CN108717590A - Material management system with feedback in work progress and method - Google Patents
Material management system with feedback in work progress and method Download PDFInfo
- Publication number
- CN108717590A CN108717590A CN201810254207.XA CN201810254207A CN108717590A CN 108717590 A CN108717590 A CN 108717590A CN 201810254207 A CN201810254207 A CN 201810254207A CN 108717590 A CN108717590 A CN 108717590A
- Authority
- CN
- China
- Prior art keywords
- management
- work
- employee
- intelligent terminal
- module
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06311—Scheduling, planning or task assignment for a person or group
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06313—Resource planning in a project environment
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
Abstract
The invention discloses the material management systems with feedback in a kind of work progress, including progress control module, manpower management module, project inspection management module and store keeping module.The invention also discloses the material management methods with feedback in a kind of work progress, include the following steps:A, progress control method;B, manpower management method;C, store keeping method.The present invention has allocates system by establishing internal function goods and materials, saves on transport costs and resource, can improve labor efficiency, save the advantages of working hour.
Description
Technical field
The present invention relates to material management methods, and system, section are allocated by establishing internal function goods and materials more particularly, to one kind
About freight charges and resource, the material management method with feedback in the work progress in working hour that can improve labor efficiency, save.
Background technology
Currently there are panoramic project management software, material with feedback in their specifications work progress
The modules of management, make the handling of goods and materials with feedback in work progress apparent with it is transparent;They are by traditional papery operation
It is converted into electronic homework, has greatly accelerated information transfer rate;Their frameworks partial interior logic, effectively saves work
Amount, improves work efficiency;Project management software on the market is limited to legacy systems framework and imagines, system software update speed
Degree is slow, does not save labour to greatest extent, and many softwares are to change traditional papery operation for electronic homework, simultaneously
These management softwares carry out modularization management, lack pool system, logical connection is not strong, the afunction of associated verification, separately
Outside, on the market project management software use scope is limited, is only limitted to contractor unit and unit in charge of construction uses, lack inclusiveness.
Invention content
Present invention aims at provide it is a kind of allocating system by establishing internal function goods and materials, save on transport costs and resource, energy
The material management method improved labor efficiency, saved with feedback in the work progress in working hour.
The present invention realized by following technical measures, the material management system with feedback in a kind of work progress, including
Progress control module, manpower management module, project inspection management module and store keeping module;
The progress control module, it is common with manpower management module and store keeping module progress data, pass through to manage and count
The preset workflow of calculation machine and program, in the real-time reminding employees job schedule of employee's intelligent terminal and further work
Hold, accomplishes inventory and the visualization of field management;
The manpower management module acquires real-time position information by employee's intelligent terminal and is sent to management computer, manages
Reason computer establishes artificial cloth bitmap, in real time clearly reflection person people work hours cloth position section, is arranged on employee's intelligent terminal
There are UHF labels;
The project inspection management module, the logging worn by inspector, whole process record its inspection process, logging
On be provided with UHF reading circuits, using UHF reading circuit rapid batch read UHF labels in information be sent to management calculate
Machine, to can ensure that the accuracy of artificial cloth bitmap when employee's intelligent terminal breaks down or is disturbed, and certainly by image
Dynamic identification shows that it does not conform to rule, unsafe action or arranges and in the typing of automatic selectivity its patrol record and be transferred to
Manage computer;
The store keeping module, management computer carry out material distribution by progress control mould progress in the block, calculate
The material inputted daily into entering an item of expenditure in the accounts, calculate daily material cost, carried in administrative staff's intelligent terminal in the shortage of stock
It wakes up.
Further include handling of goods and materials personnel credit console module in work progress as a preferred method, manages computer
By it is daily/weekly/monthly project schedule plan performance, attendance, periodically evaluation situation realizes project manager
The automatic point counting of credit and evaluation.
Employee's intelligent terminal is smartwatch as a preferred method,.
The invention also discloses the material management methods with feedback in a kind of work progress, include the following steps:
A, progress control method, the progress control method include the following steps,
A. it is drawn according to work schedule input service gauge by managing computer, which at least generates post
Work person's demand number and it is expected that consume the bill of materials;
B. work schedule is associated with live artificial cloth bitmap and sheet stock material, and management computer judges live people
Whether the personnel and materials in storage in work cloth bitmap and sheet stock material are sufficient, as inadequate, generate warning message and to outgoing
It send;
C. the estimated consumption bill of materials generated according to work schedule generates and exports material allotment list;
B, manpower management method, the manpower management method include the following steps,
A. employee information is identified by human bioequivalence device and transmits information to management computer;
B. real-time position information is acquired by employee's intelligent terminal and is sent to management computer, management computer is established artificial
Cloth bitmap is simultaneously compared and adjusts with work person's demand of progress control module, in real time clearly reflection person people work hours cloth position
Section;
C. it when work is completed, is inputted by employee's intelligent terminal and completes information, employee's intelligent terminal generates work in real time
The prompting message of progress and further work content accomplishes the inventory and visualized management of field management;
D. inspector wears logging and carries out inspection in building site, and logging whole process records its inspection process, and passes through image
Automatic identification shows that it does not conform to rule, unsafe action or cloth and postpones in the typing of automatic selectivity its patrol record and transmit
Give management computer;By the UHF reading circuits of setting, the rapid batch in inspection is read on each employee's intelligent terminal logging
Information in UHF labels is simultaneously sent to management computer, to can ensure that when employee's intelligent terminal breaks down or is disturbed
The accuracy of artificial cloth bitmap;
C, store keeping method, the material supply method include the following steps,
A. management computer generates material setup sheet according to the estimated consumption bill of materials in work schedule;
B. daily material cost is calculated, alarm signal is generated in the shortage of stock into entering an item of expenditure in the accounts by the material that inputs daily
It ceases and is sent out and reminded;
C. management computer carries out material information extraction in internet, acquires various types of materials supplier information in all parts of the country,
All types of material price references, supplier's cloth message bit pattern are provided after forming big data, facilitates and carries out material inspection and material city
The specification of field.
Further include that d. inventories waste prompting in the C, store keeping method as a preferred method, calculates outbound material
Material, the difference for returning library material generate waste prompting message with it is expected that when the difference for consuming material in the bill of materials is more than predetermined value.
Management is fine in personal and unit materials by the present invention by progress control mould work schedule in the block, is realized
The precision of management and precision, and respective modules can be sent to by estimated data and carry out early warning and prompt;Pass through progress pipe
Reason mould job schedule in the block allocates material requested in place in time, realizes the intelligent goods and materials allotment system of construction site;To
System can be allocated by establishing internal function goods and materials, save on transport costs and resource, greatly improve efficiency, save working hour.It is logical
It crosses the information that UHF reading circuit rapid batch is read on each employee's intelligent terminal in UHF labels and feeds back to management computer, carry out
The amendment of artificial cloth bitmap, it is ensured that its accuracy.
Description of the drawings
Fig. 1 is the structural schematic diagram of the embodiment of the present invention.
Specific implementation mode
With reference to embodiment and compares attached drawing invention is further described in detail.
A kind of material management system with feedback in work progress and method, with reference to figure 1, including progress control module 100,
Manpower management module 200, project inspection management module 500 and store keeping module 300;
The progress control module 100, it is common with manpower management module 200 and the progress of store keeping module 300 data, lead to
The preset workflow of management computer and program are crossed, in the real-time reminding employees job schedule of employee's intelligent terminal and next step
Inventory and the visualization of field management are accomplished in action;
The manpower management module 200 acquires real-time position information by employee's intelligent terminal and is sent to management computer,
Management computer establishes artificial cloth bitmap, in real time clearly reflection person people work hours cloth position section, is set on employee's intelligent terminal
It is equipped with UHF labels;
The project inspection management module 500, the logging worn by inspector, whole process record its inspection process, patrol
UHF reading circuits are provided on inspection instrument, reading the information in UHF labels using UHF reading circuit rapid batch is sent to management
Computer to can ensure that the accuracy of artificial cloth bitmap when employee's intelligent terminal breaks down or is disturbed, and passes through figure
As automatic identification shows that it does not conform in rule, unsafe action or arrangement and the typing of automatic selectivity its patrol record and passes
It is defeated by management computer;
The store keeping module 300, management computer carry out material distribution, meter by progress control mould progress in the block
Calculate input daily material into entering an item of expenditure in the accounts, calculate daily material cost, in the shortage of stock administrative staff's intelligent terminal carry out
It reminds.
Material management method with feedback in specific work progress, includes the following steps:
A, progress control method, the progress control method include the following steps,
A. it is drawn according to work schedule input service gauge by managing computer, which at least generates post
Work person's demand number and it is expected that consume the bill of materials;
B. work schedule is associated with live artificial cloth bitmap and sheet stock material, and management computer judges live people
Whether the personnel and materials in storage in work cloth bitmap and sheet stock material are sufficient, as inadequate, generate warning message and to outgoing
It send;
C. the estimated consumption bill of materials generated according to work schedule generates and exports material allotment list;
B, manpower management method, the manpower management method include the following steps,
A. employee information is identified by human bioequivalence device and transmits information to management computer;
B. real-time position information is acquired by employee's intelligent terminal and is sent to management computer, management computer is established artificial
Cloth bitmap is simultaneously compared and adjusts with work person's demand of progress control module, in real time clearly reflection person people work hours cloth position
Section;
C. it when work is completed, is inputted by employee's intelligent terminal and completes information, employee's intelligent terminal generates work in real time
The prompting message of progress and further work content accomplishes the inventory and visualized management of field management;
D. inspector wears logging and carries out inspection in building site, and logging whole process records its inspection process, and passes through image
Automatic identification shows that it does not conform to rule, unsafe action or cloth and postpones in the typing of automatic selectivity its patrol record and transmit
Give management computer;By the UHF reading circuits of setting, the rapid batch in inspection is read on each employee's intelligent terminal logging
Information in UHF labels is simultaneously sent to management computer, to can ensure that when employee's intelligent terminal breaks down or is disturbed
The accuracy of artificial cloth bitmap;
C, store keeping method, the material supply method include the following steps,
A. management computer generates material setup sheet according to the estimated consumption bill of materials in work schedule;
B. daily material cost is calculated, alarm signal is generated in the shortage of stock into entering an item of expenditure in the accounts by the material that inputs daily
It ceases and is sent out and reminded;
C. management computer carries out material information extraction in internet, acquires various types of materials supplier information in all parts of the country,
All types of material price references, supplier's cloth message bit pattern are provided after forming big data, facilitates and carries out material inspection and material city
The specification of field.
Management is fine to personal and unit material by system and method by the work schedule in progress control module 100
On material, precision and the precision of management are realized.Such as:Work schedule in progress control module 100 is write in this way:" July
5 workers built a wall 2000 square metres on 14th, it is contemplated that consume 25000 pieces of brick, 8 tons of cement ", then in " real work situation " then
It will appear that " A worker builds a wall 500 square metres, and B worker builds a wall 500 square metres, and C worker builds a wall 500 square metres, and D worker builds a wall 500
Square metre, consume 23000 pieces of brick, 9 tons of cement ", these data can automatically with worker's cloth bitmap, attendance management, store keeping
Etc. being verified, and when doing " work plan ", estimated data can be sent to respective modules automatically and carry out early warning and carry by system
Show, such as " July 14,4 people of labo attendant, please allocated personnel in time ", " 14 daily planning in July consumes 25000 pieces of brick, and inventory is not
Foot, please be replenished in time ", " July 14 daily planning consumes 8 tons of cement, and the shortage of stock please be replenished in time " etc.;Pass through progress control
Job schedule in module 100 allocates material requested in place in time, realizes " the intelligent goods and materials allotment system " of construction site.
Such as reinforcing bar need to be sent to the places A from warehouse, cement and brick are sent to the places B, pipeline is sent to the places C, while A
The extra cement in place need to be recycled into warehouse, and the earthwork in the places B need to be sent to the places E, and the reinforcing bar in the places C need to be sent to warehouse, building
Waste material need to be sent to the places E;So as to allocate system by establishing internal function goods and materials, saves on transport costs and resource, greatly improve
Efficiency saves working hour.Oneself of ratio is consumed by the work efficiency of " real work situation " in progress control module 100 and substance
Dynamic measuring and calculating, the prediction that realization later stage goods and materials consume, such as " July 14, A worker built a wall 500 square metres, consumed 2500 pieces of brick,
0.8 ton of cement ", then can " July 15, A worker built a wall 800 square metres " prediction consume 4000 pieces of brick, 1.28 tons of cement, so
It is counted afterwards by people or action etc., realizes artificial intelligence.Logging is worn when building site carries out inspection in inspector
The information on each employee's intelligent terminal in UHF labels is read by the UHF reading circuit rapid batch on being arranged in logging simultaneously
It is sent to management computer, to can ensure that the accurate of artificial cloth bitmap when employee's intelligent terminal breaks down or is disturbed
Property, can read information by UHF feeds back to management computer, carries out the amendment of artificial cloth bitmap, it is ensured that its accuracy.
Material management method with feedback in the work progress of the present invention, with reference to figure 1, in front on the basis of technical solution
Specifically, further include in the C, store keeping method d. inventories waste remind, calculate library material, return library material difference with
It is expected that when the difference for consuming material in the bill of materials is more than predetermined value, waste prompting message is generated.
Material management system with feedback in the work progress of the present invention, with reference to figure 1, in front on the basis of technical solution
Specifically, further include handling of goods and materials personnel credit console module 400 in work progress, management computer by it is daily/weekly/every
Month project schedule plan performance, attendance, periodically evaluation situation realizes the automatic of project manager's credit and evaluation
Point counting.
Material management system with feedback in the work progress of the present invention, with reference to figure 1, in front on the basis of technical solution
Specifically, employee's intelligent terminal is smartwatch.
It is to be expounded to the material management method with feedback in work progress of the present invention above, is used to help understand this
Invention, but embodiment of the present invention are not limited by the above embodiments, any without departing from changing made by under the principle of the invention
Become, modification, substitute, combination, simplify, should be equivalent substitute mode, be included within the scope of the present invention.
Claims (5)
1. the material management system with feedback in a kind of work progress, it is characterised in that:Including progress control module, manpower management
Module, project inspection management module and store keeping module;
The progress control module, it is common with manpower management module and store keeping module progress data, pass through and manages computer
Preset workflow and program are done in the real-time reminding employees job schedule of employee's intelligent terminal and further work content
Inventory to field management and visualization;
The manpower management module acquires real-time position information by employee's intelligent terminal and is sent to management computer, management meter
Calculation machine establishes artificial cloth bitmap, in real time clearly reflection person people work hours cloth position section, and UHF is provided on employee's intelligent terminal
Label;
The project inspection management module, the logging worn by inspector, whole process record its inspection process, are set on logging
UHF reading circuits are equipped with, reading the information in UHF labels using UHF reading circuit rapid batch is sent to management computer, from
And can ensure that the accuracy of artificial cloth bitmap when employee's intelligent terminal breaks down or is disturbed, and pass through image automatic identification
Show that it does not conform in rule, unsafe action or arrangement and the typing of automatic selectivity its patrol record and is transferred to management meter
Calculation machine;
The store keeping module, management computer carry out material distribution by progress control mould progress in the block, calculate daily
The material of input into entering an item of expenditure in the accounts, calculate daily material cost, reminded in administrative staff's intelligent terminal in the shortage of stock.
2. the material management system with feedback in work progress according to claim 1, it is characterised in that:Further include constructing
Handling of goods and materials personnel credit console module in journey, management computer by it is daily/weekly/monthly project schedule plan complete feelings
Condition, attendance, periodically evaluation situation realizes the automatic point counting of project manager's credit and evaluation.
3. the material management system with feedback in work progress according to claim 1, it is characterised in that:Employee's intelligence
Terminal is smartwatch.
4. the material management method with feedback in a kind of work progress, it is characterised in that include the following steps:
A, progress control method, the progress control method include the following steps,
A. it is drawn according to work schedule input service gauge by managing computer, which at least generates the work in post
Member's demand number and it is expected that the consumption bill of materials;
B. work schedule is associated with live artificial cloth bitmap and sheet stock material, and management computer judges the artificial cloth in scene
Whether the personnel and materials in storage in bitmap and sheet stock material are sufficient, as inadequate, generate warning message and are sent out;
C. the estimated consumption bill of materials generated according to work schedule generates and exports material allotment list;
B, manpower management method, the manpower management method include the following steps,
A. employee information is identified by human bioequivalence device and transmits information to management computer;
B. real-time position information is acquired by employee's intelligent terminal and is sent to management computer, management computer establishes artificial cloth position
Scheme simultaneously to be compared and adjust with work person's demand of progress control module, in real time clearly reflection person people work hours Bu Wei area
Between;
C. it when work is completed, is inputted by employee's intelligent terminal and completes information, employee's intelligent terminal generates job schedule in real time
And the prompting message of further work content, accomplish the inventory and visualized management of field management;
D. inspector wears logging and carries out inspection in building site, and logging whole process records its inspection process, and automatic by image
Identification shows that it does not conform to rule, unsafe acts or cloth postpones in the typing of automatic selectivity its patrol record and is transferred to pipe
Manage computer;By the UHF reading circuits of setting, the rapid batch in inspection reads UHF marks on each employee's intelligent terminal to logging
Information in label is simultaneously sent to management computer, to can ensure that artificial cloth when employee's intelligent terminal breaks down or is disturbed
The accuracy of bitmap;
C, store keeping method, the material supply method include the following steps,
A. management computer generates material setup sheet according to the estimated consumption bill of materials in work schedule;
B. daily material cost is calculated into entering an item of expenditure in the accounts by the material that inputs daily, warning message is generated simultaneously in the shortage of stock
It is sent out and is reminded;
C. management computer carries out material information extraction in internet, acquires various types of materials supplier information in all parts of the country, is formed
All types of material price references, supplier's cloth message bit pattern are provided after big data, facilitates and carries out material inspection and material market
Specification.
5. the material management method with feedback in work progress according to claim 4, it is characterised in that:The C, tubes of material
Further include that d. inventories waste prompting in reason method, calculates library material, returns the difference of library material and it is expected that consume in the bill of materials
When the difference of material is more than predetermined value, waste prompting message is generated.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810254207.XA CN108717590A (en) | 2018-03-26 | 2018-03-26 | Material management system with feedback in work progress and method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810254207.XA CN108717590A (en) | 2018-03-26 | 2018-03-26 | Material management system with feedback in work progress and method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108717590A true CN108717590A (en) | 2018-10-30 |
Family
ID=63898866
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810254207.XA Pending CN108717590A (en) | 2018-03-26 | 2018-03-26 | Material management system with feedback in work progress and method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108717590A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110992006A (en) * | 2019-12-25 | 2020-04-10 | 广东信强混凝土有限公司 | Concrete mixing plant informatization management method and system |
CN111813844A (en) * | 2020-05-22 | 2020-10-23 | 北京合力信工程投资咨询有限公司 | Visual management system of engineering |
CN117495251A (en) * | 2023-11-08 | 2024-02-02 | 江苏小梦科技有限公司 | Intelligent warehouse management system and method based on mobile trolley |
CN117495251B (en) * | 2023-11-08 | 2024-05-14 | 江苏小梦科技有限公司 | Intelligent warehouse management system and method based on mobile trolley |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20100070321A1 (en) * | 2008-09-16 | 2010-03-18 | Tetsuro Motoyama | Project Management System With Inspection Functionality |
CN103390255A (en) * | 2013-07-30 | 2013-11-13 | 上海城建市政工程(集团)有限公司 | Construction site digital management system and application method thereof |
CN104392300A (en) * | 2014-10-28 | 2015-03-04 | 吴楠 | Engineering remote integrated management system |
CN106780159A (en) * | 2016-12-08 | 2017-05-31 | 东莞华南设计创新院 | A kind of construction information management system |
CN107146168A (en) * | 2017-07-11 | 2017-09-08 | 大连锐勃电子科技有限公司 | Wisdom building site management system based on universe frequency conversion positioning Yu self-identifying technology |
CN107527299A (en) * | 2017-08-02 | 2017-12-29 | 深圳云联万企科技有限公司 | A kind of record system of engineering construction daily record |
-
2018
- 2018-03-26 CN CN201810254207.XA patent/CN108717590A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20100070321A1 (en) * | 2008-09-16 | 2010-03-18 | Tetsuro Motoyama | Project Management System With Inspection Functionality |
CN103390255A (en) * | 2013-07-30 | 2013-11-13 | 上海城建市政工程(集团)有限公司 | Construction site digital management system and application method thereof |
CN104392300A (en) * | 2014-10-28 | 2015-03-04 | 吴楠 | Engineering remote integrated management system |
CN106780159A (en) * | 2016-12-08 | 2017-05-31 | 东莞华南设计创新院 | A kind of construction information management system |
CN107146168A (en) * | 2017-07-11 | 2017-09-08 | 大连锐勃电子科技有限公司 | Wisdom building site management system based on universe frequency conversion positioning Yu self-identifying technology |
CN107527299A (en) * | 2017-08-02 | 2017-12-29 | 深圳云联万企科技有限公司 | A kind of record system of engineering construction daily record |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110992006A (en) * | 2019-12-25 | 2020-04-10 | 广东信强混凝土有限公司 | Concrete mixing plant informatization management method and system |
CN111813844A (en) * | 2020-05-22 | 2020-10-23 | 北京合力信工程投资咨询有限公司 | Visual management system of engineering |
CN117495251A (en) * | 2023-11-08 | 2024-02-02 | 江苏小梦科技有限公司 | Intelligent warehouse management system and method based on mobile trolley |
CN117495251B (en) * | 2023-11-08 | 2024-05-14 | 江苏小梦科技有限公司 | Intelligent warehouse management system and method based on mobile trolley |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Sishi et al. | Implementation of Industry 4.0 technologies in the mining industry-a case study | |
CN108520342B (en) | BIM-based Internet of things platform management method and system | |
CN105005289B (en) | A kind of industrial platform of internet of things | |
Monroy et al. | Activity based costing, time-driven activity based costing and lean accounting: Differences among three accounting systems’ approach to manufacturing | |
CN106257500B (en) | A kind of road environmental sanitation, which is kept a public place clean, intelligent operation and checks management system and method | |
CN105005885A (en) | Industrial automatic identification and data acquisition platform | |
CN105489053B (en) | A kind of parallel shutdown system construction method based on ACP methods | |
CN104200341A (en) | Metering monitoring management system and implementation method thereof | |
CN106997511A (en) | Railway beam course management system and railway beam a management method based on BIM technology | |
CN108399519A (en) | A kind of concrete mixing plant Information Management System | |
CN104132725A (en) | Weighbridge anti-cheat system based on Internet of Things technology | |
CN110600111A (en) | Warehouse management system | |
CN112070454A (en) | Design method of control safety management system for expressway maintenance construction area | |
CN108717590A (en) | Material management system with feedback in work progress and method | |
CN111553633A (en) | Engineering cost management system and method | |
CN109214679A (en) | A kind of projects management system based on Building Information Model | |
CN115994641A (en) | Comprehensive management system for construction engineering progress | |
CN108171421A (en) | A kind of road surface O&M disposal efficiency and method for evaluating quality towards urban transportation smart machine system O&M | |
CN109636312A (en) | Land control engineering online monitoring and management system | |
KR20030068661A (en) | Integrated construction management system and method using portable terminal | |
CN108647847A (en) | Material management system in work progress and method | |
CN114819291A (en) | Urban hazardous waste monitoring and management system and emission prediction method | |
CN105844451A (en) | Construction informatization management method, system and service terminal | |
CN106067099A (en) | Section of jurisdiction production management device and management method thereof | |
RU2571598C1 (en) | Virtual system for controlling process of production of homogeneous product of enterprise |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181030 |
|
RJ01 | Rejection of invention patent application after publication |