CN111507616A - Green building construction information management system - Google Patents

Green building construction information management system Download PDF

Info

Publication number
CN111507616A
CN111507616A CN202010296221.3A CN202010296221A CN111507616A CN 111507616 A CN111507616 A CN 111507616A CN 202010296221 A CN202010296221 A CN 202010296221A CN 111507616 A CN111507616 A CN 111507616A
Authority
CN
China
Prior art keywords
module
building
unit
electrically connected
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010296221.3A
Other languages
Chinese (zh)
Inventor
方静燕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Pengwei Software Co Ltd
Original Assignee
Jiangsu Pengwei Software Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Pengwei Software Co Ltd filed Critical Jiangsu Pengwei Software Co Ltd
Priority to CN202010296221.3A priority Critical patent/CN111507616A/en
Publication of CN111507616A publication Critical patent/CN111507616A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • G06Q50/26Government or public services

Abstract

The invention relates to a green building construction information management system which comprises an i5 processor and a building company recording system, wherein the output end of the i5 processor is electrically connected with an identity verification system, the output end of the identity verification system is electrically connected with a login module, and the output end of the login module is electrically connected with the building company recording system. According to the invention, through the arrangement of the building company recording system, the under-flag construction information module and the construction manager information module, the building company recording system is respectively and electrically connected with the under-flag construction information module and the construction manager information module in series, the whole building company recording system records and backups each building construction company, the follow-up accountability is ensured to be accurate through recording the building company, and the under-flag auxiliary construction team and the main constructors are recorded in the under-flag construction information module and the construction manager information module in detail.

Description

Green building construction information management system
Technical Field
The invention relates to the technical field of plastic building construction information management, in particular to a green building construction information management system.
Background
The green construction is an important stage in the whole life cycle of the building and is a key link for realizing resource saving, energy conservation and emission reduction in the building field. The green construction refers to the construction process of saving energy, land, water, materials and environment by scientific management and technical progress to the utmost extent and reducing construction activities which have negative influence on the environment under the premise of ensuring the basic requirements of quality, safety and the like in the engineering construction ("four sections and one environment protection"). The green construction is implemented, and the national, industrial and local relevant technical and economic policies are implemented according to the principle of local conditions. The green construction is the embodiment of the comprehensive application of the sustainable development concept in engineering construction, and the green construction not only means the implementation of closed construction in the engineering construction, no dust flying, no noise disturbing residents, the planting of flowers and grass around a construction site, the implementation of timed watering and the like, but also relates to various aspects of sustainable development, such as the ecological and environmental protection, the utilization of resources and energy, the social and economic development and the like.
The existing management system cannot effectively evaluate and compare construction sites in the management process, can be applied to construction sites in the green construction process, and accordingly green construction is difficult to implement, and high in accountability difficulty in the construction process and cannot be assigned to individuals.
Disclosure of Invention
The invention aims to provide a green building construction information management system to solve the problems that the existing management system proposed in the background art cannot effectively evaluate and compare construction sites in the management process, can be implemented to a construction site in the green construction process, causes difficulty in implementation of green construction, has high liability-difficulty in accountability in the construction process, and cannot be assigned to individuals.
In order to achieve the purpose, the invention provides the following technical scheme: a green building construction information management system comprises an i5 processor and a building company recording system, wherein the output end of the i5 processor is electrically connected with an identity verification system, the output end of the identity verification system is electrically connected with a login module, the output end of the login module is electrically connected with the building company recording system, the output end of the building company recording system is respectively and electrically connected with a flag construction information module and a construction manager information module, the output end of the i5 processor is electrically connected with a green construction system, the output end of the green construction system is electrically connected with an information distribution system, the output end of the information distribution system is respectively and electrically connected with a personnel safety module, a production equipment module, a building resource management module and a building pollution measure module, the output ends of the personnel safety module, the production equipment module, the building resource management module and the building pollution measure module are electrically connected with an integration terminal, the output end of the integration terminal is electrically connected with the release terminal, the output end of the information distribution system is electrically connected with the scoring system, the output end of the scoring system is electrically connected with the rechecking module, the output end of the rechecking module is electrically connected with the information determination unit, the information refilling unit and the information deleting unit respectively, the output end of the integration terminal is electrically connected with the sorting module, the output end of the sorting module is electrically connected with the statistical system, and the output end of the statistical system is electrically connected with the credit evaluation system.
Preferably, the building company recording system is electrically connected in series with the under-flag construction information module and the construction manager information module, respectively.
Preferably, the information distribution system is electrically connected in parallel with the personnel safety module, the production equipment module, the building resource management module and the building pollution measure module respectively, and the personnel safety module, the production equipment module, the building resource management module and the building pollution measure module are electrically connected in series.
Preferably, the building resource management module comprises a water resource management unit, a concrete management unit and a building material management unit, and the output end of the building resource management module is electrically connected with the water resource management unit, the concrete management unit and the building material management unit respectively.
Preferably, the building resource management module is electrically connected with the water resource management unit, the concrete management unit and the building material management unit in parallel, and the water resource management unit, the concrete management unit and the building material management unit are electrically connected in series.
Preferably, the building pollution measure module comprises a dust emission measure unit, a solid waste management unit, a light pollution measure unit and a construction noise control unit, and the output end of the building pollution measure module is electrically connected with the dust emission measure unit, the solid waste management unit, the light pollution measure unit and the construction noise control unit respectively.
Preferably, the building pollution measure module is electrically connected with the raise dust control measure unit, the solid waste management unit, the light pollution control measure unit and the construction noise control unit in parallel, and the raise dust control measure unit, the solid waste management unit, the light pollution control measure unit and the construction noise control unit are electrically connected in series.
Preferably, the rechecking module is electrically connected with the information determining unit, the information refilling unit and the information deleting unit in parallel, and the information determining unit, the information refilling unit and the information deleting unit are electrically connected in series.
Preferably, the scoring system is electrically connected in series with the publishing terminal through the integrating terminal, and the integrating terminal is electrically connected in series with the counting system through the sorting module.
Compared with the prior art, the invention has the following beneficial effects:
1. according to the invention, through the arrangement of the building company recording system, the under-flag construction information module and the construction manager information module, the building company recording system is respectively and electrically connected with the under-flag construction information module and the construction manager information module in series, the whole building company recording system records and backups each building construction company, the follow-up accountability is ensured to be accurate through recording the building company, and the company under-flag subsidiary construction team and the main constructors are recorded in the under-flag construction information module and the construction manager information module in detail, once the green unqualified building and the unqualified building occur, departments and individuals can be accurately accountable, so that the monitoring requirements and the criteria of green building construction are met.
2. The invention relates to a construction safety evaluation system, which is characterized in that through the arrangement of an information distribution system, a personnel safety module, a production equipment module, a building resource management module and a building pollution measure module, the information distribution system is respectively and electrically connected with the personnel safety module, the production equipment module, the building resource management module and the building pollution measure module in parallel, and the personnel safety module, the production equipment module, the building resource management module and the building pollution measure module are electrically connected in series, in green building construction, the life safety of constructors can be observed and evaluated by detectors, wherein the construction safety is extremely important in building construction, the constructors are required to wear safety helmets, construction labor protection clothes and the like, the energy consumption of each equipment is arranged in the production equipment module, and the energy consumption is reduced when the normal operation of the equipment is ensured, and the building resource management module, the building resources comprise water resources, concrete, building materials and the like, and all the resources are recorded, so that the building resource management module can integrally control the building materials, and the possibility of reducing resource waste is achieved.
3. The invention arranges a building resource management module, a water resource management unit, a concrete management unit and a building material management unit, wherein the building resource management module comprises a water resource management unit, a concrete management unit and a building material management unit, the output end of the building resource management module is respectively and electrically connected with a water resource management unit, a concrete management unit and a building material management unit, the building resource management module is electrically connected with the water resource management unit, the concrete management unit and the building material management unit in parallel, and the water resource management unit, the concrete management unit and the building material management unit are electrically connected in series, the whole water resource management unit, the concrete management unit and the building material management unit respectively correspond to water resources, concrete resources and building material resources, and the construction site can manage resources such as raw materials, water and the like from the following aspects: using a material containing renewable components; establishing a waste recovery system on a construction site, and performing classified collection, storage and recycling on waste materials; the installation of water-saving small-flow equipment and appliances reduces the water consumption during construction; a rainwater and sewage collection and sedimentation treatment tank is arranged on site, and the treated rainwater and sewage are used for washing vehicles, dust fall, irrigation and the like; effectively utilizing the underground precipitation in the foundation construction stage; and installing the water meter on site and monitoring the water consumption.
4. The invention adopts the arrangement of a building pollution measure module, a dust emission control measure unit, a solid waste management unit, a light pollution control measure unit and a construction noise control unit, wherein the building pollution measure module comprises the dust emission control measure unit, the solid waste management unit, the light pollution control measure unit and the construction noise control unit, the output end of the building pollution measure module is respectively and electrically connected with the dust emission control measure unit, the solid waste management unit, the light pollution control measure unit and the construction noise control unit, the building pollution measure module, the dust emission control measure unit, the solid waste management unit, the light pollution control measure unit and the construction noise control unit are electrically connected in parallel, the dust emission control measure unit, the solid waste management unit, the light pollution control measure unit and the construction noise control unit are electrically connected in series, and in the construction process, the device comprises a dust control measure unit, a solid waste management unit, a light pollution control measure unit, a measure unit and a construction noise control unit, wherein the dust control measure unit is used for judging whether a dust screen and a dust protection measure are installed on a construction site or not, the solid waste management unit is used for judging whether solid waste can be collected and transported in a centralized mode in the construction process or not, the light pollution control measure unit is used for judging whether bright light emitted by electric appliance welding is eliminated or reduced in the construction process or not, the measure unit is used for judging whether shielding equipment such as a fence is installed or not, whether low-noise equipment production.
5. The invention is characterized in that the grading system, the integrating terminal and the publishing terminal are arranged, the grading system is electrically connected with the publishing terminal in series through the integrating terminal, the integrating terminal is electrically connected with the statistical system in series through the sequencing module, the whole grading system is used for grading problems of a personnel safety module, a production equipment module, a building resource management module and a building pollution measure module in construction, when an operator fails to accurately wear safety operation, the construction site is graded, the personnel safety score is plus or minus score, the production equipment energy consumption score is plus or minus score, the building pollution measure score is plus or minus score, wherein the building pollution measure has four items, each of the occupying score and the building resource greening resource score are plus or minus score, wherein the greening resource has a common term, each occupying score is used for carrying out score comparison record on the construction site through the grading system, when the scores are too low, the person can be asked for duty, green construction can be well guaranteed, the scores are arranged through the integration terminal and uploaded to a company webpage through the publishing terminal, and the person paying attention to the house can conveniently watch the scores in real time, so that construction conditions can be met.
Drawings
FIG. 1 is a system diagram of a green building construction information management system according to the present invention;
FIG. 2 is a schematic diagram of a building resource management module system of a green building construction information management system according to the present invention;
FIG. 3 is a system diagram of a building pollution measure module of the green building construction information management system of the present invention;
fig. 4 is a statistical schematic diagram of a scoring system of the green building construction information management system of the present invention.
In the figure: 1. an i5 processor; 2. an identity verification system; 3. a login module; 4. a building company record system; 5. a flag construction information module; 6. a construction manager information module; 7. a green construction system; 8. an information distribution system; 9. a personnel safety module; 10. a production equipment module; 11. a building resource management module; 1101. a water resource management unit; 1102. a concrete management unit; 1103. a building material management unit; 12. a building pollution measure module; 1201. a dust control measure unit; 1202. a solid waste management unit; 1203. a light pollution treatment measure unit; 1204. a construction noise control unit; 13. a scoring system; 14. a rechecking module; 15. an information determination unit; 16. an information refill unit; 17. an information deleting unit; 18. integrating the terminals; 19. a release terminal; 20. a sorting module; 21. a statistical system; 22. and a reputation evaluation system.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides a technical solution: a green building construction information management system comprises an i5 processor 1, an identity verification system 2, a login module 3, a building company recording system 4, a flag construction information module 5, a construction manager information module 6, a green construction system 7, an information distribution system 8, a personnel safety module 9, a production equipment module 10, a building resource management module 11, a water resource management unit 1101, a concrete management unit 1102, a building material management unit 1103, a building pollution measure module 12, a raise dust control measure unit 1201, a solid waste management unit 1202, a light pollution control measure unit 1203, a construction noise control unit 1204, a grading system 13, a rechecking module 14, an information determination unit 15, an information rechecking unit 16, an information deletion unit 17, an integration terminal 18, a release terminal 19, a sequencing module 20, a statistical system 21 and a credit evaluation system 22, wherein the output end of the i5 processor 1 is electrically connected with the identity verification system 2, the output end of the identity verification system 2 is electrically connected with a login module 3, the output end of the login module 3 is electrically connected with a building company recording system 4, the output end of the building company recording system 4 is respectively and electrically connected with a flag construction information module 5 and a construction manager information module 6, the output end of the i5 processor 1 is electrically connected with a green construction system 7, the output end of the green construction system 7 is electrically connected with an information distribution system 8, the output end of the information distribution system 8 is respectively and electrically connected with a personnel safety module 9, a production equipment module 10, a building resource management module 11 and a building pollution measure module 12, the output ends of the personnel safety module 9, the production equipment module 10, the building resource management module 11 and the building pollution measure module 12 are electrically connected with an integration terminal 18, and the output end of the integration terminal 18 is electrically connected with a release terminal 19, the output end of the information distribution system 8 is electrically connected with a scoring system 13, the output end of the scoring system 13 is electrically connected with a rechecking module 14, the output end of the rechecking module 14 is respectively electrically connected with an information determination unit 15, an information rechecking unit 16 and an information deleting unit 17, the output end of the integration terminal 18 is electrically connected with a sorting module 20, the output end of the sorting module 20 is electrically connected with a statistical system 21, and the output end of the statistical system 21 is electrically connected with a credit evaluation system 22.
In the invention, a building company recording system 4 is respectively connected with an under-flag construction information module 5 and a construction manager information module 6 in series electrically, the whole building company recording system 4 records and backups each building construction company, the follow-up accountability is ensured to be accurate by recording the building company, and an affiliated construction team and a main constructor under the flag of the company are recorded in the under-flag construction information module 5 and the construction manager information module 6 in detail, once green unqualified buildings and unqualified buildings occur, departments and individuals can be accurately accountable, and the monitoring requirements and the criteria of green building construction are met.
The information distribution system 8 is respectively electrically connected with the personnel safety module 9, the production equipment module 10, the building resource management module 11 and the building pollution measure module 12 in parallel, and the personnel safety module 9, the production equipment module 10, the building resource management module 11 and the building pollution measure module 12 are electrically connected in series, in the green building construction, the life safety of constructors can be watched and graded by detectors, wherein the construction safety is important in the building construction, and the constructors are required to wear safety helmets, construction labor protection clothes and the like, wherein the energy consumption of each equipment is arranged in the production equipment module 10, the energy consumption is reduced when the normal operation of the equipment is ensured, and the building resource management module 11 records each resource, so that the building resource management module 11 controls the whole building material resource, the possibility of reducing resource waste is achieved.
The building resource management module 11 comprises a water resource management unit 1101, a concrete management unit 1102 and a building material management unit 1103, the output end of the building resource management module 11 is respectively and electrically connected with the water resource management unit 1101, the concrete management unit 1102 and the building material management unit 1103, the building resource management module 11 is electrically connected with the water resource management unit 1101, the concrete management unit 1102 and the building material management unit 1103 in parallel, the water resource management unit 1101, the concrete management unit 1102 and the building material management unit 1103 are electrically connected in series, the whole water resource management unit 1101, the concrete management unit 1102 and the building material management unit 1103 respectively correspond to water resources, concrete resources and building material resources, and resources such as raw materials and water can be managed on a construction site from the following aspects that materials containing renewable components are used; establishing a waste recovery system on a construction site, and performing classified collection, storage and recycling on waste materials; the installation of water-saving small-flow equipment and appliances reduces the water consumption during construction; a rainwater and sewage collection and sedimentation treatment tank is arranged on site, and the treated rainwater and sewage are used for washing vehicles, dust fall, irrigation and the like; effectively utilizing the underground precipitation in the foundation construction stage; and installing the water meter on site and monitoring the water consumption.
The building pollution measure module 12 comprises a raise dust treatment measure unit 1201, a solid waste management unit 1202, a light pollution treatment measure unit 1203 and a construction noise control unit 1204, the output end of the building pollution measure module 12 is respectively and electrically connected with the raise dust treatment measure unit 1201, the solid waste management unit 1202, the light pollution treatment measure unit 1203 and the construction noise control unit 1204, the building pollution measure module 12 is electrically connected with the raise dust treatment measure unit 1201, the solid waste management unit 1202, the light pollution treatment measure unit 1203 and the construction noise control unit 1204 in parallel, the raise dust treatment measure unit 1201, the solid waste management unit 1202, the light pollution treatment measure unit 1203 and the construction noise control unit 1204 are electrically connected in series, during the construction process, the raise dust treatment measure unit 1201 is provided with a dust screen and a raise dust protection measure on the construction site, and the solid waste management unit 1202, whether solid waste can be collected and transported in a centralized mode in the construction process, whether bright light emitted by electric appliance welding is eliminated and reduced in construction or not is judged by a light pollution treatment measure unit 1203, whether shielding equipment such as a fence is installed or not is judged by measures, whether low-noise equipment production can be achieved or not is judged by a construction noise control unit 1204, and whether low noise can be detected and managed or not is judged.
The rechecking module 14 is electrically connected with the information determining unit 15, the information rechecking unit 16 and the information deleting unit 17 in parallel, and the information determining unit 15, the information rechecking unit 16 and the information deleting unit 17 are electrically connected in series, when a detection worker transmits data into the scoring system 13, the rechecking module 14 examines, approves and determines the information, modifies and examines the information, and ensures that the data can be accurately used without obvious dislocation.
The scoring system 13 is electrically connected in series with the release terminal 19 through the integration terminal 18, the integration terminal 18 is electrically connected in series with the statistical system 21 through the sequencing module 20, the whole scoring system 13 is used for scoring problems occurring in construction of the personnel safety module 9, the production equipment module 10, the building resource management module 11 and the building pollution measure module 12, when an operator fails to accurately wear safety operation, the construction site is scored, the personnel safety score is plus or minus 20 points, the production equipment energy consumption score is plus or minus 20 points, the building pollution measure score is plus or minus 20 points, wherein the building pollution measures account for four items, each item accounts for 5 points, the building resource greening resource score is plus or minus 15 points, wherein the greening resources account for 3 items, each item accounts for 5 points, the construction site is scored and compared and recorded through the scoring system 13, when the scores are too low, the person can ask for responsibility, green construction can be well guaranteed, the scores are arranged through the integration terminal 18 and uploaded to a company webpage through the publishing terminal 19, and the person paying attention to the house can conveniently watch the scores in real time, so that construction conditions can be met.
The working principle of the embodiment is as follows: the green building construction information management system is characterized in that an inspector checks and logs in the identity of an individual through a login module 3 when the green building construction information management system is used, the inspector checks specific information of an inspection company through a building company recording system 4 at the moment, the whole building company recording system 4 records and backups each building construction company, the subsequent accountability is guaranteed to be accurate through recording the building company, an affiliated construction team and a main constructor are under the flag of the company and recorded in a detailed mode in an under-flag construction information module 5 and a construction manager information module 6, once the green building is unqualified and the construction is unqualified, departments and individuals can be accurately accountable to achieve monitoring requirements and the criteria of green building construction, and then in the green building construction, the life safety of the constructor can be watched and scored through a detector, wherein the construction safety is extremely important in the building construction, the personnel is required to wear safety helmets, construction labor protection clothes and the like, wherein the energy consumption of each device is arranged in the production equipment module 10, the energy consumption is reduced when the normal operation of the device is ensured, and the building resource management module 11 is used for recording each resource, wherein the building resources comprise water resources, concrete, building materials and the like, so that the building resource management module 11 can integrally control the building resources, the possibility of reducing the resource waste is reduced, in the construction process, the raise dust treatment measure unit 1201 is used for judging whether a dustproof net and a raise dust protection measure are installed on the construction site, the solid waste management unit 1202 is used for judging whether the solid waste can be collected and transported in a centralized way in the construction process, the light pollution treatment measure unit 1203 is used for judging whether the bright light emitted by electric appliance welding is eliminated and reduced in the construction process, wherein the measures are used for judging whether a barrier device such as a fence and the like is installed, and the, whether the production of low-noise equipment can be achieved or not, and whether the low noise can be detected and managed, and the whole scoring system 13 scores the problems of the personnel safety module 9, the production equipment module 10, the building resource management module 11 and the building pollution measure module 12 in construction, wherein when the safety operation cannot be accurately worn by an operator, the construction site is scored, the personnel safety score is plus or minus 20 points, the production equipment energy consumption score is plus or minus 20 points, and the building pollution measure score is plus or minus 20 points, wherein the building pollution measures are totally four items, each item occupies 5 points, the building resource greening resource score is plus or minus 15 points, wherein the greening resources are totally 3 items, each item occupies 5 points, the construction site is scored and recorded through the scoring system 13, and when the score is too low, green construction can be well guaranteed, the scores are arranged through the integration terminal 18 and uploaded to a company webpage through the release terminal 19, so that the house buyer can conveniently watch the scores in real time, and the construction condition is convenient.
Although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that various changes in the embodiments and/or modifications of the invention can be made, and equivalents and modifications of some features of the invention can be made without departing from the spirit and scope of the invention.

Claims (9)

1. A green building construction information management system comprising an i5 processor (1) and a building company recording system (4), characterized in that: the output electric connection of i5 treater (1) has identity verification system (2), and the output electric connection of identity verification system (2) has login module (3), the output electric connection of login module (3) has building company record system (4), and the output of building company record system (4) electric connection respectively has under-flag construction information module (5) and construction manager information module (6), the output electric connection of i5 treater (1) has green construction system (7), and the output electric connection of green construction system (7) has information distribution system (8), the output of information distribution system (8) electric connection respectively has personnel safety module (9), production equipment module (10), building resource management module (11) and building pollution measures module (12), personnel safety module (9), The output ends of the production equipment module (10), the building resource management module (11) and the building pollution measure module (12) are electrically connected with an integration terminal (18), the output end of the integration terminal (18) is electrically connected with a release terminal (19), the output end of the information distribution system (8) is electrically connected with a scoring system (13), the output end of the scoring system (13) is electrically connected with a rechecking module (14), the output end of the rechecking module (14) is respectively and electrically connected with an information determining unit (15), an information rechecking unit (16) and an information deleting unit (17), the output end of the integration terminal (18) is electrically connected with a sequencing module (20), the output end of the sorting module (20) is electrically connected with a statistical system (21), the output end of the statistical system (21) is electrically connected with a credit evaluation system (22).
2. The green building construction information management system according to claim 1, wherein: the building company recording system (4) is electrically connected in series with the under-flag construction information module (5) and the construction manager information module (6) respectively.
3. The green building construction information management system according to claim 1, wherein: the information distribution system (8) is electrically connected with the personnel safety module (9), the production equipment module (10), the building resource management module (11) and the building pollution measure module (12) in parallel, and the personnel safety module (9), the production equipment module (10), the building resource management module (11) and the building pollution measure module (12) are electrically connected in series.
4. The green building construction information management system according to claim 1, wherein: the building resource management module (11) comprises a water resource management unit (1101), a concrete management unit (1102) and a building material management unit (1103), and the output end of the building resource management module (11) is respectively and electrically connected with the water resource management unit (1101), the concrete management unit (1102) and the building material management unit (1103).
5. The green building construction information management system according to claim 4, wherein: the building resource management module (11) is electrically connected with the water resource management unit (1101), the concrete management unit (1102) and the building material management unit (1103) in parallel, and the water resource management unit (1101), the concrete management unit (1102) and the building material management unit (1103) are electrically connected in series.
6. The green building construction information management system according to claim 1, wherein: the building pollution measure module (12) comprises a raise dust treatment measure unit (1201), a solid waste management unit (1202), a light pollution treatment measure unit (1203) and a construction noise control unit (1204), and the output end of the building pollution measure module (12) is respectively and electrically connected with the raise dust treatment measure unit (1201), the solid waste management unit (1202), the light pollution treatment measure unit (1203) and the construction noise control unit (1204).
7. The green building construction information management system according to claim 6, wherein: the building pollution measure module (12) is electrically connected with the raise dust control measure unit (1201), the solid waste management unit (1202), the light pollution control measure unit (1203) and the construction noise control unit (1204) in parallel, and the raise dust control measure unit (1201), the solid waste management unit (1202), the light pollution control measure unit (1203) and the construction noise control unit (1204) are electrically connected in series.
8. The green building construction information management system according to claim 1, wherein: the rechecking module (14) is electrically connected with the information determining unit (15), the information rechecking unit (16) and the information deleting unit (17) in parallel, and the information determining unit (15), the information rechecking unit (16) and the information deleting unit (17) are electrically connected in series.
9. The green building construction information management system according to claim 1, wherein: the scoring system (13) is electrically connected in series with the publishing terminal (19) through the integration terminal (18), and the integration terminal (18) is electrically connected in series with the statistical system (21) through the sorting module (20).
CN202010296221.3A 2020-04-15 2020-04-15 Green building construction information management system Pending CN111507616A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010296221.3A CN111507616A (en) 2020-04-15 2020-04-15 Green building construction information management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010296221.3A CN111507616A (en) 2020-04-15 2020-04-15 Green building construction information management system

Publications (1)

Publication Number Publication Date
CN111507616A true CN111507616A (en) 2020-08-07

Family

ID=71876083

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010296221.3A Pending CN111507616A (en) 2020-04-15 2020-04-15 Green building construction information management system

Country Status (1)

Country Link
CN (1) CN111507616A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113610485A (en) * 2021-07-02 2021-11-05 深圳供电局有限公司 Work supervision method, system, electronic device and storage medium

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106780159A (en) * 2016-12-08 2017-05-31 东莞华南设计创新院 A kind of construction information management system
CN110910094A (en) * 2019-11-26 2020-03-24 中国石油集团西部钻探工程有限公司 Oil field construction site information management system and method
CN110969013A (en) * 2019-11-25 2020-04-07 东莞理工学院 Big data analysis data collection system with detection structure

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106780159A (en) * 2016-12-08 2017-05-31 东莞华南设计创新院 A kind of construction information management system
CN110969013A (en) * 2019-11-25 2020-04-07 东莞理工学院 Big data analysis data collection system with detection structure
CN110910094A (en) * 2019-11-26 2020-03-24 中国石油集团西部钻探工程有限公司 Oil field construction site information management system and method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113610485A (en) * 2021-07-02 2021-11-05 深圳供电局有限公司 Work supervision method, system, electronic device and storage medium

Similar Documents

Publication Publication Date Title
CN103268115B (en) Electric power demand side supervisory system and method for supervising
CN103578039B (en) A kind of power networks risk prewarning analysis system
CN106774322A (en) A kind of photovoltaic plant cruising inspection system and its operation method
CN103500423A (en) Case adaptation and decision method for power emergency events
CN206077596U (en) A kind of urban flooding monitors scheduling system on-line
CN107368951A (en) A kind of power grid enterprises' technological transformation Overhaul Quality management and control honesty Warning System and its operation method
CN108170073B (en) Intelligent photovoltaic cloud platform
CN103953393A (en) Mine ventilation system partitioning stabilized dynamic monitoring and pre-warning system
CN115099677B (en) Tailing pond safety production risk grading early warning method
CN104601657A (en) Park green ecological index online publishing system and implementation method thereof
CN105354613A (en) Distributed photovoltaic operation and maintenance mode selection system
CN104281983A (en) Method and system for dispatching resources needed by emergency repair of power distribution network
CN106786549A (en) A kind of comprehensive benefit analysis method based on intelligent distribution network cost-benefit model
CN207379530U (en) A kind of composite monitoring device based on electric force pole tower
CN112132451A (en) Platform is built fast to industrial park integrated management system
CN111507616A (en) Green building construction information management system
CN116307673A (en) Underground pipe network interaction risk early warning system for urban lifeline
CN108062603A (en) Based on distribution power automation terminal life period of an equipment life-span prediction method and system
CN113191542A (en) Wisdom environmental protection carbon emission management service platform
CN108196493A (en) A kind of wisdom water utilities control system and method based on cloud platform
CN111240256A (en) Building engineering on-site monitoring management system
CN115392748B (en) Intelligent water service system for realizing fine management of water taking process of coal mine
CN106410847A (en) Regional regulation and control interaction terminal and method for distributed photovoltaic
CN104408852A (en) Power distribution transformer antitheft auxiliary judgment method utilizing onsite acquisition and communication technology
Rongrong et al. Application of intelligent safety supervision based on artificial intelligence technology

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20200807