结构填充墙窗台压顶混凝土结构与施工方法 |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114837344A (zh) * | 2022-03-16 | 2022-08-02 | 五冶集团上海有限公司 | 一种窗台压顶混凝土预制块 |
CN114541922A (zh) * | 2022-03-31 | 2022-05-27 | 中冶建工集团有限公司 | 基于水泥空心砌块的组合式窗台压顶施工方法 |
CN114892843A (zh) * | 2022-06-08 | 2022-08-12 | 中建一局集团建设发展有限公司 | 一种砌筑墙体窗洞口压梁预制块组砌施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111101715A (zh) | 一种混凝土窗台压顶组合式施工方法及结构 | |
CN109183607A (zh) | 预制拼接uhpc管-混凝土超高桥墩及施工方法 | |
CN110792164B (zh) | 一种装配式剪力墙横向拼装装置和拼装方法 | |
CN215907176U (zh) | 用于窗台压顶梁浇筑的预制混凝土模块 | |
CN210458914U (zh) | 预制桥梁墩柱与盖梁的连接结构 | |
CN110374014A (zh) | 大跨连续梁uhpc柱施工方法 | |
CN106337530B (zh) | 一种框架梁施工缝封堵的施工方法 | |
CN212926718U (zh) | 一种预制水平灌浆套筒连接墙体单元及墙体 | |
CN211736420U (zh) | 一种混凝土窗台压顶组合式施工结构 | |
CN209669688U (zh) | 一种半装配式薄壁桥墩 | |
CN210134641U (zh) | 一种梁下混凝土挂板二次浇筑施工结构 | |
CN212427769U (zh) | 一种免拆模构造柱用的嵌锁式砌块 | |
CN108930406A (zh) | 基于整体拼装大模板狭窄空间墙体施工方法 | |
CN211342421U (zh) | 一种预制与现浇相结合的窗台压顶结构 | |
CN211397147U (zh) | 一种窗台压顶结构 | |
CN104908150B (zh) | 一种管道井制作模板及基于工厂化生产管道井的方法 | |
CN210002697U (zh) | 一种免支模构造柱装置 | |
CN210068184U (zh) | 一种隧道中心排水沟施工模板 | |
CN219753444U (zh) | 一种预制混凝土窗台压顶梁锚固块 | |
CN108999287B (zh) | 一种装配式方钢管混凝土梁柱节点连接方式 | |
CN208502251U (zh) | 一种组装式阶梯型泵管口铁盒支模 | |
CN112459474A (zh) | 后浇带pvc管模素混凝土独立柱支撑方法 | |
CN109881932A (zh) | 装配式混凝土冷却塔及建造方法 | |
CN206053129U (zh) | 一种t形轻钢构造柱 | |
CN216277492U (zh) | 一种半预制半现浇窗台压顶结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |