CN110472858A - A kind of Project Supervision approaches to IM - Google Patents

A kind of Project Supervision approaches to IM Download PDF

Info

Publication number
CN110472858A
CN110472858A CN201910737002.1A CN201910737002A CN110472858A CN 110472858 A CN110472858 A CN 110472858A CN 201910737002 A CN201910737002 A CN 201910737002A CN 110472858 A CN110472858 A CN 110472858A
Authority
CN
China
Prior art keywords
module
information
project
central processing
processing module
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910737002.1A
Other languages
Chinese (zh)
Other versions
CN110472858B (en
Inventor
薛寒
王飞萍
薛彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Tongzhou Project Management Co Ltd
Original Assignee
Zhejiang Tongzhou Project Management Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Tongzhou Project Management Co Ltd filed Critical Zhejiang Tongzhou Project Management Co Ltd
Priority to CN201910737002.1A priority Critical patent/CN110472858B/en
Publication of CN110472858A publication Critical patent/CN110472858A/en
Application granted granted Critical
Publication of CN110472858B publication Critical patent/CN110472858B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01CMEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
    • G01C11/00Photogrammetry or videogrammetry, e.g. stereogrammetry; Photographic surveying
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • G06Q10/063116Schedule adjustment for a person or group
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T17/00Three dimensional [3D] modelling, e.g. data description of 3D objects
    • G06T17/05Geographic models
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06VIMAGE OR VIDEO RECOGNITION OR UNDERSTANDING
    • G06V20/00Scenes; Scene-specific elements
    • G06V20/10Terrestrial scenes
    • G06V20/13Satellite images
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Physics & Mathematics (AREA)
  • Human Resources & Organizations (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Strategic Management (AREA)
  • Remote Sensing (AREA)
  • Economics (AREA)
  • Tourism & Hospitality (AREA)
  • General Business, Economics & Management (AREA)
  • Software Systems (AREA)
  • Multimedia (AREA)
  • Geometry (AREA)
  • Marketing (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Game Theory and Decision Science (AREA)
  • Radar, Positioning & Navigation (AREA)
  • Educational Administration (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Development Economics (AREA)
  • Computer Graphics (AREA)
  • Astronomy & Astrophysics (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention relates to a kind of Project Supervision approaches to IM, belong to project supervision technical field, the main points of its technical scheme are that project supervision information managing and control system is arranged in construction area, project supervision information managing and control system includes parameter input module, dangerous source database, mobile terminal, central processing module and display module;Parameter input module is for inputting current project scale parameter;Danger source database purchase has engineering project danger source data information;Mobile terminal is used to be acquired the danger sources information of the project of influence;Central processing module is for generating progress impact factor and being modified according to progress impact factor to project progress message;The rectification of danger source in work progress can not be counted to the entire effect of project process by solving existing project supervision information management, be unfavorable for the problem of supervisor carries out item nodes management management;Analysis assessment can be carried out to the danger source during project construction, supervisor is facilitated to carry out item nodes management.

Description

A kind of Project Supervision approaches to IM
Technical field
The present invention relates to project supervision technical fields, more particularly, to a kind of Project Supervision approaches to IM.
Background technique
Project supervision refers to engineering project of the supervisor with related qualification by the commission of Party A, according to state approval File, the law in relation to engineering construction, regulation and engineering supervision contract and other construction contracts are built, Party A is represented A kind of proficient service activity to the engineering construction implementing monitoring of Party B.Project supervision is a kind of paid engineering consulting clothes Business;It is to be entrusted to carry out by Party A;The main foundation of management is law, regulation, technical standard, related contract and file;Management Criterion be to abide by the law, is sincere, is just and scientific;Management purpose is to ensure that engineering construction quality and safety, improves engineering construction water It is flat, give full play to returns of investment with nation-building field reform gradually deepen, gradually perfect, the construction supervision of building legislation System has become one legal primary institution of China's engineering construction field, and management is with a very important position in engineering construction.
Traditional project supervision information management, most of is all to fill in various tables manually, the artificial transmitting for carrying out information And management.With the informationization of society, pipe is carried out to the information of project supervision using the software systems auxiliary based on intelligent platform Reason, is more and more widely used.The auxiliary software systems of existing project supervision can refer to Publication No. The Chinese invention patent application file of CN107705020A, it discloses a kind of project supervision information managing and control systems, comprising: client End, client's device end includes individual office unit, integrated management unit, information centre's unit, management unit, safe matter Measure administrative unit, project management unit, System Management Unit, Training Management unit and file administration unit;Server end, it is described Server end is used to receive the data that client transmissions are come and is analyzed and controlled, and the result data of analysis and control is back to The result data of initial data and analysis and control is transmitted to database purchase by client;Database, the database are used In the data that storage server end transmits.
In engineering construction construction, there is some danger sources, need to be rectified and improved in time, when supervisor is in management When finding danger source in journey, the case where needing to danger source, supervises construction party to rectify and improve in time, so avoid production development or Safety accident;Existing project supervision information management can not count the rectification of danger source in work progress to the whole shadow of project process It rings, is unfavorable for supervisor and carries out item nodes management management.
Summary of the invention
The purpose of the present invention is to provide a kind of engineering construction project supervision information management-control methods, can be to project construction mistake Danger source in journey carries out analysis assessment, and supervisor is facilitated to carry out item nodes management.
Foregoing invention purpose of the invention has the technical scheme that supervises in construction area setting engineering Manage information managing and control system, project supervision information managing and control system include parameter input module, dangerous source database, mobile terminal, in Entreat processing module and display module;
The parameter input module is for inputting current project scale parameter and project scale parameter being sent to central processing Module;
The danger source database purchase has engineering project danger source data information;
The mobile terminal is used to be acquired the danger sources information of the project of influence, and acquisition information is sent to centre Manage module;
The central processing module generates project progress message according to the project scale parameter information that parameter input module inputs;Institute The acquisition information that central processing module is sent according to mobile terminal is stated to retrieve the data information in dangerous source database, it is raw Project progress message is modified at progress impact factor and according to progress impact factor;
The display module carries out display output to the project progress message that central processing module generates.
By using above-mentioned technical proposal, central processing module is believed according to the project scale parameter that parameter input module inputs Breath generates project progress message, and then facilitates supervisor to carry out management examination to project process according to progress msg;It is constructing The some danger sources needs deposited in the process are rectified and improved in time, to avoid that industrial accident, different danger sources occurs Need to expend different manpower and material resources, the required rectification time is different, and central processing module is inputted according to parameter input module Project scale parameter information generate project progress message;The acquisition information that central processing module is sent according to mobile terminal is to danger Data information in dangerous source database is retrieved, and generates progress impact factor and according to progress impact factor to project process Information is modified, and then construction personnel is facilitated to be adjusted in time to arrangement and method for construction.
The present invention is further arranged to: the mobile terminal includes manual input module and wireless communication module, described Manual input module is for inputting danger sources information and danger sources information being sent to wireless communication module, the wireless telecommunications The danger sources information that manual input module inputs is sent to central processing module by wireless network by module.
By using above-mentioned technical proposal, management person carries mobile terminal in inspection supervision process, In After finding danger source during inspection, current danger sources information is inputted by manual input module, and then pass through wireless telecommunications Current danger sources information is sent to central processing module by module, and central processing module again carries out at analysis danger sources information Reason, so that staff be facilitated efficiently to be acquired to danger sources information.
The present invention is further arranged to: the mobile terminal further includes image capture module, and described image acquisition module is used In carrying out Image Acquisition to external environment, and the image information of acquisition is sent to wireless communication module, the wireless telecommunications Image information is sent to central processing module by wireless network by module.
By using above-mentioned technical proposal, mobile terminal includes image capture module, and then passes through image capture module energy It is enough that Image Acquisition is carried out to extraneous environment, and central processing module, and then centre are sent to by wireless communication module Reason module carries out identification judgement to image information, generates progress impact factor;It being capable of benefit by image capture module staff With being conveniently acquired to extraneous danger sources information, staff is facilitated to operate.
The present invention is further arranged to: the mobile terminal further includes GPS positioning module, and the GPS positioning module is to working as The position of preceding mobile terminal is positioned, and location information is sent to wireless communication module, and the wireless communication module will Location information is sent to central processing module by wireless network;The central processing module generates position rail according to location information Mark information, and position locus information is sent to display module, the display module show to position locus information defeated Out.
By using above-mentioned technical proposal, mobile terminal is provided with GPS positioning module, and then can patrol to supervisor Inspection route is recorded, so that the manager on backstage is facilitated to check the inspection route to each supervisor, convenient pair Project supervision carries out comprehensive management.
The present invention is further arranged to: further including satellite remote sensing image-forming module and unmanned plane acquisition module, the satellite Remotely sensed image module carries out remotely sensed image to construction area, and remotely sensed image information is sent to central processing module;It is described Unmanned plane acquisition module carries out flight acquisition image to construction area according to setting track, and flight is acquired image information hair Give central processing module;The central processing module carries out image and intends according to remotely sensed image information and flight acquisition image information It closes, generates three-dimensional live map, and three-dimensional live map is issued into display module and carries out display output.
It is comprehensive to construction area by satellite remote sensing image-forming module and unmanned plane acquisition module by using above-mentioned technical proposal It closes and carries out Image Acquisition, and then three-dimensional live map is generated by central processing module, so that staff passes through display module The case where construction area, is checked, facilitates staff to carry out management to construction area and checks.
The present invention is further arranged to: the central processing module is according to the location information of danger source in three-dimensional live map On dangerous source position is marked, and display output is carried out by display module.
By using above-mentioned technical proposal, central processing module is according to the location information of danger source on three-dimensional live map Dangerous source position is marked, and display output is carried out by display module, and then facilitate staff to danger source Position is intuitively observed, and is facilitated and is carried out rectification management work.
The present invention is further arranged to: the central processing module is according to the progress impact factor of danger source with different face Dangerous source position is marked in color.
By using above-mentioned technical proposal, central processing module is according to the progress impact factor of danger source with different colors Dangerous source position is marked, to facilitate influence of the staff intuitively to the danger source of each position to project progress Situation is observed.
The present invention is further arranged to: the central processing module generates rectification scheme information according to progress impact factor, And rectification scheme information is sent to display module, the display module carries out display output to rectification scheme information.
By using above-mentioned technical proposal, central processing module generates rectification scheme according to progress impact factor, and will Rectification scheme information is sent to display module, display output is carried out to rectification scheme by display module, thus for staff Rectification reference is carried out, staff is facilitated to carry out later period rectification to engineering project.
The present invention is further arranged to: further including SMS transmission module, the SMS transmission module is stored with the hand of owner Machine number, the central processing module generates modification report according to progress impact factor and rectification scheme, and rectification is reported It accuses and gives SMS transmission module, the SMS transmission module sends modification report to the phone number of owner in the form of short message Server-side.
By using above-mentioned technical proposal, by the setting of SMS transmission module, central processing module is influenced according to progress The factor and rectification scheme generate modification report, and then modification report is sent to owner in time by SMS transmission module, into And owner is made to understand current project rectification content in time.
In conclusion advantageous effects of the invention are as follows:
1. central processing module generates project progress message according to the project scale parameter information that parameter input module inputs, in turn Supervisor is facilitated to carry out management examination to project process according to progress msg;The some danger sources deposited in the construction process need It to be rectified and improved in time, to avoid that industrial accident occurs, different danger sources needs to expend different manpower and material resources, institute The rectification time needed is different, and central processing module generates project according to the project scale parameter information that parameter input module inputs Progress msg;The acquisition information that central processing module is sent according to mobile terminal carries out the data information in dangerous source database Retrieval generates progress impact factor and is modified according to progress impact factor to project progress message, and then facilitates construction Personnel are in time adjusted arrangement and method for construction;
2. mobile terminal includes manual input module, image capture module, wireless communication module and GPS positioning module, in turn Facilitate staff during engineering inspection, the danger sources information during inspection is acquired using mobile terminal, into And central processing module is sent to by Wi-Fi, have and is analyzed and processed by central processing module;
3. passing through the setting of satellite remote sensing image-forming module and unmanned plane acquisition module, pass through satellite remote sensing image-forming module and unmanned plane Acquisition module is comprehensive to construction area to carry out Image Acquisition, and then generates three-dimensional live map by central processing module, thus Staff checks the case where construction area by display module, facilitates staff to carry out management to construction area and looks into It sees.
Detailed description of the invention
Fig. 1 is a kind of functional block diagram of project supervision information managing and control system.
In figure, 1, parameter input module;2, dangerous source database;3, mobile terminal;31, manual input module;32, image Acquisition module;33, GPS positioning module;34, wireless communication module;4, central processing module;5, display module;6, short message is sent Module;7, satellite remote sensing image-forming module;8, unmanned plane acquisition module.
Specific embodiment
Below in conjunction with attached drawing, invention is further described in detail.
A kind of Project Supervision approaches to IM establishes project supervision information control system in construction area referring to Fig.1 System, and then management control is carried out to work progress by project supervision information managing and control system.Project supervision information managing and control system packet Include parameter input module 1, dangerous source database 2, mobile terminal 3, central processing module 4 and display module 5.Dangerous source data Library 2 is stored with engineering project danger source data information.Mobile terminal 3 uses the smart machines such as smart phone, tablet computer, PDA, It is carried convenient for supervisor.Central processing module 4 and display module 5 are shown using backstage PC host and with backstage The data of 3 front-end collection of mobile terminal are processed and displayed in device, and then supervisor and construction is facilitated to carry out construction ginseng It examines.
When carrying out management to engineering, using parameter input module 1, current engineering is inputted by peripheral hardwares such as keyboards and is advised Mould parameter and project scale parameter is sent to central processing module 4.Central processing module 4 is defeated according to parameter input module 1 The project scale parameter information entered generates project progress message.Display module 5 believes the project process that central processing module 4 generates Breath carries out display output.And then by the timing node of project progress message, supervisor to the progress node of current project into Row management examines.
Referring to Fig.1, some danger sources needs deposited in the construction process are rectified and improved in time, to avoid that safety occurs Production accident.Different danger sources needs to expend different manpower and material resources, and the required rectification time is different, and then influences whether The construction speed of project.Supervisor in the daily work, needs to carry out construction inspection to project, during constructing inspection, Mobile terminal 3 is carried.Mobile terminal 3 includes manual input module 31, image capture module 32, GPS positioning mould Block 33 and wireless communication module 34.Manual input module 31 is for inputting danger sources information and being sent to danger sources information Wireless communication module 34, the danger sources information that wireless communication module 34 inputs manual input module 31 are sent by wireless network To central processing module 4.Image capture module 32 is used to carry out Image Acquisition to external environment, and by the image information of acquisition It is sent to wireless communication module 34, image information is sent to central processing module 4 by wireless network by wireless communication module 34. GPS positioning module 33 positions the position of current mobile terminal 3, and location information is sent to wireless communication module 34, location information is sent to central processing module 4 by wireless network by wireless communication module 34.Management person is in inspection process In, after the danger source that discovery is rectified and improved, by manual input module 31 be manually entered current danger sources information or Person by image capture module 32 using the camera on mobile terminal 3 to danger source progress Image Acquisition, and then by acquisition Information is sent to central processing module 4.
Referring to Fig.1, the acquisition information that central processing module 4 is sent according to mobile terminal 3 is to the number in dangerous source database 2 It is believed that breath is retrieved, generates progress impact factor and project progress message is modified according to progress impact factor, into And the timing node of the construction speed after corresponding postponement is obtained, it is adjusted construction personnel to project construction in time.Center Processing module 4 generates rectification scheme information according to progress impact factor, and rectification scheme information is sent to display module 5, Display module 5 carries out display output to rectification scheme information.Supervisor and construction personnel refer to rectification scheme, in turn Formulate rationally efficient rectification scheme.Central processing module 4 generates position locus information according to the location information of GPS module, and And position locus information is sent to display module 5, display module 5 carries out display output to position locus information.To manage Personnel can carry out the patrolled and examined track of the management person of inspection to see and read, and then conveniently be managed to management.
Referring to Fig.1, project supervision information managing and control system further include SMS transmission module 6, satellite remote sensing image-forming module 7 and Unmanned plane acquisition module 8.SMS transmission module 6 is stored with the phone number of owner, central processing module 4 according to progress influence because Son and rectification scheme generate modification report, and modification report is sent to SMS transmission module 6, and SMS transmission module 6 will Modification report is sent to the phone number server-side of owner in the form of short message.And then when carrying out project rectification, industry is informed in time It is main, facilitate owner to supervise project.
Referring to Fig.1, satellite remote sensing image-forming module 7 carries out remotely sensed image to construction area, and remotely sensed image information is sent out Give central processing module 4;Unmanned plane acquisition module 8 carries out flight acquisition image to construction area according to setting track, and Flight acquisition image information is sent to central processing module 4;Central processing module 4 is acquired according to remotely sensed image information and flight Image information carries out image fitting, generates three-dimensional live map, and three-dimensional live map is issued display module 5 and is shown Output.Central processing module 4 is marked dangerous source position on three-dimensional live map according to the location information of danger source.In Entreat processing module 4 that dangerous source position is marked with different colors according to the progress impact factor of danger source and by aobvious Show that module 5 carries out display output.Pass through the three-dimensional live map for the construction area that display module 5 exports, the supervisor on backstage Conveniently the state of construction area can be checked.According to the progress impact factor of different danger sources with different face Dangerous source position is marked in color, so using supervisor can influence to each danger source to project process carry out it is straight The observation of sight.
The implementation principle of the present embodiment are as follows:
The management person of inspection carries mobile terminal 3, and then passes through craft when discovery danger source during inspection Input carries out Image Acquisition, and is sent to central processing module 4 by wireless network.Central processing module 4 by pair The related content of dangerous source database 2 carries out retrieval analysis, generates progress impact factor and according to progress impact factor to item Mesh progress msg is modified, and generates rectification scheme, and then guiding construction personnel and supervisor according to progress impact factor Member is constructed and is rectified and improved operation.
The embodiment of present embodiment is presently preferred embodiments of the present invention, not limits protection of the invention according to this Range, therefore: the equivalence changes that all structures under this invention, shape, principle are done, should all be covered by protection scope of the present invention it It is interior.

Claims (9)

1. a kind of Project Supervision approaches to IM, it is characterised in that: managed in construction area setting project supervision information System, project supervision information managing and control system include parameter input module (1), dangerous source database (2), mobile terminal (3), center Processing module (4) and display module (5);
The parameter input module (1) is for inputting current project scale parameter and project scale parameter being sent to centre It manages module (4);
The danger source database (2) is stored with engineering project danger source data information;
The mobile terminal (3) is used to be acquired the danger sources information of the project of influence, and acquisition information is sent to It entreats processing module (4);
The central processing module (4) generates project process according to the project scale parameter information that parameter input module (1) inputs Information;The acquisition information that the central processing module (4) sends according to mobile terminal (3) is to the number in dangerous source database (2) It is believed that breath is retrieved, generates progress impact factor and project progress message is modified according to progress impact factor;
The project progress message that the display module (5) generates central processing module (4) carries out display output.
2. a kind of Project Supervision approaches to IM according to claim 1, it is characterised in that: the mobile terminal It (3) include manual input module (31) and wireless communication module (34), the manual input module (31) is for inputting danger Source information and danger sources information is sent to wireless communication module (34), the wireless communication module (34) will be manually entered mould The danger sources information of block (31) input is sent to central processing module (4) by wireless network.
3. a kind of Project Supervision approaches to IM according to claim 2, it is characterised in that: the mobile terminal It (3) further include image capture module (32), described image acquisition module (32) is used to carry out Image Acquisition to external environment, and The image information of acquisition is sent to wireless communication module (34), the wireless communication module (34) passes through wireless network for image Information is sent to central processing module (4).
4. a kind of Project Supervision approaches to IM according to claim 2, it is characterised in that: the mobile terminal It (3) further include GPS positioning module (33), the GPS positioning module (33) positions the position of current mobile terminal (3), And location information is sent to wireless communication module (34), location information is passed through wireless network by the wireless communication module (34) Network is sent to central processing module (4);The central processing module (4) generates position locus information according to location information, and Position locus information is sent to display module (5), the display module (5) carries out display output to position locus information.
5. a kind of Project Supervision approaches to IM according to claim 1, it is characterised in that: further include that satellite is distant Feel image-forming module (7) and unmanned plane acquisition module (8), the satellite remote sensing image-forming module (7) carries out remote sensing to construction area Imaging, and remotely sensed image information is sent to central processing module (4);The unmanned plane acquisition module (8) is according to setting rail Mark carries out flight acquisition image to construction area, and flight acquisition image information is sent to central processing module (4);It is described Central processing module (4) carries out image fitting according to remotely sensed image information and flight acquisition image information, with generating three-dimensional live Figure, and three-dimensional live map is issued into display module (5) and carries out display output.
6. a kind of Project Supervision approaches to IM according to claim 5, it is characterised in that: the central processing Module (4) is marked dangerous source position on three-dimensional live map according to the location information of danger source, and passes through display Module (5) carries out display output.
7. a kind of Project Supervision approaches to IM according to claim 6, it is characterised in that: the central processing Module (4) is marked dangerous source position with different colors according to the progress impact factor of danger source.
8. a kind of Project Supervision approaches to IM according to claim 1, it is characterised in that: the central processing Module (4) generates rectification scheme information according to progress impact factor, and rectification scheme information is sent to display module (5), The display module (5) carries out display output to rectification scheme information.
9. a kind of Project Supervision approaches to IM according to claim 8, it is characterised in that: further include short message hair It send module (6), the SMS transmission module (6) is stored with the phone number of owner, and the central processing module (4) is according to progress Impact factor and rectification scheme generate modification report, and modification report is sent to SMS transmission module (6), the short message Sending module (6) sends modification report to the phone number server-side of owner in the form of short message.
CN201910737002.1A 2019-08-10 2019-08-10 Construction engineering supervision information management method Active CN110472858B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910737002.1A CN110472858B (en) 2019-08-10 2019-08-10 Construction engineering supervision information management method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910737002.1A CN110472858B (en) 2019-08-10 2019-08-10 Construction engineering supervision information management method

Publications (2)

Publication Number Publication Date
CN110472858A true CN110472858A (en) 2019-11-19
CN110472858B CN110472858B (en) 2023-05-16

Family

ID=68511372

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910737002.1A Active CN110472858B (en) 2019-08-10 2019-08-10 Construction engineering supervision information management method

Country Status (1)

Country Link
CN (1) CN110472858B (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111062679A (en) * 2019-10-28 2020-04-24 中船重工海鑫工程管理(北京)有限公司 Overall process intelligent engineering supervision information management and control system
CN111105217A (en) * 2019-12-31 2020-05-05 孙杰 Power transmission line corridor safety construction operation management and control system
CN111126939A (en) * 2019-11-22 2020-05-08 河北瑞池工程项目管理有限公司 Project progress supervision control system
CN111414526A (en) * 2020-03-02 2020-07-14 浙江同洲项目管理有限公司 Elevator installation supervision method and computer readable storage medium
CN111683224A (en) * 2020-06-02 2020-09-18 湖南电力工程咨询有限公司 Power engineering field supervision system and supervision method
CN112122221A (en) * 2020-09-28 2020-12-25 斯舰力(上海)电梯有限公司 Project supervision information management method based on Internet of things
CN113191639A (en) * 2021-04-30 2021-07-30 重庆天智慧启科技有限公司 Full-life building cycle monitoring operation and maintenance method and system
CN114739843A (en) * 2022-03-10 2022-07-12 内蒙古锐信工程项目管理有限责任公司 Construction monitoring method for building engineering supervision based on big data
CN115146933A (en) * 2022-06-20 2022-10-04 深圳市城市公共安全技术研究院有限公司 Processing method, system, equipment and storage medium for dangerous source explosion accident
CN116882672A (en) * 2023-07-03 2023-10-13 广东鼎易建筑科技有限公司 Internet-based building engineering personnel management system

Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103775129A (en) * 2013-12-26 2014-05-07 中国矿业大学 Method for early warning of dangerous sources of coal mine
CN104700161A (en) * 2015-03-06 2015-06-10 深圳市燃气集团股份有限公司 Risk factor identification-based construction site patrol optimization method and system
CN104809591A (en) * 2015-05-11 2015-07-29 东北电力大学 Electric power construction engineering supervision mechanism based on big data
CN105913183A (en) * 2016-04-11 2016-08-31 南京学安网络科技有限公司 Safety tour inspection management system
CN107133776A (en) * 2016-08-02 2017-09-05 北京尚优力达科技有限公司 A kind of mobile security supervisory systems
CN107679820A (en) * 2017-08-30 2018-02-09 深圳市易联智道科技有限公司 Construction Schedule management method
CN108010155A (en) * 2017-12-06 2018-05-08 南京学立安教育科技有限公司 A kind of safety inspection and the system and method for hidden danger management
CN108732979A (en) * 2018-05-15 2018-11-02 浙江大学 A kind of construction safety managing and control system based on BIM technology
CN108920750A (en) * 2018-05-24 2018-11-30 武汉八维时空信息技术股份有限公司 The fusion of engineering-built Dynamic and Multi dimensional information and cooperation interaction system
CN108960513A (en) * 2018-07-06 2018-12-07 厦门港湾咨询监理有限公司 Construction project major hazard source Weigh sensor monitors system
CN109102144A (en) * 2018-06-20 2018-12-28 中国石油天然气股份有限公司 Method and device for determining operation risk possibility grade and storage medium
CN109165848A (en) * 2018-08-24 2019-01-08 北京中联环建设工程管理有限公司 Project supervision supervisory systems
CN109190962A (en) * 2018-08-24 2019-01-11 北京中联环建设工程管理有限公司 Project process supervision control system
CN110021078A (en) * 2019-05-10 2019-07-16 成都轨道建设管理有限公司 An a kind of Metro Construction hidden troubles removing improvement point cruising inspection system

Patent Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103775129A (en) * 2013-12-26 2014-05-07 中国矿业大学 Method for early warning of dangerous sources of coal mine
CN104700161A (en) * 2015-03-06 2015-06-10 深圳市燃气集团股份有限公司 Risk factor identification-based construction site patrol optimization method and system
CN104809591A (en) * 2015-05-11 2015-07-29 东北电力大学 Electric power construction engineering supervision mechanism based on big data
CN105913183A (en) * 2016-04-11 2016-08-31 南京学安网络科技有限公司 Safety tour inspection management system
CN107133776A (en) * 2016-08-02 2017-09-05 北京尚优力达科技有限公司 A kind of mobile security supervisory systems
CN107679820A (en) * 2017-08-30 2018-02-09 深圳市易联智道科技有限公司 Construction Schedule management method
CN108010155A (en) * 2017-12-06 2018-05-08 南京学立安教育科技有限公司 A kind of safety inspection and the system and method for hidden danger management
CN108732979A (en) * 2018-05-15 2018-11-02 浙江大学 A kind of construction safety managing and control system based on BIM technology
CN108920750A (en) * 2018-05-24 2018-11-30 武汉八维时空信息技术股份有限公司 The fusion of engineering-built Dynamic and Multi dimensional information and cooperation interaction system
CN109102144A (en) * 2018-06-20 2018-12-28 中国石油天然气股份有限公司 Method and device for determining operation risk possibility grade and storage medium
CN108960513A (en) * 2018-07-06 2018-12-07 厦门港湾咨询监理有限公司 Construction project major hazard source Weigh sensor monitors system
CN109165848A (en) * 2018-08-24 2019-01-08 北京中联环建设工程管理有限公司 Project supervision supervisory systems
CN109190962A (en) * 2018-08-24 2019-01-11 北京中联环建设工程管理有限公司 Project process supervision control system
CN110021078A (en) * 2019-05-10 2019-07-16 成都轨道建设管理有限公司 An a kind of Metro Construction hidden troubles removing improvement point cruising inspection system

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111062679A (en) * 2019-10-28 2020-04-24 中船重工海鑫工程管理(北京)有限公司 Overall process intelligent engineering supervision information management and control system
CN111126939A (en) * 2019-11-22 2020-05-08 河北瑞池工程项目管理有限公司 Project progress supervision control system
CN111126939B (en) * 2019-11-22 2023-10-03 河北瑞池工程项目管理有限公司 Project progress supervision control system
CN111105217A (en) * 2019-12-31 2020-05-05 孙杰 Power transmission line corridor safety construction operation management and control system
CN111414526B (en) * 2020-03-02 2023-04-21 浙江同洲项目管理有限公司 Elevator additionally-installed supervision method and computer-readable storage medium
CN111414526A (en) * 2020-03-02 2020-07-14 浙江同洲项目管理有限公司 Elevator installation supervision method and computer readable storage medium
CN111683224A (en) * 2020-06-02 2020-09-18 湖南电力工程咨询有限公司 Power engineering field supervision system and supervision method
CN112122221A (en) * 2020-09-28 2020-12-25 斯舰力(上海)电梯有限公司 Project supervision information management method based on Internet of things
CN113191639A (en) * 2021-04-30 2021-07-30 重庆天智慧启科技有限公司 Full-life building cycle monitoring operation and maintenance method and system
CN114739843A (en) * 2022-03-10 2022-07-12 内蒙古锐信工程项目管理有限责任公司 Construction monitoring method for building engineering supervision based on big data
CN114739843B (en) * 2022-03-10 2023-05-02 内蒙古锐信工程项目管理有限责任公司 Construction monitoring method for building engineering supervision based on big data
CN115146933A (en) * 2022-06-20 2022-10-04 深圳市城市公共安全技术研究院有限公司 Processing method, system, equipment and storage medium for dangerous source explosion accident
CN116882672A (en) * 2023-07-03 2023-10-13 广东鼎易建筑科技有限公司 Internet-based building engineering personnel management system

Also Published As

Publication number Publication date
CN110472858B (en) 2023-05-16

Similar Documents

Publication Publication Date Title
CN110472858A (en) A kind of Project Supervision approaches to IM
CN109557934B (en) Unmanned aerial vehicle cruise control method and device based on fabricated building platform
CN110971878B (en) Engineering field management system
CN111242574A (en) Intelligent site inspection management system and method based on GPS technology
CN103942635B (en) A kind of coal mine gas safe and intelligent cruising inspection system
CN110223208A (en) A kind of garden safety monitoring system and method
CN107609765A (en) A kind of factory's hidden troubles removing method and system
CN107239868A (en) End message processing method and processing device for security cruising inspection system
CN107240164A (en) The data processing of security cruising inspection system and device
CN107240166A (en) Point inspection terminal and its data processing method
CN104636868A (en) Application management system for nuclear power station equipment maintenance information and application method thereof
CN211509189U (en) Electric power operation field supervision equipment and system
CN105844846B (en) A kind of method for safety monitoring based on Ibeacon technologies, apparatus and system
CN107748959A (en) A kind of construction management information service system
CN108304983A (en) Management platform is repaiied in a kind of oil and gas pipeline inspection acquired based on unmanned plane and network communication technology data
CN117575170B (en) Intelligent management system
CN107798489A (en) A kind of electric network operation site safety management method based on wechat platform
CN111062679A (en) Overall process intelligent engineering supervision information management and control system
CN106157166A (en) Intelligent power supply gathers service system
CN108154340A (en) Prefabricated component informationization management system based on BIM cloud platforms
CN206298231U (en) Elevator repair and maintenance managing device based on bluetooth and Mobile Data Communication Technology
CN115660241A (en) Digital mine inspection system and implementation method
CN110009195A (en) Thermal power plant's risk pre-control management system based on physical vlan information fusion technology
CN115860410A (en) WeChat-based large civil engineering construction potential safety hazard management system
CN114462882A (en) Safety protection system for water conservancy construction based on internet of things

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant