CN110607601A - 一种3d鞋面的编织方法 - Google Patents

一种3d鞋面的编织方法 Download PDF

Info

Publication number
CN110607601A
CN110607601A CN201911016480.XA CN201911016480A CN110607601A CN 110607601 A CN110607601 A CN 110607601A CN 201911016480 A CN201911016480 A CN 201911016480A CN 110607601 A CN110607601 A CN 110607601A
Authority
CN
China
Prior art keywords
needles
bed
needle
knitting
yarn nozzle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201911016480.XA
Other languages
English (en)
Other versions
CN110607601B (zh
Inventor
孙平范
张颖
吴西
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningbo Cixing Co Ltd
Original Assignee
Ningbo Cixing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningbo Cixing Co Ltd filed Critical Ningbo Cixing Co Ltd
Priority to CN201911016480.XA priority Critical patent/CN110607601B/zh
Publication of CN110607601A publication Critical patent/CN110607601A/zh
Application granted granted Critical
Publication of CN110607601B publication Critical patent/CN110607601B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • DTEXTILES; PAPER
    • D04BRAIDING; LACE-MAKING; KNITTING; TRIMMINGS; NON-WOVEN FABRICS
    • D04BKNITTING
    • D04B1/00Weft knitting processes for the production of fabrics or articles not dependent on the use of particular machines; Fabrics or articles defined by such processes
    • D04B1/22Weft knitting processes for the production of fabrics or articles not dependent on the use of particular machines; Fabrics or articles defined by such processes specially adapted for knitting goods of particular configuration
    • D04B1/24Weft knitting processes for the production of fabrics or articles not dependent on the use of particular machines; Fabrics or articles defined by such processes specially adapted for knitting goods of particular configuration wearing apparel
    • DTEXTILES; PAPER
    • D10INDEXING SCHEME ASSOCIATED WITH SUBLASSES OF SECTION D, RELATING TO TEXTILES
    • D10BINDEXING SCHEME ASSOCIATED WITH SUBLASSES OF SECTION D, RELATING TO TEXTILES
    • D10B2501/00Wearing apparel
    • D10B2501/04Outerwear; Protective garments
    • D10B2501/043Footwear

Landscapes

  • Engineering & Computer Science (AREA)
  • Textile Engineering (AREA)
  • Knitting Machines (AREA)
  • Knitting Of Fabric (AREA)

Abstract

本发明公开了一种3D鞋面的编织方法,从鞋后跟开始编织,鞋后跟和两侧的鞋帮同时起底,横向编织,鞋帮和鞋后跟完成编织后,开始编织鞋底部分,并同时用翻针并针的方法将鞋帮与鞋底连接起来,最后编织鞋舌部分,完成整只鞋的编织;编织好后,将鞋舌下部和鞋帮上部分缝合起来,套上鞋楦汽烫,一只鞋子就完成了。本发明可以使3D鞋面一体编织成型,使得整体的成鞋速度大幅度提升,同时也减少了采购需要采购辅料的压力,整体的大幅度提升了工作效率。

Description

一种3D鞋面的编织方法
技术领域
本发明属于鞋面编织技术领域,特别涉及一种3D鞋面的编织方法。
背景技术
传统的鞋面编织通常包括裁剪版、成型版、连鞋舌一体成型版,而这些编织方法往往最后都需要切割、缝合、贴内里、添加中底布等操作,增加了人工工序,提高了生产成本,局限了快速成鞋的速度。
发明内容
本发明的目的是为了提供一种能够编织出完整的3D鞋面,使得整体的成鞋速度大幅度提升的3D鞋面的编织方法。
为此,本发明的技术方案是:一种3D鞋面的编织方法,在至少具有前后一对针床的横编织机上进行编织,横编织机带有三个或三个以上的系统,带有16把或16把以上的纱嘴,一个系统带动一把纱嘴;其特征在于:鞋面包括鞋后跟、鞋帮、鞋底与鞋舌,从鞋后跟开始编织,鞋后跟和两侧的鞋帮同时起底,横向编织;
具体步骤如下:
左右以正面面对前床为参照,从左往右,初始状态时,机头停在左侧位置,第1、第2、第3纱嘴均停在左侧,前床、后床均为满针状态;以各个最小编织循环单位组成的24针为例:
1)机头右行,第3系统带第1纱嘴在前后床编织:
第1,3,5,7,9,11,13,15,17,19,21,23针前床织1针后床紧吊目,
第2,4,6,8,10,12,14,16,18,20,22,24针前床织1针;
2)第2系统带第2纱嘴在后床编织:
第1,3,5,7,9,11,13,15,17,19,21,23针不出针,
第2,4,6,8,10,12,14,16,18,20,22,24针后床织1针;
3)第1系统带第3纱嘴在后床编织:
第1,3,5,7,9,11,13,15,17,19,21,23针后床织1针,
第2,4,6,8,10,12,14,16,18,20,22,24针不出针;
4)机头左行,第1系统带第1纱嘴在前后床编织:
第1,3,5,7,9,11,13,15,17,19,21,23针前床织1针,
第2,4,6,8,10,12,14,16,18,20,22,24针前床织1针后床紧吊目;
5)第2系统带第2纱嘴在后床编织:
第1,3,5,7,9,11,13,15,17,19,21,23针后床织1针,
第2,4,6,8,10,12,14,16,18,20,22,24针不出针
6)第3系统带第3纱嘴在前后床编织:
第1,2,3,4,5,6,7,8针前床织1针,
第9,11,13,15,17,19,21,23针不出针,
第10,12,14,16,18,20,22,24针后床织1针;
7)机头右行,第3系统带第1纱嘴在前后床编织:
第1,2,3,4,5,6,7,8针后床织1针,
第9,11,13,15,17,19,21,23针前床织1针后床紧吊目,
第10,12,14,16,18,20,22,24针前床织1针;
8)第2系统带第2纱嘴在前后床编织:
第1,2,3,4,5,6,7,8针前床织1针,
第9,11,13,15,17,19,21,23针不出针,
第10,12,14,16,18,20,22,24针后床织1针
9)第1系统带第3纱嘴在前后床编织:
第1,2,3,4,5,6,7,8,9,11,13,15针后床织1针,
第10,12,14,16针不出针,
第17,18,19,20,21,22,23,24针前床织1针;
10)机头左行,第1系统不带纱嘴后床向前床翻针:
第1,3,5,7针后床向前床翻针,其余针位不出针;
11)第2系统不带纱嘴后床向前床翻针:
第2,4,6,8针后床向前床翻针,其余针位不出针;
12)机头右行,全程无其他动作;
13)机头左行,第1系统带第1纱嘴在前后床编织:
第1,2,3,4,5,6,7,8针不出针,
第9,11,13,15针前床织1针,
第10,12,14,16针前床织1针后床紧吊目,
第17,18,19,20,21,22,23,24针后床织1针;
14)第2系统带第2纱嘴在前后床编织:
第1,2,3,4,5,6,7,8,10,12,14,16针不出针,
第9,11,13,15针后床织1针,
第10,12,14,16,18,20,22,24针前床织1针;
15)第3系统带第3纱嘴在后床编织:
第1,2,3,4,5,6,7,8,9,11,13,15针不出针,
第10,12,14,16,17,18,19,20,21,22,23,24针后床织1针;
16)机头右行,第3系统不带纱嘴前床向后床翻针:
第18,20,22,24针前床向后床翻针,其余针位不出针;
17)第2系统不带纱嘴前床向后床翻针:
第17,19,21,23针前床向后床翻针,其余针位不出针;
18)机头左行,全程无其他动作;
19)机头右行,第3系统带第1纱嘴在前后床编织:
第9,11,13,15针前床织1针后床紧吊目,
第10,12,14,16针前床织1针,其余针位不出针;
20)第2系统带第2纱嘴在后床编织:
第10,12,14,16针后床织1针,其余针位不出针;
21)第1系统带第3纱嘴在后床编织:
第9,11,13,15针后床织1针,其余针位不出针;
22)机头左行,第1系统不带纱嘴前床向后床翻针:
第1,3,5,7针前床向后床右翻1个针位,其余针位不出针;
23)第2系统不带纱嘴前床向后床翻针:
第2,4,6,8针前床向后床右翻1个针位,其余针位不出针;
24)机头右行,全程无其他动作;
25)机头左行,第1系统带第1纱嘴在前后床编织:
第9,11,13,15针前床织1针,
第10,12,14,16针前床织1针后床紧吊目,其余针位不出针;
26)第2系统带第2纱嘴在后床编织:
第9,11,13,15针后床织1针,其余针位不出针;
27)第3系统带第3纱嘴在后床编织:
第10,12,14,16针后床织1针,其余针位不出针;
28)机头右行,第3系统不带纱嘴后床向前床翻针:
第18,20,22,24针后床向前床左翻1个针位,其余针位不出针;
29)第2系统不带纱嘴向后床前床翻针:
第17,19,21,23针后床向前床左翻1个针位,其余针位不出针;
30)机头左行,全程无其他动作;
31)机头右行,第3系统带第1纱嘴在前后床编织:
第9,11,13,15针前床织1针后床紧吊目,
第10,12,14,16针前床织1针,其余针位不出针;
32)第2系统带第2纱嘴在后床编织:
第10,12,14,16针后床织1针,其余针位不出针;
33)第1系统带第3纱嘴在后床编织:
第9,11,13,15针后床织1针,其余针位不出针;
34)机头左行,第1系统不带纱嘴后床向前床翻针:
第2,4,6,8针后床向前床右翻1个针位,其余针位不出针;
35)第2系统不带纱嘴后床向前床翻针:
第3,5,7针后床向前床右翻1个针位,其余针位不出针;
36)机头右行,全程无其他动作;
37)机头左行,第1系统带第1纱嘴在前后床编织:
第9,11,13,15针前床织1针,
第10,12,14,16针前床织1针后床紧吊目,其余针位不出针;
38)第2系统带第2纱嘴在后床编织:
第9,11,13,15针后床织1针,其余针位不出针;
39)第3系统带第3纱嘴在后床编织:
第10,12,14,16针后床织1针,其余针位不出针;
40)机头右行,第3系统不带纱嘴前床向后床翻针:
第17,19,21,23针前床向后床左翻1个针位,其余针位不出针;
41)第2系统不带纱嘴前床向后床翻针:
第18,20,22针前床向后床左翻1个针位,其余针位不出针;
42)机头左行,全程无其他动作;
上述步骤1)~18)为鞋帮与鞋后跟的编织步骤,其中第1针至第8针,第17针至第24针,这两边的8针各为一基础循环,可根据鞋帮的尺寸分别进行多次横向循环编织,控制鞋帮大小;其中第9到16针为一基础循环,可根据鞋后跟的尺寸进行多次横向循环编织;其中步骤1)~6)为一纵向基础循环,可以根据鞋帮与鞋后跟的尺寸进行多次循环;
上述步骤19)~42)为鞋帮和鞋底连接起来的编织步骤,其中第1针至第8针,第17针至第24针,这两边8针各为一个基础循环,分别进行多次横向循环编织,可控制鞋帮和鞋底连接的针数;第9针至第16针这8针为基础循环,可根据鞋底和鞋舌的大小进行多次横向循环编织;以步骤19)~42)为基础继续纵向循环编织,根据需求可以对编织的针数进行改变,循环编织上述的各个基础循环,从而得到合适的3D鞋面。
本发明所述的3D鞋面包括鞋后跟、鞋帮、鞋底、鞋舌以及鞋帮和鞋底的连接部。编织好后,将鞋舌下部和鞋帮上部分缝合起来,套上鞋楦汽烫,一只鞋子就完成了。整只鞋的编织顺序为,先鞋帮连着鞋后跟一起编织,鞋帮和鞋后跟完成编织后,开始编织鞋底部分,并同时用翻针并针的方法将鞋帮与鞋底连接起来,最后编织鞋舌部分,完成整只鞋的编织。
本发明可以使3D鞋面一体编织成型,使得整体的成鞋速度大幅度提升,同时也减少了采购需要采购辅料的压力,整体的大幅度提升了工作效率。
附图说明
以下结合附图和本发明的实施方式来作进一步详细说明
图1为本发明的编织示意图;
图2为鞋面各个部位展开图。
图中标记为:表示前床编织,表示后床编织,表示前床编织后床紧吊目,表示不编织前床向后床右翻一针,表示不编织后床向前床右翻一针,表示不编织前床向后床左翻一针,表示不编织后床向前床左翻一针,↓表示后床向前床翻针,↑表示前床向后床翻针,空格表示不出针,←表示机头从右向左运行,→表示机头从左向右运行;R6代表第一纱嘴,R5代表第二纱嘴,R4代表第三纱嘴,S1代表第一系统,S2代表第二系统,S3代表第三系统。所述附图由下向上看编织动作。
具体实施方式
参见附图。本实施例所述的3D鞋面的编织方法,在至少具有前后一对针床的横编织机上进行编织,横编织机带有三个或三个以上的系统,带有16把或16把以上的纱嘴,一个系统带动一把纱嘴;鞋面包括鞋后跟1、鞋帮2、鞋底3、鞋舌4以及鞋帮和鞋底的连接部5。从鞋子的后跟开始编织,鞋后跟和两侧的鞋帮同时起底,横向编织;
具体步骤如下:
左右以正面面对前床为参照,从左往右,初始状态时,机头停在左侧位置,第1、第2、第3纱嘴均停在左侧,前床、后床均为满针状态;所有针分为A、B、C三组,A组的针记为a1,a2,a3……,B组的针记为b1,b2,b3……,C组的针记为b1,b2,b3……。以A组、B组、C组各设8针为例,(A、B、C三组为相邻的三组,例如A组是1~N针,那么B组就是从接下来的N+1针开始编织,而B组编织好,就是紧接着C组,A、B、C三组的针数由鞋子的实际尺寸决定)。
1)机头右行,第3系统S3带第1纱嘴R6在前后床编织,A组的第a1,a3,a5,a7针前床织1针后床紧吊目,第a2,a4,a6,a8针前床织1针;B组的第b1,b3,b5,b7针前床织1针后床紧吊目,第b2,b4,b6,b8针前床织1针;C组的第c1,c3,c5,c7针前床织1针后床紧吊目,第c2,c4,c6,c8针前床织1针;
2)第2系统S2带第2纱嘴R5在后床编织,A组的第a1,a3,a5,a7针不出针,第a2,a4,a6,a8针后床织1针;B组的第b1,b3,b5,b7针不出针,第b2,b4,b6,b8针后床织1针;C组的第c1,c3,c5,c7针不出针,第c2,c4,c6,c8针后床织1针;
3)第1系统S1带第3纱嘴R4在后床编织,A组的第a1,a3,a5,a7针后床织1针,第a2,a4,a6,a8针不出针;B组的第b1,b3,b5,b7针后床织1针,第b2,b4,b6,b8针不出针;C组的第c1,c3,c5,c7针后床织1针,第c2,c4,c6,c8针不出针;
4)机头左行,第1系统S1带第1纱嘴R6在前后床编织,A组的第a1,a3,a5,a7针前床织1针,第a2,a4,a6,a8针前床织1针后床紧吊目;B组的第b1,b3,b5,b7针前床织1针,第b2,b4,b6,b8针前床织1针后床紧吊目;C组的第c1,c3,c5,c7针前床织1针,第c2,c4,c6,c8针前床织1针后床紧吊目;
5)第2系统S2带第2纱嘴R5在后床编织,A组的第a1,a3,a5,a7针后床织1针,第a2,a4,a6,a8针不出针;B组的第b1,b3,b5,b7针后床织1针,第b2,b4,b6,b8针不出针;C组的第c1,c3,c5,c7针后床织1针,第c2,c4,c6,c8针不出针;
6)第3系统S3带第3纱嘴R4在前后床编织,A组的第a1,a2,a3,a4,a5,a6,a7,a8针前床织1针,B组的第b1,b3,b5,b7针不出针,第b2,b4,b6,b8针后床织1针;C组的第c1,c3,c5,c7针不出针,第c2,c4,c6,c8针后床织1针;
7)机头右行,第3系统S3带第1纱嘴R6在前后床编织,A组的第a1,a2,a3,a4,a5,a6,a7,a8针后床织1针,B组的第b1,b3,b5,b7针前床织1针后床紧吊目,第b2,b4,b6,b8针前床织1针;C组的第c1,c3,c5,c7针前床织1针后床紧吊目,第c2,c4,c6,c8针前床织1针;
8)第2系统S2带第2纱嘴R5在前后床编织,A组的第a1,a2,a3,a4,a5,a6,a7,a8针前床织1针,B组的第b1,b3,b5,b7针不出针,第b2,b4,b6,b8针后床织1针;C组的第c1,c3,c5,c7针不出针,第c2,c4,c6,c8针后床织1针;
9)第1系统S1带第3纱嘴R4在前后床编织,A组的第a1,a2,a3,a4,a5,a6,a7,a8针后床织1针,B组的第b1,b3,b5,b7针后床织1针,第b2,b4,b6,b8针不出针,C组的第c1,c2,c3,c4,c5,c6,c7,c8针前床织1针;
10)机头左行,第1系统S1不带纱嘴后床向前床翻针,A组的第a1,a3,a5,a7针后床向前床翻针,第a2,a4,a6,a8针不出针,B、C组针位不出针;
11)第2系统S2不带纱嘴后床向前床翻针,A组的第a1,a3,a5,a7针不出针,第a2,a4,a6,a8针后床向前床翻针,B、C组针位不出针;
12)机头右行,全程无其他动作;
13)机头左行,第1系统S1带第1纱嘴R6在前后床编织,A组的第a1,a2,a3,a4,a5,a6,a7,a8针不出针,B组的第b1,b3,b5,b7针前床织1针,第b2,b4,b6,b8针前床织1针后床紧吊目,C组的第c1,c2,c3,c4,c5,c6,c7,c8针后床织1针;
14)第2系统S2带第2纱嘴R5在前后床编织,A组的第a1,a2,a3,a4,a5,a6,a7,a8针不出针,B组的第b1,b3,b5,b7针后床织1针,第b2,b4,b6,b8针不出针,C组的第c1,c2,c3,c4,c5,c6,c7,c8针前床织1针;
15)第3系统S3带第3纱嘴R4在后床编织,A组的第a1,a2,a3,a4,a5,a6,a7,a8针不出针,B组的第b1,b3,b5,b7针不出针,第b2,b4,b6,b8针后床织1针,C组的第c1,c2,c3,c4,c5,c6,c7,c8针后床织1针;
16)机头右行,第3系统S3不带纱嘴前床向后床翻针,C组的第c1,c3,c5,c7针不出针,第c2,c4,c6,c8针前床向后床翻针,A、B组针位不出针;
17)第2系统S2不带纱嘴前床向后床翻针,C组的第c1,c3,c5,c7针前床向后床翻针,第c2,c4,c6,c8针不出针;A、B组针位不出针;
18)机头左行,全程无其他动作;
上述步骤1)~18)为鞋帮与鞋后跟的编织步骤,A组和C组编织的部位为鞋子两侧的鞋帮,其中第a1~a8针和第c1~c8针为基础循环,可根据鞋帮的大小分别进行多次横向循环编织;B组编织的部位为鞋后跟,其中第b1~b8针为基础循环,可根据鞋后跟的大小进行多次横向循环编织;根据鞋帮与鞋后跟的大小,以步骤1)~6)为基础循环,纵向循环编织出鞋后跟和鞋帮;
19)机头右行,第3系统S3带第1纱嘴R6在前后床编织,B组的第b1,b3,b5,b7针前床织1针后床紧吊目,第b2,b4,b6,b8针前床织1针,A、C组针位不出针;
20)第2系统S2带第2纱嘴R5在后床编织,B组的第b1,b3,b5,b7针不出针,第b2,b4,b6,b8针后床织1针,A、C组针位不出针;
21)第1系统S1带第3纱嘴R4在后床编织,B组的第b1,b3,b5,b7针后床织1针,第b2,b4,b6,b8针不出针,A、C组针位不出针;
22)机头左行,第1系统S1不带纱嘴前床向后床翻针,A组的第a1,a3,a5,a7针前床向后床右翻1个针位,第a2,a4,a6,a8针不出针,B、C组针位不出针;
23)第2系统S2不带纱嘴前床向后床翻针,A组的第a1,a3,a5,a7针不出针,第a2,a4,a6,a8针前床向后床右翻1个针位,B、C组针位不出针;
24)机头右行,全程无其他动作;
25)机头左行,第1系统S1带第1纱嘴R6在前后床编织,B组的第b1,b3,b5,b7针前床织1针,第b2,b4,b6,b8针前床织1针后床紧吊目,A、C组针位不出针;
26)第2系统S2带第2纱嘴R5在后床编织,B组的第b1,b3,b5,b7针后床织1针,第b2,b4,b6,b8针不出针,A、C组针位不出针;
27)第3系统S3带第3纱嘴R4在后床编织,B组的第b1,b3,b5,b7针不出针,第b2,b4,b6,b8针后床织1针,A、C组针位不出针;
28)机头右行,第3系统S3不带纱嘴后床向前床翻针,C组的第c1,c3,c5,c7针不出针,第c2,c4,c6,c8针后床向前床左翻1个针位,A、B组针位不出针;
29)第2系统S2不带纱嘴向后床前床翻针,C组的第c1,c3,c5,c7针后床向前床左翻1个针位,第c2,c4,c6,c8针不出针,A、B组针位不出针;
30)机头左行,全程无其他动作;
31)机头右行,第3系统S3带第1纱嘴R6在前后床编织,B组的第b1,b3,b5,b7针前床织1针后床紧吊目,第b2,b4,b6,b8针前床织1针,A、C组针位不出针;
32)第2系统S2带第2纱嘴R5在后床编织,B组的第b1,b3,b5,b7针不出针,第b2,b4,b6,b8针后床织1针,A、C组针位不出针;
33)第1系统S1带第3纱嘴R4在后床编织,B组的第b1,b3,b5,b7针后床织1针,第b2,b4,b6,b8针不出针,A、C组针位不出针;
34)机头左行,第1系统S1不带纱嘴后床向前床翻针,A组的第a1,a3,a5,a7针不出针,第a2,a4,a6,a8针后床向前床右翻1个针位,B、C组针位不出针;
35)第2系统S2不带纱嘴后床向前床翻针,A组的第a3,a5,a7针后床向前床右翻1个针位,第a1,a2,a4,a6,a8针不出针,B、C组针位无动作;
36)机头右行,全程无其他动作;
37)机头左行,第1系统S1带第1纱嘴R6在前后床编织,B组的第b1,b3,b5,b7针前床织1针,第b2,b4,b6,b8针前床织1针后床紧吊目,A、C组针位不出针;
38)第2系统S2带第2纱嘴R5在后床编织,B组的第b1,b3,b5,b7针后床织1针,第b2,b4,b6,b8针不出针,A、C组针位不出针;
39)第3系统S3带第3纱嘴R4在后床编织,B组的第b1,b3,b5,b7针不出针,第b2,b4,b6,b8针后床织1针,A、C组针位不出针;
40)机头右行,第3系统S3不带纱嘴前床向后床翻针,C组的第c1,c3,c5,c7针前床向后床左翻1个针位,第c2,c4,c6,c8针不出针,A、B组针位不出针;
41)第2系统S2不带纱嘴前床向后床翻针,C组的第c1,c3,c5,c7,c8针不出针,第c2,c4,c6针前床向后床左翻1个针位,A、B组针位不出针;
42)机头左行,全程无其他动作;
上述步骤19)~42)为鞋帮和鞋底连接起来的编织步骤,A组和C组编织的部位为鞋帮、鞋底的连接部,其中第a1~a8针和第c1~c8针为基础循环,分别进行多次横向循环编织,可控制鞋帮和鞋底连接的针数;B组编织的部位为鞋底和鞋舌,其中第b1~b8针为基础循环,可根据鞋底和鞋舌的大小进行多次横向循环编织;以步骤19)~42)为基础继续纵向循环编织,在实际编织过程中,根据需求可以对编织的针数进行改变,循环编织上述的各个基础循环,从而得到合适的3D鞋面。

Claims (1)

1.一种3D鞋面的编织方法,在至少具有前后一对针床的横编织机上进行编织,横编织机带有三个或三个以上的系统,带有16把或16把以上的纱嘴,一个系统带动一把纱嘴;其特征在于:鞋面包括鞋后跟、鞋帮、鞋底与鞋舌,从鞋后跟开始编织,鞋后跟和两侧的鞋帮同时起底,横向编织;
具体步骤如下:
左右以正面面对前床为参照,从左往右,初始状态时,机头停在左侧位置,第1、第2、第3纱嘴均停在左侧,前床、后床均为满针状态;
1)机头右行,第3系统带第1纱嘴在前后床编织:
第1,3,5,7,9,11,13,15,17,19,21,23针前床织1针后床紧吊目,
第2,4,6,8,10,12,14,16,18,20,22,24针前床织1针;
2)第2系统带第2纱嘴在后床编织:
第1,3,5,7,9,11,13,15,17,19,21,23针不出针,
第2,4,6,8,10,12,14,16,18,20,22,24针后床织1针;
3)第1系统带第3纱嘴在后床编织:
第1,3,5,7,9,11,13,15,17,19,21,23针后床织1针,
第2,4,6,8,10,12,14,16,18,20,22,24针不出针;
4)机头左行,第1系统带第1纱嘴在前后床编织:
第1,3,5,7,9,11,13,15,17,19,21,23针前床织1针,
第2,4,6,8,10,12,14,16,18,20,22,24针前床织1针后床紧吊目;
5)第2系统带第2纱嘴在后床编织:
第1,3,5,7,9,11,13,15,17,19,21,23针后床织1针,
第2,4,6,8,10,12,14,16,18,20,22,24针不出针
6)第3系统带第3纱嘴在前后床编织:
第1,2,3,4,5,6,7,8针前床织1针,
第9,11,13,15,17,19,21,23针不出针,
第10,12,14,16,18,20,22,24针后床织1针;
7)机头右行,第3系统带第1纱嘴在前后床编织:
第1,2,3,4,5,6,7,8针后床织1针,
第9,11,13,15,17,19,21,23针前床织1针后床紧吊目,
第10,12,14,16,18,20,22,24针前床织1针;
8)第2系统带第2纱嘴在前后床编织:
第1,2,3,4,5,6,7,8针前床织1针,
第9,11,13,15,17,19,21,23针不出针,
第10,12,14,16,18,20,22,24针后床织1针
9)第1系统带第3纱嘴在前后床编织:
第1,2,3,4,5,6,7,8,9,11,13,15针后床织1针,
第10,12,14,16针不出针,
第17,18,19,20,21,22,23,24针前床织1针;
10)机头左行,第1系统不带纱嘴后床向前床翻针:
第1,3,5,7针后床向前床翻针,其余针位不出针;
11)第2系统不带纱嘴后床向前床翻针:
第2,4,6,8针后床向前床翻针,其余针位不出针;
12)机头右行,全程无其他动作;
13)机头左行,第1系统带第1纱嘴在前后床编织:
第1,2,3,4,5,6,7,8针不出针,
第9,11,13,15针前床织1针,
第10,12,14,16针前床织1针后床紧吊目,
第17,18,19,20,21,22,23,24针后床织1针;
14)第2系统带第2纱嘴在前后床编织:
第1,2,3,4,5,6,7,8,10,12,14,16针不出针,
第9,11,13,15针后床织1针,
第10,12,14,16,18,20,22,24针前床织1针;
15)第3系统带第3纱嘴在后床编织:
第1,2,3,4,5,6,7,8,9,11,13,15针不出针,
第10,12,14,16,17,18,19,20,21,22,23,24针后床织1针;
16)机头右行,第3系统不带纱嘴前床向后床翻针:
第18,20,22,24针前床向后床翻针,其余针位不出针;
17)第2系统不带纱嘴前床向后床翻针:
第17,19,21,23针前床向后床翻针,其余针位不出针;
18)机头左行,全程无其他动作;
19)机头右行,第3系统带第1纱嘴在前后床编织:
第9,11,13,15针前床织1针后床紧吊目,
第10,12,14,16针前床织1针,其余针位不出针;
20)第2系统带第2纱嘴在后床编织:
第10,12,14,16针后床织1针,其余针位不出针;
21)第1系统带第3纱嘴在后床编织:
第9,11,13,15针后床织1针,其余针位不出针;
22)机头左行,第1系统不带纱嘴前床向后床翻针:
第1,3,5,7针前床向后床右翻1个针位,其余针位不出针;
23)第2系统不带纱嘴前床向后床翻针:
第2,4,6,8针前床向后床右翻1个针位,其余针位不出针;
24)机头右行,全程无其他动作;
25)机头左行,第1系统带第1纱嘴在前后床编织:
第9,11,13,15针前床织1针,
第10,12,14,16针前床织1针后床紧吊目,其余针位不出针;
26)第2系统带第2纱嘴在后床编织:
第9,11,13,15针后床织1针,其余针位不出针;
27)第3系统带第3纱嘴在后床编织:
第10,12,14,16针后床织1针,其余针位不出针;
28)机头右行,第3系统不带纱嘴后床向前床翻针:
第18,20,22,24针后床向前床左翻1个针位,其余针位不出针;
29)第2系统不带纱嘴向后床前床翻针:
第17,19,21,23针后床向前床左翻1个针位,其余针位不出针;
30)机头左行,全程无其他动作;
31)机头右行,第3系统带第1纱嘴在前后床编织:
第9,11,13,15针前床织1针后床紧吊目,
第10,12,14,16针前床织1针,其余针位不出针;
32)第2系统带第2纱嘴在后床编织:
第10,12,14,16针后床织1针,其余针位不出针;
33)第1系统带第3纱嘴在后床编织:
第9,11,13,15针后床织1针,其余针位不出针;
34)机头左行,第1系统不带纱嘴后床向前床翻针:
第2,4,6,8针后床向前床右翻1个针位,其余针位不出针;
35)第2系统不带纱嘴后床向前床翻针:
第3,5,7针后床向前床右翻1个针位,其余针位不出针;
36)机头右行,全程无其他动作;
37)机头左行,第1系统带第1纱嘴在前后床编织:
第9,11,13,15针前床织1针,
第10,12,14,16针前床织1针后床紧吊目,其余针位不出针;
38)第2系统带第2纱嘴在后床编织:
第9,11,13,15针后床织1针,其余针位不出针;
39)第3系统带第3纱嘴在后床编织:
第10,12,14,16针后床织1针,其余针位不出针;
40)机头右行,第3系统不带纱嘴前床向后床翻针:
第17,19,21,23针前床向后床左翻1个针位,其余针位不出针;
41)第2系统不带纱嘴前床向后床翻针:
第18,20,22针前床向后床左翻1个针位,其余针位不出针;
42)机头左行,全程无其他动作;
上述步骤1)~18)为鞋帮与鞋后跟的编织步骤,其中第1针至第8针,第17针至第24针,这两边的8针各为一基础循环,可根据鞋帮的尺寸分别进行多次横向循环编织,控制鞋帮大小;其中第9到16针为一基础循环,可根据鞋后跟的尺寸进行多次横向循环编织;其中步骤1)~6)为一纵向基础循环,可以根据鞋帮与鞋后跟的尺寸进行多次循环;
上述步骤19)~42)为鞋帮和鞋底连接起来的编织步骤,其中第1针至第8针,第17针至第24针,这两边8针各为一个基础循环,分别进行多次横向循环编织,可控制鞋帮和鞋底连接的针数;第9针至第16针这8针为基础循环,可根据鞋底和鞋舌的大小进行多次横向循环编织;以步骤19)~42)为基础继续纵向循环编织,根据需求可以对编织的针数进行改变,循环编织上述的各个基础循环,从而得到合适的3D鞋面。
CN201911016480.XA 2019-10-24 2019-10-24 一种3d鞋面的编织方法 Active CN110607601B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911016480.XA CN110607601B (zh) 2019-10-24 2019-10-24 一种3d鞋面的编织方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911016480.XA CN110607601B (zh) 2019-10-24 2019-10-24 一种3d鞋面的编织方法

Publications (2)

Publication Number Publication Date
CN110607601A true CN110607601A (zh) 2019-12-24
CN110607601B CN110607601B (zh) 2020-09-04

Family

ID=68895069

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911016480.XA Active CN110607601B (zh) 2019-10-24 2019-10-24 一种3d鞋面的编织方法

Country Status (1)

Country Link
CN (1) CN110607601B (zh)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105307530A (zh) * 2013-06-21 2016-02-03 株式会社岛精机制作所 鞋帮的制造方法及鞋帮
CN105324050A (zh) * 2013-06-17 2016-02-10 株式会社岛精机制作所 鞋帮及鞋帮的制造方法
EP2982787B1 (en) * 2013-04-04 2018-01-10 Shima Seiki Manufacturing., Ltd. Method for knitting footwear
CN107708467A (zh) * 2015-06-15 2018-02-16 株式会社岛精机制作所 鞋帮及鞋帮的制造方法
CN107974757A (zh) * 2017-12-13 2018-05-01 慈星互联科技有限公司 一种3d鞋面的编织方法
CN108978010A (zh) * 2017-06-05 2018-12-11 纮织国际有限公司 具舌片的一体成形立体鞋胚及其制造方法
CN109082764A (zh) * 2018-08-03 2018-12-25 东莞市坦睿飞织鞋面设计有限公司 一体成型针织跟鞋、跟鞋鞋面及其针织工艺
EP3449747A1 (en) * 2016-04-25 2019-03-06 Shima Seiki Mfg., Ltd. Method of manufacturing footwear and footwear
CN110353344A (zh) * 2019-05-29 2019-10-22 信泰(福建)科技有限公司 一种一体成型的针织鞋生产工艺以及一种针织鞋

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2982787B1 (en) * 2013-04-04 2018-01-10 Shima Seiki Manufacturing., Ltd. Method for knitting footwear
CN105324050A (zh) * 2013-06-17 2016-02-10 株式会社岛精机制作所 鞋帮及鞋帮的制造方法
CN105307530A (zh) * 2013-06-21 2016-02-03 株式会社岛精机制作所 鞋帮的制造方法及鞋帮
CN107708467A (zh) * 2015-06-15 2018-02-16 株式会社岛精机制作所 鞋帮及鞋帮的制造方法
EP3449747A1 (en) * 2016-04-25 2019-03-06 Shima Seiki Mfg., Ltd. Method of manufacturing footwear and footwear
CN108978010A (zh) * 2017-06-05 2018-12-11 纮织国际有限公司 具舌片的一体成形立体鞋胚及其制造方法
CN107974757A (zh) * 2017-12-13 2018-05-01 慈星互联科技有限公司 一种3d鞋面的编织方法
CN109082764A (zh) * 2018-08-03 2018-12-25 东莞市坦睿飞织鞋面设计有限公司 一体成型针织跟鞋、跟鞋鞋面及其针织工艺
CN110353344A (zh) * 2019-05-29 2019-10-22 信泰(福建)科技有限公司 一种一体成型的针织鞋生产工艺以及一种针织鞋

Also Published As

Publication number Publication date
CN110607601B (zh) 2020-09-04

Similar Documents

Publication Publication Date Title
CN107385656B (zh) 针织一体鞋面的编织工艺
US20180206585A1 (en) Seamless 3D flat knit vamp and manufacturing method thereof
CN109594190B (zh) 一种换色提花织物的制作工艺
CN107217377B (zh) 单层针织一体鞋面的制作工艺
CN107348601B (zh) 一种具有织带的针织一体鞋及其编织工艺
CN103866478B (zh) 由双针床横编机编织织可穿1×1罗纹组织织物的方法
CN107299453A (zh) 一种针织一体鞋面的鞋面口结构及其编织工艺
CN108208999A (zh) 一种一次成型休闲运动鞋的编织工艺
CN103866479A (zh) 一种由双针床横编机编织织可穿2×1罗纹组织织物的方法
CN103628243B (zh) 一种带有口袋的针织衫与编织用针织机及其编织方法
US10829877B2 (en) Warp knitting machine, warp knitted fabric manufacturing method and warp knitted fabric
CN103866482A (zh) 一种由双针床横编机编织织可穿2×2罗纹组织织物的方法
CN107287748A (zh) 一体鞋面局部加弹结构及其编织工艺
CN207002950U (zh) 一种针织一体鞋面的鞋面口结构
CN107099920A (zh) 一体成型鞋口上弹性领口的编织方法
CN110607601B (zh) 一种3d鞋面的编织方法
CN106637638A (zh) 一种纵向鞋眼扣花型的编织方法
CN107326517B (zh) 一种鞋面的编织方法
CN106637639B (zh) 一种鞋后跟成型编织方法
CN103882617B (zh) 一种由双针床横编机编织织可穿织物的加针编织方法
CN103849992B (zh) 带有仿缝合缝份的织物与编织该织物的针织机及编织方法
CN107974757B (zh) 一种3d鞋面的编织方法
CN106801289A (zh) 一种鱼鳞花的编织方法
TWI520690B (zh) The Weaving Structure and Weaving Method of One Weft Weft Knitted Upper
CN107164875B (zh) 一种改良的经编编织方法

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant