CN110985752B - 一种承插管道的安装工具及安装方法 - Google Patents
一种承插管道的安装工具及安装方法 Download PDFInfo
- Publication number
- CN110985752B CN110985752B CN202010137759.XA CN202010137759A CN110985752B CN 110985752 B CN110985752 B CN 110985752B CN 202010137759 A CN202010137759 A CN 202010137759A CN 110985752 B CN110985752 B CN 110985752B
- Authority
- CN
- China
- Prior art keywords
- pipeline
- hoop
- clamp
- installation
- winch
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L1/00—Laying or reclaiming pipes; Repairing or joining pipes on or under water
- F16L1/024—Laying or reclaiming pipes on land, e.g. above the ground
- F16L1/06—Accessories therefor, e.g. anchors
- F16L1/09—Accessories therefor, e.g. anchors for bringing two tubular members closer to each other
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66D—CAPSTANS; WINCHES; TACKLES, e.g. PULLEY BLOCKS; HOISTS
- B66D1/00—Rope, cable, or chain winding mechanisms; Capstans
- B66D1/60—Rope, cable, or chain winding mechanisms; Capstans adapted for special purposes
- B66D1/74—Capstans
- B66D1/7442—Capstans having a horizontal rotation axis
- B66D1/7452—Capstans having a horizontal rotation axis driven manually only
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L1/00—Laying or reclaiming pipes; Repairing or joining pipes on or under water
- F16L1/024—Laying or reclaiming pipes on land, e.g. above the ground
- F16L1/06—Accessories therefor, e.g. anchors
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L1/00—Laying or reclaiming pipes; Repairing or joining pipes on or under water
- F16L1/024—Laying or reclaiming pipes on land, e.g. above the ground
- F16L1/06—Accessories therefor, e.g. anchors
- F16L1/10—Accessories therefor, e.g. anchors for aligning
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L47/00—Connecting arrangements or other fittings specially adapted to be made of plastics or to be used with pipes made of plastics
- F16L47/02—Welded joints; Adhesive joints
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66D—CAPSTANS; WINCHES; TACKLES, e.g. PULLEY BLOCKS; HOISTS
- B66D2700/00—Capstans, winches or hoists
- B66D2700/01—Winches, capstans or pivots
- B66D2700/0116—Manually or spring operated winches
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66D—CAPSTANS; WINCHES; TACKLES, e.g. PULLEY BLOCKS; HOISTS
- B66D2700/00—Capstans, winches or hoists
- B66D2700/01—Winches, capstans or pivots
- B66D2700/0183—Details, e.g. winch drums, cooling, bearings, mounting, base structures, cable guiding or attachment of the cable to the drum
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Lining Or Joining Of Plastics Or The Like (AREA)
Abstract
本发明涉及管道安装领域,特别是涉及一种承插管道的安装工具及安装方法。该安装工具包括拉拽绳索、紧固机构、第一管线卡箍和第二管线卡箍,第一管线卡箍上设有绞盘机构,第一管线卡箍和第二管线卡箍上均设有导轮机构,拉拽绳索依次与第一管线卡箍上的导轮机构和第二管线卡箍上的导轮机构连接后再与绞盘机构连接,绞盘机构带动第一管线卡箍和第二管线卡箍靠拢,并通过紧固机构限制第一管线卡箍和第二管线卡箍背向远离。本发明的有益效果是:使得两个管道能够快速准确安装,操作简单方便,不易损伤管道,提高了效率。
Description
技术领域
本发明涉及管道安装领域,特别是涉及一种承插管道的安装工具及安装方法。
背景技术
承插管道安装时,管道容易受到损伤,尤其是玻璃钢管道的安装,需要将管道的插口端插入另一个管道的承口端,来完成管道的安装,但是玻璃钢承插管道在施工过程中没有专用的施工工具,现场施工时主要是采用绳索或铁链拴住管道,通过人工拉拽进行对正安装,安装时费时费力,绳索容易划伤管道,并且安装的管道不能保证对中性。
发明内容
鉴于以上所述现有技术的缺点,本发明的目的在于提供一种承插管道的安装工具及安装方法,用于解决现有技术中管道安装不便、管道易损伤等问题。
为实现上述目的及其他相关目的,本发明提供一种承插管道的安装工具,包括拉拽绳索、紧固机构、以及同轴设置的第一管线卡箍和第二管线卡箍,所述第一管线卡箍上设有绞盘机构,所述第一管线卡箍和第二管线卡箍上均设有导轮机构,所述拉拽绳索的第一端与第一管线卡箍上的导轮机构连接,拉拽绳索的第二端绕过第二管线卡箍上的导轮机构后与绞盘机构连接,所述绞盘机构运行带动第一管线卡箍和第二管线卡箍靠拢至指定位置,并通过紧固机构限制第一管线卡箍和第二管线卡箍背向远离。
本发明的有益效果是:不仅使得两个管道能够快速准确安装,而且操作简单方便,不易损伤管道,将带动两个管道靠拢的绞盘机构和使得到位的两个管道保持不动的紧固机构独立设置,使得管道到位后,便可以拆下绞盘机构进行下一组的管道安装,提高了效率。
可选地,所述紧固机构包括螺旋扣,所述螺旋扣的两端通过紧固绳索分别与第一管线卡箍和第二管线卡箍连接。
可选地,所述第一管线卡箍和第二管线卡箍上均设有用于安装紧固绳索的挂环。
可选地,当同一管线卡箍上的挂环数量大于或等于两个时,多个挂环沿同一管线卡箍圆周方向均匀分布,且第一管线卡箍上的挂环与第二管线卡箍上的挂环对齐。
可选地,所述绞盘机构包括手摇绞盘,所述手摇绞盘通过绞盘底座安装在第一管线卡箍上。
可选地,所述第一管线卡箍和第二管线卡箍均包括两个对称设置的箍瓣,两个箍瓣通过螺栓可拆卸的连接,并锁紧螺栓使得箍瓣抱紧管道。
可选地,所述箍瓣的内壁设有内衬,所述内衬为胶板。
可选地,同一管线卡箍的两个箍瓣通过两个对称设置的螺栓连接,同一管线卡箍上设有两个对称设置的导轮机构,所述导轮机构安装在与其对应的螺栓上。
采用上述可选地方案的有益效果是:结构对称,受力均匀稳定,同时保证了两个管道安装的同轴度,提高了安装质量。
一种承插管道的安装方法,通过如前述安装工具进行安装,其安装步骤包括,(1)通过第一管线卡箍和第二管线卡箍分别抱紧两个管道;(2)绞盘机构运行使得第一管线卡箍和第二管线卡箍靠拢直至两个管道到达安装位置;(3)调节紧固机构限制第一管线卡箍和第二管线卡箍相背向远离;(4)卸下绞盘机构;(5)卸下紧固机构。
可选地,在两个管道到达安装位置之前,先在其中一个管道的承口端和另一个管道的插口端的连接部位涂刷树脂,且待树脂完全固化后再卸下紧固机构。
本发明的有益效果是:管道安装步骤简单、操作方便,提高了安装质量和效率。
附图说明
图1显示为本发明的承插管道的安装工具的主视图;
图2显示为本发明的承插管道的安装工具的俯视图;
图3显示为本发明的承插管道的安装工具的第一管线卡箍的侧视图;
图4显示为本发明的承插管道的安装工具的第二管线卡箍的侧视图;
图5显示为本发明的承插管道的安装工具的第二管线卡箍的俯视图。
零件标号说明
1 第一管线卡箍;
11 箍瓣;
12 螺栓;
13 挂环;
14 内衬
21 螺旋扣;
22 紧固绳索;
3 拉拽绳索;
4 导轮机构;
5 第二管线卡箍;
51 箍瓣;
52 螺栓;
53 挂环;
54 内衬;
61 手摇绞盘;
62 绞盘底座;
7 管道。
具体实施方式
以下通过特定的具体实例说明本发明的实施方式,本领域技术人员可由本说明书所揭露的内容轻易地了解本发明的其他优点与功效。本发明还可以通过另外不同的具体实施方式加以实施或应用,本说明书中的各项细节也可以基于不同观点与应用,在没有背离本发明的精神下进行各种修饰或改变。
需要说明的是,本说明书中所引用的如“上”、“下”、“左”、“右”、“中间”及“一”等的用语,亦仅为便于叙述的明了,而非用以限定本发明可实施的范围,其相对关系的改变或调整,在无实质变更技术内容下,当亦视为本发明可实施的范畴。
在对本发明实施例进行详细叙述之前,先对本发明的应用环境进行描述。本发明的技术主要是应用于管道安装,特别是应用于玻璃钢管道安装。本发明是解决管道安装操作不便、安装效率低,安装质量难以保证,管道易损伤等问题。
如图1至图5所示,本发明的承插管道的安装工具,包括拉拽绳索3、紧固机构、以及同轴设置的第一管线卡箍1和第二管线卡箍5,第一管线卡箍1上设有绞盘机构,第一管线卡箍1和第二管线卡箍5上均设有导轮机构4,拉拽绳索3的第一端与第一管线卡箍1上的导轮机构4连接,拉拽绳索3的第二端绕过第二管线卡箍5上的导轮机构4后与绞盘机构连接,绞盘机构运行带动第一管线卡箍1和第二管线卡箍5靠拢至指定位置,从而使得第一管线卡箍1和第二管线卡箍5抱紧的管道7靠拢至指定位置,并通过紧固机构限制第一管线卡箍1和第二管线卡箍5背向远离,使得两个管道7保持安装位置不动。其中,绞盘机构包括手摇绞盘61,手摇绞盘61通过绞盘底座62安装在第一管线卡箍1上,绞盘底座62可以通过螺栓与第一管线卡箍1连接,拆装简单方便,手摇绞盘61上的伸缩绳设有挂钩,挂钩勾住拉拽绳索3的第二端,通过摇动手摇绞盘61拉动拉拽绳索3,从而使得第一管线卡箍1和第二管线卡箍5相向靠拢。
如图1至图4所示,紧固机构包括螺旋扣21,螺旋扣21的两端通过紧固绳索22分别与第一管线卡箍1和第二管线卡箍5连接。第一管线卡箍1上设有用于安装紧固绳索22的挂环13,第二管线卡箍5上设有用于安装紧固绳索22的挂环53,挂环13与挂环53数量相等,且设置位置对应,便于调整螺旋扣21拉紧紧固绳索22。当同一管线卡箍上的挂环数量大于或等于两个时,多个挂环沿同一管线卡箍圆周方向均匀分布,且第一管线卡箍1上的挂环13与第二管线卡箍5上的挂环53对齐,结构布局稳定对称,使得第一管线卡箍1和第二管线卡箍5受力均匀,从而使得两个管道7受到均匀稳定的紧固力,保证了安装质量,并且不易损伤管道。挂环的数量可以根据需求进行设置,在本实施例中,第一管线卡箍1其圆周方向均匀设置了4个挂环13,第二管线卡箍5沿其圆周方向均匀设置了4个挂环53。
如图1至图5所示,第一管线卡箍1和第二管线卡箍5均包括两个对称设置的箍瓣,第一管线卡箍1的两个箍瓣11通过两个螺栓12可拆卸的连接,并锁紧螺栓12使得箍瓣11抱紧其中一个管道7,两个螺栓12对称设置,第一管线卡箍1上的导轮机构4对称设置,并安装在螺栓12上。第二管线卡箍5的两个箍瓣51通过螺栓52可拆卸的连接,并锁紧螺栓52使得箍瓣51抱紧另一个管道7,两个螺栓52对称设置,第二管线卡箍5上的导轮机构4对称设置,并安装在螺栓52上。箍瓣11的内壁设有内衬14,箍瓣51的内壁设有内衬54,内衬14和内衬54均可以为胶板,通过设置胶板不仅能够增大摩擦力,充分抱紧管道7,还能避免损伤管道7。两根拉拽绳索3的第一端分别与第一管线卡箍1上的两个导轮机构4连接,两根拉拽绳索3的第二端分别绕过第二管线卡箍5上的两个导轮机构4后汇合再与绞盘机构的挂钩连接,两根拉拽绳索3的第二端汇合与同一挂钩连接,保证两根拉拽绳索3一样长,使得拉拽力的着力点统一,能够保证同时受力,受力均匀,便于管道7自动调整位置,保证了两个管道7安装的同轴度,提高了安装质量,并且简化了结构。
本发明的承插管道的安装方法,通过前述的安装工具进行安装,其安装步骤包括,(1)通过第一管线卡箍1和第二管线卡箍5分别抱紧两个管道7;(2)绞盘机构运行使得第一管线卡箍1和第二管线卡箍5靠拢直至两个管道7到达安装位置,到达安装位置后,保持手摇绞盘61的拉紧状态。并且在两个管道7到达安装位置之前,先在其中一个管道7的承口端和另一个管道7的插口端的连接部位涂刷树脂,为两根管道7的紧固做好准备;(3)调节紧固机构限制第一管线卡箍1和第二管线卡箍5相背向远离,通过转动紧固机构的螺旋扣21使得紧固绳索22拉紧,从而使得两个到位的管道7保持不动;(4)卸下绞盘机构,可以仅卸下绞盘机构的手摇绞盘61,拆装方便,降低劳动强度,或者也可以直接卸下整个绞盘机构;(5)卸下紧固机构,待树脂完全固化后再卸下紧固机构。该安装方法操作简单方便,不仅降低了安装难度,还提高了安装效率。
本发明通过对称的结构设计,保证了管道受到的拉拽力的对称性,使得管道对中安装,保证了同轴度,并且同时设置了绞盘机构和紧固机构,使得绞盘机构将管道拉拽到位后便可以进行下一组管道的安装,管道的拉拽到位和紧固通过不同的机构实现,提高了效率,节省了人力,降低了成本。
上述实施例仅例示性说明本发明的原理及其功效,而非用于限制本发明。任何熟悉此技术的人士皆可在不违背本发明的精神及范畴下,对上述实施例进行修饰或改变。因此,举凡所属技术领域中具有通常知识者在未脱离本发明所揭示的精神与技术思想下所完成的一切等效修饰或改变,仍应由本发明的权利要求所涵盖。
Claims (5)
1.一种承插管道的安装方法,其特征在于:其安装步骤包括,
(1)通过第一管线卡箍和第二管线卡箍分别抱紧两个管道,第一管线卡箍和第二管线卡箍通过两根拉拽绳索拉拢,其中,所述第一管线卡箍和第二管线卡箍同轴设置,所述第一管线卡箍上设有绞盘机构,所述第一管线卡箍和第二管线卡箍均包括两个对称设置的箍瓣,两个箍瓣通过螺栓可拆卸的连接,并锁紧螺栓使得箍瓣抱紧管道,同一管线卡箍的两个箍瓣通过两个对称设置的螺栓连接,同一管线卡箍上设有两个对称设置的导轮机构,所述导轮机构安装在与其对应的螺栓上,两根拉拽绳索的第一端分别与第一管线卡箍上的两个导轮机构连接,两根拉拽绳索的第二端分别绕过第二管线卡箍上的两个导轮机构后汇合与绞盘机构的挂钩连接;
(2)在两个管道到达安装位置之前,先在其中一个管道的承口端和另一个管道的插口端的连接部位涂刷树脂,绞盘机构运行收缩绞盘机构上的伸缩绳使得第一管线卡箍和第二管线卡箍靠拢直至两个管道到达安装位置;
(3)两个管道到达安装位置后,通过调节紧固机构限制第一管线卡箍和第二管线卡箍背向远离,所述紧固机构包括螺旋扣,所述螺旋扣的两端通过紧固绳索分别与第一管线卡箍和第二管线卡箍连接;
(4)卸下绞盘机构,进行后一组管道的承插;
(5)卸下绞盘机构后,紧固机构持续固定直至前一组管道的树脂完全固化后再卸下紧固机构。
2.根据权利要求1所述的一种承插管道的安装方法,其特征在于:所述第一管线卡箍和第二管线卡箍上均设有用于安装紧固绳索的挂环。
3.根据权利要求2所述的一种承插管道的安装方法,其特征在于:当同一管线卡箍上的挂环数量大于或等于两个时,多个挂环沿同一管线卡箍圆周方向均匀分布,且第一管线卡箍上的挂环与第二管线卡箍上的挂环对齐。
4.根据权利要求1所述的一种承插管道的安装方法,其特征在于:所述绞盘机构包括手摇绞盘,所述手摇绞盘通过绞盘底座安装在第一管线卡箍上。
5.根据权利要求1所述的一种承插管道的安装方法,其特征在于:所述箍瓣的内壁设有内衬,所述内衬为胶板。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010137759.XA CN110985752B (zh) | 2020-03-03 | 2020-03-03 | 一种承插管道的安装工具及安装方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010137759.XA CN110985752B (zh) | 2020-03-03 | 2020-03-03 | 一种承插管道的安装工具及安装方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110985752A CN110985752A (zh) | 2020-04-10 |
CN110985752B true CN110985752B (zh) | 2020-06-09 |
Family
ID=70081378
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010137759.XA Active CN110985752B (zh) | 2020-03-03 | 2020-03-03 | 一种承插管道的安装工具及安装方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110985752B (zh) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112344102B (zh) * | 2020-10-17 | 2022-03-22 | 中建一局集团第一建筑有限公司 | 一种基于bim的冷热源泵房管道装配式系统及其工法 |
CN112324361A (zh) * | 2020-11-02 | 2021-02-05 | 中国石油化工股份有限公司 | 一种卡箍安装辅助支架及卡箍安装辅助装置 |
CN112942540B (zh) * | 2021-02-04 | 2022-06-28 | 鸿川建筑产业集团有限公司 | 一种市政管道施工装置及施工方法 |
CN113336078A (zh) * | 2021-06-28 | 2021-09-03 | 中国十七冶集团有限公司 | 一种混凝土承插管安装装置 |
Citations (26)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3015883A (en) * | 1957-12-02 | 1962-01-09 | Phillips Petroleum Co | Flange aligning tool |
US3653115A (en) * | 1970-08-06 | 1972-04-04 | Ralph Perkins | Pipe joining jack |
US3710427A (en) * | 1971-08-26 | 1973-01-16 | J Doty | Collar puller for metal pipe |
DE2347331A1 (de) * | 1973-09-20 | 1975-04-17 | Dyckerhoff & Widmann Ag | Vorrichtung zum verlegen von rohren |
BE864228A (nl) * | 1977-02-23 | 1978-08-23 | Baggermij Bos & Kalis B V | Werkwijze voor het leggen of verlengen van een buisleiding en daarbij toe te passen middelen |
BE870712Q (fr) * | 1974-02-25 | 1979-01-15 | Krings Josef | Dispositif pour resserrer ensemble des tuyaux de canalisation a manchon conique disposes a la suite l'un de l'autre dans une tranchee |
SU811044A1 (ru) * | 1978-08-24 | 1981-03-07 | Экспериментальное Конструкторское Бюропо Железобетону Министерства Строительствапредприятий Нефтяной И Газовой Промышлен-Ности Cccp | Устройство дл захвата строительногогРузА |
DE9204496U1 (zh) * | 1992-04-02 | 1992-06-04 | Winden- Und Maschinenbau Gressbach Gmbh, 8753 Obernburg, De | |
DE4305383A1 (de) * | 1993-02-22 | 1994-08-25 | Delmag Maschinenfabrik | Verlegegerät |
DE19728209C1 (de) * | 1997-07-02 | 1999-01-28 | Guenther Pleier | Rohrpreßgerät |
US6227765B1 (en) * | 1997-08-26 | 2001-05-08 | Kvaerner Oilfield Products A.S. | Pipeline device, a tool for the guide-in of a pipeline end and a method for the pull-in of a pipeline end |
CN2883847Y (zh) * | 2006-04-12 | 2007-03-28 | 河北可耐特玻璃钢有限公司 | 玻璃钢管道承插安装卡具 |
CN201007411Y (zh) * | 2007-02-06 | 2008-01-16 | 毛瑜 | 管道承插连接器 |
WO2008025041A1 (en) * | 2006-08-24 | 2008-02-28 | Graham Theodor Bower | A pipe tool |
EP2098767B1 (en) * | 2008-03-08 | 2010-09-29 | Excavadoras de Totana SL | Device for assembling pipes |
DE202012000584U1 (de) * | 2012-01-23 | 2013-04-25 | Norbert Schütz GmbH & Co. KG | Vorrichtung zum Verbinden von Rohren beziehungsweise zum Trennen einer Rohrverbindung |
CN103363190A (zh) * | 2013-07-30 | 2013-10-23 | 中国人民解放军总后勤部油料研究所 | 管线拉力器 |
CA2816196A1 (fr) * | 2013-05-21 | 2014-11-21 | Benoit Bouchard | Outil d'assemblage de tuyaux |
WO2015095374A1 (en) * | 2013-12-18 | 2015-06-25 | Isco Industries, Inc. | Assembly and method of coupling pipes |
CN105715869A (zh) * | 2016-04-14 | 2016-06-29 | 上海逸通科技股份有限公司 | 液压管材拉紧机 |
CN205716010U (zh) * | 2016-06-19 | 2016-11-23 | 余辉 | 油田建设管线安装装置 |
CN206504009U (zh) * | 2017-02-08 | 2017-09-19 | 张英鹏 | 钢筋混凝土排水管对接安装及修正的工具 |
CN108036131A (zh) * | 2017-12-07 | 2018-05-15 | 中冶天工集团有限公司 | 一种用于超静音管道倒装的连接装置及其使用方法 |
CN108488484A (zh) * | 2018-02-28 | 2018-09-04 | 中冶南方城市建设工程技术有限公司 | 一种高效的承插管道接口安装装置 |
CN109973717A (zh) * | 2019-05-20 | 2019-07-05 | 李联辉 | 一种自来水输送管道铺设装置 |
CN110792848A (zh) * | 2019-12-04 | 2020-02-14 | 奥瑞拓能源科技股份有限公司 | 一种新型推拉管装置 |
-
2020
- 2020-03-03 CN CN202010137759.XA patent/CN110985752B/zh active Active
Patent Citations (27)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3015883A (en) * | 1957-12-02 | 1962-01-09 | Phillips Petroleum Co | Flange aligning tool |
US3653115A (en) * | 1970-08-06 | 1972-04-04 | Ralph Perkins | Pipe joining jack |
US3710427A (en) * | 1971-08-26 | 1973-01-16 | J Doty | Collar puller for metal pipe |
DE2347331A1 (de) * | 1973-09-20 | 1975-04-17 | Dyckerhoff & Widmann Ag | Vorrichtung zum verlegen von rohren |
BE870712Q (fr) * | 1974-02-25 | 1979-01-15 | Krings Josef | Dispositif pour resserrer ensemble des tuyaux de canalisation a manchon conique disposes a la suite l'un de l'autre dans une tranchee |
BE864228A (nl) * | 1977-02-23 | 1978-08-23 | Baggermij Bos & Kalis B V | Werkwijze voor het leggen of verlengen van een buisleiding en daarbij toe te passen middelen |
SU811044A1 (ru) * | 1978-08-24 | 1981-03-07 | Экспериментальное Конструкторское Бюропо Железобетону Министерства Строительствапредприятий Нефтяной И Газовой Промышлен-Ности Cccp | Устройство дл захвата строительногогРузА |
DE9204496U1 (zh) * | 1992-04-02 | 1992-06-04 | Winden- Und Maschinenbau Gressbach Gmbh, 8753 Obernburg, De | |
DE4244331A1 (de) * | 1992-04-02 | 1993-10-07 | Winden Und Maschinenbau Gresba | Vorrichtung zum Zusammenfügen von Rohren |
DE4305383A1 (de) * | 1993-02-22 | 1994-08-25 | Delmag Maschinenfabrik | Verlegegerät |
DE19728209C1 (de) * | 1997-07-02 | 1999-01-28 | Guenther Pleier | Rohrpreßgerät |
US6227765B1 (en) * | 1997-08-26 | 2001-05-08 | Kvaerner Oilfield Products A.S. | Pipeline device, a tool for the guide-in of a pipeline end and a method for the pull-in of a pipeline end |
CN2883847Y (zh) * | 2006-04-12 | 2007-03-28 | 河北可耐特玻璃钢有限公司 | 玻璃钢管道承插安装卡具 |
WO2008025041A1 (en) * | 2006-08-24 | 2008-02-28 | Graham Theodor Bower | A pipe tool |
CN201007411Y (zh) * | 2007-02-06 | 2008-01-16 | 毛瑜 | 管道承插连接器 |
EP2098767B1 (en) * | 2008-03-08 | 2010-09-29 | Excavadoras de Totana SL | Device for assembling pipes |
DE202012000584U1 (de) * | 2012-01-23 | 2013-04-25 | Norbert Schütz GmbH & Co. KG | Vorrichtung zum Verbinden von Rohren beziehungsweise zum Trennen einer Rohrverbindung |
CA2816196A1 (fr) * | 2013-05-21 | 2014-11-21 | Benoit Bouchard | Outil d'assemblage de tuyaux |
CN103363190A (zh) * | 2013-07-30 | 2013-10-23 | 中国人民解放军总后勤部油料研究所 | 管线拉力器 |
WO2015095374A1 (en) * | 2013-12-18 | 2015-06-25 | Isco Industries, Inc. | Assembly and method of coupling pipes |
CN105715869A (zh) * | 2016-04-14 | 2016-06-29 | 上海逸通科技股份有限公司 | 液压管材拉紧机 |
CN205716010U (zh) * | 2016-06-19 | 2016-11-23 | 余辉 | 油田建设管线安装装置 |
CN206504009U (zh) * | 2017-02-08 | 2017-09-19 | 张英鹏 | 钢筋混凝土排水管对接安装及修正的工具 |
CN108036131A (zh) * | 2017-12-07 | 2018-05-15 | 中冶天工集团有限公司 | 一种用于超静音管道倒装的连接装置及其使用方法 |
CN108488484A (zh) * | 2018-02-28 | 2018-09-04 | 中冶南方城市建设工程技术有限公司 | 一种高效的承插管道接口安装装置 |
CN109973717A (zh) * | 2019-05-20 | 2019-07-05 | 李联辉 | 一种自来水输送管道铺设装置 |
CN110792848A (zh) * | 2019-12-04 | 2020-02-14 | 奥瑞拓能源科技股份有限公司 | 一种新型推拉管装置 |
Also Published As
Publication number | Publication date |
---|---|
CN110985752A (zh) | 2020-04-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110985752B (zh) | 一种承插管道的安装工具及安装方法 | |
CN206128255U (zh) | 水下对接管辅助装置 | |
BRPI1106929A2 (pt) | mecanismo de fixaÇço para engate | |
US7563055B2 (en) | Marine pipe laying system, method and hoisting device | |
CN104260826A (zh) | 一种铺管船的拉力测试系统和方法 | |
CN107546658B (zh) | 电缆穿沟装置 | |
US8827596B2 (en) | Hoisting method and assembly for abandoning and/or recovering an underwater pipeline from a laying vessel, and laying vessel equipped with such a hoisting assembly | |
EP2689173B1 (en) | Abandon / recovery method for pipelines and apparatus therefor | |
CN111101448A (zh) | 一种斜拉索梁端卷扬机快速牵引装备及其牵引方法 | |
US6405802B1 (en) | Subsea flowline jumper handling apparatus | |
US8434740B2 (en) | Apparatus (sheave) for guiding cable in and out of manholes and conduits | |
CN111946900B (zh) | 管节安装装置及方法 | |
CN213575898U (zh) | 管节安装装置 | |
US20150354194A1 (en) | Methods and systems for pulling pipe | |
CN106567565A (zh) | 超长库板的安装方法 | |
CN217030186U (zh) | 一种管线套管对接装置 | |
JP2002233016A (ja) | 下水道管内光ケーブル敷設方法 | |
CN213326630U (zh) | 管节扣件 | |
CN113108125B (zh) | 一种可使排水管道施工时管节之间紧密贴合的辅助工具及使用方法 | |
CN211947975U (zh) | 一种斜拉索梁端卷扬机快速牵引装备 | |
CN112722734B (zh) | 一种管廊内大口径重型钢管运输方法 | |
CN213299025U (zh) | 管节紧固装置 | |
CN213685544U (zh) | 一种地下引水管的安装器具 | |
CN108130859B (zh) | 斜拉索的梁端安装方法 | |
CN216643277U (zh) | 一种方便pccp管道安装的内拉导链连接装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address | ||
CP03 | Change of name, title or address |
Address after: Building 2, No.86, Beiyi Road, Dongying Development Zone, Shandong Province, 257055 Patentee after: Shengli new big new materials Co., Ltd Address before: 257055 No. 86 Beiyi Road, Dongying Development Zone, Shandong Province Patentee before: SHENGLI OILFIELD XINDA PIPES TECHNOLOGY DEVELOPMENT Co.,Ltd. |