CN110963422A - 一种大型枢纽站房建设成套设备 - Google Patents
一种大型枢纽站房建设成套设备 Download PDFInfo
- Publication number
- CN110963422A CN110963422A CN201911309228.8A CN201911309228A CN110963422A CN 110963422 A CN110963422 A CN 110963422A CN 201911309228 A CN201911309228 A CN 201911309228A CN 110963422 A CN110963422 A CN 110963422A
- Authority
- CN
- China
- Prior art keywords
- welding
- cavity
- wall
- welded
- hub station
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims abstract description 42
- 229910052742 iron Inorganic materials 0.000 claims abstract description 21
- 238000001125 extrusion Methods 0.000 claims abstract description 9
- 239000000725 suspension Substances 0.000 claims abstract description 7
- 238000010276 construction Methods 0.000 claims abstract description 5
- 239000000463 material Substances 0.000 claims abstract description 5
- 238000003466 welding Methods 0.000 claims description 42
- 238000004804 winding Methods 0.000 claims description 20
- 244000309464 bull Species 0.000 claims description 3
- 230000002093 peripheral effect Effects 0.000 claims description 3
- 238000009434 installation Methods 0.000 claims description 2
- 230000003137 locomotive effect Effects 0.000 claims 1
- 239000011469 building brick Substances 0.000 abstract description 3
- 239000011449 brick Substances 0.000 description 3
- 238000010586 diagram Methods 0.000 description 3
- 238000006073 displacement reaction Methods 0.000 description 3
- 230000002457 bidirectional effect Effects 0.000 description 2
- 239000004566 building material Substances 0.000 description 2
- 238000004873 anchoring Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000005096 rolling process Methods 0.000 description 1
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
- B66C23/18—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
- B66C23/36—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes mounted on road or rail vehicles; Manually-movable jib-cranes for use in workshops; Floating cranes
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
- B66C23/62—Constructional features or details
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/16—Tools or apparatus
- E04G21/162—Handles to carry construction blocks
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
Description
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201911309228.8A CN110963422B (zh) | 2019-12-18 | 2019-12-18 | 一种大型枢纽站房建设成套设备 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201911309228.8A CN110963422B (zh) | 2019-12-18 | 2019-12-18 | 一种大型枢纽站房建设成套设备 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN110963422A true CN110963422A (zh) | 2020-04-07 |
| CN110963422B CN110963422B (zh) | 2020-11-10 |
Family
ID=70034892
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201911309228.8A Active CN110963422B (zh) | 2019-12-18 | 2019-12-18 | 一种大型枢纽站房建设成套设备 |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN110963422B (zh) |
Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN201071264Y (zh) * | 2007-06-28 | 2008-06-11 | 李其明 | 一种新型电动吊车 |
| CN201660380U (zh) * | 2010-04-09 | 2010-12-01 | 武汉钢铁(集团)公司 | 一种新型起重运输车 |
| CN202936116U (zh) * | 2012-11-26 | 2013-05-15 | 徐州徐工随车起重机有限公司 | 一种折叠式汽车起重机 |
| CN203460755U (zh) * | 2013-08-27 | 2014-03-05 | 重庆重型汽车集团专用汽车有限责任公司 | 随车起重运输车 |
| CN203486791U (zh) * | 2013-09-27 | 2014-03-19 | 湖南双达机电有限责任公司 | 石油修井车组用随车吊 |
| CN205634696U (zh) * | 2016-05-16 | 2016-10-12 | 湖南中涛起重科技有限公司 | 随车起重运输车用的传动起吊装置 |
-
2019
- 2019-12-18 CN CN201911309228.8A patent/CN110963422B/zh active Active
Patent Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN201071264Y (zh) * | 2007-06-28 | 2008-06-11 | 李其明 | 一种新型电动吊车 |
| CN201660380U (zh) * | 2010-04-09 | 2010-12-01 | 武汉钢铁(集团)公司 | 一种新型起重运输车 |
| CN202936116U (zh) * | 2012-11-26 | 2013-05-15 | 徐州徐工随车起重机有限公司 | 一种折叠式汽车起重机 |
| CN203460755U (zh) * | 2013-08-27 | 2014-03-05 | 重庆重型汽车集团专用汽车有限责任公司 | 随车起重运输车 |
| CN203486791U (zh) * | 2013-09-27 | 2014-03-19 | 湖南双达机电有限责任公司 | 石油修井车组用随车吊 |
| CN205634696U (zh) * | 2016-05-16 | 2016-10-12 | 湖南中涛起重科技有限公司 | 随车起重运输车用的传动起吊装置 |
Also Published As
| Publication number | Publication date |
|---|---|
| CN110963422B (zh) | 2020-11-10 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN206799009U (zh) | 适用于大型盾构机的卷扬式管片吊机 | |
| CN216105555U (zh) | 一种可调节式装配式建筑楼梯构件的吊装用具 | |
| CN111358386B (zh) | 可调式无轨悬吊牵引车及其运作方法 | |
| CN115402909B (zh) | 一种超高层倾斜双层异形幕墙施工装置 | |
| CN205312918U (zh) | 一种换装龙门架 | |
| CN213505648U (zh) | 一种用于钢结构工程的吊装设备 | |
| CN105776092B (zh) | 一种伸展式吊篮装置 | |
| CN110963422B (zh) | 一种大型枢纽站房建设成套设备 | |
| CN104831623B (zh) | 一种跨墩吊架自行走装置 | |
| CN210854811U (zh) | 一种托盘自动收放线排线装置 | |
| CN204252013U (zh) | 跨墩自行走装置 | |
| CN218841492U (zh) | 一种起吊货物稳定的塔吊用起吊机构 | |
| CN103058072A (zh) | 一种大型动臂塔式起重机引进机构 | |
| CN214733964U (zh) | 多功能吊装机 | |
| CN216406210U (zh) | 一种建筑工程装配式柱辅助钢筋吊立装置 | |
| CN216893413U (zh) | 一种砼筒施工用作业平台 | |
| CN215946552U (zh) | 一种土建施工用承重挂架 | |
| CN203295074U (zh) | 伸缩型两维全自动微型悬臂吊 | |
| CN210505314U (zh) | 一种人防设备安装用吊装装置 | |
| CN210712555U (zh) | 一种浇筑防撞墙的台车 | |
| CN202848919U (zh) | 一种直轨式吊机 | |
| CN115676617A (zh) | 一种桁架式钢卷吊运装置 | |
| CN114635553A (zh) | 一种可水平移动可调节高度的挂篮 | |
| CN113216586A (zh) | 一种可调式室内装修用高稳定性安全建筑平台 | |
| CN220704316U (zh) | 一种路桥机电安装操作平台 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| CB02 | Change of applicant information | ||
| CB02 | Change of applicant information |
Address after: Room 801-1, 20 Shijingshan Road, Shijingshan District, Beijing 100000 Applicant after: China Railway Construction Group Infrastructure Construction Co.,Ltd. Address before: Room 801-1, 20 Shijingshan Road, Shijingshan District, Beijing 100000 Applicant before: CHINA RAILWAY CONSTRUCTION GROUP MUNICIPAL ENGINEERING Co.,Ltd. |
|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| TR01 | Transfer of patent right | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20230510 Address after: 100043 Shijingshan Road, Shijingshan District, Shijingshan District, Beijing Patentee after: CHINA RAILWAY CONSTRUCTION GROUP Co.,Ltd. Patentee after: China Railway Construction Group Infrastructure Construction Co.,Ltd. Address before: Room 801-1, 20 Shijingshan Road, Shijingshan District, Beijing Patentee before: China Railway Construction Group Infrastructure Construction Co.,Ltd. |