CN110910094A - Oil field construction site information management system and method - Google Patents

Oil field construction site information management system and method Download PDF

Info

Publication number
CN110910094A
CN110910094A CN201911172640.XA CN201911172640A CN110910094A CN 110910094 A CN110910094 A CN 110910094A CN 201911172640 A CN201911172640 A CN 201911172640A CN 110910094 A CN110910094 A CN 110910094A
Authority
CN
China
Prior art keywords
management
information
module
hse
team
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201911172640.XA
Other languages
Chinese (zh)
Inventor
敬克宣
王兴军
刘凯
刘新力
张新强
郑红
何军榜
张卫净
景江
任四武
徐永波
姜杨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Petroleum Corp
CNPC Xibu Drilling Engineering Co Ltd
Original Assignee
China National Petroleum Corp
CNPC Xibu Drilling Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Petroleum Corp, CNPC Xibu Drilling Engineering Co Ltd filed Critical China National Petroleum Corp
Priority to CN201911172640.XA priority Critical patent/CN110910094A/en
Publication of CN110910094A publication Critical patent/CN110910094A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/02Agriculture; Fishing; Mining

Abstract

The invention relates to the technical field of information management, in particular to an information management system and a method for an oil field construction site, wherein the information management system comprises a background subsystem and a front terminal system; the background subsystem is used for controlling the user authority and the input, storage and management of information; and the front terminal system is used for displaying, inquiring and downloading background information, and recording and uploading field information. The intelligent management system is flexible to use, can stably circulate real-time information on an operation site and behind, effectively connects all departments in series, improves the working efficiency, can carry out operations such as information uploading and information checking on the operation site by oilfield operators in real time, ensures timely delivery of company bulletins and effective recording of site operation, and realizes intelligent management of information.

Description

Oil field construction site information management system and method
Technical Field
The invention relates to the technical field of information management, in particular to an oil field construction site information management system and method.
Background
The oil field construction operation sites are scattered and far away from each other, the on-site HSE control information and risk control condition branch companies cannot master the information in time, and meanwhile, the management and regulation system, the weekly report, the HSE supervision information and other contents of the branch companies cannot be transmitted to each operation site in time. When a manager finds a problem in field inspection, corresponding materials which are urgently needed cannot be obtained in real time, and the problem which is found in the field inspection, the operation risk and the requirement of the first party cannot be timely transmitted to the branch company.
Disclosure of Invention
The invention provides an information management system and method for an oil field construction site, overcomes the defects of the prior art, and can effectively solve the problem that personnel on the existing oil field operation site cannot upload information and know company notification in time.
One of the technical schemes of the invention is realized by the following measures: an information management system for an oil field construction site comprises a background subsystem and a front terminal system;
the background subsystem is used for controlling the user authority and the input, storage and management of information;
and the front terminal system is used for displaying, inquiring and downloading background information, and recording and uploading field information.
The following is further optimization or/and improvement of the technical scheme of the invention:
the background subsystem comprises a user management unit and an information management unit;
the user management unit is used for increasing and deleting user rights and checking user login information;
and the information management unit is used for inputting, storing and managing information, wherein the information comprises working files, pictures, videos, standing books and forms.
The user management unit comprises an administrator management module and a team user login module;
the administrator management module is used for adding and deleting super administrator authorities, adding team users, managing team user login passwords, checking administrator login information and checking team user login information;
and the team user login module is used for checking the login information of the team user.
The information management unit comprises an information input module, a branch company input module, a standing book management module and a team station input module;
the information input module is used for inputting, storing and managing team files and performing management authority setting on the team files, wherein the management of the team files comprises classification, inquiry, downloading, modification and deletion of the team files;
the branch company recording module is used for acquiring, storing and managing the files recorded by the branch companies and setting the management authority of the files, wherein the files recorded by the management branch companies comprise files recorded by the branch companies which are classified, inquired, downloaded, modified and deleted;
the system comprises an account management module, a database management module and a database management module, wherein the account management module is used for acquiring, storing and managing account data recorded by teams and setting management authority of the account data, and the account management module is used for classifying, inquiring, downloading, modifying and deleting the account data;
and the team station recording module is used for acquiring, storing and managing form data recorded by teams and groups and setting management authority for the form data, wherein the management form data comprises classification, query, download, modification, deletion and printing of the form data.
The front terminal system comprises a permission operation management unit, an operation information input unit, a division information display unit and an HSE management unit;
the permission operation management unit is used for allowing hoisting operation, firing operation, temporary power utilization operation, high-altitude operation, controlled space operation and excavation operation;
the operation information input unit is used for inputting operation information, standing book information and inspection information;
the branch company information display unit is used for notifying announcement, monitoring information, week work arrangement, HSE examination, a team information management module, team HSE activity records, construction daily reports, monthly examination, field supervision, standardized management, dynamic data, permission operation, check acceptance, ledger management and HSE management;
and the HSE management unit is used for HSE management of the branch company, the team and the class.
The operation information input unit comprises a team daily essential data filling module, a team ledger recording module and a field check table acceptance module;
the team daily necessary-filling data module is used for well control activity records, team activity records, employee training records, handover well records, road survey records, post walking check tables, hydrochloric acid use records, equipment operation records and contractor five-party bottom of delivery;
the team standing book recording module is used for equipment facility standing books, sling lifting appliance standing books, high-pressure part standing books, measuring instrument standing books, tool standing books, certificate standing books, accident time standing books, labor insurance product standing books and health examination standing books;
and the field inspection table acceptance module is used for horizontal well acceptance records, conventional well acceptance records, ground resistance test records, waste disposal lists, well control pressure test records, well control device use records and temporary special inspection records.
The HSE management unit comprises a branch HSE management module, a team HSE activity module and a class HSE activity module;
the branch HSE management module is used for recording, displaying and managing a regulation and regulation file, a construction instruction file, an experience sharing file, a violation management file, a risk management and control file, a hidden danger management and control file, a system management file, a notice, supervision information, a week work arrangement file and HSE assessment information;
the team HSE activity module is used for recording, displaying and managing a target responsibility book, an HSE commitment book, a private car management file, a defense clearing file, an emergency management file, a traffic management file, a well control management file, an HSE configuration list, a capability evaluation file and an observation and communication file;
the class HSE activity module is used for recording, displaying and managing safety analysis files before work, problem analysis files, evaluation recording files, safety/technical training recording files, safety experience sharing files and shift switching recording files.
The second technical scheme of the invention is realized by the following measures: an information management method for an oil field construction site comprises the following steps:
the administrator inputs various information required by the user in the background subsystem, and configures the login password and the authority of each user through the background subsystem;
and the user logs in the front subsystem by using the login password, operates the information in the background subsystem within the authority range, inputs and uploads the information to be submitted, wherein when the information to be submitted is uploaded, the information can be automatically stored, and breakpoint transmission is carried out continuously.
The invention can stably circulate the real-time information at the operation site and behind, thereby effectively connecting all departments in series, improving the working efficiency, simultaneously, the oil field operation personnel can carry out operations of uploading information, checking information and the like in real time at the operation site, ensuring the timely delivery of company bulletins and the effective record of the site operation, and realizing the intelligent management of the information.
Drawings
Fig. 1 is a block diagram showing the structure of embodiment 1 of the present invention.
FIG. 2 is a flow chart of example 2 of the present invention.
Detailed Description
The present invention is not limited by the following examples, and specific embodiments may be determined according to the technical solutions and practical situations of the present invention.
The invention is further described with reference to the following examples and figures:
embodiment 1, as shown in fig. 1, the information management system for an oil field construction site comprises a background subsystem and a front terminal system;
the background subsystem is used for controlling the user authority and the input, storage and management of information;
and the front terminal system is used for displaying, inquiring and downloading background information, and recording and uploading field information.
The following is further optimization or/and improvement of the technical scheme of the invention:
as shown in fig. 1, the background subsystem includes a user management unit and an information management unit;
the user management unit is used for adding and deleting user rights and checking user login information;
the information management unit is used for inputting, storing and managing information, wherein the information comprises working files, pictures, videos, standing books and forms.
As shown in fig. 1, the user management unit includes an administrator management module and a team user login module;
the administrator management module is used for adding and deleting super administrator authorities, adding team users, managing team user login passwords, checking administrator login information and checking team user login information; the administrator login information comprises information such as login time, login times and last login IP of each administrator, and information such as login times and login time of the group user login information.
And the team user login module is used for checking the team user login information.
As shown in fig. 1, the information management unit includes an information entry module, a branch entry module, a standing book management module, and a team station entry module;
the information input module is used for inputting, storing and managing team files and performing management authority setting on the team files, wherein the management team files comprise classification, inquiry, downloading, modification and deletion of the team files; wherein the team file comprises documents, pictures and the like submitted by each team.
The branch company recording module is used for acquiring, storing and managing the files recorded by the branch company and setting the management authority of the files, wherein the files recorded by the management branch company comprise files recorded by the branch company which are classified, inquired, downloaded, modified and deleted; the file recorded by the branch company comprises a document, a picture and the like recorded by the branch company;
the machine account management module is used for acquiring, storing and managing machine account data recorded by a team and setting management authority for the machine account data, wherein the machine account data is managed by classifying, inquiring, downloading, modifying and deleting the machine account data;
and the team station entry module is used for acquiring, storing and managing form data entered by teams and groups and setting management authority for the form data, wherein the management form data comprises classification, query, download, modification, deletion and printing of the form data.
As shown in fig. 1, the front terminal system includes a permitted job management unit, a job information entry unit, a division information presentation unit, and an HSE management unit;
the permission operation management unit is used for allowing hoisting operation, firing operation, temporary power utilization operation, high-altitude operation, controlled space operation and excavation operation;
the operation information input unit is used for inputting operation information, standing book information and inspection information;
the branch company information display unit is used for notifying announcement, monitoring information, week work arrangement, HSE examination, a team information management module, team HSE activity record, construction daily report, monthly examination, field supervision, standardized management, dynamic data, permission operation, inspection acceptance, ledger management and HSE management;
and the HSE management unit is used for HSE management of branch companies, teams and classes.
As shown in fig. 1, the operation information entry unit includes a team daily essential data filling module, a team ledger recording module, and a field check table acceptance module;
the team daily necessary-filling data module is used for well control activity records, team activity records, staff training records, hand-over well records, road survey records, post walking check tables, hydrochloric acid use records, equipment operation records and contractor five-hand-over bottom;
the team standing book recording module is used for an equipment facility standing book, a sling lifting appliance standing book, a high-pressure part standing book, a measuring instrument standing book, a tool standing book, a certificate standing book, an accident time standing book, a labor insurance product standing book and a health examination standing book;
the field inspection table acceptance module is used for horizontal well acceptance records, conventional well acceptance records, grounding resistance test records, waste disposal lists, well control pressure test records, well control device use records and temporary special inspection records.
As shown in fig. 1, the HSE management unit includes a branch HSE management module, a group HSE activity module and a class HSE activity module;
the branch HSE management module is used for recording, displaying and managing a regulation and regulation file, a construction instruction file, an experience sharing file, a violation management file, a risk management and control file, a hidden danger management and control file, a system management file, a notice, supervision information, a week work arrangement file and HSE assessment information;
the team HSE activity module is used for recording, displaying and managing a target responsibility book, an HSE commitment book, a private car management file, a defense clearing file, an emergency management file, a traffic management file, a well control management file, an HSE configuration list, a capability evaluation file and an observation and communication file;
the class HSE activity module is used for recording, displaying and managing a safety analysis file before work, an existing problem analysis file, an evaluation record file, a safety/technical training record file, a safety experience sharing file and a shift record file, wherein the safety analysis before work comprises a file related to risk shift, work summary and arrangement before construction work, and the safety/technical training record file comprises training records of new staff, shift staff and trainees.
Embodiment 2, as shown in fig. 2, the method for managing information in an oil field construction site includes the following steps:
the administrator inputs various information required by the user in the background subsystem, and configures the login password and the authority of each user through the background subsystem;
and the user logs in the front subsystem by using the login password, operates the information in the background subsystem within the authority range, inputs and uploads the information to be submitted, wherein when the information to be submitted is uploaded, the information can be automatically stored, and breakpoint transmission is carried out continuously.
The user can log in the front terminal system by using terminal equipment such as a mobile phone and a tablet, and information interaction is realized through the front terminal system and the background subsystem. The user supports breakpoint continuous transmission when uploading information, so that data uploading can be still carried out under the condition that the network is unstable.
The invention can stably circulate the real-time information at the operation site and behind, thereby effectively connecting all departments in series, improving the working efficiency, simultaneously, the oil field operation personnel can carry out operations of uploading information, checking information and the like in real time at the operation site, ensuring the timely delivery of company bulletins and the effective record of the site operation, and realizing the intelligent management of the information.
The above technical features constitute the best embodiment of the present invention, which has strong adaptability and best implementation effect, and unnecessary technical features can be increased or decreased according to actual needs to meet the requirements of different situations.

Claims (9)

1. An information management system for an oil field construction site is characterized by comprising a background subsystem and a front terminal system;
the background subsystem is used for controlling the user authority and the input, storage and management of information;
and the front terminal system is used for displaying, inquiring and downloading background information, and recording and uploading field information.
2. The oilfield construction site information management system of claim 1, wherein the back-office subsystem comprises a user management unit and an information management unit;
the user management unit is used for adding and deleting user rights and checking user login information;
the information management unit is used for inputting, storing and managing information, wherein the information comprises working files, pictures, videos, standing books and forms.
3. The oilfield construction site information management system of claim 2, wherein the user management unit comprises an administrator management module and a team user login module;
the administrator management module is used for adding and deleting super administrator authorities, adding team users, managing team user login passwords, checking administrator login information and checking team user login information;
and the team user login module is used for checking the team user login information.
4. The oil field construction site information management system according to claim 2 or 3, wherein the information management unit comprises an information entry module, a branch entry module, a standing book management module and a team station entry module;
the information input module is used for inputting, storing and managing team files and performing management authority setting on the team files, wherein the management team files comprise classification, inquiry, downloading, modification and deletion of the team files;
the branch company recording module is used for acquiring, storing and managing the files recorded by the branch company and setting the management authority of the files, wherein the files recorded by the management branch company comprise files recorded by the branch company which are classified, inquired, downloaded, modified and deleted;
the machine account management module is used for acquiring, storing and managing machine account data recorded by a team and setting management authority for the machine account data, wherein the machine account data is managed by classifying, inquiring, downloading, modifying and deleting the machine account data;
and the team station entry module is used for acquiring, storing and managing form data entered by teams and groups and setting management authority for the form data, wherein the management form data comprises classification, query, download, modification, deletion and printing of the form data.
5. The oilfield construction site information management system according to claim 1, 2 or 3, wherein the front terminal system includes a permitted work management unit, a work information entry unit, a branch information disclosure unit, and an HSE management unit;
the permission operation management unit is used for allowing hoisting operation, firing operation, temporary power utilization operation, high-altitude operation, controlled space operation and excavation operation;
the operation information input unit is used for inputting operation information, standing book information and inspection information;
the branch company information display unit is used for notifying announcement, monitoring information, week work arrangement, HSE examination, a team information management module, team HSE activity record, construction daily report, monthly examination, field supervision, standardized management, dynamic data, permission operation, inspection acceptance, ledger management and HSE management;
and the HSE management unit is used for HSE management of branch companies, teams and classes.
6. The oilfield construction site information management system according to claim 5, wherein the operation information entry unit comprises a team daily essential data module, a team ledger recording module and a site check table acceptance module;
the team daily necessary-filling data module is used for well control activity records, team activity records, staff training records, hand-over well records, road survey records, post walking check tables, hydrochloric acid use records, equipment operation records and contractor five-hand-over bottom;
the team standing book recording module is used for an equipment facility standing book, a sling lifting appliance standing book, a high-pressure part standing book, a measuring instrument standing book, a tool standing book, a certificate standing book, an accident time standing book, a labor insurance product standing book and a health examination standing book;
the field inspection table acceptance module is used for horizontal well acceptance records, conventional well acceptance records, grounding resistance test records, waste disposal lists, well control pressure test records, well control device use records and temporary special inspection records.
7. The oilfield construction site information management system of claim 5, wherein the HSE management unit comprises a branch HSE management module, a team HSE activity module, and a class HSE activity module;
the branch HSE management module is used for recording, displaying and managing regulations and systems, construction instructions, experience sharing, violation management, risk management and control, hidden danger management and control, system management, notification announcement, supervision information, week work arrangement and HSE assessment information;
the team HSE activity module is used for recording, displaying and managing target responsibility, HSE commitments, private car management, defense clearing files, emergency management, traffic management, well control management, HSE configuration lists, capability evaluation, observation and communication;
the class HSE activity module is used for recording, displaying and managing safety analysis before work, problem analysis, evaluation record, safety/technology training record, safety experience sharing and shift switching record.
8. The oilfield construction site information management system of claim 6, wherein the HSE management unit comprises a branch HSE management module, a team HSE activity module, and a class HSE activity module;
the branch HSE management module is used for recording, displaying and managing a regulation and regulation file, a construction instruction file, an experience sharing file, a violation management file, a risk management and control file, a hidden danger management and control file, a system management file, a notice, supervision information, a week work arrangement file and HSE assessment information;
the team HSE activity module is used for recording, displaying and managing a target responsibility book, an HSE commitment book, a private car management file, a defense clearing file, an emergency management file, a traffic management file, a well control management file, an HSE configuration list, a capability evaluation file and an observation and communication file;
the class HSE activity module is used for recording, displaying and managing safety analysis files before work, problem analysis files, evaluation recording files, safety/technical training recording files, safety experience sharing files and shift switching recording files.
9. The oilfield construction site information management method according to any one of claims 1 to 8, comprising the steps of:
the administrator inputs various information required by the user in the background subsystem, and configures the login password and the authority of each user through the background subsystem;
and the user logs in the front subsystem by using the login password, operates the information in the background subsystem within the authority range, inputs and uploads the information to be submitted, wherein when the information to be submitted is uploaded, the information can be automatically stored, and breakpoint transmission is carried out continuously.
CN201911172640.XA 2019-11-26 2019-11-26 Oil field construction site information management system and method Pending CN110910094A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911172640.XA CN110910094A (en) 2019-11-26 2019-11-26 Oil field construction site information management system and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911172640.XA CN110910094A (en) 2019-11-26 2019-11-26 Oil field construction site information management system and method

Publications (1)

Publication Number Publication Date
CN110910094A true CN110910094A (en) 2020-03-24

Family

ID=69819682

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911172640.XA Pending CN110910094A (en) 2019-11-26 2019-11-26 Oil field construction site information management system and method

Country Status (1)

Country Link
CN (1) CN110910094A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111507616A (en) * 2020-04-15 2020-08-07 江苏鹏为软件有限公司 Green building construction information management system
CN113095644A (en) * 2021-03-31 2021-07-09 北京骏陇国际石油工程技术有限公司 Oil and gas field construction site information management system and method
CN113846996A (en) * 2021-09-18 2021-12-28 核工业二四三大队 Drilling rig platform dynamic monitoring system

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6519568B1 (en) * 1999-06-15 2003-02-11 Schlumberger Technology Corporation System and method for electronic data delivery
US20120054270A1 (en) * 2010-08-26 2012-03-01 Bp Corporation North America Inc. Hydrocarbon well information portal
CN104700211A (en) * 2015-03-11 2015-06-10 上海金能安全科技有限责任公司 RFID management system for site construction worker safety
CN106384491A (en) * 2016-08-25 2017-02-08 嘉洋智慧安全生产科技发展(北京)有限公司 Mobile intelligent device based HSE data acquisition instrument
CN107480954A (en) * 2017-08-22 2017-12-15 北京化工大学 A kind of petroleum works LIMS
CN107609660A (en) * 2017-10-13 2018-01-19 广东电网有限责任公司江门供电局 A kind of Work tool information management and control automated system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6519568B1 (en) * 1999-06-15 2003-02-11 Schlumberger Technology Corporation System and method for electronic data delivery
US20120054270A1 (en) * 2010-08-26 2012-03-01 Bp Corporation North America Inc. Hydrocarbon well information portal
CN104700211A (en) * 2015-03-11 2015-06-10 上海金能安全科技有限责任公司 RFID management system for site construction worker safety
CN106384491A (en) * 2016-08-25 2017-02-08 嘉洋智慧安全生产科技发展(北京)有限公司 Mobile intelligent device based HSE data acquisition instrument
CN107480954A (en) * 2017-08-22 2017-12-15 北京化工大学 A kind of petroleum works LIMS
CN107609660A (en) * 2017-10-13 2018-01-19 广东电网有限责任公司江门供电局 A kind of Work tool information management and control automated system

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
张冬梅等: "现代化信息管理系统在项目管理中的应用", 《石油工程建设》 *
张红卫: "HSE综合信息管理系统的研究", 《价值工程》 *
杨涛等: "HSE信息系统的应用概述", 《中国石油和化工标准与质量》 *
王焕欣: "基于Android的石油勘探信息管理系统的设计与实现", 《中国优秀硕士学位论文全文数据库 信息科技辑》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111507616A (en) * 2020-04-15 2020-08-07 江苏鹏为软件有限公司 Green building construction information management system
CN113095644A (en) * 2021-03-31 2021-07-09 北京骏陇国际石油工程技术有限公司 Oil and gas field construction site information management system and method
CN113846996A (en) * 2021-09-18 2021-12-28 核工业二四三大队 Drilling rig platform dynamic monitoring system

Similar Documents

Publication Publication Date Title
CN110910094A (en) Oil field construction site information management system and method
DE112013000367B4 (en) Control method, control computer program and control system for a work machine
KR100606861B1 (en) Infrastructure maintenance and management business support system, the method using the same
CN109710696B (en) System and method for power equipment checking and transaction moving operation
CN113313387B (en) Intelligent management and control method and system for major security risk classification of enterprise
CN104902011B (en) Upkeep operation control method based on mobile terminal
CN208888869U (en) It is a kind of based on internet+external coordination construction team safety control platform
US20140172513A1 (en) Environmental compliance and management system
CN111709707A (en) Management and control system and method applied to project delivery construction site
CN101807270A (en) Mobile supervision and management method and system for city management
KR102269793B1 (en) System for controlling heavy equipment in construction site using iot
DE202021103315U1 (en) BIM-based management and monitoring device for the structural safety of a structural ground cover
CN112288282A (en) Safety production supervision and management system and management method thereof
JP2020501233A (en) Method and system for providing and receiving information for on-site risk management
CN115130807A (en) Intelligent supervision method for pharmaceutical production safety
CN114943428A (en) Emergency comprehensive management system for safety production of hazardous chemical substances
CN108960513A (en) Construction project major hazard source Weigh sensor monitors system
CN113469509B (en) Dynamic analysis method for safety risk of oil and gas storage and transportation station and four-color chart system
CN110599120A (en) Remote information management system for oil field construction site
CN104021092A (en) Working condition data hierarchical storage structure and method
CN207070219U (en) Projects supervision system based on video monitoring
CN111784172A (en) Distribution network operation and maintenance management system based on GIS and big data
CN110880096A (en) Multi-party cooperative office system for constructional engineering
CN114418547A (en) Hazardous chemical substance enterprise information acquisition and management system convenient for government supervision
CN112463871A (en) Urban management-based two-violation regulation information processing system and processing method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination