CN106780159A - A kind of construction information management system - Google Patents
A kind of construction information management system Download PDFInfo
- Publication number
- CN106780159A CN106780159A CN201611123965.5A CN201611123965A CN106780159A CN 106780159 A CN106780159 A CN 106780159A CN 201611123965 A CN201611123965 A CN 201611123965A CN 106780159 A CN106780159 A CN 106780159A
- Authority
- CN
- China
- Prior art keywords
- construction
- manpower
- unit
- module
- management module
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06311—Scheduling, planning or task assignment for a person or group
- G06Q10/063112—Skill-based matching of a person or a group to a task
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06311—Scheduling, planning or task assignment for a person or group
- G06Q10/063114—Status monitoring or status determination for a person or group
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06311—Scheduling, planning or task assignment for a person or group
- G06Q10/063116—Schedule adjustment for a person or group
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
Abstract
The invention discloses a kind of construction information management system, including manpower management module, construction management module, construction dispatching module, construction application server and memory module, construction application server respectively with manpower management module, construction management module, construction dispatching module and memory module are connected, memory module respectively with manpower management module, construction management module and construction dispatching module are connected, manpower management module includes manpower attendance record unit, Material Transportation manpower unit, building site stores manpower unit, implement manpower unit and logistics service manpower unit in building site, manpower attendance record unit is used to record the situation of turning out for work of workmen, Material Transportation manpower unit is used to record and distribute construction material conveying people.The present invention will construction internal resource it is information-based, the construction content of reasonable distribution workmen improves the operating efficiency of workmen, it is to avoid the situation generation that delays of construction link delays work, and improves the overall progress of construction.
Description
Technical field
The present invention relates to management system technical field, more particularly to a kind of construction information management system.
Background technology
Informationization refers to new productivity of the intelligent instrument of culture, development based on computer as representative, and is allowed to make
Good fortune is in the historical process of society.(intelligent instrument is also known as the information-based tool of production.It must typically possess acquisition of information, letter
Breath transmission, information processing, information regeneration, the function of Information Pull.) productivity adaptable with intelligent instrument, referred to as information
Metaplasia force of labor.As information-based is continued to develop, increasingly increase in the application of all trades and professions, in the daily management of construction particularly
It is prominent, especially at large-scale site construction scene, because the personnel at site construction scene are numerous, live goods and materials are chaotic, set
Standby performance is inconsistent, is arranged by manual site, time-consuming more long, is easy to the situation for station skewness weighing apparatus occur, makes goods and materials
Not in time, each working link progress is inconsistent for scheduling, has a strong impact on the integral construction progress at scene, and a kind of construction is needed for this
KXG.
The content of the invention
The invention aims to solve shortcoming present in prior art, and a kind of construction informationization for proposing is managed
System.
To achieve these goals, present invention employs following technical scheme:
A kind of construction information management system, including manpower management module, construction management module, construction dispatching module, apply
Work application server and memory module, the construction application server respectively with manpower management module, construction management module, construction
Scheduler module and memory module are connected, the memory module respectively with manpower management module, construction management module and construction dispatching
Module is connected.
Preferably, the manpower management module includes manpower attendance record unit, Material Transportation manpower unit, building site storage
Manpower unit, building site implement manpower unit and logistics service manpower unit, and the manpower attendance record unit is used to record constructs
The situation of turning out for work of personnel, the Material Transportation manpower unit is used to record and distribute construction material conveying people, and the building site is deposited
Storage manpower unit is used to record and distribute live goods and materials watchman, and manpower unit is implemented in the building site to be used to record and distribute work
Implement personnel on ground, and the logistics service manpower unit is used to recording and distributing construction logistics service personnel.
Preferably, the construction management module includes construction plan unit, construction procurement unit, implementation unit of constructing, applies
The work later stage checks and accepts unit and job site monitoring unit, and the construction plan unit is used for the preconsolidation stress to whole construction, bag
Scheduling, construction procurement plan, field operation construction and the construction later stage for including personnel check and accept, and the construction procurement unit is used for
Building site uses the buying of raw material and instrument, and the construction implementation unit is used for the specific job content distribution of building-site, described
The examination that the construction later stage is checked and accepted after the completion of unit is used for site construction, the field monitor unit is used to monitor the work of job site
Industry situation.
Preferably, the construction dispatching module includes construction manpower scheduler module and construction speed scheduler module, described to apply
Workman's power scheduler module is used for the arrangement of Material Transportation, site operation personnel, goods and materials storage watchman and rear service personnel, described
Construction speed scheduler module is used for the formulation of construction plan, shopping list formulation, the distribution of Contraction in Site task, later stage examination
Follow-up and the monitoring of field operation progress.
Preferably, the construction application server be used for process manpower management module attendance and classification information and
The construction content of construction management module, the memory module is used to store the attendance for the treatment of manpower management module and classification is believed
The construction content of breath and construction management module.
Beneficial effects of the present invention:
1st, the manpower management module by setting carries out Classification Management to site operation personnel, and by site operation personnel's
Information carries out digitization, the information unification scheduling according to field workmen, realizes the real-time management scheduling of a workmen, keeps away
Personal scheduling is exempted from not in time, the irrational situation of post arrangement;
2nd, by the construction management module for setting, planning management is carried out to current process, construction content information is carried out
Digitization, facilitates personnel to check current site operation progress, is easy to administrative staff to the construction speed at scene and the pipe of goods and materials
Reason;
3rd, by the construction dispatching module for setting, construction speed, resource and manpower management according to construction management module
The human resource information of inside modules, to live reasonable distribution workmen and the distribution of materials, improve personnel operating efficiency and
The overall progress of construction.
Brief description of the drawings
Fig. 1 is a kind of structural representation of construction information management system proposed by the present invention.
Specific embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete
Site preparation is described, it is clear that described embodiment is only a part of embodiment of the invention, rather than whole embodiments.
Reference picture 1, a kind of construction information management system, including manpower management module, construction management module, construction dispatching
Module, construction application server and memory module, construction application server respectively with manpower management module, construction management module,
Construction dispatching module and memory module are connected, memory module respectively with manpower management module, construction management module and construction dispatching
Module is connected, manpower management module include manpower attendance record unit, Material Transportation manpower unit, building site storage manpower unit,
Manpower unit and logistics service manpower unit are implemented in building site, and manpower attendance record unit is used to record the shape of turning out for work of workmen
Condition, Material Transportation manpower unit is used to record and distribute construction material conveying people, building site storage manpower unit be used to recording and
The live goods and materials watchman of distribution, manpower unit is implemented in building site to be used to recording and distributing building site implementation personnel, logistics service manpower
Unit be used for record and distribute construction logistics service personnel, construction management module include construction plan unit, construction procurement unit,
Construction implementation unit, construction later stage check and accept unit and job site monitoring unit, and construction plan unit is used for whole construction
Preconsolidation stress, including the scheduling of personnel, construction procurement plan, field operation construction and construction later stage check and accept, construction procurement
Unit is used for buying of the building site using raw material and instrument, and construction implementation unit is used for the specific job content distribution of building-site,
The examination that the construction later stage is checked and accepted after the completion of unit is used for site construction, field monitor unit is used to monitor the operation feelings of job site
Condition, construction dispatching module includes construction manpower scheduler module and construction speed scheduler module, and construction manpower scheduler module is used for thing
The arrangement of money transport, site operation personnel, goods and materials storage watchman and rear service personnel, construction speed scheduler module is used to construct
The formulation of plan, shopping list are formulated, Contraction in Site task is distributed, the later stage checks and accepts follow-up and field operation progress prison
Depending on construction application server is used to process the attendance and classification information of manpower management module and applying for construction management module
Work content, memory module is used to storing the attendance and classification information and construction management module for the treatment of manpower management module
Construction content.
In the present invention, manpower management module is classified the personnel inside constructing according to job category, and personnel are divided into
Material Transportation, goods and materials storage management, building site design, building site are implemented and post-service personnel, and record the feelings of turning out for work of current persons
Current personal information is please uploaded to construction application server and memory module by condition, and whole workmen is carried out into digitization pipe
Reason;Current construction construction is planned, a complete project under construction is divided into buying construction, is set by construction management module
Meter construction, site are implemented and post-service construction, and the construction task of segmentation are uploaded into construction application server and are deposited
Storage module, digitization is carried out by construction content;At this time workmen's information is carried out classification treatment by construction application server, knot
Attendance situation and having planned for task are closed, the personnel inside construction are scheduled, rationally utilize workmen and resource,
Construction speed is tracked, the design will construct, and internal resource is information-based, and the construction content of reasonable distribution workmen is improved
The operating efficiency of workmen, it is to avoid the situation that the delay of construction link delays work occurs, and improves the overall progress of construction.
The above, the only present invention preferably specific embodiment, but protection scope of the present invention is not limited thereto,
Any one skilled in the art the invention discloses technical scope in, technology according to the present invention scheme and its
Inventive concept is subject to equivalent or change, should all be included within the scope of the present invention.
Claims (5)
1. a kind of construction information management system, including manpower management module, construction management module, construction dispatching module, construction
Application server and memory module, it is characterised in that:The construction application server respectively with manpower management module, construction management
Module, construction dispatching module and memory module connection, the memory module respectively with manpower management module, construction management module and
Construction dispatching module is connected.
2. a kind of construction information management system according to claim 1, it is characterised in that the manpower management module bag
Include manpower attendance record unit, Material Transportation manpower unit, building site storage manpower unit, building site and implement manpower unit and logistics clothes
Business manpower unit, the manpower attendance record unit is used to record the situation of turning out for work of workmen, the Material Transportation manpower list
For recording and distributing construction material conveying people, the building site storage manpower unit is used to record and distribute live goods and materials to see for unit
Pipe personnel, manpower unit is implemented in the building site to be used to recording and distributing building site implementation personnel, and the logistics service manpower unit is used
In record and distribution construction logistics service personnel.
3. a kind of construction information management system according to claim 1, it is characterised in that the construction management module bag
Construction plan unit, construction procurement unit, construction implementation unit, the examination of construction later stage unit and job site monitoring unit are included,
The construction plan unit is used for the preconsolidation stress to whole construction, including personnel scheduling, construction procurement plan, scene
Job execution and construction later stage check and accept, and the construction procurement unit is used for buying of the building site using raw material and instrument, described to apply
Work implementation unit is used for the specific job content distribution of building-site, and the construction later stage checks and accepts unit to be used for after the completion of site construction
Examination, the field monitor unit is used to monitor the handling situations of job site.
4. a kind of construction information management system according to claim 1, it is characterised in that the construction dispatching module bag
Construction manpower scheduler module and construction speed scheduler module are included, the construction manpower scheduler module is used for Material Transportation, scene and applies
The arrangement of workman person, goods and materials storage watchman and rear service personnel, the construction speed scheduler module is used for the system of construction plan
Fixed, shopping list is formulated, Contraction in Site task is distributed, the later stage checks and accepts follow-up and the monitoring of field operation progress.
5. a kind of construction information management system according to claim 1, it is characterised in that the construction application server
For processing the attendance and classification information of manpower management module and the construction content of construction management module, the storage mould
Block is used to store the attendance for the treatment of manpower management module and the construction content of classification information and construction management module.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611123965.5A CN106780159A (en) | 2016-12-08 | 2016-12-08 | A kind of construction information management system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611123965.5A CN106780159A (en) | 2016-12-08 | 2016-12-08 | A kind of construction information management system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106780159A true CN106780159A (en) | 2017-05-31 |
Family
ID=58881768
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611123965.5A Pending CN106780159A (en) | 2016-12-08 | 2016-12-08 | A kind of construction information management system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106780159A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108038674A (en) * | 2017-12-29 | 2018-05-15 | 安徽送变电工程有限公司 | A kind of visualized presence monitoring system and method for possessing construction dynamic monitoring function |
CN108717590A (en) * | 2018-03-26 | 2018-10-30 | 崔战宾 | Material management system with feedback in work progress and method |
CN108876287A (en) * | 2018-05-29 | 2018-11-23 | 杭州众软信息技术有限公司 | data management system based on BIM |
CN111507616A (en) * | 2020-04-15 | 2020-08-07 | 江苏鹏为软件有限公司 | Green building construction information management system |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20030200130A1 (en) * | 2002-02-06 | 2003-10-23 | Kall Jonathan J. | Suite of configurable supply chain infrastructure modules for deploying collaborative e-manufacturing solutions |
CN102955985A (en) * | 2011-08-22 | 2013-03-06 | 铁道部信息技术中心 | Day shift traffic plan synergy compilation platform system and compilation method |
CN104573892A (en) * | 2013-10-17 | 2015-04-29 | 王丽华 | Whole process visual project management system for engineering construction |
CN104992308A (en) * | 2015-08-12 | 2015-10-21 | 刘鸣 | Enterprise informatization management system |
-
2016
- 2016-12-08 CN CN201611123965.5A patent/CN106780159A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20030200130A1 (en) * | 2002-02-06 | 2003-10-23 | Kall Jonathan J. | Suite of configurable supply chain infrastructure modules for deploying collaborative e-manufacturing solutions |
CN102955985A (en) * | 2011-08-22 | 2013-03-06 | 铁道部信息技术中心 | Day shift traffic plan synergy compilation platform system and compilation method |
CN104573892A (en) * | 2013-10-17 | 2015-04-29 | 王丽华 | Whole process visual project management system for engineering construction |
CN104992308A (en) * | 2015-08-12 | 2015-10-21 | 刘鸣 | Enterprise informatization management system |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108038674A (en) * | 2017-12-29 | 2018-05-15 | 安徽送变电工程有限公司 | A kind of visualized presence monitoring system and method for possessing construction dynamic monitoring function |
CN108717590A (en) * | 2018-03-26 | 2018-10-30 | 崔战宾 | Material management system with feedback in work progress and method |
CN108876287A (en) * | 2018-05-29 | 2018-11-23 | 杭州众软信息技术有限公司 | data management system based on BIM |
CN111507616A (en) * | 2020-04-15 | 2020-08-07 | 江苏鹏为软件有限公司 | Green building construction information management system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Guo et al. | Synchroperation in industry 4.0 manufacturing | |
CN106780159A (en) | A kind of construction information management system | |
CN107146065A (en) | Railway engineering management platform system | |
CN109784781A (en) | A kind of project management system served as theme with project progress, method and storage medium | |
Shi et al. | A new approach for project scheduling using fuzzy dependency structure matrix | |
CN109557934B (en) | Unmanned aerial vehicle cruise control method and device based on fabricated building platform | |
CN105160463A (en) | Enterprise management system on basis of project management | |
CN109190944A (en) | Medicine enterprise manufactures execution system | |
CN104574002B (en) | Asset management information processing method and processing device based on big data analysis | |
Ighravwe et al. | A non-zero integer non-linear programming model for maintenance workforce sizing | |
CN106651125A (en) | Material distribution system and processing method thereof | |
CN105893158A (en) | Big data hybrid scheduling model on private cloud condition | |
CN105139159A (en) | Project cost management and control method in power industry | |
CN107169539A (en) | Reinforcing bar automation processing delivery system and method based on two-dimensional bar code | |
CN105321051A (en) | Extra-high voltage substation intelligent operation and maintenance management and method for generating report thereof | |
Seebacher et al. | In-plant logistics efficiency valuation using discrete event simulation | |
CN104318386B (en) | A kind of aviation MRO industry Manufacture Execution method and system | |
CN106651155A (en) | Enterprise informatization management system | |
CN111445135A (en) | Intelligent maintenance method and device, computer equipment and storage medium | |
CN110717685A (en) | Building material management system and method | |
CN110880090A (en) | Aviation part manufacturing digital management system | |
Shi et al. | Research on intelligent assembly modes of aerospace products based on digital twin | |
Kim et al. | Enhanced subcontractors allocation for apartment construction project applying conceptual 4d digital twin framework | |
Liu et al. | Satisfaction-driven bi-objective multi-skill workforce scheduling problem | |
CN109284330A (en) | A kind of Internet of Things big data management system for garden |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170531 |