CN110528731A - Steel construction and insulation construction integral type solid model shear wall and construction method - Google Patents

Steel construction and insulation construction integral type solid model shear wall and construction method Download PDF

Info

Publication number
CN110528731A
CN110528731A CN201910924404.2A CN201910924404A CN110528731A CN 110528731 A CN110528731 A CN 110528731A CN 201910924404 A CN201910924404 A CN 201910924404A CN 110528731 A CN110528731 A CN 110528731A
Authority
CN
China
Prior art keywords
steel
solid model
construction
model plate
steel construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910924404.2A
Other languages
Chinese (zh)
Inventor
许刚
刘昭勇
许亮
宗利强
冀非
何平
冯景海
赵金风
许雁飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Zhongji Applied Technology Research Institute Co Ltd
Original Assignee
Beijing Zhongji Applied Technology Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Zhongji Applied Technology Research Institute Co Ltd filed Critical Beijing Zhongji Applied Technology Research Institute Co Ltd
Priority to CN201910924404.2A priority Critical patent/CN110528731A/en
Publication of CN110528731A publication Critical patent/CN110528731A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/64Insulation or other protection; Elements or use of specified material therefor for making damp-proof; Protection against corrosion
    • E04B1/642Protecting metallic construction elements against corrosion
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/74Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls
    • E04B1/76Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls specifically with respect to heat only
    • E04B1/78Heat insulating elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/56Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members
    • E04B2/58Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members with elongated members of metal
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/56Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members
    • E04B2/58Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members with elongated members of metal
    • E04B2/60Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members with elongated members of metal characterised by special cross-section of the elongated members

Abstract

The invention belongs to technical field of buildings, more particularly to a kind of steel construction and insulation construction integral type solid model shear wall and construction method, shear wall includes steel construction, it is respectively equipped with interior solid model plate and outer solid model plate inside and outside steel construction, is filled with foamed concrete in the space that steel construction, interior solid model plate, outer solid model plate are gone along with sb. to guard him.The present invention has efficient quick construction efficiency, has good integral strength, reduces the oxidation point intensity defect that intermediate breakpoint joint may cause.And has and facilitate finishing, improves the distinguishing features such as space utilization rate.The present invention also has remote construction advantage;The processing is simple, efficiently, system easy to control the quality;Easily implement all weather operations construction;Waterproofness, fire line, seismic seeurity, hurricane performance, pest-resistant mouse ant property are excellent;Space clear space utilization rate is high, realizes the insulation construction integration same service life, is the wind vane of future architecture technology.

Description

Steel construction and insulation construction integral type solid model shear wall and construction method
Technical field
The present invention relates to a kind of steel constructions and insulation construction integral type solid model shear wall and construction method, belong to Building technology Field.
Background technique
The either light steel of the steel house in China or general steel system are substantially all the skill for being derived from and introducing developed country Art, the original technology of non-native.Steel building has the spies such as antidetonation, hurricane resistant, efficiency of construction height and discarded recovery utilization rate height Point has become the main future developing trend in world architecture field.Steel construction is divided into lightweight steel construction and general steel structure, light steel knot Structure mainly builds low-rise dwelling, mostly cold bending thin wall, and light steel construction mode is stressed-skin construction, is lightgage steel joist and thermal insulation material wood The multilayer composite of matter structural slab (OSB).Although faster than traditional brick mix structure speed, now with the increasing year by year of labour cost Long, this method of construction by live man-made assembly increasingly shows the deficiency of building low efficiency, wooden due to using Structural slab and foamed material, there is the hidden danger of fire and the original deficiencies such as waterproof, termite-proof.
General steel structure can build multilayer and skyscraper, since the volume that general steel structure is mainly H profile steel component is larger, The building enclosure construction style of filling wall is mostly used, H profile steel and filling wall fusion structure connectivity are poor, and general H profile steel is exposed solely It stands in the inside of wall, such steel construction is easy to corrode in air, varies with temperature fluctuation and generates and expand with heat and contract with cold, occurs linear It splashes swollen, brings to building enclosure stress rupture, lead to building enclosure local cracks, heat preservation and waterproof performance are destroyed, simultaneously The frightful sound that steel structure breathing generates often is heard, since exposed steel part brings certain difficulty to interior decoration and occupies Certain space, this filling wall such as aerated blocks building construction efficiency is lower, and exterior wall heat-preserving system and structure cannot Integral type, is easy crack, and heat-insulation system fails because of infiltration.
Summary of the invention
According to the above-mentioned deficiencies in the prior art, the technical problem to be solved by the present invention is providing a kind of steel construction and protecting Warm structural integrity formula solid model shear wall, is the super low energy consumption construction for being suitable for low layer, multilayer, high level extensively, and antidetonation resists Hurricane performance obtains more significantly improving, efficient building construction, energy-efficient, section material, saving of labor, structure and heat-insulating integral formula same longevity Life, fire prevention, waterproof, termite-proof, sound insulation is comfortable, environmentally friendly, and transportation radius (than PC assembled) improves ten several times, extensive suitable Plateau, puna environment and maritime with high salt, high humidity and hinterland are answered, is the wind vane of future architecture technology.
Steel construction of the present invention and insulation construction integral type solid model shear wall, including steel construction, two inside and outside steel construction Side is respectively equipped with interior solid model plate and outer solid model plate, is filled with foaming in the space that steel construction, interior solid model plate, outer solid model plate are gone along with sb. to guard him Concrete.
Interior solid model plate, outer solid model plate can be cement fibrolite plate, calcium silicate board, magnesia fibers plate, lithotome plate, stone Cream plate, exterior wall finish composite plate etc..At least one side roughening of outer solid model plate is handled, strong with the compound removing of foamed cement to improve Degree.Corresponding plate stitch should be reserved when the two adjacent plates up and down connection of outer solid model plate.Interior solid model plate, outer solid model plate except vertical and It is laterally fixed outer, interior solid model plate, outer solid model plate inside be preferably provided with intersection construction again, reinforcing rib is equivalent to, with enhancing It is anti-to pour foamed cement mortar pressure and cause the fixing intensity of template evagination.
Foamed concrete of the invention, can be pure foamed cement or in foamed cement slurry, add aglite or The mixed slurry of chopped strand such as adds EPS expanded beads, addition expanded perlite, glass microballoon or or chopped natural plants Fiber or staple fibre etc. increase thermal insulation property or increase strength character to reduce density.Foamed cement filler material mainly plays Structure and heat insulation integrated effect, can keep the temperature and have good structural strength, with fire-proof and water-proof insect prevention and cheap The advantages that, dry density is in 200-500kg/m3Between.
Door or window can be arranged in the present invention on shear wall, set between the position of door or window, interior solid model plate, outer solid model plate Have closing closure plate (as shown in figure 11), closing closure plate material can use OSB plate, and foamed concrete is from door or window when preventing from pouring Position outflow.
Interior fixed heat insulating strip and outer is respectively equipped with inside and outside the steel construction between interior solid model plate, outer solid model plate Fixed heat insulating strip.Inside and outside fixed heat insulating strip can be lateral, vertical, diagonal cross, and heat insulating strip can be natural batten, sham wood Item or plastics, composite slats such as wood moulding, high-density plastic's plate etc..It is main, and there are four effects:
1. especially peripheral template thermal coefficient is higher, if directly joined with steel structure since inside and outside solid model plate density is larger It connects and has heat bridge cold bridge effect.Fixed heat-insulating bridge-cut-off plays the role of heat-insulating bridge-cut-off using the lesser material of thermal coefficient
2. template and steel structure hardness are big, directly fixed with adjusting screw, it is bad to eat nail property, is not fixed firmly, when by temperature change Move back nail phenomenon when with vibration, thermal insulation item have good elasticity, toughness and it is good eat nail, can be fixed stably for a long time It is qualitative.
3. another effect for increasing heat insulating strip is exactly good leakproofness, the sealing function of waterproof spillage is played.
4. wherein the fixation heat insulating strip of diagonal cross is to play most important anti-mould evagination effect of rising of being in the milk, that is, interior The reinforcing rib of outer solid model plate.
The steel construction includes the mullion being fixed together and stull, is fixed with inside and outside mullion and stull tiltedly Support.
The mullion is intermediate jointless single overall steel material.
The stull is intermediate jointless single overall steel material, and stull passes through mullion.
Traditional steel construction is divided into lightweight steel construction system and general steel structural system, and the present invention can be with lightweight steel construction, general steel knot Structure and general light mixed structure, and construction of the invention, it is more quick more rationally scientific.Mullion can be a material, arbitrarily Long, tie point is few (oxidation corrosion point is few), and integral strength is high, and speed of application is fast, and quality is easy to control.
The mullion uses one or more of H-type, Z-type, c-type, square type steel, and general high level mostly uses H profile steel (general steel structure), multilayer or low layer use C-type steel or square type steel,, can be in H steel for the levelling that is in the milk when using H profile steel Web portion separates levelling hole, square type or round, size can according to the size of H steel profile, generally wide × high (50--200) × (100--300) mm, the spacing in levelling hole are 600-2000mm;Stull can be rectangle steel, C-type steel, Z-shape steel, round steel, three The connection of angle steel etc., stull and mullion generally passes through connection among mullion, and single material can pass through mostly with mullion, fixed shape Formula is that perforation is welded with the mode connect, wherein welding can use the mode of spot welding;Diagonal brace can be C-type steel, rectangle steel, and diagonal brace is main It is the stabilization mechanical structure that multiple triangles are formed with mullion, stull, diagonal brace can weld solid on the outside or inside and outside bilateral It is scheduled on mullion.
The inside of the steel construction or inside and outside be equipped with collar tie beam, for fixing interlayer floor support plate.Collar tie beam can be square Shape steel, triangular steel, C-type steel or U-steel, collar tie beam are divided into ground beam and interlayer collar tie beam.Ground beam connection mullion is simultaneously tethered with earth anchor Fixation is connect, interlayer collar tie beam plays bracketing interlayer floor support plate, in the inside of external shear wall and the bilateral peace of internal shear wall Dress.Interlayer collar tie beam is also that the upper and lower plates of interior solid model plate are connected and fixed a little.
The steel construction outer surface spraying or dip-coating corrosion resistant transition layer.When steel construction, construction material use relatively thin steel When material, although there is the corrosion protection anode protective layer of hot galvanizing on steel material surface, due to foamed cement slurry pH value 11-12 it Between, there is certain corrosivity to metal, it is especially larger to the corrosion failure effect of thin-walled light steel building material.In addition Several Thiourea Derivatives on Zinc Plate Surface Smooth, foamed cement is lower to its adhesive force, foamed cement density itself is smaller, will affect the integral strength of shearing structure.This The corrosion resistant transition layer of invention can use anti-corrosive properties resin modified cement mortar, such as epoxy-modified mortar clay E series, poly- ammonia Ester pu mortar, acrylic acid modified mortar series etc..Spraying is brushed, dip-coating 0.3-5mm, and the anti-corrosive properties of steel construction can be effectively improved Energy and the adhesion property with foamed cement.
The construction method of steel construction and insulation construction integral type solid model shear wall of the invention, comprising the following steps:
(1) steel member is processed;
(2) steel construction is assembled;
(3) window frame doorframe is installed;
(4) anticorrosion with painting transition zone;
(5) the inside and outside fixed heat insulating strip of fixed steel construction two sides is installed;
(6) fixed cable conduct and hot-water heating pipe are installed;
(7) assembled large stretch of steel structure and fixation are lifted;
(8) the outer solid model plate and interior solid model plate of first layer are installed;
(9) foamed concrete is poured;
(10) plate stitch of outer solid model plate and interior solid model plate is filled;
(11) one layer of outer solid model plate and interior solid model plate are successively installed;
(12) one layer of foamed concrete is successively poured;
(13) the assembling installation of higher steel construction is attached on the high steel structure upper section of layer poured according to layer height, it will Above-mentioned operation layer height is repeated to build.
Wherein, assembling steel construction can using ground large area assemble steel structure component or on the basis of fixed mullion is installed And other component two schemes are fixed in installation.Steel construction i.e. of the invention single material can be fixedly mounted on building foundation, Can be after ground be assembled into a face wall or Large Area Steel structure body, then carry out mechanical hoisting and fix.
Compared with the prior art, the invention has the beneficial effects that:
Steel construction of the present invention and insulation construction integral type solid model shear wall have efficient quick construction efficiency, Intensity ratio, rigidity ratio, structural behaviour significantly improve, and are compared with the traditional technology, and not only assembling is fast at scene, and mainly mullion can be with It is one through multilayer, stull perforation connection is also possible to a root long material through more mullions, and interlayer not only has without breakpoint joint Good integral strength decreases the oxidation point intensity defect that intermediate breakpoint joint may cause.And due to this " one To top " feature, light steel low-rise building can be built, 2-5 layers of building can expect top with a steel.More inclined support structures with more Stull mullion science dexterously constitutes several triangles, produces stable X frame structure.And it can be completed in wall body structure When, roof is first installed, realizes all-weather construction (behind installation roof, encounter rainy weather, do not influence indoor construction), and it is traditional It is all to build finally to bind from level to level.
The present invention can complete structural thermal insulation integration with the stealthy steel structure in service life, to guarantee that it is good that steel structure has with one-step method Anti-corrosion stability of preventing fires and the oxidation corrosion for isolating from air solve the short slab of traditional steel structure, improve building life, steel Not exposed, have and facilitate finishing, improve the distinguishing features such as space utilization rate.Either low layer, multilayer, high level all can be according to need It selects.Light general steel and concrete structure more optimizes structural behaviour, and for low layer based on light steel, load needs to increase general steel structure, and multilayer is high Layer assists light steel, obtains good load and steel using amount ratio, this method is applied not only to house, public building based on general steel Field can also be widely used in industrial factory building, the industrial building as New-generation efficient energy-saving.
The present invention has remote construction advantage;The processing is simple, efficiently, system easy to control the quality;Easily implement all weather operations to apply Work;Waterproofness, fire line, seismic seeurity, hurricane performance, pest-resistant mouse ant property are excellent;Space clear space utilization rate is high.
Detailed description of the invention
Fig. 1 is structural schematic diagram of the invention;
Fig. 2 is side structure schematic view of the invention;
Fig. 3 is the partial enlarged view at the position A in Fig. 2;
Fig. 4 is overlooking structure diagram of the invention;
Fig. 5 is the partial enlarged view at the position B in Fig. 4;
Fig. 6 is the partial enlarged view at the position C in Fig. 4;
Fig. 7 is the inside structure schematic diagram of shear wall;
Fig. 8 is the partial enlarged view at the position D in Fig. 7;
Fig. 9 is the outside structure diagram of shear wall;
Figure 10 is the schematic diagram of steel construction;
Figure 11 is the mounting structure schematic diagram of window frame and closing closure plate;
Figure 12 is the structural schematic diagram of steel construction, corrosion resistant transition layer and foamed concrete.
In figure: 1, steel construction;1.1, H profile steel mullion;1.2, stull;1.3, square type steel mullion;1.4, diagonal brace;2, collar tie beam; 3, interior fixed heat insulating strip;4, outer fixed heat insulating strip;5, outer solid model plate;6, interior solid model plate;7, interlayer floor support plate;8, foam coagulation Soil;9, closure plate is closed;10, corrosion resistant transition layer.
Specific embodiment
The present invention is described further below with reference to embodiment:
As shown in Fig. 1~11, steel construction of the present invention and insulation construction integral type solid model shear wall, including steel construction 1, interior solid model plate 6 and outer solid model plate 5 are respectively equipped with inside and outside steel construction 1, and steel construction 1, interior solid model plate 6, outer solid model plate 5 are gone along with sb. to guard him At space in be filled with foamed concrete 8.
Wherein, interior solid model plate 6, outer solid model plate 5 can be cement fibrolite plate, calcium silicate board, magnesia fibers plate, natural stone Material plate, plasterboard, exterior wall finish composite plate etc..
Wherein, foamed concrete 8 can be pure foamed cement or in foamed cement slurry, adds aglite or is chopped The mixed slurry of fiber.
Door or window can be set on shear wall, envelope is equipped between the position of door or window, interior solid model plate 6, outer solid model plate 5 Closure plate 9 is closed, closing closure plate material uses OSB plate, and foamed concrete 8 is flowed out from the position of door or window when preventing from pouring.
Be equipped between interior solid model plate 6, outer solid model plate 5 inside and outside steel construction 1 interior fixed heat insulating strip 3 and outer fixation every Hot item 4.Heat insulating strip can be laterally, vertical, diagonal cross, heat insulating strip can be natural batten, artificial batten or plastics, compound Lath such as wood moulding, high-density plastic's plate etc..
Steel construction 1 includes the mullion being fixed together and stull 1.2, is fixed with inside and outside mullion and stull 1.2 Diagonal brace 1.4.Mullion, stull 1.2 are intermediate jointless single overall steel material, and stull 1.2 passes through mullion.
Mullion uses one or more of H-type, Z-type, c-type, square type steel, can use H profile steel mullion 1.1 and square type Steel mullion 1.3, the two are alternately arranged (as shown in Figure 10).According to the actual situation, general high level mostly uses H profile steel (general steel knot Structure), multilayer or low layer use C-type steel or square type steel,, can be in the web portion of H steel for the levelling that is in the milk when using H profile steel Separate levelling hole;Stull 1.2 can be rectangle steel, C-type steel, Z-shape steel, round steel, triangular steel etc., the company of stull 1.2 and mullion It connecing and generally passes through connection among mullion, single material can pass through mostly with mullion, and fixed form is that perforation is welded with the mode connect, Wherein welding can use the mode of spot welding;Diagonal brace 1.4 can be C-type steel, rectangle steel, and diagonal brace 1.4 is mainly and mullion, stull 1.2 form the stabilization mechanical structure of multiple triangles, and diagonal brace 1.4 can be weldingly fixed on perpendicular on the outside or inside and outside bilateral On column.
The inside of steel construction 1 or inside and outside be equipped with collar tie beam 2, for fixing interlayer floor support plate 7.Collar tie beam 2 can be rectangle Steel, triangular steel, C-type steel or U-steel, collar tie beam 2 divide for ground beam and interlayer collar tie beam.Ground beam connection mullion is simultaneously tethered with earth anchor Fixation is connect, interlayer collar tie beam plays bracketing interlayer floor support plate 7, in the inside of external shear wall and the bilateral peace of internal shear wall Dress.Interlayer collar tie beam is also that the upper and lower plates of interior solid model plate are connected and fixed a little.
The construction method of steel construction and insulation construction integral type solid model shear wall, comprising the following steps:
(1) steel member is processed;
(2) steel construction is assembled;
(3) window frame doorframe is installed;
(4) anticorrosion with painting transition zone;
(5) the inside and outside fixed heat insulating strip of fixed steel construction two sides is installed;
(6) fixed cable conduct and hot-water heating pipe are installed;
(7) assembled large stretch of steel structure and fixation are lifted;
(8) the outer solid model plate and interior solid model plate of first layer are installed;
(9) foamed concrete is poured;
(10) plate stitch of outer solid model plate and interior solid model plate is filled;
(11) one layer of outer solid model plate and interior solid model plate are successively installed;
(12) one layer of foamed concrete is successively poured;
(13) the assembling installation of higher steel construction is attached on the high steel structure upper section of layer poured according to layer height, it will Above-mentioned operation layer height is repeated to build.
Wherein, assembling steel construction can using ground large area assemble steel structure component or on the basis of fixed mullion is installed And other component two schemes are fixed in installation.Steel construction i.e. of the invention single material can be fixedly mounted on building foundation, Can be after ground be assembled into a face wall or Large Area Steel structure body, then carry out mechanical hoisting and fix.
Embodiment one:
The present embodiment is three layers of low layer New Residence building of light steel, a height of 3000mm of layer, the flat-top daughter of total a height of 9500mm Building, exterior wall thickness 252mm, each portion's component are as follows:
Steel construction
1. collar tie beam structure:
Ground beam: specification 100x50x5, material: Q235b preservative treatment is epoxide coal bituminous, three oily two cloth.
Interlayer collar tie beam and upper collar tie beam: specification 120x60x2.5 material Q235b hot galvanizing square shaped pipe.
2. going along with sb. to guard him shearing and internal shear force wall construction:
Mullion: specification 80x80x2.5x9400 material Q235b hot galvanizing square type steel
Stull: specification 60x40x2.0 material Q235b hot galvanizing square type steel
Diagonal brace: specification 40x40x1.5 material Q235b hot galvanizing square type steel
3. processing and assembling
In the enterprising eleven punch 11 of mullion (41x62) mm, the successively aperture from the 50-100 of one end, away from (stull root distance) 850mm root Stull length is cut according to reserved door and window, diagonal brace material length is cut according to the specification of inside and outside solid model plate.
Assembling
(1) steel member is processed;
(2) it assembles steel construction: stull is penetrated in mullion perforation and be sequentially connected away from putting on ground by 1200 columns by mullion And fixed with adjusting screw, secondly side is successively fixed diagonal brace (bridging) and fixed with adjusting screw, inside interlayer position, installation is fixed Interlayer collar tie beam and upper collar tie beam appropriate local welding or add supporting piece and fix in addition to adjusting screw;
(3) window frame doorframe is installed;
(4) anticorrosion with painting transition zone;
(5) it is installed in the two sides of diagonal brace, stull and mullion and fixes heat insulating strip, material pine, specification 40x30x3000, 60x80x60,60x70x50;
(6) electric wire or hot-water heating pipeline or casing are successively installed;
(7) above-mentioned steel structure component is successively lifted, is fixed in ground beam;
(8) the outer solid model plate and interior solid model plate of first layer are installed:
Outer solid model plate: cement fibrolite plate specification 20 × 1200 × 2400
Interior solid model plate: waterproof gypsum board specification 12 × 1200 × 3000
Solid model plate in outer is successively fixedly mounted from bottom to top, first template can be fixed temporarily with nailing gun and use silk on it Nail is fixed, on diagonal brace (bridging) and anyhow to fixing glue away from 250mm or so.Outer solid model plate stitch 8-10mm is reserved, it is interior Solid model plate stitch 6mm, wire box is installed in aperture on interior solid model plate.
Fixed wallboard and outer solid model plate are installed at door and window position
Wallboard material: OSB plate gauge lattice 200 × 20 × 2400
(9) it is poured foamed cement:
Using foamed cement machinery, the dry density of joints cement is 320kg, when being poured first time, pours grouting height It is carried out after being cast in 4-8h for the second time between 400-600, under room temperature, grouting height successively pours building between 600-1500 Board and floor part.
(10) plate stitch of outer solid model plate and interior solid model plate is filled:
Inside and outside plate stitch is handled, inner and external wall putty processing inner-outer wall plate stitch is respectively adopted.
(11) successively the steel structure component for mutually connecting one layer is connected and fixed, and outer solid model plate and interior solid model plate is successively installed, Pour foamed concrete;And Lou Chenggang structure component is successively lifted from bottom to top, and be fixed on collar tie beam.
(12) the assembling installation of higher steel construction is attached on the high steel structure upper section of layer poured according to layer height, it will Above-mentioned operation layer height is repeated to build.
Utilize the construction method of above-mentioned steel construction and insulation construction integral type solid model shear wall, three layers of New Residence of construction 280m2, 12 people of in-site installation personnel, major project is without finishing, construction period 4 days, equivalent 48 work days.Building performance ginseng Number:
Grade >=9 degree 1. antidetonation earthquake intensity is set up defences
2. fire line
A) fire endurance >=4h
B) A grades it is non-ignitable
3. 16 grades >=55m/s of hurricane resistant
4. building energy conservation: >=85% enclosure wall heat transfer coefficient≤0.14w/m2·k
5. sound insulation value >=55dB
6. environmental-protecting performance: Eo grades
7. service life: >=70 years
The construction method of the present embodiment, maximum feature are exactly that multilayer is once completed, and first can build roof and realize round-the-clock , there is significant high efficiency in the long region of operation, especially rainfall time Big Wet, and traditional method of construction is built most from level to level After bind, this is outstanding feature of the invention.
The light steel integrated house of traditional cold bending thin wall, fills heat-preservation cotton in keel, can be in heat-preservation cotton after floods Water suction, insulation failure.
Embodiment two:
The present embodiment is the multilayer residential building of general steel light steel mixing structure, a height of 7 layers total, a height of 3 meters of layer, total height 21 Rice (2100), exterior enclosure wall thickness 340mm, 60x12 area 5040m2
1. steel construction
180 × 100 × 8 Q235 anti-corrosion channel steel of ground beam
160 × 60 × 8 Q235 channel steel of interlayer collar tie beam
2. going along with sb. to guard him shear wall and interior scissors wall construction
200 × 120 × 8 × 10000 Q325 H profile steel of mullion
100 × 50 × 2.0 Q325 hot galvanizing square type steel of stull
40 × 60 × 2.0 Q325 hot galvanizing square type steel of diagonal brace
3. pressing design drag link spacing successively aperture 42 × 62 on mullion H steel, and the stream of aperture DN120 is starched on web Hole, pitch-row 800mm, and the diagonal brace fixation hole that drills on H steel cut ground beam link slot (fluting) in H steel bottom.
4. assembling steel member
(1) mullion H steel is put into 2400 columns away from since H steel total length is 21000mm, by transport shadow on ground by design Sound can carry out butt welding connection by two 10000+11000;
(2) stull perforation is sequentially connected, carries out spot welding and fixes;
(3) diagonal brace is installed in H steel two sides;
(4) ground beam and inside installation interlayer and upper collar tie beam are fixedly mounted at H steel bottom slot;
(5) anticorrosion with painting transition zone;
(6) heat-insulated fixed strip and block be installed in the two sides of diagonal brace, mullion, crossbeam, material OSB, lath 25 × 60 × 2400, Compound wooden unit 100 × 135 × 50,70 × 100 × 50;
(7) electric wire and hot-water heating pipeline or casing are successively installed;
(8) successively assembling steel member is lifted and is fixed in ground anchor bolt;
(9) it is sequentially connected adjacent steel member;
(10) fixed building is lifted from bottom to top and hold steel member, be fixed on collar tie beam (joist).
5. solid model plate and installation
Outer solid model plate: aluminium-magnesium silicate fiberboard specification 15 × 1200 × 2400
Interior solid model plate: cement fibrolite plate specification 10 × 1200 × 2400
(1) successively the interior solid model plate from outside the right installation in a left side, reserved plate stitch, Side fascia 10mm, interior wall stitch 6mm from bottom to top, Wire box is installed in aperture on interior solid model plate.
(2) door and window and closing closure plate are successively installed.
6. pouring foamed cement
(1) mixture of EPS expanded beads and foamed cement is used, dry density 280kg is in the milk using 50 type foamed cements Machine, EPS/ foamed cement are 30/70, are successively poured from bottom to top.
(2) building bearing structure and roof structure are successively poured.
Above-mentioned construction technology of the invention builds 7 layers of residential building 5040m225 human agent's construction periods 12 days, 300 works Day, 10 times or more are improved than traditional construction speed.Its performance parameter is as follows:
1. shake earthquake intensity is done to set up defences grade >=9 degree
2. fire line
A. fire endurance >=4.5h
B.A grades non-ignitable
3. hurricane resistant >=16 grade >=55m/s
4. building energy conservation >=90% vertical plane wall heat transfer coefficient≤0.135W/m2·k
5. sound insulation value >=60Db
6. feature of environmental protection Eo grades
7. service life >=70 year
It is coated on by solid model plate and foamed cement material using the peripheral protective general steel structure after building technology of the invention It is interior, it is provided convenience to building inner room finishing and utilizing.Unlike there is the independent general steel structural steel columns of protrusion in traditional room. The sound of the harmomegathus generated by temperature change and splitting for stress rupture generation are not generated since steel construction is adiabatic after material cladding Seam.
Embodiment three:
The present embodiment be concrete frame shear structure skyscraper shear wall, concrete column away from hole be 4000 × 8000, construction method is as follows:
The steel construction of shear wall is lightweight steel construction, can size blanking according to column away from hole.The present embodiment column is away from hole 4000 × 8000, i.e., high by 4000 (4 meters), long 8000 (8 meters), wall thickness 250mm.
1. steel construction:
(1) the C-type steel Q235 of 50 × 100 × 20 × 2.5 × 7980 hot dip of mullion
(2) 60 × 60 × 45 × 2.0 hot galvanizing Z-shape steel Q235 of stull
(3) 30 × 50 × 1.5 hot dip square type steel Q235b of diagonal brace
2. processing assembling
According to design requirement stull support away from being 1000, i.e., successively slot in (hole) on mullion, L-type, about 70 × 70 × 8 And intermediate five L-type holes, aperture use plasma cutting machine or punching machine.
Assembling:
A) C-type steel column is successively put on ground
B) stull angle steel is successively penetrated into respective perforations and spot welding is fixed
C) diagonal brace is installed in C-type steel two sides
D) anticorrosion with painting transition zone;
E) in diagonal brace, the fixed heat-insulated fixed strip of vertical and horizontal column two sides installation or block.
Material: Wood-plastic profiles lath 25 × 60 × 3,000 65 × 50 × 3000 (stull), block: 75 × 50 × 50
F) electric wire and hot-water heating pipeline and casing are successively installed
G) outer solid model plate is successively installed
Outer 15 × 1200 × 2400 calcium silicate board of solid model plate
H) package assembly is lifted:
Lift package assembly: and by surrounding steel construction and concrete structure bolt, it is connected using expansible plug connection or built-in fitting.
I) solid model plate in installing
Interior solid model plate: 10 × 1200 × 2400 cement pressure fiberboards
J) wire box and closed windows closure plate are installed.
K) in upper top position, pouring hole at least two or more is opened and the slurry seam that overflows (pushing up lower 20mm)
3. pouring foamed cement
Foamed cement, dry density 310kg/m3, it is in the milk out of pouring hole.Three or back-grouting can be divided into, it is last from the slurry that overflows Seam overflows.
It is handled with putty and does not pour gap.
Addition dispersion short glass fiber in foamed cement described in the present embodiment, length 15mm, additive amount 2%, Play the humidification to foamed cement.
Be increased to using construction high-layer shear force wall of the invention than one layer of traditional construction speed 8 days 1.5 days one layer, have significant Construction quickly and efficiently property.And set up defences than traditional antidetonation, hurricane resistant performance high anti-seismic earthquake intensity and improve 2 degree, hurricane resistant performance It is improved by 14 grades to 16 grades or more.
Example IV:
Remote construction advantage: traditional EPC assembled architecture, is to transport in-site installation by factory made elements Construction, EPC component is that figure is larger mostly, is influenced by transportation range very sensitive.It can significantly be increased more than 300km cost, Competitiveness and value are almost lost more than 5000km!
The present invention can be poured using site machinery, and single machine can realize 50m3/ h can be real if it is 10 mechanical works Existing 500m3/ h, daily 5000m3, convert into 200mm thickness foamed cement wall 25000m2.Because volume is maximum in whole building , 65% or more is cement, and cement is easy buying as basic architecture material, and price is not much different.425#Cement 1.2-1.6T/m of bulk density3, 3.0-3.15t/m of EPC component density3.If transported from Beijing to Xinjiang Urumqi city, 30 tons of EPC component 3168km, for freight charges at 3.412 ten thousand yuan, freight charges are component self-values more than 2 times.And the present invention can be on the spot Materials buy ordinary cement, so that it becomes foamed cement, density 0.3T/m3, that is, can be 10 times with relative expansion, not only Save freight charges, at the same realize building structure with it is heat insulation integrated, one-time mechanicalization is efficiently poured and be can be completed.Of the invention It can be adapted for constructing at a distance, there is the very strong market competitiveness.
Embodiment five:
The processing is simple, efficiently, system easy to control the quality: punching connection of the invention, the processing is simple, high construction efficiency, and quality is easy Control such as uses the incomparably rigid structural system of light steel, such as mullion 80*80*2.0, stull 40*60*2.0, diagonal brace 30*50*1.5's Q235 hot galvanizing rectangle steel processes very simple, punching is only processed on mullion, can without processing to support crosswise The length that interception needs as needed at the construction field (site).Most supports crosswise are long material structure.Scene need to only be put, and be worn Hole connection.Industrial worker can be used, be not necessarily to skilled worker.Since perforation processing is carried out according to the design needs in automation equipment Processing, precision is higher, and scene is hardly malfunctioned.Because if quality is easy just in case error must be processing or design link Control.The efficiency of perforation construction is 3-5 times of the light steel of traditional cold bending thin wall, in addition mostly nonstandard, the complicated component of the latter, one As need competency profiling skilled worker complete, in the construction process be easy error, do over again.Since low efficiency, assembly difficulty are big, Ask craftsmanship high, relative competitive is weak.
Embodiment six:
Easily implement all weather operations construction: proposed four layers of light steel construction in south China, the high 2800mm of layer is total high 12000mm (contains parapet), flat-top, construction area 2000m225 people of construction worker.
Mullion uses the Q235 hot galvanizing rectangle steel of 80*80*2.5*12000.It can be assembled on ground, exterior wall and interior Shear wall preferentially assembles, and then assembles floor support plate structure.After carrying out lifting fixation, roof enclosed structure is built.These project amounts It can be completed in four days.Just as having propped up one gamp, building materials, material can be moved into " gamp " and be constructed, even if Rain can also carry out normal construction.
This one the characteristics of expecting top, first building roof the structural system depending on this science of the invention, use The stable rigidity of the bidirectional stress of rectangle steel, and the triangular form Crossing brace being evenly distributed, this novel incomparable rigid system, rigidity ratio With intensity ratio, safety guarantee is provided first to build roof structure.
The light steel method of construction of traditional cold bending thin wall determines it due to itself structural system and material mechanical performance Build, finally bind from level to level, this way be constructed in rainy season the duration there is no guarantee that, be not easy to implement all weather operations construction.Cause This present invention has apparent competitiveness in the big area construction of rainy season rainfall.
Embodiment seven:
Waterproofness is excellent: the construction material of the present embodiment, and outer solid model plate is the cement pressure fiberboard of 20mm thickness, exterior wall Face is pu water proof type exterior coating, and interior solid model plate is 12mm thickness waterproof gypsum board.Waterproof experiment: the 900mm depth of water is carried out, it is soaked Then 30h is drained, waterproof is impregnated again after 100h, continuously 10 experiments repeatedly, examination by sectioning, steel construction non-corroding, hair Soaked mud water absorption rate≤5%, house does not influence normal use.Compare the light steel building of cold bending thin wall, filling in lightgage steel joist Heat-preservation cotton be rock wool formula mineral wool, press above-mentioned soaked experiment 10h, split wall inspection, the corrosion of light steel section, OSB expands, part Screw loosening, heat-preservation cotton water absorption rate >=100%, house, which is scrapped, to be used.
The southern area along China the Changjiang river, the house probability proportion that wet season of summer crosses water is larger, Hunan, Hubei, Jiangxi Etc. ground some even secondary generations in 3 years.Promoting present invention building to this area has significant waterproof sexual clorminance.
Embodiment eight:
Excellent fire line, the accessible high usage in space: utilize building technology technique of the invention, the high level of construction or High-rise general steel structure, H profile steel are covered by shear wall, become stealthy steel construction, and not only shearing strength is more preferable, are being foamed In the package of cement thermal insulation fire-proof material fire endurance it is higher >=4h, such as outer solid model plate is 20mm calcium silicate board, and interior solid model plate is 10mm magnesium oxide plate, H steel are 250*100*12, wall thickness 350mm, fire endurance 4h.
Since the stealthy steel construction of construction of the invention is space decoration utilization, provides convenience, increase utilization rate.
Compare traditional general steel structure H profile steel independently of exterior wall outside, need to apply very thick flood control coating, become space Barrier, to finishing and using making troubles.
Embodiment nine:
Excellent seismic seeurity: since building structure of the invention is that pouring for steel construction and light foaming cement is compound Body has better anti-seismic performance than traditional light steel, general steel structure.The structure of the present embodiment use perforation structure, i.e., mullion, Stull, inclined support structure are all " long material ", and structural attachment point is few, are specifically as follows H profile steel mullion 1.1 and square type steel mullion 1.3, two Person is alternately arranged (as shown in Figure 10), and stull 1.2 passes through among mullion, and globality intensity is high, even if super earthquake occurs, 10 Grade or more, construction wall is destroyed, and deform bending, will not be broken, therefore very safe.Foamed cement is lightweight material Material, pouring structure are not easy to form bulk, and pendant object is caused to hurt sb.'s feelings.Generally using building of the invention, grade >=9 degree of providing fortification against earthquakes, Comparison EPC assembled architecture easily goes wrong on connecting portion, causes unit module to collapse, and EPC component density is big, antidetonation Safety is poor.EPC in recent years has found these hidden danger in promoting in the application, and thoroughly solves the problems, such as this technical side Not yet, the present invention can become the technical substitution of EPC system to case.
Embodiment ten:
Hurricane resistant is had excellent performance: hurricane resistant performance is an important performance in current world wide to house requirement, i.e., Make the flourishing U.S., it is serious to be destroyed life and property loss by hurricane every year.Traditional lightweight steel construction especially cold bending thin wall U-type groove Keel type, Multi-layer composite are easy to be stripped destruction from level to level in hurricane, and whole building is caused to tear or damage.
The building of the present embodiment uses H profile steel mullion 1.1, square type steel mullion 1.3, rectangle steel stull 1.2, rectangle steel diagonal brace " solid core " structural complexity that 1.4 steel constructions formed and foamed cement pour, and steel construction is " long material " structure, is had good Whole hurricane resistant load, be not easy successively to remove tearing phenomenon, hurricane resistant can achieve the superiority of 17 grades of hurricanes of 60m/s Energy.
Embodiment 11:
Pest-resistant mouse ant property is excellent: traditional timber structure and lightweight steel construction, main material is wooden structures plate, all vulnerable to worm The infringement of mouse ant, especially termite, mouse are easy to do nest in soft structure gap and heat-preservation cotton.Once into being difficult to expel.
The building of the present embodiment, filling has poured dry in the space that steel construction 1, interior solid model plate 6, outer solid model plate 5 are gone along with sb. to guard him Density 310kg/m3Foamed concrete 8, form " solid core " structural body, cement material do not destroy and do the item of nest to worm mouse Part, therefore have good insect prevention mouse ant property.

Claims (10)

1. a kind of steel construction and insulation construction integral type solid model shear wall, it is characterised in that: including steel construction (1), steel construction (1) Inside and outside be respectively equipped with interior solid model plate (6) and outer solid model plate (5), steel construction (1), interior solid model plate (6), outer solid model plate (5) enclose Foamed concrete (8) are filled in the space protected.
2. steel construction according to claim 1 and insulation construction integral type solid model shear wall, it is characterised in that: the steel Interior fixed heat insulating strip (3) is equipped between interior solid model plate (6), outer solid model plate (5) inside and outside structure (1) and outer fixation is heat-insulated Item (4), the arranged direction of heat insulating strip are lateral, vertical, diagonal cross.
3. steel construction according to claim 1 and insulation construction integral type solid model shear wall, it is characterised in that: the steel Structure (1) includes the mullion being fixed together and stull (1.2), is fixed with diagonal brace inside and outside mullion and stull (1.2) (1.4)。
4. steel construction according to claim 3 and insulation construction integral type solid model shear wall, it is characterised in that: described is perpendicular Column is intermediate jointless single overall steel material.
5. steel construction according to claim 4 and insulation construction integral type solid model shear wall, it is characterised in that: the cross Supportting (1.2) is intermediate jointless single overall steel material, and stull (1.2) passes through mullion.
6. steel construction according to claim 3 and insulation construction integral type solid model shear wall, it is characterised in that: described is perpendicular Column uses one or more of H-type, Z-type, c-type, square type steel;Stull (1.2) uses square type, triangular form, Z-type, c-type, circle One or more of structural section;C-type steel or rectangle steel are used with diagonal brace (1.4).
7. steel construction according to claim 1 and insulation construction integral type solid model shear wall, it is characterised in that: the steel The inside of structure (1) or inside and outside be equipped with collar tie beam (2).
8. steel construction according to claim 1 and insulation construction integral type solid model shear wall, it is characterised in that: the steel The spraying of structure (1) outer surface or dip-coating corrosion resistant transition layer (10).
9. the construction method of a kind of steel construction described in claim 1 and insulation construction integral type solid model shear wall, feature exist In the following steps are included:
(1) steel member is processed;
(2) steel construction is assembled;
(3) window frame doorframe is installed;
(4) anticorrosion with painting transition zone;
(5) the inside and outside fixed heat insulating strip of fixed steel construction two sides is installed;
(6) fixed cable conduct and hot-water heating pipe are installed;
(7) assembled large stretch of steel structure and fixation are lifted;
(8) the outer solid model plate and interior solid model plate of first layer are installed;
(9) foamed concrete is poured;
(10) plate stitch of outer solid model plate and interior solid model plate is filled;
(11) one layer of outer solid model plate and interior solid model plate are successively installed;
(12) one layer of foamed concrete is successively poured;
(13) the assembling installation of higher steel construction is attached on the high steel structure upper section of layer poured according to layer height, will be repeated Above-mentioned operation layer height is built.
10. the construction method of steel construction according to claim 9 and insulation construction integral type solid model shear wall, feature exist In: assembling steel construction can using ground large area assemble steel structure component or on the basis of fixed mullion is installed and installation is fixed Other component two schemes.
CN201910924404.2A 2019-09-27 2019-09-27 Steel construction and insulation construction integral type solid model shear wall and construction method Pending CN110528731A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910924404.2A CN110528731A (en) 2019-09-27 2019-09-27 Steel construction and insulation construction integral type solid model shear wall and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910924404.2A CN110528731A (en) 2019-09-27 2019-09-27 Steel construction and insulation construction integral type solid model shear wall and construction method

Publications (1)

Publication Number Publication Date
CN110528731A true CN110528731A (en) 2019-12-03

Family

ID=68670659

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910924404.2A Pending CN110528731A (en) 2019-09-27 2019-09-27 Steel construction and insulation construction integral type solid model shear wall and construction method

Country Status (1)

Country Link
CN (1) CN110528731A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080282634A1 (en) * 2006-05-18 2008-11-20 Ping Qu Composite Concrete Shear Wall for Heat Insulation
CN202117345U (en) * 2011-06-01 2012-01-18 崔兴征 Integrated energy-saving foam concrete house system
CN105155730A (en) * 2015-09-02 2015-12-16 江苏通创现代建筑产业技术研究院有限公司 Outer wall building module and application thereof
CN107268984A (en) * 2017-06-21 2017-10-20 山东新活新材料科技有限公司 A kind of aluminum alloy pattern plate construction technology
CN108547396A (en) * 2018-03-19 2018-09-18 北京工业大学 Assembling truss type light steel frame-bar-mat reinforcement-foamed concrete faced wall
CN109881825A (en) * 2019-04-17 2019-06-14 淄博仲基能源科技有限公司 Novel solid model shear wall and construction method
CN210857606U (en) * 2019-09-27 2020-06-26 北京仲基应用技术研究院有限公司 Steel construction and insulation construction integral type solid mould shear force wall

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080282634A1 (en) * 2006-05-18 2008-11-20 Ping Qu Composite Concrete Shear Wall for Heat Insulation
CN202117345U (en) * 2011-06-01 2012-01-18 崔兴征 Integrated energy-saving foam concrete house system
CN105155730A (en) * 2015-09-02 2015-12-16 江苏通创现代建筑产业技术研究院有限公司 Outer wall building module and application thereof
CN107268984A (en) * 2017-06-21 2017-10-20 山东新活新材料科技有限公司 A kind of aluminum alloy pattern plate construction technology
CN108547396A (en) * 2018-03-19 2018-09-18 北京工业大学 Assembling truss type light steel frame-bar-mat reinforcement-foamed concrete faced wall
CN109881825A (en) * 2019-04-17 2019-06-14 淄博仲基能源科技有限公司 Novel solid model shear wall and construction method
CN210857606U (en) * 2019-09-27 2020-06-26 北京仲基应用技术研究院有限公司 Steel construction and insulation construction integral type solid mould shear force wall

Similar Documents

Publication Publication Date Title
WO2021253808A1 (en) Building technique for low-carbon society in high-technology era
CN100464043C (en) Bound-type composite heat-insulation wall with support body
CN206769115U (en) A kind of lightgage steel joist steel mesh self-heat conserving composite partition
CN101914974B (en) Light slab
CN105421818B (en) Built-in steel Standard house
CN207878960U (en) A kind of construction material for installing high-strength durable fiber cloth or/and plastic film
US20140000204A1 (en) Outer thermal insulating composite wall with supporters for outer walls
CN101845857B (en) Metal mesh built-in insulating outer wall and construction method thereof
CN202611016U (en) Thermal insulating wall on concrete overhanging eaves board
CN101168977A (en) Plastering composite wall with reinforcing steel bar and/or metal net equipped at inter and outer or two-side
CN203174810U (en) Bearing-and-leaning type installed assembly wall body
CN1982554A (en) Thermal-insulating binded composite wall with supporter
CN103572866A (en) Assembly type wall
CN103590511A (en) Bearing-reclining-type mounted assembly-type wall
CN2532147Y (en) Composite wall board
CN202099896U (en) Heat insulation composite wall body with plaster meshes on two sides
CN106592825A (en) Assembly type wood frame energy-saving shear wall
WO2009012660A1 (en) A composite wall with steel bar and/or metal wire mesh and mortar on internal and external sides thereof and bonding construction method therefor to resist cracking
WO2012119479A1 (en) Outer insulating composite wall of outer wall
CN210857606U (en) Steel construction and insulation construction integral type solid mould shear force wall
CN219060418U (en) Light prefabricated composite heat-insulating external wall panel and wall structure
CN202170580U (en) Compound thermal insulation wall for building
CN104420556A (en) Assembly type energy-saving wall
CN201817962U (en) Light plate
CN111101594A (en) Cold-formed thin-wall light steel structure building

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination