CN211427131U - Gridding monitoring management system - Google Patents

Gridding monitoring management system Download PDF

Info

Publication number
CN211427131U
CN211427131U CN201921475455.3U CN201921475455U CN211427131U CN 211427131 U CN211427131 U CN 211427131U CN 201921475455 U CN201921475455 U CN 201921475455U CN 211427131 U CN211427131 U CN 211427131U
Authority
CN
China
Prior art keywords
control unit
construction site
monitoring
alarm
vehicle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921475455.3U
Other languages
Chinese (zh)
Inventor
杨小兵
苗九成
吴汝波
李召
谢建军
甄保斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Third Highway Engineering Co Ltd
Original Assignee
CCCC Third Highway Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Third Highway Engineering Co Ltd filed Critical CCCC Third Highway Engineering Co Ltd
Priority to CN201921475455.3U priority Critical patent/CN211427131U/en
Application granted granted Critical
Publication of CN211427131U publication Critical patent/CN211427131U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Alarm Systems (AREA)

Abstract

The application provides a gridding monitoring management system, which comprises a remote management end, a video monitoring system, a vehicle positioning monitoring system and a construction site supervision system; the remote management end comprises a control unit, a cloud database and a gridding monitoring screen; the video monitoring system comprises a video acquisition terminal which is arranged on a construction site and used for acquiring video information in the construction site; the vehicle positioning monitoring system comprises a GPS positioning device arranged on the vehicle and a vehicle camera device arranged on the vehicle; the building site supervisory systems is including the noise sensor, alarm broadcast unit, the alarm display screen of locating the building site, the noise information that the noise sensor will gather passes through the control unit and transmits extremely high in the clouds database, the output of control unit is connected with the input of alarm display screen, and the noise surpasss the threshold value control unit of predetermineeing and starts alarm broadcast unit, meshing monitoring management system can conveniently be to the management of job site, realize the intelligent management to construction site.

Description

Gridding monitoring management system
Technical Field
The utility model relates to a control management field indicates a meshing control management system especially.
Background
With the rapid development of economy, the construction industry is changing day by day, and the construction safety is very important. Generally, the construction administrative departments at all levels supervise the construction site by adopting a management mode of field inspection and telephone interview. However, the method has too much manpower and material resources, and cannot effectively monitor the safety of the construction site in real time. Therefore, at present, a video monitoring mode is adopted for a construction site, monitoring is only limited to a video picture, whether safety problems occur in the construction site can be roughly monitored, the construction site environment, vehicles and personnel cannot be monitored in multiple aspects, and the monitoring personnel cannot be warned before problems occur.
Disclosure of Invention
In order to solve the problem, the utility model provides a grid control management system supervises many-sided, the grid control management system of safe efficient.
In order to achieve the above object, the utility model adopts the following technical scheme: a gridding monitoring management system comprises a remote management end, a video monitoring system, a vehicle positioning monitoring system and a construction site supervision system; the remote management end comprises a control unit, a cloud database and a gridding monitoring screen; the video monitoring system comprises a video acquisition terminal which is arranged on a construction site and used for acquiring video information in the construction site, the video acquisition terminal transmits the collected video information to a cloud database through a control unit, and the control unit transmits the collected video information to a gridding monitoring screen; the vehicle positioning monitoring system comprises a GPS positioning device arranged on the vehicle and a vehicle camera device arranged on the vehicle; the output end of the GPS positioning device is connected with the input end of the control unit, and the output end of the control unit is connected with the input end of the cloud database; the output end of the vehicle camera device is connected with the input end of the control unit; the building site supervisory systems including locate the noise sensor of building site, locate the alarm broadcast unit of building site, locate the alarm display screen of building site, the noise sensor passes through the control unit with the noise information of gathering transmit to high in the clouds database, wherein the output of control unit is connected with the input of alarm display screen, and the control unit starts when the noise surpasss predetermined threshold value the alarm broadcast unit.
Furthermore, the construction site supervision system also comprises a dust sensor arranged on the construction site and a dust removal device arranged on the construction site; the raise dust sensor transmits the raise dust information of gathering the building site to the high in the clouds database through the control unit, and the raise dust exceeds preset threshold value the control unit starts dust collector sprays water smoke to the building site.
Further, building site supervisory systems still includes PM2.5 monitor, TSP particulate matter monitor, PM2.5 monitor and TSP particulate matter monitor all transmit the data of monitoring to the high in the clouds database through the control unit, just alarm display screen shows PM2.5 numerical value, the TSP particulate matter numerical value that corresponds.
Further, the alarm broadcasting unit is an audible and visual alarm.
Further, still include personnel's control management system, personnel's control management system is including setting up at the attendance unit of punching the card, personnel camera device, the attendance alarm unit of handling official business the entry, just the attendance unit of punching the card will correspond staff's information and transmit to high in the clouds database through the control unit, the portrait information that personnel camera device collected transmits to the high in the clouds database through the control unit, the output of the control unit is connected with the input of attendance alarm unit.
The beneficial effects of the utility model reside in that: the system is convenient for construction sites and construction administrative departments at all levels to realize remote real-time multi-aspect supervision without field investigation, and the management is efficient and convenient and can prevent potential safety hazards in time.
Drawings
Fig. 1 is a block diagram of a grid monitoring management system according to the present invention.
The reference numbers illustrate: 1. a remote management terminal; 11. a control unit; 12. a gridding monitoring screen; 13. a cloud database; 2. a video monitoring system; 21. a video acquisition terminal; 3. a vehicle positioning monitoring system; a GPS positioning device; 32. a vehicle camera device; 4. a worksite supervision system; 41. a dust sensor; 42. a dust removal device; a PM2.5 monitor; a TSP particulate matter monitor; 45. an alarm broadcasting unit; 46. an alarm display screen; 47. a noise sensor; 5. a personnel monitoring and management system; 51. a card swiping attendance unit; 52. a personnel camera device; 53. attendance alarm unit.
Detailed Description
Referring to fig. 1, the present invention relates to a grid monitoring management system, which includes a remote management terminal 1, a video monitoring system 2, a vehicle positioning monitoring system 3, and a construction site supervision system 4; the remote management terminal 1 comprises a control unit 11, a cloud database 13 and a gridding monitoring screen 12; the video monitoring system 2 comprises a video acquisition terminal 21 which is arranged on a construction site and used for acquiring video information in the construction site, the video acquisition terminal 21 transmits the collected video information to the cloud database 13 through the control unit 11, and the control unit 11 transmits the collected video information to the gridding monitoring screen 12; the vehicle positioning monitoring system 3 comprises a GPS positioning device 31 arranged on the vehicle and a vehicle camera device 32 arranged on the vehicle; the output end of the GPS positioning device 31 is connected with the input end of the control unit 11, and the output end of the control unit 11 is connected with the input end of the cloud database 13; the output end of the vehicle camera device 32 is connected with the input end of the control unit 11; the construction site supervision system 4 comprises a noise sensor 47 arranged on a construction site, an alarm broadcasting unit 45 arranged on the construction site and an alarm display screen 46 arranged on the construction site, wherein the noise sensor 47 transmits collected noise information to the cloud database 13 through the control unit 11, the output end of the control unit 11 is connected with the input end of the alarm display screen 46, and the alarm broadcasting unit 45 is started when noise exceeds a preset threshold value of the control unit 11.
The remote management terminal 1 is arranged in each level of construction units, such as a construction bureau, a construction company, a developer, a supervision company, a design unit and a labor company, and the remote management terminal 1 can be operated by each level of construction units through modes of simulating control equipment, a mouse, a keyboard, a cloud mirror and the like. Construction units at all levels can inquire and monitor the construction site management information through the remote management terminal 1.
The video acquisition terminal 21 is used for acquiring video information in a construction site. The video information includes vehicle information, site facility information, site road information, personnel information, and the like. The video information obtained by the video acquisition terminal 21 can be directly displayed on the gridding monitoring screen 12 of the remote management terminal 1, and can be displayed according to multiple pictures, and multiple positions of a construction site can be monitored simultaneously; the display can be circularly displayed in the same window according to a polling playing mode. The remote management terminal 1 can also set a cruising route of the camera device, and display video information according to the cruising route through the control unit 11; the real-time pictures shot by the video acquisition terminal 21 can be captured.
The vehicle positioning and monitoring system 3 comprises a GPS positioning device 31 and a vehicle camera device 32. A GPS positioning device 31 is placed on the vehicle. According to the site map information in the site geographic information system and the positioning of the vehicle by the positioning device, the remote management system can acquire the position information of the vehicle and store the position information of the vehicle in the cloud database 13. Once the remote management terminal 1 sends the query instruction, the cloud database 13 returns the location information to the remote management terminal 1, where the location information includes time, longitude, latitude, speed, direction, location mark, vehicle and terminal status, and the like. The vehicle trajectory unit may plot a vehicle-type trajectory based on the GPS positioning device 31 and the worksite geographic information system. Besides positioning, the GPS positioning device 31 can also prompt overspeed alarm information, so that fleet scheduling management is facilitated, and road safety is enhanced.
The construction site supervision system 4 comprises a noise sensor 47 arranged on a construction site, an alarm broadcasting unit 45 arranged on the construction site and an alarm display screen 46 arranged on the construction site, wherein the alarm display screen 46 is arranged on the construction site, when the noise information collected by the noise sensor 47 exceeds a preset threshold value, the control unit 11 starts the alarm broadcasting unit 45, and meanwhile, the alarm display screen 46 displays real-time noise information. The alarm broadcasting unit 45 and the alarm display screen 46 can also be used in conjunction with other systems, for example, once an error message occurs in the internal system of the worksite supervision system 4, the alarm broadcasting unit and the alarm display screen 46 can display the error message through a warning message; and the emergency abnormal situation is found, the alarm broadcasting unit 45 can inform the leaders and the staff of each management department through the alarm display screen 46; wherein the alarm broadcasting unit 45 is an acousto-optic alarm, and warns the construction site personnel or the management personnel at the remote management terminal 1 by using acousto-optic effect.
Further, the construction site supervision system 4 further comprises a dust sensor 41 arranged on the construction site, and a dust removing device 42 arranged on the construction site; raise dust sensor 41 will gather the raise dust information on building site and transmit to through control unit 11 high in the clouds database 13, raise dust surpasss predetermined threshold value control unit 11 and starts dust collector 42 sprays water smoke to the building site. The system also comprises a dust sensor 41, which is used for detecting whether the field dust exceeds the standard or not, and starting a dust removal device 42 when the field dust exceeds the standard, wherein if the field dust exceeds the standard, the water mist spraying device controls the dust by spraying water mist, so that the dust in the vehicle transportation process is prevented from polluting the urban environment and the health of workers;
further, building site supervisory systems 4 still includes PM2.5 monitor 43, TSP particulate matter monitor 44, PM2.5 monitor 43 and TSP particulate matter monitor 44 all transmit the data of monitoring to cloud database 13 through the control unit 11, just alarm display screen 46 shows corresponding PM2.5 numerical value, TSP particulate matter numerical value. The system also comprises a PM2.5 monitor 43 and a TSP particulate matter monitor 44 which respectively detect substances with different particle sizes. This be convenient for building site administrative department controls construction environment, and the environmental department's supervision of being convenient for.
Further, still include personnel control management system 5, personnel control management system 5 is including setting up at the attendance unit 51 of punching the card, personnel camera device 52, attendance alarm unit 53 of official working entry, just the attendance unit 51 of punching the card will correspond staff's information and transmit to high in the clouds database 13 through the control unit 11, the portrait information that personnel camera device 52 collected transmits to high in the clouds database 13 through the control unit 11, the output of the control unit 11 is connected with attendance alarm unit 53's input.
A card swiping attendance unit 51 is arranged at an entrance and an exit of a construction site, and personnel use a work card to swipe the card through the card swiping attendance unit 51. The personnel camera 52 is arranged in the attendance checking passage and takes and records the pictures of the personnel when the personnel pass by. For the personnel without the card or the personnel using the card to swipe the card, the personnel monitoring and management system 5 sends the violation information to the corresponding manager in the construction site. Meanwhile, the staff who has verified the identity utilizes the field of the construction site to be provided with the attendance alarm unit 53 equipment, the staff name is automatically broadcasted, and once the verification is wrong, the attendance alarm unit 53 gives an alarm.
The above embodiments are only for describing the preferred embodiments of the present invention, and are not intended to limit the scope of the present invention, and various modifications and improvements made by the technical solution of the present invention by those skilled in the art are all within the scope of the present invention as defined by the claims.

Claims (4)

1. A gridding monitoring management system is characterized in that: the system comprises a remote management terminal, a video monitoring system, a vehicle positioning monitoring system, a construction site supervision system and a personnel monitoring management system; the remote management end comprises a control unit, a cloud database and a gridding monitoring screen; the video monitoring system comprises a video acquisition terminal which is arranged on a construction site and used for acquiring video information in the construction site, the video acquisition terminal transmits the collected video information to a cloud database through a control unit, and the control unit transmits the collected video information to a gridding monitoring screen; the vehicle positioning monitoring system comprises a GPS positioning device arranged on the vehicle and a vehicle camera device arranged on the vehicle; the output end of the GPS positioning device is connected with the input end of the control unit, and the output end of the control unit is connected with the input end of the cloud database; the output end of the vehicle camera device is connected with the input end of the control unit; the construction site supervision system comprises a noise sensor arranged on a construction site, an alarm broadcasting unit arranged on the construction site and an alarm display screen arranged on the construction site, wherein the noise sensor transmits collected noise information to the cloud database through a control unit, the output end of the control unit is connected with the input end of the alarm display screen, and the control unit starts the alarm broadcasting unit when the noise exceeds a preset threshold value; personnel's control management system is including setting up at the attendance unit of punching the card, personnel camera device, attendance alarm unit of official working entry, just the attendance unit of punching the card will correspond staff's information and transmit to high in the clouds database through the control unit, the portrait information that personnel camera device collected transmits to high in the clouds database through the control unit, the output of the control unit is connected with the input of attendance alarm unit.
2. The gridding monitoring and management system according to claim 1, wherein the construction site supervision system further comprises a dust sensor arranged on a construction site, and a dust removing device arranged on the construction site; the raise dust sensor transmits the raise dust information of gathering the building site to the high in the clouds database through the control unit, and the raise dust exceeds preset threshold value the control unit starts dust collector sprays water smoke to the building site.
3. The grid monitoring and management system according to claim 1, wherein the site supervision system further comprises a PM2.5 monitor and a TSP particulate matter monitor, the PM2.5 monitor and the TSP particulate matter monitor transmit monitored data to a cloud database through a control unit, and the alarm display screen displays corresponding PM2.5 values and TSP particulate matter values.
4. The grid monitoring and management system according to claim 1, wherein the alarm broadcasting unit is an audible and visual alarm.
CN201921475455.3U 2019-09-05 2019-09-05 Gridding monitoring management system Expired - Fee Related CN211427131U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921475455.3U CN211427131U (en) 2019-09-05 2019-09-05 Gridding monitoring management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921475455.3U CN211427131U (en) 2019-09-05 2019-09-05 Gridding monitoring management system

Publications (1)

Publication Number Publication Date
CN211427131U true CN211427131U (en) 2020-09-04

Family

ID=72275347

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921475455.3U Expired - Fee Related CN211427131U (en) 2019-09-05 2019-09-05 Gridding monitoring management system

Country Status (1)

Country Link
CN (1) CN211427131U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113034756A (en) * 2021-02-26 2021-06-25 中国二冶集团有限公司 Engineering monitoring and management system based on 5G technology

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113034756A (en) * 2021-02-26 2021-06-25 中国二冶集团有限公司 Engineering monitoring and management system based on 5G technology

Similar Documents

Publication Publication Date Title
CN205281207U (en) Building site management system
CN111242574A (en) Intelligent site inspection management system and method based on GPS technology
CN113298444A (en) Private cloud-based intelligent power safety control platform
CN111569346B (en) Intelligent fire extinguisher remote monitoring and management system
CN112966903A (en) Dangerous chemical safety production risk monitoring and early warning system and method
CN110652684A (en) Electric fire safety integrated management system
CN110969405A (en) Mobile GIS-based forest protection positioning and attendance checking calculation method
CN112153345A (en) On-site intelligent anti-violation management and control platform based on 5G application operation
CN112232645A (en) Construction site management system
CN110796758A (en) Forest protection inspection method based on mobile GIS
KR20230004405A (en) Method and system for preventing serious disaster accidents
CN113935645A (en) High-risk operation management and control system and method based on identification analysis technology
CN113470346A (en) BIM-based municipal engineering traffic accident emergency processing method and device
CN114399265A (en) Electric power engineering construction project overall process management and control system
CN112819374A (en) System and method for risk management of railway bridge constructors
CN115271334A (en) Three-dimensional visual security management system
CN116993051A (en) Intelligent engineering supervision platform based on big data
CN211427131U (en) Gridding monitoring management system
CN110058196B (en) Position monitoring system for chemical plant
CN115759868A (en) Forest inspection personnel management method, intelligent terminal and storage medium
CN110738466A (en) kinds of park management system and method
CN115035249A (en) A visual real-time monitoring system that wisdom building site construction progress that is used for
CN219085499U (en) Automatic management and control system for tunnel construction
CN113295589B (en) Raise dust monitoring method, device and system
CN116502886A (en) Burn power plant wisdom security protection system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200904

Termination date: 20210905

CF01 Termination of patent right due to non-payment of annual fee