CN108960513A - Construction project major hazard source Weigh sensor monitors system - Google Patents

Construction project major hazard source Weigh sensor monitors system Download PDF

Info

Publication number
CN108960513A
CN108960513A CN201810735612.3A CN201810735612A CN108960513A CN 108960513 A CN108960513 A CN 108960513A CN 201810735612 A CN201810735612 A CN 201810735612A CN 108960513 A CN108960513 A CN 108960513A
Authority
CN
China
Prior art keywords
information
dangerous
danger
production
weight
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810735612.3A
Other languages
Chinese (zh)
Other versions
CN108960513B (en
Inventor
王晓明
陈芳
施景桓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xiamen Harbour Consulting Supervision Co Ltd
Original Assignee
Xiamen Harbour Consulting Supervision Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xiamen Harbour Consulting Supervision Co Ltd filed Critical Xiamen Harbour Consulting Supervision Co Ltd
Priority to CN201810735612.3A priority Critical patent/CN108960513B/en
Publication of CN108960513A publication Critical patent/CN108960513A/en
Application granted granted Critical
Publication of CN108960513B publication Critical patent/CN108960513B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0635Risk analysis of enterprise or organisation activities
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • G06Q50/26Government or public services
    • G06Q50/265Personal security, identity or safety
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Tourism & Hospitality (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Marketing (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Quality & Reliability (AREA)
  • Development Economics (AREA)
  • Operations Research (AREA)
  • Game Theory and Decision Science (AREA)
  • Educational Administration (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Data Mining & Analysis (AREA)
  • Computer Security & Cryptography (AREA)
  • Alarm Systems (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention discloses a kind of construction project major hazard source Weigh sensor monitoring system;System includes the network switch, database server, subregional camera, access display end, further includes: information collection end, for acquiring production status information;Data uploading module, for uploading the essential information in dangerous operation place to database server;Video administration module, for managing the monitor video of each dangerous operation point real time status;Study on Trend module, for drawing real-time situation curve graph in access display end;Trend analysis prediction module is analyzed for the dangerous situation situation to one period of particular risk place, draws predictive situation curve graph on access display end;Call management module;The present invention is by integrating data, and entire engineering face safety in production situation is assessed in building, the assurance for the whole situation of safety in production;Management module is called to improve the overall efficiency of emergency processing according to distribution weight sequencing publication call instruction.

Description

Construction project major hazard source Weigh sensor monitors system
Technical field
The present invention relates to project management field, especially a kind of comprehensive strong construction project major hazard source intelligence is known It Jian Ce not system.
Background technique
The major hazard source of general significance refer to chronically or provisionally produce, carry, using or storing dangerous article, and The quantity of dangerous goods equals or exceeds the unit of critical quantity.Unit refers to (set) process units, facility or place, or same Belong to a production-operation unit and Edge Distance is less than several (set) process units, facility or the place of 500m;Construction project weight Big danger source then has more extensive meaning, a Dangerous Building, and hazardous equipment or dangerous operating environment also belong to danger Dangerous source;The comprehensive identification monitoring and processing of construction project major hazard source are all a key subjects all the time.
Summary of the invention
The technical solution adopted by the present invention to solve the technical problems is: system of the invention includes the network switch, uses In the database server of integrated management, subregional camera, the access display end for manipulating and inquiring for administrator, also wrap Include: information collection end for acquiring production status information, and filters out the essential information in dangerous operation place, uploads with data Module is carried out wireless communication by the network switch;Production status information includes production site information, production staffing information, production Quantitative information, production violation information, production hidden danger information, production special equipment information;Data uploading module, with database service Device interaction, for uploading the essential information in dangerous operation place to database server, the essential information packet in dangerous operation place Include dangerous point title, danger level, nature of danger, hazards monitoring standard, dangerous point geographical location;Video administration module, passes through It is wirelessly connected each subregional camera and is interacted with database server, for managing each dangerous operation point real time status Monitor video, obtain real-time video from the video camera of each dangerous operation point and store to database server;Situation Analysis module is interacted with database server and is also interacted with access display end, the dangerous operation place for that will collect Essential information analyzes the current situation in hazardous area as input, according to algorithm, is drawn on the basis of geographical map data model real When situation curve figure on access display end, different hazardous areas are come using three kinds of colors of red, yellow, and green as three danger levels Label and display;Trend analysis prediction module is interacted with database server and is also interacted with access display end, for specific danger The dangerous situation situation in one period of dangerous place is analyzed, and predictive situation curve is drawn on the basis of time coordinate data model Figure provides decision basis on access display end for next step safety in production.
Further, the information collection end is the fixed terminal machine that disparity items region point is arranged in, fixed terminal machine Including at least data input unit, single-chip microcontroller and it is connected to interface.
In addition, the information collection end is for supervisor in data input unit marks geographical location information map Danger source, danger source at least marks map coordinate information, danger sources information, system record acquisition log.
Further, system further include: emergency set, calls management module, emergency processing tune at emergency processing recalls information end It with information terminal and calls management module by radio communication, management module is called to interact with data server;Emergency is set Standby to be distributed in each construction project region point dangerous for handling dangerous or aid in treatment, and emergency set includes vehicle and dedicated Equipment;Emergency processing recalls information end is distributed in each construction project region point and is distributed in the Office Area for the treatment of people, emergency Processing recalls information end is used to receive the call instruction for calling management module publication;Call management module according to each hazardous area Specifying information content assignment seconded officer and call vehicle and according to distribution weight sequencing publication call instruction at emergency Manage recalls information end.
Further, emergency processing recalls information end includes cell phone application, wireless terminal.
Further, management module is called specifically to set first to emergency according to distribution weight sequencing publication call instruction Back-up distributes ID with ID, to each emergency worker;Then by danger level, nature of danger, three kinds of dangerous point geographical location data Outer layer weight is distributed respectively, and danger level outer layer weight is X, nature of danger outer layer weight is Y, dangerous point geographical location outer layer power Weight is Z, X+Y+Z=1;Danger level divides attached weight according to grade again: 1/2/3/4/5/6/7/8/9/10, nature of danger Divide attached weight again according to concrete type: 1/2/3/4/5/6/7/8/9/10, dangerous point geographical location according to the position with The distance of emergency worker divides attached weight again: 1/2/3/4/5/6/7/8/9/10, the corresponding weight in each hazardous area X multiplied by corresponding attached weight, Y multiplied by corresponding attached weight and Z multiplied by the quantity of corresponding attached weight and, each is dangerous Place carries out bubble sort according to corresponding weight, issues call instruction according to sequence, call instruction includes called emergency Equipment id information, calls destination at emergency worker's id information.
The invention has the advantages that the present invention is for major hazard source analysis identifying processing and the letter of method reply first Breath management, by integrating to data, entire engineering face safety in production situation is assessed in building, is realized for safety The assurance of the whole situation of production provides effective foundation for the decision commanding of safety in production;Administrative departments at different levels or construction, Supervisor can also check danger source specifying information by accessing display end, call management module according to distribution weight sequencing hair The overall efficiency of cloth call instruction raising emergency processing.
Detailed description of the invention
Fig. 1 is present system connection configuration diagram.
Fig. 2 is dangerous operation place-real-time situation curve graph.Wherein, red (to show ground red in Fig. 2 for clarity It is square, in red-label region with alphabetical A in Fig. 2) indicating the highest place of danger level, yellow (is shown in Fig. 2 for clarity The place of yellow, in yellow flag region with letter b in Fig. 2) indicate the medium place of danger level, green is (for clarity The place for showing Fig. 2 Green, in Green Marker region with letter C in Fig. 2) indicate the minimum place of danger level;Without face The non-hazardous region of expression of color marker or the region without construction project.
Fig. 3 is dangerous operation place-predictive situation curve graph.Wherein, abscissa indicates the period of prediction, and unit is day; The dangerous density of infection that ordinate indicates, density of infection is negative and the smaller expression extent of injury of negative numerical value is bigger, and density of infection is Non-hazardous state is indicated when zero.
Specific embodiment
In the embodiment shown in fig. 1, system of the invention includes the network switch, the database clothes for integrated management Business device, subregional camera, the access display end for manipulating and inquiring for administrator, further includes: information collection end, for adopting Collect production status information, and filter out the essential information in dangerous operation place, with data uploading module by the network switch into Row wireless communication;Therein, production status information includes production site information, production staffing information, production quantitative information, production Violation information, production hidden danger information, production special equipment information;Data uploading module, interacts with database server, for The essential information in dangerous operation place is passed to database server, the essential information in dangerous operation place include dangerous point title, Danger level, nature of danger, hazards monitoring standard, dangerous point geographical location;Video administration module, by being wirelessly connected each point It the camera in region and is interacted with database server, for managing the monitor video of each dangerous operation point real time status, from The video camera of each dangerous operation point, which obtains real-time video and stores, arrives database server;Study on Trend module, with number It is also interacted with access display end according to the interaction of library server, the essential information in the dangerous operation place for that will collect is as defeated Enter, the current situation in hazardous area is analyzed according to algorithm, real-time situation curve graph is drawn on the basis of geographical map data model and is existed It accesses on display end, different hazardous areas is marked and shown as three danger levels using three kinds of colors of red, yellow, and green;Become Potential analysis prediction module is interacted with database server and also interact with access display end, when being used for one section of particular risk place The dangerous situation situation of phase is analyzed, and predictive situation curve graph is drawn on the basis of time coordinate data model and is shown in access On end, decision basis is provided for next step safety in production.
The information collection end is the fixed terminal machine that disparity items region point is arranged in, and fixed terminal machine includes at least Data input unit, single-chip microcontroller and it is connected to interface.In addition, the information collection end is for supervisor in data input unit Danger source on identified geographic location information map, danger source at least mark map coordinate information, danger sources information, system record Acquire log.
In the implementation or information collection end is mobile phone, and mobile phone includes at least wireless upload list Member, data input unit, single-chip microcontroller.
System of the invention further include: emergency set, calls management module, emergency processing at emergency processing recalls information end Recalls information end and calling management module call management module to interact with data server by radio communication;Emergency Device distribution is dangerous for handling dangerous or aid in treatment in each construction project region point, and emergency set includes vehicle and specially Use equipment;Emergency processing recalls information end is distributed in each construction project region point and is distributed in the Office Area for the treatment of people, answers Anxious processing recalls information end is used to receive the call instruction for calling management module publication;Call management module according to each dangerous field Specifying information content assignment seconded officer and call vehicle and according to distribution weight sequencing publication call instruction to meet an urgent need Handle recalls information end;Emergency processing recalls information end includes cell phone application, wireless terminal.
Above-mentioned calling management module issues call instruction according to distribution weight sequencing, and specifically distribution sort is as follows, first First ID is distributed to emergency set distribution ID, to each emergency worker;Then by danger level, nature of danger, dangerous point geography position It sets three kinds of data and distributes outer layer weight respectively, danger level outer layer weight is X, nature of danger outer layer weight is Y, dangerous point is geographical Position outer layer weight is Z, X+Y+Z=1;Danger level divides attached weight according to grade again: 1/2/3/4/5/6/7/8/9/ 10, nature of danger divides attached weight according to concrete type again: 1/2/3/4/5/6/7/8/9/10, dangerous point geographical location is pressed Attached weight is divided again at a distance from emergency worker according to the position: 1/2/3/4/5/6/7/8/9/10, each hazardous area Corresponding weight be X multiplied by corresponding attached weight, Y multiplied by corresponding attached weight and Z multiplied by the quantity of corresponding attached weight and, general Each hazardous area carries out bubble sort according to corresponding weight, issues call instruction according to sequence, call instruction includes institute The emergency set id information of calling, calls destination at emergency worker's id information.Information acquisition module acquisition production first in implementation Status information, including production site information, production staffing information, production quantitative information, production violation information, production hidden danger letter Breath, production special equipment information select suitable data access type, endanger according to the actual conditions in dangerous operation place Dangerous point data acquisition docking.Data uploading module uploads the essential information in dangerous operation place to database server in implementation, Including dangerous point title, danger level, nature of danger, hazards monitoring standard, dangerous point geographical location;Video supervises mould in implementation Block obtains real-time video from the video camera of each dangerous operation point and stores to database server.
Study on Trend module in implementation, using the essential information in the dangerous operation place collected as input, according to calculation Method analyzes the current situation in hazardous area, and real-time situation curve graph is drawn on the basis of geographical map data model in access display end On, different hazardous areas are marked and shown as three danger levels using red, yellow, green three kinds of colors, Yi Zhongshi When situation curve figure see Fig. 2.
Trend analysis prediction module in implementation analyzes the dangerous situation situation in one period of particular risk place, Predictive situation curve graph is drawn on the basis of time coordinate data model on access display end.A kind of predictive situation curve graph is shown in Fig. 3.
In implementation, registration, identification, early warning of the present invention for the larger sub-item engineering of risk are called, to danger source Monitoring and artificial intelligence intervention;Administrative departments at different levels can check the danger source distribution situation of local projects by system, right Danger source is counted;Construction, supervisor can check the danger source specifying information of accepted project by system, be conducive to blame Appointing unit, targetedly implementation focus is supervised.
As known by the technical knowledge, the present invention can pass through the embodiment party of other essence without departing from its spirit or essential feature Case is realized.Embodiment disclosed above, in all respects are merely illustrative, and are not only.It is all in this hair It is included in the invention in bright range or in the change being equal in the scope of the present invention.

Claims (6)

1. a kind of construction project major hazard source Weigh sensor monitors system, including the network switch, for integrated management Database server, subregional camera, the access display end for manipulating and inquiring for administrator, which is characterized in that also wrap It includes:
Information collection end for acquiring production status information, and filters out the essential information in dangerous operation place, uploads with data Module is carried out wireless communication by the network switch;Production status information includes production site information, production staffing information, production Quantitative information, production violation information, production hidden danger information, production special equipment information;
Data uploading module, interacts with database server, and the essential information for uploading dangerous operation place takes to database Business device, the essential information in dangerous operation place includes dangerous point title, danger level, nature of danger, hazards monitoring standard, danger Point geographical location;
Video administration module, by being wirelessly connected each subregional camera and being interacted with database server, for managing The monitor video of each dangerous operation point real time status obtains real-time video from the video camera of each dangerous operation point and deposits Store up database server;
Study on Trend module is interacted with database server and is also interacted with access display end, and the danger for that will collect is made The essential information in industry place analyzes the current situation in hazardous area as input, according to algorithm, using geographical map data model as base Standard draws real-time situation curve graph on access display end, endangers to different hazardous areas using three kinds of colors of red, yellow, and green as three Dangerous rank is marked and is shown;
Trend analysis prediction module is interacted with database server and is also interacted with access display end, for particular risk place The dangerous situation situation in one period is analyzed, and predictive situation curve graph is drawn on the basis of time coordinate data model and is being visited It asks on display end, provides decision basis for next step safety in production.
2. a kind of construction project major hazard source Weigh sensor according to claim 1 monitors system, which is characterized in that The information collection end is the fixed terminal machine that disparity items region point is arranged in, and fixed terminal machine includes at least data input Unit, single-chip microcontroller and it is connected to interface.
3. a kind of construction project major hazard source Weigh sensor according to claim 1 monitors system, which is characterized in that The information collection end is used for danger source of the supervisor on data input unit marks geographical location information map, dangerous Source at least marks map coordinate information, danger sources information, system record acquisition log.
4. a kind of construction project major hazard source Weigh sensor according to claim 1 monitors system, which is characterized in that System further include: management module, emergency processing recalls information end and calling are called in emergency set, emergency processing recalls information end Management module calls management module to interact with data server by radio communication;Emergency set is distributed in each build If Engineering Zone point is dangerous for handling dangerous or aid in treatment, emergency set includes vehicle and special equipment;Emergency processing Recalls information end is distributed in each construction project region point and is distributed in the Office Area for the treatment of people, emergency processing recalls information end For receiving the call instruction for calling management module publication;Call management module according to the specifying information content of each hazardous area It distributes seconded officer and calls vehicle and issue call instruction to emergency processing recalls information end according to distribution weight sequencing.
5. a kind of construction project major hazard source Weigh sensor according to claim 4 monitors system, which is characterized in that Emergency processing recalls information end includes cell phone application, wireless terminal.
6. a kind of construction project major hazard source Weigh sensor according to claim 4 monitors system, which is characterized in that It calls management module to issue call instruction according to distribution weight sequencing, specifically includes: first to emergency set distribution ID, to each Emergency worker distributes ID;Then danger level, nature of danger, three kinds of dangerous point geographical location data are distributed to outer layer power respectively Weight, danger level outer layer weight is X, nature of danger outer layer weight is Y, dangerous point geographical location outer layer weight is Z, X+Y+Z= 1;Danger level divides attached weight according to grade again: 1/2/3/4/5/6/7/8/9/10, nature of danger is according to concrete type Divide attached weight again: 1/2/3/4/5/6/7/8/9/10, dangerous point geographical location according to the position and emergency worker away from From dividing attached weight again: 1/2/3/4/5/6/7/8/9/10, the corresponding weight in each hazardous area is X multiplied by corresponding attached Belong to weight, Y multiplied by corresponding attached weight and Z multiplied by the quantity of corresponding attached weight and, by each hazardous area according to correspondence Weight carry out bubble sort, issue call instruction according to sequence, call instruction includes called emergency set id information, answers Anxious personnel's id information calls destination.
CN201810735612.3A 2018-07-06 2018-07-06 Intelligent identification and monitoring system for major hazard source of construction project Active CN108960513B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810735612.3A CN108960513B (en) 2018-07-06 2018-07-06 Intelligent identification and monitoring system for major hazard source of construction project

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810735612.3A CN108960513B (en) 2018-07-06 2018-07-06 Intelligent identification and monitoring system for major hazard source of construction project

Publications (2)

Publication Number Publication Date
CN108960513A true CN108960513A (en) 2018-12-07
CN108960513B CN108960513B (en) 2022-09-06

Family

ID=64484327

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810735612.3A Active CN108960513B (en) 2018-07-06 2018-07-06 Intelligent identification and monitoring system for major hazard source of construction project

Country Status (1)

Country Link
CN (1) CN108960513B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110458421A (en) * 2019-07-19 2019-11-15 浙江龙腾畅想软件有限公司 A kind of quality safety management method, apparatus and storage device
CN110472858A (en) * 2019-08-10 2019-11-19 浙江同洲项目管理有限公司 A kind of Project Supervision approaches to IM
CN110867047A (en) * 2019-11-29 2020-03-06 万翼科技有限公司 Intelligent early warning method and system for construction site
CN112800107A (en) * 2021-01-18 2021-05-14 湖北宸威玺链信息技术有限公司 Novel data source security identification method, system, device and medium

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102496246A (en) * 2011-12-08 2012-06-13 西安航空电子科技有限公司 Method for processing and displaying alarm based on priority and danger level
CN103238167A (en) * 2010-11-30 2013-08-07 国际商业机器公司 Hazard detection for asset management
US20130268230A1 (en) * 2010-12-16 2013-10-10 Bae Systems Plc Processing distributions
CN105809331A (en) * 2016-02-26 2016-07-27 北京元心科技有限公司 Method and server for generating and issuing inspection tasks
CN107330636A (en) * 2017-07-25 2017-11-07 成都宗升智能科技有限公司 Engineering construction risk source based on 3DGIS+BIM technologies is monitored and artificial intelligence Forecasting Methodology in real time

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103238167A (en) * 2010-11-30 2013-08-07 国际商业机器公司 Hazard detection for asset management
US20130268230A1 (en) * 2010-12-16 2013-10-10 Bae Systems Plc Processing distributions
CN102496246A (en) * 2011-12-08 2012-06-13 西安航空电子科技有限公司 Method for processing and displaying alarm based on priority and danger level
CN105809331A (en) * 2016-02-26 2016-07-27 北京元心科技有限公司 Method and server for generating and issuing inspection tasks
CN107330636A (en) * 2017-07-25 2017-11-07 成都宗升智能科技有限公司 Engineering construction risk source based on 3DGIS+BIM technologies is monitored and artificial intelligence Forecasting Methodology in real time

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110458421A (en) * 2019-07-19 2019-11-15 浙江龙腾畅想软件有限公司 A kind of quality safety management method, apparatus and storage device
CN110472858A (en) * 2019-08-10 2019-11-19 浙江同洲项目管理有限公司 A kind of Project Supervision approaches to IM
CN110472858B (en) * 2019-08-10 2023-05-16 浙江同洲项目管理有限公司 Construction engineering supervision information management method
CN110867047A (en) * 2019-11-29 2020-03-06 万翼科技有限公司 Intelligent early warning method and system for construction site
CN112800107A (en) * 2021-01-18 2021-05-14 湖北宸威玺链信息技术有限公司 Novel data source security identification method, system, device and medium
CN112800107B (en) * 2021-01-18 2023-02-03 湖北宸威玺链信息技术有限公司 Data source security authentication method, system, device and medium

Also Published As

Publication number Publication date
CN108960513B (en) 2022-09-06

Similar Documents

Publication Publication Date Title
CN108960513A (en) Construction project major hazard source Weigh sensor monitors system
US10756809B1 (en) Emergency communication satellite terminal management system
CN106056690B (en) Shield line intelligent polling method and system based on big data, cloud platform and Internet of Things
CN111242574A (en) Intelligent site inspection management system and method based on GPS technology
CN104766173B (en) Water system user cuts off the water the digitalized processing method of alarm
Martin et al. The interactional affordances of technology: An ethnography of human-computer interaction in an ambulance control centre
CN105389654A (en) Wearable device and operator real-time active management control analysis system
CN109522380A (en) A kind of power grid disaster comprehensive monitoring warning data system and method towards mobile application
CN108964269A (en) Power distribution network O&M and total management system
CN104836837A (en) Chemical industrial park environmental pollution prevention and emergency system
CN106598000A (en) Production scheduling and safety management and control system
CN111178828A (en) Method and system for building fire safety early warning
CN113794819A (en) Intelligent management method, system, device and medium for epidemic prevention place
CN114186650A (en) Maritime personnel emergency management system and management method
CN115130807A (en) Intelligent supervision method for pharmaceutical production safety
CN111126751A (en) Intelligent inspection and safety monitoring early warning system and method based on mobile interconnection
CN109992604B (en) Land pursuit and seizing informatization system and seizing method
CN105022771A (en) GIS based digital law enforcement subsystem and operation method thereof
CN105843137A (en) Integrated monitoring method and system
CN116503021A (en) Digital tool system and method for on-site rush repair of power base unit
CN212647305U (en) On-line monitoring system for whole process of producing, treating and discharging sewage
CN113593069A (en) Intelligent inspection system for mathematics twin
CN211427131U (en) Gridding monitoring management system
CN114297522A (en) Display method and device of power grid station monitoring data and electronic equipment
CN113721556A (en) On-line monitoring system for whole process of producing, treating and discharging sewage

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: No.15 Dongdu Road, Huli District, Xiamen City, Fujian Province 361012

Applicant after: Zhonglian Luhai Group Co.,Ltd.

Address before: No.15 Dongdu Road, Huli District, Xiamen City, Fujian Province 361012

Applicant before: XIAMEN GANGWAN CONSULTING & SUPERVISING CO.,LTD.

CB02 Change of applicant information
GR01 Patent grant