CN203174810U - Bearing-and-leaning type installed assembly wall body - Google Patents

Bearing-and-leaning type installed assembly wall body Download PDF

Info

Publication number
CN203174810U
CN203174810U CN 201220675913 CN201220675913U CN203174810U CN 203174810 U CN203174810 U CN 203174810U CN 201220675913 CN201220675913 CN 201220675913 CN 201220675913 U CN201220675913 U CN 201220675913U CN 203174810 U CN203174810 U CN 203174810U
Authority
CN
China
Prior art keywords
prefabricated
wall
construction
prefabricated panel
reinforcing bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220675913
Other languages
Chinese (zh)
Inventor
吴淑环
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 201220675913 priority Critical patent/CN203174810U/en
Application granted granted Critical
Publication of CN203174810U publication Critical patent/CN203174810U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model relates to a bearing-and-leaning type installed assembly wall body, and relates to assembly wall bodies for buildings. The problems that a framework structure wall body is more in thermal bridge, poor in durability and complex in aseismatic structure, has influences on energy conservation and housing industrialization and the like are solved. In a first structure, a structure bearing piece for bearing a prefabricated wall plate is arranged on the outer side of a beam column, the prefabricated wall plate is connected with the lateral face of the beam column in a bearing-and-leaning mode, and a common bearing-and-leaning type assembly wall body is formed. In a second structure, a structure bearing piece for bearing a prefabricated wall plate and a prefabricated strip plate is arranged on the outer side of a beam column, the prefabricated wall plate and the prefabricated strip plate are connected with the lateral face of a beam in a bearing-and-leaning mode, a sliding construction piece is installed at the horizontal seam position of the prefabricated strip plate and the structure bearing piece or a beam plate, when storey drifting is caused in a building body structure, the assembly wall body can horizontally move along a sliding groove along with the beam or the plate, and therefore the sliding bearing-and-leaning type assembly wall body can be formed. Energy conservation and heat preservation effects of the bearing-and-leaning type installed assembly wall body are greatly improved, installation speed is high, construction cost is low, durability is good, anti-seismic performance is good, and the bearing-and-leaning type installed assembly wall body is favorable for promoting the housing industrialization.

Description

The assembling body of wall that a kind of support, the formula that reclines are installed
Technical field
The assembling body of wall that a kind of construction wall in the present invention relates to build, particularly a kind of support, the formula that reclines are installed.
Background technology
The current problem that exists with prefabricated panel installation assembling body of wall mainly is:
1, the power saving of construction wall technology is not solved all the time.
Once the issue report showed that the emission reduction effect that green building and building energy conservation are contained was greater than all greenhouse gas emissions that require in the Kyoto Protocol in March, 2007 in the United Nations, was equivalent to three times of the predetermined CER of Kyoto Protocol.The building energy conservation situation directly influences global warming, and south poles is melted, and melt on the iceberg, sea level rise, the animals and plants extinction.
The report that the World Bank delivers is warned: " multirow moves unless take more to climate warming, otherwise global temperatures will rise four degrees centigrade again in the end of this century.The danger of liter, food shortage, extreme weather conditions on the global plane of bordering on the sea, this will make that coastal cities and the poor are in the face of catastrophic effect ".The World Bank on November 18th, 2012, the issue report claimed, climate change is one of ultimate challenge of facing of global evolution, is descendants's meter, and various countries should undertake moral duty separately, the minimizing greenhouse gas emission of taking action conscientiously.……
Much publicize the data of heat insulating materials now, how good the heat insulating material insulation that all publicizes oneself is, how low wall heat transfer coefficient can reach, but this is the main wall body heat transferring coefficient that does not contain heat bridges such as window, balcony slab in fact, rather than mean thermal transmittance, and our the final wall heat transfer coefficient that requires is the mean thermal transmittance that contains heat bridge.
Contain the influence of heat bridges such as window, balcony slab interior existing, China heating area, really reaching body of wall mean thermal transmittance K is 0.5w/m 2.k Yi Xia building is few, heating phase body of wall total heat consumption=24K * days of heating period (be 170 days as the Harbin City) * indoor and outdoor mean temperature difference in winter (stipulating that the Harbin City is 26.5 degree) * wall area.As seen, wall heat transfer coefficient is very big to the influence of winter heating heat consumption.Same thermal transmittance is also very big to the energy consumption influence of refrigeration air-conditioner in summer, and southern non-heating region body of wall mean thermal transmittance K now is about 1w/m 2Even more .k.
Some prefabricated panels are provided with topping at the termination side; mostly these toppings are cement mortar or add light weight sand mortar or the magnesia cement mortar cover of light material; its coefficient of thermal conductivity forms heat bridge much larger than the prefabricated panel inner thermal insulating layer, causes the prefabricated panel heat bridge too many.Also have wallboard termination gaping of joints, ventilative problem, in addition winter along the seam crossing dewfall, mouldy, become mildewed, the phenomenon of wood flooring warpage takes place.Though be heat-insulation wall plate, because of ventilative, energy-saving heat preserving is also bad.How to pass prefabricated panel with reinforcing bar as the crab-bolt level during installation, prefabricated panel and beam column are fixed, conduct heat again.
The frame beam column area accounts for exterior wall area 25~40%, and the wallboard of building filled wall or installation in framework by laying bricks or stones is installed in the framework hole more, and there are thinner masonry or wallboard in the frame beam column outside, and the insulation of beam column place is weak, forms heat bridge;
Also have the plug-in body of wall of (building standard design atlas " precast concrete out-hung panel " 08SJ110-2,08SG333), because interior siphonal lobe concrete is too heavy, to stressed unfavorable, insulation layer thickness is restricted, and these are all very big to the influence of body of wall energy-saving heat preserving.
The heat bridge of existing body of wall technology is all too many: different structure form, different decoration, different energy-saving wall technology, different balcony heat preservation technologies, (there is air layer at the place as the sandwich heat preserving wall body inner thermal insulating layer, forms cross-ventilation to add a large amount of door and window heat bridges, steel tie heat bridge, cross-ventilated heat bridge.), these heat bridges are a lot, and the heat bridge amount of calculation is big, and it is very difficult that the designer calculates heat bridge, causes the body of wall mean thermal transmittance not have transparency, often misled building energy conservation.
2, the reinforcing bar or the crab-bolt corrosion that are connected with major structure of construction of the assembling body of wall formed of prefabricated panel, socket as setting that reinforcing bar passes insulation layer and major structure of construction sockets, and steelframe is set in prefabricated panel, socket reinforcing bar or diagonal reinforcement or oblique cutting steel wire and pass insulation layer inside and outside reinforcing bar is socketed.Reinforcing bar when not having the protection of strong concrete alkaline environment, easy-to-rust, durability is bad, common engineering be unwilling to be used stainless steel rebar, with galvanizing steel may be all seldom.Prefabricated panel is connected ironware with major structure of construction solder joint does not have alkaline cement mortar or concrete protection, is easy to corrosion, influences safety, the durability of assembling body of wall, and is unfavorable to social sustainable development.
What 3, have arranges the prefabricated panel that lightgage steel joist is installed light-duty complex heat-preservation template, and prefabricated panel and keel are fixed, and what is the anchored force of lightgage steel joist and flooring up and down? be unknown number, this wallboard bears horizontal loading and can not design by ultimate limit state.The assembling body of wall of the present type composite insulation boards of not taking a favourable turn can satisfy regulation and the case history of ultimate limit state design, poor stability.Follow closely sheet iron at the dry wall edges of boards in addition, again with iron sheet nail connection prefabricated panel on major structure of construction, is the pulling force that this connection can be born much? it also is unknown number, can only be used for the little low-rise building of wind-force, and the corrosion resistance of tie point is also bad, at first corrode at the ailing place, influences durability.And wallboard divide is done inside and outside two-layer and keel fixed installation, and not only beam column outside heat bridge is many, and its ratio of rigidity closes two-layer wallboard and do one deck precast wall body and install very differently, and wallboard is stressed indeterminate, and increases prefabricated and installation cost.
The prefabricated panel template consumption of the assembling body of wall that 4, has is big, needs great amount of investment, adds a large amount of investments in land, because increasing considerably cost, makes that carrying out the assembling body of wall is difficult to carry out.
5, China and global earthquakes are multiple, and China's highrise building ratio is very big.Current filled wall is stressed fuzzy to the major structure of construction influence, is difficult to calculate, and is unfavorable for guaranteeing building aseismicity safety, is unfavorable for the anti-sidesway safety of highrise building.The existing assembling wall structure that has the adaptation major structure of construction to be out of shape is too complicated, cost is high.As:
1), by Beijing City Building Design Inst. the connection of the Japanese architecture wallboard " structure ", a literary composition as seen, the anti-seismic construction of the assembling body of wall of Japanese slip is complexity too;
2), also as building standard design atlas " precast concrete out-hung panel " 08SJ110-2,08SG333, wherein the 16th, 17,32~35,44~47 pages is the exterior wall concrete link plate, be whole concrete panel of slip, structure is complicated too, processing prefabricated panel difficulty is big, installation difficulty is big, amount of reinforcement is big, installed part quantity is many, the cost height, must be prefabricated on platform, occupied ground is big, the land resources that waste is valuable, only be used in a few high-end engineering at present and suffered, be unfavorable for that the assembling body of wall is popularized and assurance building aseismicity safety and the anti-sidesway safety of highrise building.
6, in the highrise building curtain wall decoration being installed, when the curtain wall decoration particularly is installed, under wind load and horizontal earthquake action, when the major structure of construction interlayer is subjected to displacement the angle, the curtain wall squeeze and destroy being taken place easily, is reluctant problem in installing.
Durability, the safety of the problems referred to above influence building, influence building energy conservation and reduce discharging, influence reduces global greenhouse gas emission, influences the anti-sidesway safety of building aseismicity and highrise building, influences the housing industrialization process.For addressing the above problem, convenient construction reduces cost, the assembling body of wall that the present invention proposes a kind of support, the formula that reclines is installed.
Summary of the invention
The assembling body of wall that the object of the invention provides a kind of support, the formula that reclines is installed.One of them is the assembling body of wall that a kind of common support, the formula that reclines are installed; Wherein two are a kind of slips, the assembling body of wall that support, the formula that reclines are installed is to solve the described problem of background technology.
One of assembling body of wall that a kind of support of the present invention, the formula that reclines are installed, it comprises major structure of construction, prefabricated panel, or also comprises prefabricated batten; Described major structure of construction is beam slab post wall and basis;
Be provided with support prefabricated panel or the structure supporting parts of the prefabricated batten of support also at the major structure of construction lateral surface, the structure supporting parts is major structure of construction extension in the horizontal direction; Described structure supporting parts is that concrete cornices, or is the metal supporting parts, or is cornicing of wood or bamboo, or/and the structure supporting parts is sole plate or floor; Described structure supporting parts is to arrange continuously or is the local interruption setting;
Described and the major structure of construction side formula that reclines is installed and is: with the installation that is posted by connecting of beam slab post, the shear wall lateral surface of prefabricated panel and major structure of construction; Or at the additional part that reclines of beam slab arranged outside, the additional part that reclines is the beam slab extension in the vertical direction of major structure of construction, with the installation that is posted by connecting of the additional part that reclines of prefabricated panel and major structure of construction; When being provided with prefabricated batten, prefabricated batten is between prefabricated panel, and the installation of prefabricated batten is identical with prefabricated panel;
The assembling body of wall that a kind of support, the formula that reclines are installed has following 3 kinds of installation constitutions, according to installation site difference, easy construction and use needs, selects the 1st for use) plant, or with the 1st) plant and the 2nd) kind cooperates installation; Or select the 3rd for use) plant, or with the 3rd) plant and the 2nd) kind cooperates installation:
1), with prefabricated panel or also have prefabricated batten to be installed on the structure supporting parts or be installed on the concrete slab, structure supporting parts or concrete slab outer end do not have insulation layer;
2), with prefabricated panel or also have prefabricated batten to be installed on the structure supporting parts or be installed on the concrete slab, there is insulation layer structure supporting parts or concrete slab outer end;
3), with prefabricated panel directly and the installation that is posted by connecting of the lateral surface of major structure of construction;
To interconnect between the prefabricated panel, or be connected between prefabricated panel and the prefabricated batten, co-operation forms the general monolithic body of wall of joining that a kind of common support, the formula that reclines are installed;
Described prefabricated panel, prefabricated batten be not for comprising prefabricated panel, the prefabricated batten of the various structures beyond the decorative heat preservation plate; When prefabricated panel, prefabricated batten were light-duty composite thermo-insulating wall board, the various materials of light-duty composite thermo-insulating wall board connected as one, and formed the primary structure member of an integral body; Described assembling body of wall topping satisfies the fire endurance requirement, and the opening protection layer satisfies the fire endurance requirement, is the first fire protection construction requirement of assembling body of wall.
Two of the assembling body of wall that a kind of support of the present invention, the formula that reclines are installed, it comprises major structure of construction, prefabricated panel, prefabricated batten, sliding component; Described major structure of construction is beam slab post wall and basis;
Be provided with the structure supporting parts of support prefabricated panel, prefabricated batten at the major structure of construction lateral surface, the structure supporting parts is connected with major structure of construction, and the structure supporting parts is major structure of construction extension in the horizontal direction; Described structure supporting parts is that concrete cornices, or is the metal supporting parts, or is cornicing of wood or bamboo, or/and the structure supporting parts is sole plate or floor, or described structure supporting parts is for forming the part in the sliding component; Described structure supporting parts is to arrange continuously or is the local interruption setting;
Described and the major structure of construction side formula that reclines is installed and is: with the installation that is posted by connecting of the beam slab lateral surface of prefabricated panel, prefabricated batten upper end or lower end and major structure of construction; Or at the additional part that reclines of beam slab arranged outside, the additional part that reclines is the beam slab extension in the vertical direction of major structure of construction, with the installation that is posted by connecting of the additional part that reclines of prefabricated panel, prefabricated batten and major structure of construction; Prefabricated batten is between prefabricated panel;
Between the assembling body of wall of described a kind of support, the formula that reclines installation and the post of major structure of construction or the shear wall following 2 kinds of structures are arranged, select one and select for use or fit applications:
1), prefabricated panel, prefabricated batten be connected with the beam slab of major structure of construction (1), be not connected with post or shear wall;
2), the installation that is posted by connecting of the post of prefabricated panel and major structure of construction or shear wall lateral surface, be provided with elastic expansion joint at post or shear wall side;
Sliding component is set at a certain distance, and sliding component is positioned at the horizontal joint place of prefabricated batten and structure supporting parts or is positioned at the flooring horizontal joint place of prefabricated batten and major structure of construction;
When the window still wall of assembling body of wall is longer, can establish additional sliding and position limitation device at the slippage end of window still wall, the beam slab of additional sliding and position limitation device and assembling body of wall and major structure of construction is fixed, and additional sliding and position limitation device can slide along with the slippage end of window still wall;
The assembling body of wall that a kind of support, the formula that reclines are installed has following 3 kinds of installation constitutions, according to using needs to select 1 separately for use) or 2) structure, or with 1) or 2) with 3) the structure collocation;
1), be installed in prefabricated panel, prefabricated batten on the structure supporting parts or be installed on the concrete slab, structure supporting parts or concrete slab outer end do not have insulation layer;
2), be installed in prefabricated panel, prefabricated batten on the structure supporting parts or be installed on the concrete slab, there is insulation layer structure supporting parts or concrete slab outer end;
3), with prefabricated panel directly with installations that be posted by connecting of the beam slab lateral surface of major structure of construction, the window still wall between the window about being positioned at arranges elastic expansion joint between the prefabricated panel of window still wall and adjacent installation;
Be connected between prefabricated panel and the prefabricated batten, co-operation forms and is out of shape between a kind of post that contains major structure of construction and the beam, assembling body of wall slip, that support, the formula that reclines are installed;
Described prefabricated panel, prefabricated batten be not for comprising prefabricated panel, the prefabricated batten of the various structures beyond the decorative heat preservation plate; When described prefabricated panel, prefabricated batten were light-duty composite thermo-insulating wall board, the various materials of light-duty composite thermo-insulating wall board connected as one, and formed the primary structure member of an integral body; Described assembling body of wall topping satisfies the fire endurance requirement, and the opening protection layer satisfies the fire endurance requirement, is the first fire protection construction requirement of assembling body of wall.
Two kinds of assembling bodies of wall of the present invention can fit applications in the different parts of building.
The present invention is with the key difference technical characterictic of public technology:
1, following 4 technical characterictics are arranged is that current assembling body of wall technology is unexistent to the assembling body of wall of embodiment of the present invention one:
1) at major structure of construction the structure supporting parts is set, support is at the outside assembling body of wall of installing of major structure of construction, and structure supporting parts (mainly being that concrete cornices) arranges or the local interruption setting continuously.
2), the structure supporting parts is interrupted when arranging, the termination of prefabricated panel is provided with breach, the position of breach is with to be interrupted the structure supporting parts that arranges corresponding, this is convenient to be template outside the beam with the prefabricated panel, concreting cornices.
When 3), prefabricated panel is light-duty composite thermo-insulating wall board, the various materials of light-duty composite thermo-insulating wall board connect as one, form the primary structure member of an integral body, the assembling body of wall of disclosed light prefabricated composite thermo-insulating wall board can not form the primary structure member of an integral body.
4), assembling body of wall topping satisfies the fire endurance requirement, the opening protection layer satisfies the fire endurance requirement, disclosed assembling body of wall technology does not have and proposes this requirement.
2, embodiment of the present invention seven except have above-mentioned 4 technical characterictics be current assembling body of wall technology unexistent, it is that current assembling body of wall technology is unexistent that following technical characterictic is arranged again: the assembling body of wall of embodiment seven is not plug-in body of wall, one end of assembling body of wall is fixed end, and the other end is the slippage end.
The present invention is not only the body of wall of slip, and still is at the assembling formula body of wall of three direction dampings.This makes the slip assembling body of wall contrast of the assembling wall structure of slip of the present invention and the described Japan of background technology and China's structure atlas, its structure, install all too simple.It is unrestricted that assembling body of wall of the present invention increases core layer thickness, easily realizes the overcast hot coefficient of body of wall.
The slip body of wall of the described Japan of background technology or China is out-hung panel.Japan is plug-in with shaped steel; China's atlas body of wall is plug-in with the bracket that is installed on the wallboard; or the shaped steel that is installed in the concrete edges of boards is connected plug-in with wallboard; see the 33rd page of atlas; bracket had both been born the weight of assembling body of wall; slip property is born in bracket the inner mounting slip spare again; and if plug-in with shaped steel; with the local increase thickness that needs of the internal lobe concrete of shaped steel connecting portion; reduce insulation layer thickness, these two kinds of installation constitutions are all very complicated, and connected node is stressed big; require installation accuracy too high, the construction trouble.The assembling wall insulating layer of atlas is too thick not all right because more unfavorable to structure stress, structure design is more complicated.
3, embodiment of the present invention two, eight is that current various prefabricated panel mounting technique is unexistent with assembling body of wall and being connected of major structure of construction.Because embodiment one, seven has been installed in prefabricated panel on the structure supporting parts, embodiment two, eight can be fixed prefabricated panel and major structure of construction fast with crab-bolt again.Needn't be provided with diagonal brace after crab-bolt is fixing and just can guarantee the prefabricated panel stability of installing, construction install convenience is installed reliably, and its safety is not only considerably beyond current various filled walls of building by laying bricks or stones, also surpass current various assembling bodies of wall, this is that the existing prefabricated panel technology of installing is unexistent.
4, install in the embodiment three, nine being configured with of reinforcing bar following 2 different with existing assembling body of wall technology:
1), longitudinal reinforcement and main tie point are positioned at the vertical joint place of prefabricated panel, or the prefabricated batten place between prefabricated panel, the force direction that is subjected to that the main tie point that longitudinal reinforcement is connected with major structure of construction transmits power is the direction of reinforcing bar along the longitudinal, stressed clear and definite, stressed good, easy for installation, rolled steel dosage is few.
5, embodiment of the present invention four, ten anticorrosive measure are that existing assembling body of wall technology is unexistent.
1), the present invention is in textural easy construction with assurance supporting, reinforcing bar and tie point protective layer thickness; longitudinal reinforcement is installed in the vertical joint place of prefabricated panel; or be installed in prefabricated batten place between the prefabricated panel; make things convenient for reinforcing bar localised protection layer to thicken, thereby make the anticorrosive measure that guarantees thickness of protection tier in the embodiment four, ten to realize.
2), proposed near supporting, reinforcing bar and tie point with cement polymer elasticity mortar or cement polymer elastic concrete, or also add the silicon ash, be that prior art is unexistent.
Near the reinforcing bar or ironware that prefabricated panel is connected with major structure of construction, should not smear conventional cement mortar, because the easy dry shrinkage and cracking of a spot of conventional cement mortar, reinforcing bar or tie point are perishable.And smear cement polymer mortar or cement polymer concrete, particularly cement polymer elastic mortar or or the cement polymer elastic concrete can protect tie point to avoid corrosion effectively.
Cement polymer elastic mortar or cement polymer elastic concrete good springiness, tensile strength height, to adapt to the distortion crack resistance good, and with conventional cement mortar or concrete ratio, anti-carbonization, corrosion resistance are good.If add the silicon ash again, more increase anti-corrosion capability.The silicon ash can form the C-S-H gel in reaction; gel-filled in the hole of hydrated cementitious; increase the topping compactness; significantly reduced the cement space; the intrusion and the corrosiveness that have stoped acid ion effectively; significant prolongation concrete application life, particularly pollute under the adverse circumstances such as erosion, sulfate attack, high humility at villaumite, the durability of concrete is doubled even several times.So to the protection reinforcing bar, it is favourable to prevent that burn into from increasing durable years, satisfies the anticorrosion requirement easily under thinner protective layer thickness.
Technique effect of the present invention:
1, assembling wall heat transfer coefficient of the present invention has transparency, during hole heat insulation break bridge structure, reduce energy consumption 50~70% approximately than current energy-saving wall, promote body of wall energy-saving heat preserving level significantly, reduce construction investment significantly, help the whole world to reduce greenhouse gas emission.This has following reason:
1) assembling body of wall of the present invention is at prefabricated panel, purposes was the most extensive when prefabricated batten was light prefabricated warming plate.Stressed unfavorable to building because of heavy wallboard, can not produce fast with special equipment, take a large amount of land resources, the template investment is big, manpower consumption is many, the cost height.
There is not the slit between the sandwich layer between the sandwich layer of light prefabricated heat-insulation wall plate and the assembling body of wall, the coefficient of thermal conductivity that the external wall outer insulation slit increases does not take place, for example consider to socket the heat transfer that steel wire increases, when 1 reinforcing bar is installed at the place, slit, sandwich layer is the desirable 0.042w/m.k of the revised coefficient of thermal conductivity of EPS plate, and external wall outer insulation is because of the influence in slit, and the desirable 0.05w/m.k of the revised coefficient of thermal conductivity of EPS plate increases energy-saving heat preserving effect 20%.
2) the present invention has eliminated beam column heat bridge, hole heat bridge, balcony slab heat bridge, the heat bridge that only cornices at last, but and the local interruption setting of cornicing.The assembling body of wall that common support, the formula that reclines are installed is interrupted setting and cornices, and seam is installed 1 and 2 reinforcing bars, only increases body of wall mean thermal transmittance 0.02w/m respectively approximately 2.k, 0.04w/m 2..The thermal transmittance of table 4 is the thermal transmittances that comprise various heat bridges, and it is unrestricted to increase core layer thickness, and the assembling body of wall easily reaches low heat transfer coefficient, as follows face table 2~table 4 calculated data.So with current heating area and non-heating region energy-saving wall thermal transmittance present situation ratio, can reduce heat waste 50~70% approximately, promote body of wall energy-saving heat preserving level significantly.It is many at position heat bridges such as beam columns to have solved the described current frame construction of background technology, influences body of wall energy-saving heat preserving effect problem.
Why has generality by hole heat insulation break bridge structure? 1), to plaster in the hole increase a lot of wet trades, increases labour cost, low in hole EPS plate brushing fire prevention glue, the fireproof paint cost of plastering than at the hole; 2), the hole floated coat hidden on the indoor and outdoor trimming bar the pre-buried steel disc that is used for installing window, is inconvenient to install window; 3), the hole formation heat bridge of plastering, increase the about 0.15~0.2w/m of body of wall mean thermal transmittance 2.k, very big to the energy-saving heat preserving influence.So regardless of to the energy-conservation requirement of body of wall, all recommend the hole to take heat insulation break bridge structure.
Applicant was once carried out economic analysis to low-energy building, reach a conclusion in " low-energy building is to reducing the meaning of social infrastructure construction investment " (being published in " China Reconstructs's newspaper " on February 16th, 2,006 12 editions) literary composition: low-energy building can reduce the construction investment of earth source heat pump equipment and solar energy heat collection equipment significantly, and the engineering cost of earth source heat pump heating and central heating supply are approached, considering does not need to establish in addition chiller plant investment in summer, also reduces construction investment.Table 1 is applicant to Beijing, Shenyang, Harbin when the different building energy saving rate, presses the power distributing amount index that electric heating calculates a theoretical electricity consumption value of heating phase heating and needs.
In the low-energy building of heating phase weak point, central heating supply needs the outdoor pipe network of great amount of investment, boiler room, does not calculate very much; And with electric heating (as using heating cable), adopt the electric load tuner, and need not increase power distributing amount, the expense of increasing capacity that do not increase electric power, can reduce construction investment significantly.By table 1 heating theoretical value as seen, the electric heating expense of Beijing area energy-conservation 75% is well below the central heating supply expense; If use earth source heat pump, its equipment operation power consumption only is 1/4 of electric heating, contains management fee interior, possible heating cost be electric heating take 50%, namely only 25% of current approximately central heating supply expense just much of that? this will become the investor's attraction.More than analyzing is in order to illustrate: the present invention is in the technical possibility of building low-energy building that provides of body of wall, and because body of wall reaches low heat transfer coefficient easily, the present invention can reduce engineering significantly for ensureing the investment of building thermal environments.
The different energy conservation standard electric heating of table 1 theoretical value, power distributing amount index (building shape coefficient about 0.22~0.23)
Figure BSA00000820441700071
Calculated description: the supposition post is apart from 7.2m, floor height 3m, and the window of 2 long 2.4m, high 1.5m is interrupted that 4 concrete high 100mm that cornices, each wide 0.06=0.3m of length=0.24+1 root reinforcing bar seam that cornices, interior 4 the long 1.2m that cornice of post distance being set; During bi-steel, the wide 0.2m of seam, each cornice long be 0.44m, 4 long 1.76m that cornice; , sandwich layer EPS plate thickness is divided into 150mm, 180mm, four kinds of situations of 200mm, 250mm are calculated.Calculate the prefabricated panel thermal transmittance respectively, concrete cornices or supporting place thermal transmittance (table 2, table 3), then to the assembling body of wall by weighted average calculation mean thermal transmittance (table 4).When the steel truss supporting was set, the supporting thermal transmittance was got and is corniced identical with concrete.Do not count the thickness that concrete cornices or supports inboard concrete beam in the calculating, calculate relatively safety.
The EPS plate is the big plate of monoblock, and the seam crossing sealing is not so can consider that the slit is to the adverse effect of insulation.Only increase EPS plate coefficient of thermal conductivity 0.001w/m.k by the stainless steel wire that passes the EPS plate in the table 2, comprising the assembling body of wall is long-term use in insulation layer the influence of certain water capacity is arranged, be 0.042w/m after the correction of EPS plate coefficient of thermal conductivity 2.k.
Table 2, prefabricated panel thermal transmittance computational chart w/m 2.k
Figure BSA00000820441700081
Table 3, concrete cornice or supporting place thermal transmittance computational chart w/m 2.k
Figure BSA00000820441700082
Calculate the body of wall mean thermal transmittance again:
The body of wall gross area=axis 7.2 * floor height 3-window ara 2 * 2.4 * 1.5=21.6-7.2=14.4m 2
1), cornice along the total length setting and when heat bridge is arranged:
The total length of cornicing thermal bridge area=length 7.2 * high 0.1=0.72m 2
The EPS plate is 150mm, body of wall mean thermal transmittance k={0.72 * 3.315+ (14.4-0.72) * 0.265} ÷ 14.4={2.387+3.625} ÷ 14.4=0.418 ≈ 0.42w/m 2.k;
The EPS plate is that 180mm, 200mm, 250mm calculate slightly.
2), cornicing be interrupted to arrange, the seam single steel bar, thermal bridge area=0.12m cornices 2By calculating as seen, seam is single
During the root reinforcing bar, cornicing increases the about 0.02~0.025w/m of thermal transmittance than main wall body 2.k.
The EPS plate is 150mm, body of wall mean thermal transmittance k={0.12 * 3.315+ (14.4-0.12) * 0.265} ÷ 14.4={0.398+4.0} ÷ 14.4=0.29w/m 2.k;
The EPS plate is 180mm, body of wall mean thermal transmittance k={0.12 * 2.976+ (14.4-0.12) * 0.223} ÷ 14.4={0.3571+3.14} ÷ 14.4=0.243w/m 2.k;
The EPS plate is 200mm, body of wall mean thermal transmittance k={0.12 * 2.876+ (14.4-0.12) * 0.201} ÷ 14.4={0.3451+2.87} ÷ 14.4=0.223w/m 2.k;
The EPS plate is 250mm, body of wall mean thermal transmittance k={0.12 * 2.657+ (14.4-0.12) * 0.162} ÷ 14.4={0.319+2.313} ÷ 14.4=0.183w/m 2.k;
3), cornicing be interrupted to arrange, 2 reinforcing bars, thermal bridge area=0.176m cornices 2Increase sockets steel wire quantity, and EPS plate coefficient of thermal conductivity is 0.043w/m.k.Calculate by above-mentioned steps, when the EPS plate was 150mm, 180mm, 200mm, 250mm, the body of wall mean thermal transmittance was respectively 0.31,0.262,0.197w/m 2.k; As seen, 2 reinforcement ratios of seam 1 increase the about 0.02w/m of wall heat transfer coefficient with reinforcing bar 2.k.
4), slip assembling body of wall mounting slip member place cornices and thickens, slip steel plug-in unit place increases heat bridge, again 3) on the basis of numerical value, increase the about 0.02w/m of wall heat transfer coefficient 2.k.
The concrete of curtain wall decoration cornices and need to encrypt arranges, and also increases the body of wall mean thermal transmittance, and the heating area should prevent mounting slip spare 2-1 place dewfall, advises that herein cement polymer mortar or cement polymer concrete haydite are aggregate.Assembling body of wall mean thermal transmittance reference table and strengths and weaknesses analysis that table 4, summary sheet---support, the formula that reclines are installed
Figure BSA00000820441700091
By the thermal transmittance of table 4 summary sheet and strengths and weaknesses analysis as seen, be interrupted to arrange that the structure supporting parts---concrete cornices, the outer end of cornicing is not incubated the superiority maximum: convenient construction, the convenient seam crossing reinforcing bar of installing, make things convenient for the mounting slip member, can satisfy body of wall low heat transfer coefficient requirement etc.The balcony fence of Figure 20 can reach the thermal transmittance identical with the main wall body, and the heat bridge of assembling body of wall only is to be interrupted the structure supporting parts heat bridge that arranges.Though civilian construction have balcony, also satisfy the requirement of low-energy building easily, it is big that building energy conservation is reduced discharging meaning, and reduce the cost that satisfies the building thermal environments investment significantly.
2, assembling wall structure of the present invention is simple, in light weight, installation rate is fast, easy construction, steel using amount are few, safety and good endurance, can satisfy the designing requirement of structural limits state, not only the assembling wall cost is low, and reduce the major structure of construction cost and reduce building thermal environments cost, wide application of the present invention.
Structure and standard construction atlas " precast concrete out-hung panel " 08SJ110-2,08SG333 contrast with embodiment of the present invention seven~11, assembling wall structure of the present invention is too simpler than standard construction atlas, steel using amount (comprising that alkaline-resisting screen cloth is converted to gauze wire cloth) is about 20% of the 45th page of quantity of reinforcement of atlas generally speaking, but its function is not less than the performance of standard construction atlas assembling body of wall: be can contain be out of shape between the post of major structure of construction and the beam, slip the assembling body of wall, and also have cushioning effect in three directions.
Why is the standard collective drawings steel using amount big? because the prefabricated panel of atlas is not the combined wall board that can form whole primary structure member, inside and outside leaf concrete slab and centre accompany insulation layer, between not bonding connection, be to rely on the oblique rollering steel muscle that interior siphonal lobe concrete slab is socketed connection mutually, between the layers of material changing of the relative positions can take place, therefore can not think that inside and outside leaf concrete slab and insulation layer form the integrated member of common stress deformation by theory of mechanics of materials.Atlas wallboard inboard is stressed wallboard; thickness is for being not less than the 150mm concrete; the outside is the thick concrete of 50mm; weight is big, is about 4 times of the conventional gross thickness of the interior external protection of the present invention, is 4 times of the present invention by the seismic Calculation geological process therefore; and the cross section bending resistance arm of force of internal lobe concrete slab is little; quantity of reinforcement is just much bigger than the present invention naturally, in the calculating is its control action of geological process, and is very unfavorable to structural calculation.Illustrate: if the standard construction atlas need be provided, ask auditor and applicant to contact, applicant is issued the auditor with the atlas of downloading.
The assembling body of wall of this standard construction atlas must be prefabricated on platform, and occupied ground is big, China's land resources anxiety, and the construction amount is too big, and prefabricated panel is all prefabricated on platform to be infeasible.And the present invention is when adopting light prefabricated heat-insulation wall plate, and existing mechanical equipment can reach approximately produces prefabricated panel 1000~2000m every day 2, the health of putting on the shelf, occupied ground is few, and the amount of labour used is few, and prefabricated cost is low.
When the composite thermo-insulating wall board that the present invention adopts forms the primary structure member of an integral body, the cross section bending resistance arm of force is big, and sandwich layer thickens unrestricted, except door and window hole need be with the reinforcing bar bending resistance, in most cases, just the bending resistance designing requirement be can satisfy with netted tensile materials, reinforcing bar and netted tensile materials contained interior, steel using amount is few, save great deal of steel, main tie point quantity is few, easy for installation, stressed clear and definite, and safety of structure is good; When the needs encryption arranged reinforcing bar, the body of wall that can satisfy the hurricane typhoon region bore the horizontal loading requirement, and this existing assembling body of wall technology is not accomplished.
Assembling body of wall of the present invention is 25% of structure atlas wall weight approximately, reduces geological process significantly, is conducive to the major structure of construction antidetonation.Assembling body of wall of the present invention not only self cost is low, because of in light weight, also reduce the major structure of construction cost, particularly reduce earthquake zone major structure of construction cost significantly, as described above, also reduce the building thermal environments construction investment, wide application of the present invention has important energy saving and reduces discharging meaning and building aseismicity meaning.
Whether adopt slip assembling body of wall to need not definite on an equal basis according to local seismic fortification intensity, building height, wind reference pressure, building importance rate.
3, embodiment of the present invention seven has three directions the geological process of alleviating is arranged, and increases quake-resistant safety.
4, assembling body of wall of the present invention is installed hanger for exterior wall condition is provided, as anti-theft fence, sunbreaker, curtain wall decoration be installed, to such an extent as to billboard, solar opto-electronic board carry out exterior wall greening etc., the exterior wall hanger can be directly be connected with steel plate or block shaped steel on the prefabricated panel longitudinal reinforcement, the assembling body of wall that needn't pass is connected with major structure of construction, squeeze and destroy can not take place in curtain wall, both safety, reduce heat bridge again, energy-conservation, this is that disclosed assembling body of wall technology is not accomplished.When the present invention was used for curtain wall decoration, the shaped steel specification of curtain skeleton reduced significantly, and steel consumption is few.
5, assembling wall structure of the present invention can satisfy the multiple facade modeling requirement that has ordinary rectangular or arc-shaped window, horizontal townhouse window, vertical bar window simultaneously.
The invention solves the problem that the described current assembling body of wall of background technology exists, simple structure of the present invention, technical know-how is perfect, technical measures are comparatively tight, and safety is good, easy construction, installation rate are fast; The present invention can promote the energy-conservation level of body of wall significantly, and favourable building energy conservation reduces discharging, reduces the building greenhouse gas emission, adapts to the low-carbon (LC) social situations, the control global warming; The present invention is the optimization to the assembling wall structure: use a spot of steel, satisfy the designing requirement of structural limits state, and favourable building aseismicity, favourable wall reform, be conducive to advance housing industrialization; Assembling body of wall of the present invention self cost is low, and reduces major structure of construction investment and building thermal environments investment, reduces total investment of engineering, wide application significantly, has great social significance.
Description of drawings
Fig. 1 is embodiment one~six assembling body of wall prefabricated panel mounting vertical plane figure, the concrete elongated setting of cornicing, and the window still wall is divided into up and down 2 prefabricated panels and installs;
Fig. 2 is embodiment one~six assembling body of wall prefabricated panel mounting vertical plane figure, the concrete local interruption setting of cornicing, the window still wall directly with the monoblock installation of the beam outside;
Fig. 3 is embodiment one~six assembling body of wall prefabricated panel mounting vertical plane figure, and the concrete local interruption setting of cornicing is installed but the window still wall is provided with the breach monoblock, also can be divided into up and down 2 prefabricated panels and install, and the monoblock installation is convenient;
Fig. 4 is on the basis of Fig. 3, also being provided with the part on the major structure of construction of window still wall bottom cornices, be that window still wall middle part also has structure supporting parts rest, but vertical reinforcing bar 6-1 inside and outside the installation room on cornicing in middle part, be connected with window level reinforcing bar 6-2 at window, be applicable to and use (Figure 25) when the window still wall is longer;
The difference of Fig. 5 and Fig. 2 is that the prefabricated panel seam crossing is installed 2 reinforcing bars, and prefabricated batten is arranged between the prefabricated panel; Illustrate: 1 or 2 reinforcing bars of seam crossing installation are determined according to instructions for use, and are irrelevant with window still wall mounting means.
Fig. 6 is the 1-1 sectional drawing of Fig. 1, Fig. 2, Fig. 4, Figure 11~Figure 13;
Fig. 7 is the 2-2 sectional drawing of Fig. 1, Fig. 2, Fig. 4;
Fig. 8 is the 3-3 sectional drawing of Fig. 5;
Fig. 9 is the node A enlarged drawing of Fig. 4;
Figure 10 is the Node B enlarged drawing of Fig. 5;
Figure 11 is embodiment one~six assembling body of wall prefabricated panel mounting vertical plane figure of blank wall place, the concrete elongated setting of cornicing;
Figure 12 is embodiment one~six assembling body of wall prefabricated panel mounting vertical plane figure of blank wall place, the concrete local interruption setting of cornicing;
Figure 13 is embodiment one~six window assembling body of wall prefabricated panel mounting vertical plane figure when being arc;
Figure 14 is the 4-4 sectional drawing of Fig. 5;
Figure 15 is the 5-5 sectional drawing of Fig. 2, Fig. 3, Fig. 5, Figure 12;
Figure 16 is the 6-6 sectional drawing of Fig. 2, Fig. 4;
Figure 17 is that the concrete slab 1-2 of embodiment one establishes the additional part 1-3 that reclines of concrete---vertical concrete slab, when support, the formula that reclines installation, and assembling body of wall vertical cross section;
Figure 18 is that embodiment one is installed in prefabricated panel on the indoor concrete plate, with the beam installation vertical cross section that is posted by connecting, can be used for the inboard body of wall of balcony or family spaced heat wall, reinforcing bar can be set, or only reinforcing bar be installed on the doorway.But when being applied to the slip body of wall of embodiment seven, the mounting slip member need arrange reinforcing bar;
Figure 19 is that the concrete slab 1-2 of major structure of construction 1 is posted by connecting face hour, the additional part 1-3 that reclines of metal of vertical steel skeleton is set, prefabricated panel 15 and the additional part 1-3 connection organigram that reclines;
Figure 20 is Fabricated balcony breast board sectional drawing, and horizontal thick dashed line is illustrated in the local concrete that the additional part 1-3 that reclines (vertical concrete slab) bottom arranges and cornices among the figure;
Figure 21 be the outer insulation of the structure supporting parts of embodiment one~six assembling body of wall prefabricated panel mounting vertical plane figure, be interrupted concrete being set cornicing, supporting is set, do not recommend to adopt;
Figure 22 is the 7-7 sectional drawing of Figure 21;
Figure 23 is wall between windows place prefabricated panel operation drawing, the topping local reduction at edge, in order to be connected between contiguous prefabricated wallboard or prefabricated panel and the prefabricated batten with the net of tension, whether edge protection layer needs local reduction, requires etc. to determine according to decorating;
Figure 24 is the node C enlarged drawing of Figure 23;
Figure 25 is the window still wall prefabricated panel operation drawing of Fig. 4, being provided with outdoor vertical reinforcing bar 6-1-1* in the middle of the window still wall is connected for cornicing with the concrete of structure supporting parts, (unprotect layer) exposed in the part near indoor vertical reinforcing bar 6-1-2* lower end was positioned at flooring, indoor vertical reinforcing bar protruded length satisfies the connection request with major structure of construction, and anchor bar is convenient to be connected with indoor vertical reinforcing bar in the major structure of construction;
Figure 26 arranges the steel truss supporting among Figure 21, steel truss supporting installation constitution schematic diagram;
Figure 27 represents the supporting of cement polymer mortar parcel steel truss, satisfies anticorrosion and fire protection requirement schematic diagram, and two steel truss supportings are connected with outdoor two vertical reinforcing bars, and when outdoor vertical reinforcing bar was single steel bar, the steel truss supporting was 1;
Figure 28 is the horizontal sectional drawing that the prefabricated batten of assembling body of wall seam crossing is connected with contiguous prefabricated wallboard, and the double joint reinforcing bar is installed, and steel plate is installed on the reinforcing bar, steel plate is given prominence to beyond topping, one side topping outwards thickens, and be used for the exterior wall hanger is installed, or the topping partial thickening is used for decorating;
Figure 29 is that the prefabricated panel seam connects horizontal sectional drawing.Wherein it (1) be the indoor levelling, plaster, netted tensile materials sockets, filling elaxtic seal in outside forms the groove Ornamental Stitching; Wherein they (2) are that the seam both sides are provided with longitudinal reinforcement, the sealing of seam crossing sandwich layer filling heat insulating material, or clog fire-retardant heat-insulation material between the seam crossing sandwich layer, form the fire barrier; Or outside filling elaxtic seal, form the groove Ornamental Stitching; The outside also can be by the interior structure levelling, plaster, socket;
Figure 30 is two windows of assembling body of wall when very near (as Figure 13), according to bending resistance and anti-shearingly require the wall between windows thickening, forms the horizontal profile drawing like combined column.Combined column is the outstanding facade moulding that is formed with vertical bar outwards, or combined column is to indoor outstanding, and the part combined column is connected with flooring;
Figure 31 is that prefabricated batten is installed the bi-steel sectional drawing, only waters internal layer topping 8 when prefabricated in the template, be installed in prefabricated batten on the agent structure after, smear the topping 8 of outside one deck again.When being applied to slip assembling body of wall, at prefabricated batten one end slip steel plug-in unit 2-1 being installed and being connected (Figure 42) with the vertical reinforcing bar of indoor and outdoor.
Figure 32 is horizontal sectional drawing when longitudinal reinforcement 6-1* is set in the prefabricated panel;
Figure 33 is that embodiment seven~11 is interrupted concrete cornice (being the structure supporting parts) is set, the assembling body of wall prefabricated panel of door and window hole, slip, prefabricated batten mounting vertical plane figure (concrete corniced heat bridge or outer insulation) are arranged, prefabricated batten and the horizontal joint place mounting slip member that cornices among the figure, the window still wall is divided into 2 settings up and down; " 4 " that mark among the figure are window still wall additional sliding and position limitation devices 4 when longer, are represented by dotted lines among the figure;
Figure 34 is that the upper end of embodiment seven~11 slip assembling bodies of wall is the slippage end, when the lower end is fixed end, and vertical cross section;
Figure 35 is additional sliding and position limitation device 4 drawings of Figure 33, Figure 38;
Figure 36 is that embodiment seven~11 is interrupted concrete cornice (being the structure supporting parts) is set, no door and window hole, slip assembling body of wall prefabricated panel, prefabricated batten mounting vertical plane figure (concrete corniced heat bridge or outer insulation), the horizontal joint place mounting slip member of prefabricated batten 15-1 and structure supporting parts;
Figure 37 is the 8-8 sectional drawing of Figure 33, and the horizontal joint place is provided with sliding component, and cornicing is not incubated, and also represents to arrange between window still wall and the flooring additional sliding and position limitation device 4;
Figure 38 is that Figure 36 does not have the 9-9 of window place vertical cross section, and the horizontal joint place is provided with sliding component, and cornicing is not incubated,
Figure 39 it (1) is that slip assembling body of wall external corner is connected one of structure with post, and prefabricated panel is connected with post, and prefabricated panel 45 degree of post both sides join; Establish elastic expansion joint on the post limit, and the corresponding concrete of the expression setting of cornicing in Figure 39 they (2);
Figure 40 it (1) is that slip assembling body of wall external corner is connected the another structure of structure with post, and prefabricated panel is connected with post, the prefabricated panel right angle vertical connection of post both sides,, or on-the-spot sandwich layer, topping, the corner reinforcing bar etc. installed in corner; Establish elastic expansion joint on the post limit, and the corresponding concrete of the expression setting of cornicing in Figure 40 they (2);
Figure 41 is window edge horizontal sectional drawing when prefabricated batten 15-1 was positioned at window when bi-steel was installed, wherein it (1) is that window reinforcing bar and stirrup are positioned at the preform strip panel edges, the connection steel disc is arranged on the window reinforcing bar, when window is installed with fixing window be connected the steel disc connection, slip assembling body of wall window reinforcing bar is not suitable for this structure; Wherein they (2) are that window reinforcing bar and stirrup are positioned at prefabricated batten, at the window reinforcing bar connection steel disc is installed, connect with the fixing steel disc that is connected of window when window is installed, the window of common assembling body of wall and slip assembling body of wall is available this structure all, recommends employing (2).
Figure 42 is prefabricated batten vertical cross section, can be applicable to the assembling body of wall of embodiment seven at prefabricated batten mounting slip spare 2-1;
Figure 43 is the 10-10 horizontal sectional drawing of Figure 33, and prefabricated panel is not connected with post, flexible encapsulant between prefabricated panel and the post;
Figure 44 is the 11-11 horizontal sectional drawing of Figure 33, and prefabricated panel is not connected with post, flexible encapsulant between prefabricated panel and the post;
Figure 45 is that the window still wall of Figure 33 is divided into 2 settings up and down, is positioned at the following prefabricated panel operation drawing of horizontal sliding seam, when window still wall length surpasses certain-length, may be provided with breach 10 in the centre;
Figure 46 is Figure 37, Figure 38 node D enlarged drawing;
Figure 47 is the 12-12 sectional drawing of Figure 33 and Figure 45, namely along the sectional drawing of the vertical mounting slip member of body of wall.
Embodiment
Embodiment one: see Fig. 1~Figure 32, Figure 41, the assembling body of wall that a kind of support of present embodiment, the formula that reclines are installed, it is by major structure of construction 1, prefabricated panel 15, or also has prefabricated batten 15-1 to form; Described major structure of construction 1 is beam slab post wall and basis, major structure of construction 1 is concrete frame structure, steel reinforced concrete frame structure, frame structure, steel framed structure, the combination frame structure of concrete and steel, steel wood frame construction, or be bamboo framework, wood frame construction, or be shear wall structure;
Be provided with support prefabricated panel 15 or the structure supporting parts 1-1 of the prefabricated batten 15-1 of support also at major structure of construction 1 lateral surface, structure supporting parts 1-1 is major structure of construction 1 extension in the horizontal direction; Described structure supporting parts 1-1 is that concrete cornices, or be that the metal supporting parts (cornices conveniently with concrete when major structure of construction is concrete material, available metal supporting parts when major structure of construction is steel work, also can be outside steel work the formwork concreting cornice), or be wood or bamboo cornice (cornicing when major structure of construction is bamboo framework, wood frame construction), or/and structure supporting parts 1-1 is sole plate or floor; Described structure supporting parts 1-1 is for arranging (Fig. 1 cornices for the concrete that arranges continuously) continuously or being local interruption setting (Fig. 2~Fig. 5 cornices for the concrete of local interruption setting);
Described and the major structure of construction 1 side formula that reclines is installed and is: with the installation that is posted by connecting of beam slab post, the shear wall lateral surface of prefabricated panel 15 (one or both ends up and down are or/and prefabricated panel 15 stiles, or/and the middle part) and major structure of construction 1; Or at the additional part 1-3 that reclines of beam slab arranged outside, the additional part 1-3 that reclines is the beam slab extension in the vertical direction of major structure of construction 1, with the additional part 1-3 that reclines of prefabricated panel 15 and major structure of construction 1 be posted by connecting installations (for example Figure 17, Figure 20, at the vertical concrete slab of beam slab arranged outside for adding the part 1-3 that reclines.The face that is posted by connecting of major structure of construction 1 is less not to be satisfied and is posted by connecting when requiring, or the external surface of Liang Yuzhu is in one plane the time, and the additional part 1-3 that reclines is set to be provided and satisfy the condition that the formula that reclines is installed.When prefabricated panel being installed in the cantilevered plate side of major structure of construction 1, because abutment face is little, the additional part 1-3 that reclines need be set generally, to satisfy the formula connection request that reclines; Can establish the concrete constructional column, constructional column does not bear the building gravity load yet, is used for that floor height is higher, when post is horizontal platoon moulding, parapet apart from big or external wall more.); The additional part 1-3 that reclines is the additional part that reclines of concrete, (the vertical steel skeleton post of Figure 19 for installing, the reinforcing bar trestle needs to satisfy with major structure of construction the condition of anchor connection to the additional part that reclines of steel.) or be the composite component (as composite beam, combined column, the expression of drawing) of concrete and heat insulating material, or be that wooden frame adds (expression of drawing are applied to bamboo framework, wood frame construction) such as the parts that reclines;
When being provided with prefabricated batten 15-1, prefabricated batten 15-1 (when bi-steel is set, have prefabricated batten 15-1 more convenient) between prefabricated panel 15, the installation of prefabricated batten 15-1 is identical with prefabricated panel 15;
The assembling body of wall that a kind of support, the formula that reclines are installed has following 3 kinds of installation constitutions, according to installation site difference, easy construction and use needs, select the 1st for use) or the 2nd) plant, or with the 1st) or the 2nd) plant and the 3rd) kind cooperates installation (when the window still wall is longer, structure supporting parts 1-1 may be set; Wall between windows selects the 1st for use) or the 2nd) plant and construct):
1), with prefabricated panel 15 or also have prefabricated batten 15-1 to be installed in structure supporting parts 1-1 to go up or be installed in concrete slab 1-2 and go up that (Figure 18 is for being installed on the concrete slab, concrete slab comprises sole plate), structure supporting parts 1-1 or concrete slab 1-2 outer end do not have insulation layer (Fig. 6~Fig. 8, Figure 14~Figure 20, Figure 22);
2), with prefabricated panel 15 or also have prefabricated batten 15-1 to be installed in structure supporting parts 1-1 to go up or be installed on the concrete slab 1-2, there are insulation layer (Figure 21, Figure 22 in structure supporting parts 1-1 or concrete slab 1-2 outer end, when prefabricated panel 15 was composite thermo-insulating wall board, this embodiment was incubated just meaningful outward.);
The inboard of the prefabricated panel 15 of the assembling body of wall of outer insulation is positioned on structure supporting parts 1-1 or the concrete slab 1-2 during this structure, and the outside of prefabricated panel 15 is positioned at the outside of structure supporting parts 1-1 or concrete slab 1-2; Installation constitution can have following 3 kinds, 1., the upper end of prefabricated panel 15 is or/and the lower end is L shaped production performance and easy construction according to pre-control equipment are selected one of them:, L shaped covering is structure supporting parts 1-1 or the concrete slab 1-2 outer end of setting continuously, and is connected with the outer end; 2., prefabricated panel 15 upper ends or lower end do not become L shaped, reproduce an installation sandwich layer 3 in the outer end of the structure supporting parts 1-1 that arranges continuously or concrete slab 1-2, plaster again and form topping 8 in sandwich layer 3 outsides, in topping 8 or the surface netted tensile materials 5 is installed is connected with the topping 8 of prefabricated panel 15, sandwich layer 3, the topping 8 of installation outside prefabricated panel 15 and structure supporting parts 1-1 or the concrete slab 1-2 is connected as a single entity; 3., when structure supporting parts 1-1 arranges for being interrupted, the termination of prefabricated panel 15 is provided with breach 10, the position of breach 10 is with to be interrupted the structure supporting parts 1-1 that arranges corresponding, the on-the-spot installation of the layered material of structure supporting parts 1-1 outer end; Or prefabricated panel 15 terminations are not provided with breach 10, the on-the-spot installation of the layered material of the layered material between structure supporting parts 1-1 and structure supporting parts 1-1 outer end;
3), with prefabricated panel 15 directly with installations (generally for installation window still wall) that be posted by connecting of the lateral surfaces of major structure of construction 1;
When structure supporting parts 1-1 arranged for being interrupted, the termination of prefabricated panel 15 was provided with breach 10, and the position of breach 10 is corresponding with the structure supporting parts 1-1 that is interrupted setting; Or the termination of prefabricated panel 15 does not have breach 10, the on-the-spot installation of the materials for wall layering between structure supporting parts 1-1 (prefabricated panel is rectangle, and prefabricated panel reduces cut height);
Recommendation selects for use the former to establish breach in the prefabricated panel termination, and the prefabricated panel termination does not have breach to increase wet trade, trouble; Beam side formwork arranges local interruption the concrete trouble of cornicing slightly is set, and can cornice with regard to the concrete that forms the local interruption setting at gap position with prefabricated panel as the side template that beam or the additional vertical concrete slab of part that reclines are, is easy to.
To interconnect between the prefabricated panel 15, or be connected between prefabricated panel 15 and the prefabricated batten 15-1, co-operation forms the assembling body of wall that a kind of common support, the formula that reclines are installed;
For example, to interconnect between the prefabricated panel 15: as with foamed glue with bonding connection between the sandwich layer, or it is bonding with cement polymer elasticity mortar, also available elastic heat preserving mortar is bonding, determine according to energy-saving heat preserving requirement and adhesives condition, during installation jam-packed between prefabricated thermal insulation wallboard and the prefabricated thermal insulation batten is installed.
With netted tensile materials adjacent prefabricated panel is connected, satisfy the overlap joint requirement, topping interconnects, or outer protection layer seam crossing filling elastic packing waterproofing materials connects, see Figure 29, the topping 8 of prefabricated panel 15 is exactly the topping 8 of assembling body of wall, does not get rid of the big need of construction error and makes up a deficiency and plaster;
(namely before prefabricated panel 15 is installed, having formed major structure of construction 1) that described major structure of construction 1 forms for construction formerly, or major structure of construction 1 is with prefabricated panel 15 or also has prefabricated batten 15-1 as a side template of major structure of construction 1, the synchronous construction and installation of assembling body of wall of installing with support, the formula that reclines; Or part major structure of construction 1 is (forming post as construction formerly) that construction formerly forms, part major structure of construction 1 is with prefabricated panel 15, or also has prefabricated batten 15-1 as a side template of major structure of construction 1, (build Figure 20 as template with prefabricated panel as the outside of concrete beam, the vertical concrete slab at balcony slab edge with the synchronous construction and installation of assembling body of wall that support, the formula that reclines are installed; Concrete beam can be whole cast-in-place beams or for prefabricated superposed beam, the top of prefabricated superposed beam is cast-in-place, just can form to cornice or cornice in the part.)
Described prefabricated panel 15, prefabricated batten 15-1 be not for comprising prefabricated panel, the prefabricated batten of the various structures beyond the decorative heat preservation plate, described decorative heat preservation plate is the decorative heat preservation plate that does not have inboard topping, as decorative heat preservation plates compound with heat insulating material such as granite slab or ceramic wafers; 1), when prefabricated panel 15, prefabricated batten 15-1 are light-duty composite thermo-insulating wall board for example prefabricated panel 15, prefabricated batten 15-1 have following several:, the various materials of light-duty composite thermo-insulating wall board are connected as a single entity, form an integral body primary structure member (accompanying drawing all represents to use composite thermo-insulating wall board, because of in light weight, energy-saving heat preserving good easy for installation, lattice are low); 2) or for the prefabricated panel of internal lobe, siphonal lobe concrete and middle insulation layer is arranged, rely on the oblique rollering steel muscle to connect, distortion has the changing of the relative positions between the layering, do not meet the mechanics of materials and make the prefabricated panel of the requirement of as a whole primary structure member (be the structure of building standard design atlas " precast concrete out-hung panel " 08SJ110-2,08SG333, or like configurations); 3) or be non-insulation prefabricated panel, lightweight concrete slab (as rice husk concrete, foamed concrete) and straw plate, honeycomb card board of light weight aggregate concrete plate, concrete core unit etc.;
When prefabricated panel 15, prefabricated batten 15-1 were light-duty composite thermo-insulating wall board, light-duty composite thermo-insulating wall board was made up of sandwich layer 3, topping 8, netted tensile materials 5; Described sandwich layer 3 is inorganic or organic insulation material, as macromolecule heat insulating material, foam cement, mineral wool, straw, honeycomb card board, thermal insulation mortar, rice husk concrete, glue powder polyphenyl particle or foamed glass; Described sandwich layer 3 is identical heat insulating material; or be different heat insulating materials (local awkward combustion phenolic resins for example at the sandwich layer 3 of diverse location; and other position is the EPS plate); can be provided with ribs in the described sandwich layer 3 or not be provided with ribs that (ribs is oblique or perpendicular to the topping setting, to increase wallboard rigidity in sandwich layer.Ribs in the market mostly is magnesia cement, and durability is bad, is provided with reinforcing bar in the ribs or is not provided with reinforcing bar); Described netted tensile materials 5 is alkaline-resisting screen cloth or basalt fibre screen cloth or wire lath; Described topping 8 is cement mortar or layer of concrete, or described topping 8 layer of concrete for the cement mortar of modification or modification, or described topping 8 is cement calcium silicate board with microporous, cement fibrolite plate; The external surface of topping 8 is the plane, or the external surface of topping 8 is matsurface; Described topping 8 is positioned at sandwich layer 3 both sides, and sandwich layer 3 is connected (as bonding connection, be connected with topping or/and core layer surface is fluted, satisfy the requirement of strength that sandwich layer is connected with topping) with topping 8; Topping 8 thickness of diverse location can be different (as at prefabricated thermal insulation panel edges seam areas topping 8 attenuates, Figure 23~Figure 25; When being provided with reinforcing bar, reinforcement location need be thickeied topping 8, Figure 32); Netted tensile materials 5 is positioned at topping 8, or alkaline-resisting screen cloth or basalt fibre screen cloth Pasting be on topping 8 surfaces, and netted tensile materials 5 can be selected for use a kind of or select multiple installation simultaneously for use, or the local netted tensile materials 5 that is provided with reinforcement; Or described prefabricated panel 15 is steel wire net rack cement filled board; The external surface of described prefabricated panel 15, prefabricated batten 15-1 can be provided with decorative layer or not be provided with decorative layer;
The prefabricated panel 15 (door and window mouth both sides prefabricated panel is installed, window still wall prefabricated panel is installed) that described assembling body of wall is installed for pressing stick, or the piece prefabricated panel 15 (possibility prefabricated and installation all inconvenient, recommend adopt the former) of assembling body of wall for installing by hole or the standard width of a room in an old-style house;
There is opening protection layer 8-1 at the door and window hole place of assembling integral wall, and described opening protection layer 8-1 is the door and window hole fire barrier; Described opening protection layer 8-1 is fire-retardant type or nonflammable heat insulating material; or the brushing fireproof paint, the fire prevention glue; form the heat-insulating bridge-cut-off hole and (can be " 0 " as the linear thermal transmittance in difficult combustion phenolic resins hole is installed; if the heat insulating material that coefficient of thermal conductivity is higher; though be the heat-insulating bridge-cut-off hole, the hole thermal resistance still hinders less than the main wall body heat.); Or described opening protection layer 8-1 be cement mortar or concrete floated coat, or be the concrete floated coat of the cement mortar of modification or modification, is formed with the heat bridge hole; Opening protection layer 8-1 is connected (being generally bonding connection) with adjacent sandwich layer 3; opening protection layer 8-1 both sides matcoveredn 8; opening protection layer 8-1 is connected with topping 8 that (when prefabricated panel was installed, the hole periphery should on-the-spotly be installed opening protection layer 8-1, and the hole must be seam crossing.);
The topping 8 of described assembling body of wall satisfies the fire endurance requirement, and opening protection layer 8-1 satisfies the fire endurance requirement, is the first fire protection construction requirement of assembling body of wall.The topping of prefabricated thermal insulation wallboard, prefabricated thermal insulation batten is exactly the topping of assembling body of wall.
Illustrate:
1, the assembling body of wall of a kind of support of present embodiment, the formula that reclines installation, refer to that the assembling body of wall is installed on the structure supporting parts, even do not cornice in the prefabricated panel place at window still wall position, but connect as one after the installation of assembling body of wall, co-operation, the assembling body of wall is by the structure supporting parts---the support of cornicing.
2, the assembling body of wall of a kind of support of present embodiment, the formula that reclines installation, with major structure of construction 1 side that the prefabricated panel side refer to assembling body of wall main wall body and major structure of construction the are installed installation that is posted by connecting that is posted by connecting, comprise the installation that is posted by connecting of side with beam, plate, or the installation that is posted by connecting of prefabricated panel and the additional part that reclines.The concrete slab 1-2 that the concrete slab 1-2 outer end of Figure 17 has the 1-1 that cornices to form T shape, Figure 20 is L shaped, and Figure 19 installs the additional part that reclines of steel frame, the installation that is posted by connecting of prefabricated panel and the additional part that reclines.When prefabricated panel being installed on the plate of major structure of construction, plate is exactly the structure supporting parts, sees Figure 18.
3, whether present embodiment has prefabricated batten 15-1, need decide according to the situation that arranges of embodiment three reinforcing bars, if prefabricated panel 15 seam crossings are not provided with reinforcing bar, or 1 reinforcing bar only is set, and prefabricated batten 15-1 just needn't be arranged; If prefabricated panel 15 seam crossings arrange 2 reinforcing bars, joint gap is big, wet trade is many, it is more convenient to be provided with prefabricated batten 15-1 construction and installation, Figure 31 is the horizontal sectional drawing of prefabricated batten 15-1, the vertical cross section of the prefabricated batten 15-1 of Figure 42 when being applied to present embodiment, does not need the sliding component 2-1 of bottom and the concrete of periphery.
Present embodiment is with prefabricated panel 15 during as a side template of major structure of construction 1, prefabricated panel 15 bottoms of basecoat assembling body of wall are installed in basic beam slab side and cornice on the 1-1, with the grade beam installation that reclines, or prefabricated panel 15 is directly installed on the basic beam slab.
The installation that is posted by connecting of the described beam slab post with prefabricated panel and major structure of construction of present embodiment, shear wall lateral surface, not to say that prefabricated panel must be both and the installation that is posted by connecting of the beam slab of major structure of construction, also with the installation that is posted by connecting of post, shear wall lateral surface.The stress system of the assembling body of wall that this will determine according to design determines, for example, the assembling body of wall is above down when flooring is the single load bearing plate of bearing, and prefabricated panel can be only be connected with flooring up and down; And the assembling body of wall is when being the bidirectional stress plate, and prefabricated panel not only is connected with flooring up and down, also needs be connected with post or shear wall.
Present embodiment is very easy to form the outer facade moulding of vertical bar body of wall, vertical bar window; When the outer facade moulding that forms horizontal body of wall, horizontal window, the outstanding flooring position of assembling body of wall is outrigger base; , post higher at floor height often needs to arrange the reinforcing bar trestle, the additional exactly part that reclines of reinforcing bar trestle when big.
Embodiment two: the difference of present embodiment and embodiment one is, assembling body of wall and major structure of construction 1 be connected with following mode, select wherein a kind, or 1), 2), 3) plant collocation and share:
1), with crab-bolt 20 with prefabricated panel 15 or also have prefabricated batten 15-1 and the side of major structure of construction 1 or the additional part 1-3 that reclines is fixed; Crab-bolt 20 penetrates prefabricated panel 15, prefabricated batten 15-1 and major structure of construction 1 or fixes with the side of the additional part 1-3 that reclines;
2), with cementitious materials that beam slab post, the shear wall side of prefabricated panel 15, prefabricated batten 15-1 and major structure of construction 1 is bonding, or/and bonding with the additional part 1-3 side that reclines;
Prefabricated panel 15, prefabricated batten 15-1 are during as the template of major structure of construction 1, but the bonding plane topping of prefabricated panel 15 is matsurface or is the zigzag convenient construction; On the bonding plane of prefabricated panel 15, prefabricated batten 15-1 and major structure of construction 1, scrape the cement polymer mortar of smearing certain altitude from the bottom, concreting is upwards scraped the cement polymer mortar of smearing certain altitude, concreting more again, finish until concreting, can be bonding;
Recommend to adopt 1 simultaneously) with 2) two kinds be connected structure; In addition, but embedded iron parts in the topping of prefabricated panel 15 and major structure of construction 1 bonding plane is connected with major structure of construction 1;
3), with cementitious materials with prefabricated panel 15 or also have the termination of prefabricated batten 15-1 and structure supporting parts 1-1 or concrete slab 1-2 bonding, or (Figure 15, Figure 17, Figure 18 are applied to require netted tensile materials 5 and the bonding need of major structure of construction 1 to satisfy anchorage length also to be provided with netted tensile materials 5 in the cementitious materials between bonding plane.), or be provided with netted tensile materials 5 in the bonding plane between the prefabricated panel 15 up and down; Netted tensile materials 5 is overhanging to be connected with indoor topping 8, and netted tensile materials 5 is connected with major structure of construction 1, or prefabricated panel 15 connects up and down.
The net that is provided with tension in the assembling body of wall topping just is equivalent to arrangement of reinforcement in topping, but is not the reinforcing bar of traditional sense, but substitutes reinforcing bar with the net (as alkaline-resisting screen cloth) of tension, prefabricated, easy for installation, reduction cost.
Prefabricated panel and concrete slab or and concrete be provided with netted tensile materials in the cementitious materials in slit between cornicing.This structure makes the assembling body of wall by netted tensile materials and major structure of construction anchoring, easy construction, and stressed safety is better, even reinforcing bar is not set, its safety just is higher than current common filled wall of building by laying bricks or stones far away.
Cementitious materials has multiple choices, for example: 1) cement mortar or cement polymer mortar.As described above, generally should not use conventional cement mortar, the cement polymer mortar good water-retaining property, the adhesive strength height is recommended to select for use; 2) elastic sealant, the price height, adhesive strength not necessarily meets the demands.3) polyurethane foam glue can be used between the sandwich layer bondingly, and adhesive strength also not necessarily meets the demands; 4), structure glue, valency height, operation inconvenience generally should not be used.
The topping at the bonding plane place between prefabricated panel and beam column, the shear wall, but and seam crossing topping attenuate, also attenuate not.According to major structure of construction be formerly construct, or prefabricated panel 15 as a side template of major structure of construction 1, the outer decoration different and easy for installationly determined.
Embodiment three: present embodiment and embodiment one or twos' difference is, present embodiment increases reinforcing bar 6 and stirrup 12, and reinforcing bar 6 is positioned at assembling body of wall topping 8; Reinforcing bar 6 comprises longitudinal reinforcement 6-1 and horizontal reinforcement or arch steel 6-2, or reinforcing bar 6 is the steel hoop (expression of not drawing) that arranges at the door and window hole periphery; Longitudinal reinforcement 6-1 be positioned at prefabricated panel 15 vertical joint places topping 8 (job site seam crossing sandwich layer is bare board, and the on-the-spot longitudinal reinforcement of installing is comparatively convenient when 1 longitudinal reinforcement is set, because of wet trade few.), or longitudinal reinforcement 6-1 is positioned at the topping 8 (be the prefabricated batten 15-1 of formwork, wet trade is many during because of bi-steel, longitudinal reinforcement 6-1 is installed in the topping of prefabricated batten 15-1 more convenient) of prefabricated batten 15-1;
Or the topping 8 that is positioned at prefabricated panel 15 also arrange longitudinal reinforcement 6-1* (Figure 32, be used for horizontal loading very big or floor height is higher, post when big, increase arrangement of reinforcement quantity; Reach Fig. 4, when Figure 25 window still wall is longer, establish longitudinal reinforcement 6-1* at the prefabricated panel middle part of window still wall.);
Described longitudinal reinforcement 6-1 comprises outdoor longitudinal reinforcement 6-1-1 and indoor longitudinal reinforcement 6-1-2, and described horizontal reinforcement or arch steel 6-2 comprise outdoor horizontal reinforcing bar or arch steel 6-2-1, indoor horizontal reinforcing bar or arch steel 6-2-2; (can be provided with reinforcing bar between bi-steel arranged side by side sockets and also can not be provided with reinforcing bar and socket described reinforcing bar 6 for single steel bar or for bi-steel arranged side by side, or/and on bi-steel arranged side by side welding steel or block shaped steel, can between bi-steel, connect welding steel or block shaped steel, or perpendicular to metope welding steel or block shaped steel on reinforcing bar); Door and window hole should be provided with reinforcing bar 6 when being provided with reinforcing bar 6, be provided with horizontal reinforcement or arch steel 6-2 at door and window hole windowsill place, or also above door and window hole, be provided with horizontal reinforcement or arch steel 6-2, or also be provided with horizontal reinforcement 6-2 (Figure 13) in other position, horizontal reinforcement or arch steel 6-2 are connected with longitudinal reinforcement 6-1, or are connected with supporting 1-1-5; Reinforcing bar 6 at indoor and outdoor single steel bar or bi-steel arranged side by side is provided with stirrup 12, and stirrup 12 sockets indoor and outdoor reinforcing bar 6 (stirrup 12 can be two limb hoops or is single hoop);
Illustrate: when window epithelium absolute altitude is identical with beam, indoor horizontal reinforcing bar or arch steel needn't be set, stirrup is connected with beam directly that (can be on beam ailing, stainless steel wire is connected with the steel nail take-up strap, sees Figure 20.)。
Reinforcing bar 6 installation constitutions have following 3 kinds, select one and select for use:
1), structure supporting parts 1-1 or concrete slab 1-2 heat bridge are arranged, the upper and lower side of longitudinal reinforcement 6-1 is connected with major structure of construction 1, or is connected (Figure 15~Figure 20) with structure supporting parts 1-1 or concrete slab 1-2;
Be provided with reinforcing bar 6 (Figure 22) outward when 2), structure supporting parts 1-1 or concrete slab 1-2 are incubated, the upper and lower side of indoor longitudinal reinforcement 6-1-2 is connected with major structure of construction 1, or be connected with structure supporting parts 1-1 or concrete slab 1-2, the upper and lower side of outdoor longitudinal reinforcement 6-1-1 is connected with supporting 1-1-5, or be connected (outdoor longitudinal reinforcement 6-1-1 namely is set is in order to hang external protection 8, and strengthen hole weak part bending resistance) with the major structure of construction 1 of encorbelmenting (as oblique roof panel, sole plate);
The inner and major structure of construction 1 anchoring of described supporting 1-1-5, the position of supporting 1-1-5 is corresponding with the position of assembling body of wall outside longitudinal reinforcement 6-1-1; Described supporting 1-1-5 is the steel truss supporting, the steel truss supporting is provided with brace (Figure 26, Figure 27), or described supporting 1-1-5 is for (cement polymer mortar prevents oblique reinforcing bar distortion and displacement with the fixing diagonal reinforcement of cement polymer mortar, prevent oblique reinforcement corrosion, be applicable to and support hour application of encorbelmenting, generally should not use), or described supporting 1-1-5 is the concrete hanging top supporting; Outdoor longitudinal reinforcement 6-1-1 is connected with supporting 1-1-5, thereby the external protection 8 of assembling body of wall is hung;
The two ends of described longitudinal reinforcement 6-1 become the main tie point of assembling body of wall and major structure of construction 1, and described main tie point is connected transmission power with major structure of construction 1 the force direction that is subjected to is the direction of reinforcing bar 6-1 along the longitudinal;
3) or also in the topping 8 of the prefabricated panel 15 of assembling body of wall longitudinal reinforcement 6-1* is set, longitudinal reinforcement 6-1* comprises outdoor longitudinal reinforcement 6-1*-1, indoor longitudinal reinforcement 6-1*-2;
Following 2 kinds of installation constitutions are arranged when longitudinal reinforcement 6-1* is set, select one and select for use:
1., structure supporting parts 1-1 or concrete slab 1-2 heat bridge are arranged, when namely structure supporting parts 1-1 or concrete slab 1-2 outer end were not incubated, longitudinal reinforcement 6-1* upper and lower side was connected with major structure of construction 1, or was connected with structure supporting parts 1-1 or concrete slab 1-2;
2., structure supporting parts 1-1 or concrete slab 1-2 are incubated outward; The upper and lower side of indoor longitudinal reinforcement 6-1*-2 is connected with major structure of construction 1, or is connected with structure supporting parts 1-1 or concrete slab 1-2; Interconnect between the outdoor longitudinal reinforcement 6-1*-1 up and down, or it is corresponding with longitudinal reinforcement 6-1* that supporting 1-1-5 also is set, outdoor longitudinal reinforcement 6-1*-1 upper and lower side is connected (when closeer longitudinal reinforcement 6-1* is set with supporting 1-1-5, supporting 1-1-5 may be also closeer, when 1 or 2 longitudinal reinforcement 6-1* are set in the middle of the prefabricated panel, can be in prefabricated panel termination and longitudinal reinforcement 6-1* opposite position leaving certain gaps uncovered by the economic plan 10, be used for supporting 1-1-5 and be connected with longitudinal reinforcement 6-1*, hang external protection 8); Longitudinal reinforcement 6-1* also is connected (for example about window) with indoor and outdoor horizontal reinforcement or arch steel 6-2;
Longitudinal reinforcement 6-1* also can install at the construction field (site); with stirrup 12 outdoor longitudinal reinforcement 6-1*-1 is connected with indoor longitudinal reinforcement 6-1*-2; and then plaster at prefabricated panel 15 and to form topping 8 (prefabricated panel 15 of installation can be semiproduct; the topping of one half thickness is namely only arranged, and netted tensile materials is pasted in the outside.Plaster behind installation longitudinal reinforcement 6-1* and the stirrup and form whole toppings.), but bother;
The two ends of described longitudinal reinforcement 6-1* also are the main tie points of assembling body of wall and major structure of construction 1; Described main tie point is connected transmission power with major structure of construction 1 the force direction that is subjected to is the direction of reinforcing bar 6-1* along the longitudinal;
Thereby satisfy every a determining deviation assembling body of wall is connected with major structure of construction 1 by longitudinal reinforcement 6-1.
Illustrate:
Structure supporting parts 1-1 or concrete slab 1-2 that 1, continuous setting is arranged, and the outer end is not incubated, when body of wall does not have hanger (Fig. 1), reinforcing bar 6 can be set or reinforcing bar 6 is not set, or only reinforcing bar 6 is set at the hole; When reinforcing bar 6 not being set, have netted tensile materials 5 to interconnect at the hole in the hole in the external protection 8, netted tensile materials 5 is positioned at opening protection layer 8 or surperficial, is connected with opening protection layer 8.
When 2, local interruption arranges concrete and cornices, reinforcing bar 6 is set is advisable.
(decorate, install billboard, the thick and heavy decoration of door and window mouth as stone curtain wall when 3, the assembling body of wall is installed hanger, or the heavier hanger of indoor installation), when reinforcing bar not being set can not hanger being installed, when the hole is heat insulation break bridge structure or other establish reinforcing bar 6 when needing, the spacing of assembling body of wall longitudinal reinforcement 6-1, and main tie point position, quantity are determined according to the requirement that hanger is installed etc.
4, the wall between windows between two windows of assembling body of wall shown in Figure 30 is very narrow, can local thickening design wall between windows, forms the wall between windows like compound pilaster.Compound pilaster can outwards be given prominence to, and is formed with the architectural image of pilaster, enriches architectural image; Compound pilaster also can be to indoor outstanding, namely pilaster some be located at the outer peripheral inboard of major structure of construction, compound pilaster be wall also be post, just needn't be at indoor setting such as steel frame vertically add the part that reclines.
When prefabricated panel 15 is light-duty composite thermo-insulating wall board, longitudinal reinforcement 6-1 and stirrup 12 inconveniences are installed when the processing prefabricated panel, therefore longitudinal reinforcement 6-1 and stirrup 12 can be in the on-the-spot installations of prefabricated panel seam crossing, or be installed in the prefabricated batten 15-1 (Figure 31, Figure 41), and with longitudinal reinforcement 6-1 and stirrup 12 installations, when window still wall intermediate demand was installed, the installation number of steel bars was few, also (Fig. 4, Figure 25) can be installed in prefabricated panel 15.The prefabricated batten 15-1 that is positioned at the hole should the pre-buried ironware that is connected with the window level reinforcing bar or reinforcing bar 6-3 (Figure 31, Figure 41).
Embodiment four: see Fig. 6~Fig. 8, Figure 14, Figure 27, Figure 28, Figure 30~Figure 32, Figure 41, the difference of present embodiment and embodiment one~three is, the assembling body of wall of present embodiment is connected with major structure of construction 1 takes the following the 1st)~4) anticorrosive measure, or also take the 5th), 6) anticorrosive measure:
1), will be provided with the sandwich layer 3 place local reductions of reinforcing bar 6 or longitudinal reinforcement 6-1* position, increase topping 8 thickness (Fig. 6~Fig. 8, Figure 14, Figure 29~Figure 32); Or attenuate sandwich layer 3 thickness not, increase topping 8 thickness (Figure 28) of reinforcing bar 6 or longitudinal reinforcement 6-1* laterally; The reinforcing bar 6 that described assembling body of wall is installed or also have longitudinal reinforcement 6-1*, supporting 1-1-5, embedded iron parts and weld seam around all be positioned under the protection of alkaline topping 8, topping 8 thickness satisfy the anticorrosion requirement;
2), with major structure of construction 1 and the structure supporting parts 1-1 place of longitudinal reinforcement 6-1 junction be the concrete of after-pouring, or the cement polymer concrete of after-pouring makes longitudinal reinforcement 6-1 be positioned at the protection of basic matterial, the thickness of topping 8 meets the demands; Or at major structure of construction 1 and structure supporting parts 1-1 place is pre-buried or ironware or reinforcing bar are installed in bar planting; with the scene longitudinal reinforcement 6-1 being installed is connected; or be connected with the longitudinal reinforcement 6-1 of prefabricated batten 15-1, longitudinal reinforcement 6-1 is positioned at the operating space of prefabricated batten 15-1 connecting portion and satisfies the thickness requirement that connects back topping 8.
3), pour into topping 8 in the breach 10-1 of supporting 1-1-5 and periphery thereof, topping 8 thickness satisfy the anticorrosion requirement, and protection supporting 1-1-5 prevents corrosion, or on supporting 1-1-5 the brushing corrosion resistant coating;
4), the described stirrup 12 that passes sandwich layer 3 satisfies anticorrosion and requires that (stainless steel soft-state with Ф 2.0, Ф 2.5 or Ф 3 sockets steel wire as anti-shearing stirrup optimum, Ф 2.0 stainless steel soft-states that for example are equivalent to U.S. 304# austenitic stainless steel socket the steel wire price and only are 60% of Ф 6 reinforcing bars, multipotency satisfies anti-shearing requirement, and conducts heat seldom.Only be common iron and current a lot of assembling body of wall passes stirrup, the oblique rollering steel muscle of non-alkaline insulation layer, do not satisfy the anticorrosion requirement.);
5), when being provided with longitudinal reinforcement 6-1*, leave distance between the prefabricated panel 15 that upper and lower layer is installed, leave assurance up and down vertical reinforcing bar 6-1 connect the operating space of length, guarantee that topping 8 thickness of longitudinal reinforcement 6-1* satisfy the anticorrosion requirement; Or when the processing prefabricated panel, topping 8 in longitudinal reinforcement 6-1* termination connects length range does not form, to plaster again after the connection of levels longitudinal reinforcement 6-1* termination in to be installed, form the topping 8 of longitudinal reinforcement 6-1* joint up and down, can guarantee that topping 8 thickness of longitudinal reinforcement 6-1* satisfy the anticorrosion requirement;
6), when the protective layer thickness of conventional cement mortar or ordinary concrete is difficult to satisfy anticorrosion and requires; topping 8 around reinforcing bar 6 and the weld seam in the certain limit is cement polymer mortar or cement polymer concrete; or also add the silicon ash in cement polymer mortar or the cement polymer concrete, satisfy the anticorrosion requirement.
Also can be in the position of connecting reinforcement or supporting the brushing corrosion resistant coating, but need often maintenance, trouble is not as taking the permanent anticorrosive measure of present embodiment.
Certainly the netted tensile materials 5 of assembling body of wall also needs to adapt to the life requirement of assembling body of wall, satisfies the anticorrosion requirement.Should satisfy the alkaline-resisting strength retention ratio of standard-required as alkaline-resisting screen cloth, with the after heat galvanized electric welded mesh etc.
Embodiment five: the difference of one of present embodiment and embodiment one~four is that present embodiment also increases connection ironware 7 (the connection ironware is reinforcing bar, steel plate or shaped steel), connects ironware 7 side of prefabricated panel 15 with major structure of construction 1 is connected; The tie point that connects ironware 7 exposes, and is convenient by the covering of the topping of alkalescence, avoid the tie point corrosion, or embedded iron parts 7 is zinc-plated ironware, stainless steel ironware.
Embodiment six: see Figure 20, the difference of one of present embodiment and embodiment one~five is that present embodiment also increases following fire protection construction measure, selects for use one of them or collocation to select for use as required, is the 3rd fire protection construction measure of assembling body of wall:
1), the insulation bar installed of the doorframe and window frame outside satisfies fire endurance and requires (window perimeter walls bulk diffusion in the time of can reducing fire and take place); In the window frame of the heat insulation break bridge structure outside insulation bar is installed, the topping on insulation bar surface can be the cement polymer elastic mortar+alkaline-resisting screen cloth that thickens, or the fireproof paint of brushing on the topping, brushing fire prevention glue, satisfies the fire endurance requirement;
2), in the assembling body of wall, increase fire barrier 11, the fire endurance requirement is satisfied in fire barrier 11; As fire barrier 11 for not firing or difficult combustion heat insulating material, fireproof paint, fire prevention glue, cement mortar or concrete, or for the concrete of the cement mortar of modification or modification etc.; Fire barrier 11 be provided with following 2 kinds of modes, according to using needs to select: 1., at interlayer horizontal fire barrier 11-1 is set; 2., in prefabricated panel (15) vertical joint, vertical fire barrier 11-2 is set; Form closed fire compartmentation structure;
Elastic expansion joint 30 (Figure 36) for not firing or difficult combustion heat insulating material, is exactly vertical fire barrier 11-2 by the heat insulating material in the structure atlas, sees Figure 39 it (1), Figure 40 it (1).
3), in the topping 8 of crab-bolt 20 outer ends or the surface fire proofing material is arranged, crab-bolt 20 satisfies the fire endurance requirement; As on the crab-bolt surface or topping surface local brushing fire prevention glue, or fire proofing material is joined in the topping of plastering of certain limit on the crab-bolt.
4), described supporting 1-1-5 satisfies the fire endurance requirement; describedly satisfy the fire endurance requirement (during as the bar planting mounting support at major structure of construction 1 built-in fitting (such as embedded bar) that arrange, that be connected with longitudinal reinforcement 6-1 and longitudinal reinforcement 6-1*; organic chemistry glue does not satisfy the fire endurance requirement and just not allows to use; also have at supporting periphery perfusion topping; just can satisfy the fire endurance requirement again so that the anticorrosion requirement had both been satisfied in supporting.Kill two birds with one stone.If do not establish supporting, then there is not this fire protection construction requirement).
Embodiment seven: see Figure 23~Figure 47, the assembling body of wall that a kind of support of present embodiment, the formula that reclines are installed, it is made up of major structure of construction 1, prefabricated panel 15, prefabricated batten 15-1 and sliding component 2; Described major structure of construction 1 is beam slab post wall and basis, major structure of construction 1 is concrete frame structure, steel reinforced concrete frame structure, frame structure, steel framed structure, the combination frame structure of concrete and steel, steel wood frame construction, or be bamboo framework, wood frame construction;
Be provided with the structure supporting parts 1-1 of support prefabricated panel 15, prefabricated batten 15-1 at major structure of construction 1 lateral surface, structure supporting parts 1-1 is connected with major structure of construction 1, and structure supporting parts 1-1 is major structure of construction 1 extension in the horizontal direction; Described structure supporting parts 1-1 is that concrete cornices, or be that the metal supporting parts (cornices conveniently with concrete when major structure of construction is concrete material, available metal supporting parts when major structure of construction is steel work, but it is many to conduct heat, also can be outside steel work the formwork concreting cornice), or be wood or bamboo cornice (cornicing when major structure of construction is bamboo framework, wood frame construction), or/and structure supporting parts 1-1 is sole plate or floor, or described structure supporting parts 1-1 is for forming the part in the sliding component 2; Described structure supporting parts 1-1 is for arranging continuously or being local interruption setting (recommendation selects for use the concrete of local interruption setting to cornice);
Described and the major structure of construction 1 side formula that reclines is installed and is: the beam slab lateral surface of prefabricated panel 15, prefabricated batten 15-1 upper end or lower end and major structure of construction 1 is posted by connecting, and (Figure 34 represents the installation that is posted by connecting of the beam lateral surface of prefabricated panel 15 lower ends and major structure of construction 1 in installation, be that assembling body of wall lower end is fixed end, the upper end is the slippage end, all the other accompanying drawings are all represented the installation that is posted by connecting of the beam slab lateral surface with prefabricated panel 15, prefabricated batten 15-1 upper end and major structure of construction 1, namely the upper end is fixed end, and the lower end is the slippage end.); Or at the additional part 1-3 that reclines of beam slab arranged outside, the additional part 1-3 that reclines is the beam slab extension in the vertical direction of major structure of construction 1, the additional part 1-3 that reclines of prefabricated panel 15, prefabricated batten 15-1 and major structure of construction 1 is posted by connecting, and (face that is posted by connecting of major structure of construction 1 is less not to be satisfied and is posted by connecting when requiring in installation, or the external surface of beam is when being positioned at post inboard, and the additional part 1-3 that reclines is set to be provided and satisfy the condition that the formula that reclines is installed.); The additional part 1-3 that reclines is the additional part or be the composite component of concrete and heat insulating material of reclining of the additional part that reclines of concrete, steel;
Prefabricated batten 15-1 is between prefabricated panel 15;
Between the assembling body of wall of described a kind of support, the formula that reclines installation and the post of major structure of construction 1 or the shear wall following 2 kinds of structures are arranged, select one and select for use or fit applications:
1), prefabricated panel 15, prefabricated batten 15-1 be connected with the beam slab of major structure of construction 1, be not connected with post or shear wall; Flexible encapsulant can be installed at the edge in the slit, post both sides of assembling body of wall and major structure of construction 1, and (Figure 43, Figure 44 as bonding with the elastic sealant sealing, or accompany the polyethylene foamed rod in addition.);
2), the post of prefabricated panel 15 and major structure of construction 1 or the shear wall lateral surface installation that is posted by connecting, post or shear wall side be provided with elastic expansion joint 30 (elastic expansion joint can the post limit or with post apart from certain limit in, but this prefabricated panel termination must not be connected with beam, Figure 39, Figure 40);
Can adopt 2 at structure sediment seam, Temperature Joint and other position such as external corner position that needs) structure; Other position employing 1) structure.
Sliding component 2 is set at a certain distance, sliding component 2 is positioned at the horizontal joint place of prefabricated batten 15-1 and structure supporting parts 1-1, and (Figure 33~Figure 38) or the flooring horizontal joint place that is positioned at prefabricated batten 15-1 and major structure of construction 1 (become the assembling body of wall of slip as the assembling body of wall mounting slip member 2 of Figure 18, also as shown in figure 30 compound pilaster to be positioned at major structure of construction outer peripheral when inboard, also may need sliding component 2 is installed between indoor compound pilaster and the flooring.); Cornicing of mounting slip member place generally need thicken (Figure 33, Figure 36);
Sliding component 2 can have following structure:
1), sliding component 2 comprises sliding component 2-1, steel chute 2-2, yielding rubber pad 2-3, and yielding rubber pad 2-3 (Figure 46, Figure 47) is arranged between sliding component 2-1 and the steel chute 2-2; Sliding component 2-1 is positioned at the slippage end of prefabricated batten 15-1, and steel chute 2-2, yielding rubber pad 2-3 are positioned at prefabricated batten 15-1 fixed end, or is positioned at the structure supporting parts 1-1 of fixed end;
2), sliding component 2-1 also can be (expressions of not drawing) such as damping rubber tires;
Recommendation is selected the former for use, and, good seal big because of the former yielding rubber pad bearing area are favourable to damping, and be favourable to the durability of yielding rubber pad.Because of the part that prefabricated batten 15-1 is the assembling body of wall, the slippage end of prefabricated batten 15-1 or fixed end are exactly slippage end or the fixed end of assembling body of wall.
Steel chute 2-2 and yielding rubber 2-3 are stops, can limit the assembling body of wall and slide in steel chute 2-2.
The purpose that sliding component is set is, under wind load or horizontal earthquake action, during assembling body of wall generation relative storey displacement, sliding component is mobile in the steel chute, and guarantee that the slippage end is positioned at steel chute 2-2, and yielding rubber all plays cushioning effect in three directions, and namely present embodiment is not only the slip body of wall, still is at the assembling body of wall of three direction dampings.
Steel chute 2-2 has structure supporting parts 1-1 or concrete slab 1-2 (being that steel chute 2-2 is installed in the middle of structure supporting parts 1-1 or the concrete slab 1-2) in the both sides of body of wall length direction, steel chute 2-2 is connected (comprise with structure supporting parts 1-1 or concrete slab 1-2 and being connected) with major structure of construction 1; The termination that is positioned at assembling body of wall slippage end is provided with sliding component 2-1, and sliding component 2-1 is corresponding with steel chute 2-2 position; When relative storey displacement took place for major structure of construction 1, sliding component 2-1 can be along the displacement of steel chute 2-2 occurred level, or the movement that can deform of the spring shock absorption pad of sliding component 2-1;
Or the steel chute 2-2 of sliding component 2 is connected with major structure of construction 1, or with both sides structure supporting parts 1-1---cornicing is connected, i.e. become structure supporting parts 1-1 after steel chute 2-2 and the yielding rubber pad 2-3 combination; Also can be structure supporting parts 1-1 simultaneously as the steel chute 2-2 in the sliding component of Figure 46, Figure 47, yielding rubber pad 2-3;
Or the sliding component 2-1 of sliding component 2 is connected with major structure of construction 1, or with both sides structure supporting parts 1-1---cornicing is connected, namely sliding component 2-1 becomes structure supporting parts 1-1;
Or steel chute 2-2 and yielding rubber 2-3 also can be positioned at the termination of prefabricated batten 15-1, and sliding component 2-1 is connected with major structure of construction 1;
Figure 46, Figure 47 represent to be provided with vertical hole in the yielding rubber pad, behind the yielding rubber pressurized, the space of lateral expansion are arranged, and play cushioning effect.Heat preservation fireproofing material such as aluminium silicate wool, rock wool 3-1 are arranged in the yielding rubber both sides.Present embodiment not only can be applicable to exterior wall, also can be applicable to sliding shock-damping interior wall (as being used for Figure 18, becoming slip assembling body of wall), if on the interior exterior wall of building sliding component has been installed all, must alleviate the geological process of building greatly.
When the window still wall of assembling body of wall is longer, can establish additional sliding and position limitation device 4 (Figure 33, Figure 35, Figure 37) at the slippage end of window still wall, additional sliding and position limitation device 4 is fixed with the beam slab of assembling body of wall and major structure of construction 1, and additional sliding and position limitation device 4 can slide along with the slippage end of window still wall; Additional sliding and position limitation device 4 is made of angle steel 4-1 usually, there are slip hole 4-2, additional sliding and position limitation device 4 also to comprise sliding sheet 4-4 (teflon plate), slippage screw rod 4-5 (should be stainless steel bolt), anchor slab 4-6 on the angle steel 4-1, slippage screw rod 4-5 and anchor slab 4-6 connect as one, the inboard topping anchoring (Figure 37) of slippage screw rod 4-5 and anchor slab 4-6 and assembling body of wall; Slippage screw rod 4-5 passes slip hole 4-2 and the annex thereof on the additional sliding and position limitation device 4: steel plate washer 4-3, sliding sheet 4-4 and assembling body of wall, two end nuts are fixed (Figure 35, Figure 37); Slippage screw rod 4-5 can slide in the slip hole 4-2 of additional sliding and position limitation device 4; Slip hole 4-2 is the hole of horizontal direction, and the space of certain upper and lower displacement can also be arranged simultaneously in the vertical direction, makes the window still wall that is connected with additional sliding and position limitation device to be subjected to displacement along with wall between windows.
Because the weight of the assembling body of wall of slip of the present invention does not act on the additional sliding and position limitation device 4, so indoor additional sliding component 4 suffered power are far smaller than stressed on the 39th page of bracket of atlas or the shaped steel, it does not bear prefabricated panel weight, only play a part spacing and satisfy slippage, install simple;
Described major structure of construction 1 is that formerly construction forms, or major structure of construction 1 is with prefabricated panel 15, the prefabricated batten 15-1 side template as major structure of construction 1, the synchronous construction and installation of assembling body of wall of installing with support, the formula that reclines; Or part major structure of construction 1 is that formerly construction forms, and part major structure of construction 1 is with prefabricated panel 15, the prefabricated batten 15-1 side template as major structure of construction 1, the synchronous construction and installation of assembling body of wall of installing with support, the formula that reclines;
The assembling body of wall that a kind of support, the formula that reclines are installed has following 3 kinds of installation constitutions, according to using needs to select 1 separately for use) or 2) structure, or with 1) or 2) with 3) the structure collocation;
1), with prefabricated panel 15 or also have prefabricated batten 15-1 to be installed in structure supporting parts 1-1 to go up or be installed on the concrete slab 1-2, structure supporting parts 1-1 or concrete slab 1-2 outer end do not have insulation layer (see Figure 34, Figure 37, Figure 38, structure supporting parts 1-1 is generally concrete and cornices);
2), with prefabricated panel 15 or also have prefabricated batten 15-1 to be installed in structure supporting parts 1-1 to go up or be installed on the concrete slab 1-2, there is insulation layer structure supporting parts 1-1 or concrete slab 1-2 outer end, and (the structure supporting parts 1-1 that is Figure 34, Figure 37, Figure 38 shortens, and there is heat insulating material the outside.Prefabricated panel 15 is that this embodiment of composite thermo-insulating wall board is just meaningful.);
The inboard of the prefabricated panel 15 of the assembling body of wall of outer insulation is positioned on structure supporting parts 1-1 or the concrete slab 1-2, and the outside of prefabricated panel 15 is positioned at the outside of structure supporting parts 1-1 or concrete slab 1-2; Installation constitution can have following 3 kinds, 1., the upper end of prefabricated panel 15 is or/and the lower end is L shaped production performance and easy construction according to pre-control equipment are selected one of them:, L shaped covering is structure supporting parts 1-1 or the concrete slab 1-2 outer end of setting continuously, and is connected with the outer end; 2., prefabricated panel 15 upper ends or lower end do not become L shaped, reproduce an installation sandwich layer 3 in the outer end of the structure supporting parts 1-1 that arranges continuously or concrete slab 1-2, plaster again and form topping 8 in sandwich layer 3 outsides, in topping 8 or the surface netted tensile materials 5 is installed is connected with the topping 8 of prefabricated panel 15, sandwich layer 3, the topping 8 of installation outside prefabricated panel 15 and structure supporting parts 1-1 or the concrete slab 1-2 is connected as a single entity; 3., when structure supporting parts 1-1 arranges for being interrupted, the termination of prefabricated panel 15 is provided with breach 10, the position of breach 10 is with to be interrupted the structure supporting parts 1-1 that arranges corresponding, the on-the-spot installation of the layered material of structure supporting parts 1-1 outer end; Or prefabricated panel 15 terminations are not provided with breach 10, the on-the-spot installation of the layered material of the layered material between structure supporting parts 1-1 and structure supporting parts 1-1 outer end;
3), with prefabricated panel 15 directly with installations that be posted by connecting of the beam slab lateral surfaces of major structure of construction 1, the window still wall between the window about being positioned at arranges elastic expansion joint between the prefabricated panel of window still wall and adjacent installation;
When structure supporting parts 1-1 arranged for being interrupted, the termination of prefabricated panel 15 was provided with breach 10, and the position of breach 10 is corresponding with the structure supporting parts 1-1 that is interrupted setting; Or the termination of prefabricated panel 15 does not have breach 10, the on-the-spot installation of the materials for wall layering between structure supporting parts 1-1 (prefabricated panel is rectangle, and prefabricated panel reduces cut height);
Be connected between prefabricated panel 15 and the prefabricated batten 15-1, co-operation forms and is out of shape between a kind of post that contains major structure of construction 1 and the beam, assembling body of wall slip, that support, the formula that reclines are installed;
For example, to interconnect between the prefabricated panel 15: as with foamed glue with bonding connection between the sandwich layer, or it is bonding with cement polymer elasticity mortar, also available elastic heat preserving mortar is bonding, determine according to energy-saving heat preserving requirement and adhesives condition, during installation jam-packed between prefabricated thermal insulation wallboard and the prefabricated thermal insulation batten is installed.
With netted tensile materials adjacent prefabricated panel is connected, satisfy the overlap joint requirement, topping interconnects, or outer protection layer seam crossing filling elastic packing waterproofing materials connects, see Figure 29, the topping 8 of prefabricated panel 15 is exactly the topping 8 of assembling body of wall, does not get rid of the big need of construction error and makes up a deficiency and plaster;
Described prefabricated panel 15, prefabricated batten 15-1 be not for comprising prefabricated panel, the prefabricated batten of the various structures beyond the decorative heat preservation plate, described decorative heat preservation plate is the decorative heat preservation plate that does not have inboard topping, as decorative heat preservation plates compound with heat insulating material such as granite slab or ceramic wafers; 1), when prefabricated panel 15, prefabricated batten 15-1 are light-duty composite thermo-insulating wall board for example prefabricated panel 15, prefabricated batten 15-1 have following several:, the various materials of light-duty composite thermo-insulating wall board are connected as a single entity, form an integral body primary structure member (accompanying drawing all represents to use composite thermo-insulating wall board, because of in light weight, energy-saving heat preserving good easy for installation, lattice are low); 2) or for the prefabricated panel of internal lobe, siphonal lobe concrete and middle insulation layer is arranged, rely on the oblique rollering steel muscle to connect, distortion has the changing of the relative positions between the layering, do not meet the mechanics of materials and make the prefabricated panel of the requirement of as a whole primary structure member (be the structure of building standard design atlas " precast concrete out-hung panel " 08SJ110-2,08SG333, or like configurations); 3) or be non-insulation prefabricated panel, lightweight concrete slab (as rice husk concrete, foamed concrete) and straw plate, honeycomb card board of light weight aggregate concrete plate, concrete core unit etc.;
When prefabricated panel 15, prefabricated batten 15-1 were light-duty composite thermo-insulating wall board, light-duty composite thermo-insulating wall board was made up of sandwich layer 3, topping 8, netted tensile materials 5; Described sandwich layer 3 is inorganic or organic insulation material, as macromolecule heat insulating material, foam cement, mineral wool, straw, honeycomb card board, thermal insulation mortar, rice husk concrete, glue powder polyphenyl particle or foamed glass; Described sandwich layer 3 is identical heat insulating material; or be different heat insulating materials (local awkward combustion phenolic resins for example at the sandwich layer 3 of diverse location; and other position is the EPS plate); can be provided with ribs in the described sandwich layer 3 or not be provided with ribs that (ribs is oblique or perpendicular to the topping setting, to increase wallboard rigidity in sandwich layer.Ribs in the market mostly is magnesia cement, and durability is bad, is provided with reinforcing bar in the ribs or is not provided with reinforcing bar); Described netted tensile materials 5 is alkaline-resisting screen cloth or basalt fibre screen cloth or wire lath; Described topping 8 is cement mortar or layer of concrete, or described topping 8 layer of concrete for the cement mortar of modification or modification, or described topping 8 is cement calcium silicate board with microporous, cement fibrolite plate; The external surface of topping 8 is the plane, or the external surface of topping 8 is matsurface; Described topping 8 is positioned at sandwich layer 3 both sides, and sandwich layer 3 is connected (as bonding connection, be connected with topping or/and core layer surface is fluted, satisfy the requirement of strength that sandwich layer is connected with topping) with topping 8; Topping 8 thickness of diverse location can be different (as at prefabricated thermal insulation panel edges seam areas topping 8 attenuates, Figure 23~Figure 25; When being provided with reinforcing bar, reinforcement location need be thickeied topping 8, Figure 32); Netted tensile materials 5 is positioned at topping 8, or alkaline-resisting screen cloth or basalt fibre screen cloth Pasting be on topping 8 surfaces, and netted tensile materials 5 can be selected for use a kind of or select multiple installation simultaneously for use, or the local netted tensile materials 5 that is provided with reinforcement; Or described prefabricated panel 15 is steel wire net rack cement filled board; The external surface of described prefabricated panel 15, prefabricated batten 15-1 can be provided with decorative layer or not be provided with decorative layer;
There is opening protection layer 8-1 at the door and window hole place of assembling body of wall, and described opening protection layer 8-1 is the door and window hole fire barrier; Described opening protection layer 8-1 is fire-retardant type or nonflammable heat insulating material; or the brushing fireproof paint, the fire prevention glue; form the heat-insulating bridge-cut-off hole and (can be " 0 " as the linear thermal transmittance in difficult combustion phenolic resins hole is installed; if the heat insulating material that coefficient of thermal conductivity is higher; though be the heat-insulating bridge-cut-off hole, the hole thermal resistance still hinders less than the main wall body heat.); Or described opening protection layer 8-1 be cement mortar or concrete floated coat, or be the concrete floated coat of the cement mortar of modification or modification, is formed with the heat bridge hole; Opening protection layer 8-1 is connected (being generally bonding connection) with adjacent sandwich layer 3; opening protection layer 8-1 both sides matcoveredn 8; opening protection layer 8-1 is connected with topping 8 that (when prefabricated panel was installed, the hole periphery should on-the-spotly be installed opening protection layer 8-1, and the hole must be seam crossing.);
The topping 8 of described assembling body of wall satisfies the fire endurance requirement, and opening protection layer 8-1 satisfies the fire endurance requirement, is the first fire protection construction requirement of assembling body of wall.The topping of prefabricated thermal insulation wallboard, prefabricated thermal insulation batten is exactly the topping of assembling body of wall.
It is wide that the prefabricated batten width of mounting slip member 2 needs 150~250mm approximately among Figure 31, and the vertical reinforcing bar of indoor and outdoor respectively is 2 is advisable, and is symmetrical arranged.
Be positioned at sliding component and the horizontal joint place at position should be installed by softness or elastic heat preserving material in addition, or lubricious material also is installed on heat insulating material.Not only with horizontal joint sealing insulation, but also do not hinder slippage between the upper and lower plates.
Mounting slip spare obviously is very inconvenient when processing prefabricated panel 15, yielding rubber pad internal channel in the steel chute that is difficult to install on the sliding component in the prefabricated panel 15 and structure supporting parts and the structure supporting parts is accurately aimed at, and influence the efficient that plant equipment is processed prefabricated panel, so present embodiment need be by prefabricated batten 15-1.The prefabricated batten formwork of Figure 31, Figure 42 section is prefabricated easily, and sliding component 2 is installed in an end of prefabricated batten, and easy for installation, easily install accurately the position.
The assembling body of wall notes preventing the water inlet of body of wall horizontal joint, following several way is arranged, for reference: 1), in wall outer side block finish material is installed, stretch under the block finish material on upper strata, horizontal joint place, the block finish material of lower floor shortens, namely cover in horizontal joint with the block finish material of stretching down, can avoid the horizontal joint water inlet; 2), dash cover plate 40 (Figure 46) are installed at the horizontal joint place, as stainless steel or aluminium alloys cover plate, cover plate and horizontal joint upper protective layer edge be adhesively fixed (it is bonding to stick with glue agent, can add tapping screw and fix), cover plate hides horizontal joint and elongation downwards, can avoid the horizontal joint water inlet; 3), the elongation of the external protection lower end of prefabricated panel, hide the upper end section of lower floor's prefabricated thermal insulation wallboard, namely hide horizontal joint, but prefabricated trouble.
Embodiment eight: the difference of present embodiment and embodiment seven is, assembling body of wall and major structure of construction 1 be connected with following mode, select wherein a kind, or 1), 2), 3) plant collocation and share:
1), with crab-bolt 20 with prefabricated panel 15 or also have prefabricated batten 15-1 and the side of major structure of construction 1 or the additional part 1-3 that reclines is fixed;
Crab-bolt 20 penetrates prefabricated panel 15, prefabricated batten 15-1 and major structure of construction 1 or fixes with the side of the additional part 1-3 that reclines;
2), with cementitious materials that beam slab post, the shear wall side of prefabricated panel 15, prefabricated batten 15-1 and major structure of construction 1 is bonding, or/and bonding with the additional part 1-3 side that reclines;
Recommend to adopt 1 simultaneously) with 2) two kinds be connected structure; In addition, but embedded iron parts in the topping of prefabricated panel 15 and major structure of construction 1 bonding plane is connected with major structure of construction 1;
3), with cementitious materials that the fixed end termination of prefabricated panel 15, prefabricated batten 15-1 and structure supporting parts 1-1 or concrete slab 1-2 is bonding, or be provided with netted tensile materials 5 in the cementitious materials between bonding plane; Netted tensile materials 5 is overhanging to be connected with topping 8, and netted tensile materials 5 is connected (netted tensile materials 5 satisfies anchorage length with the bonding need of major structure of construction 1) with major structure of construction 1;
Cementitious materials has multiple choices, the cement polymer mortar good water-retaining property, and the adhesive strength height is recommended to select for use.
Embodiment nine: present embodiment and embodiment seven or eights' difference is, present embodiment increases reinforcing bar 6 and stirrup 12, and reinforcing bar 6 is positioned at assembling body of wall indoor and outdoor topping 8; Reinforcing bar 6 comprises longitudinal reinforcement 6-1 and horizontal reinforcement or arch steel 6-2, or the steel hoop (do not draw expression) of reinforcing bar 6 for being provided with at door and window hole; Longitudinal reinforcement 6-1 is positioned at the topping 8 at prefabricated panel 15 vertical joint places, or longitudinal reinforcement 6-1 is positioned at the topping 8 of prefabricated batten 15-1, is connected between prefabricated panel 15 and the prefabricated batten 15-1;
Or in the topping 8 of prefabricated panel 15, also arrange longitudinal reinforcement 6-1* (Figure 32 is used for horizontal loading when very big, or floor height is higher, post when big, increase arrangement of reinforcement quantity; And Figure 25 window still wall is established longitudinal reinforcement 6-1* when longer at the middle part.);
Described longitudinal reinforcement 6-1 comprises outdoor longitudinal reinforcement 6-1-1 and indoor longitudinal reinforcement 6-1-2, and described horizontal reinforcement or arch steel 6-2 comprise outdoor horizontal reinforcing bar or arch steel 6-2-1, indoor horizontal reinforcing bar or arch steel 6-2-2; (can be provided with reinforcing bar between bi-steel arranged side by side sockets and also can not be provided with reinforcing bar and socket described reinforcing bar 6 for single steel bar or for bi-steel arranged side by side, or/and on bi-steel arranged side by side welding steel or block shaped steel, can between bi-steel, connect welding, or weld at reinforcing bar perpendicular to metope.); Door and window hole should be provided with reinforcing bar 6, be provided with horizontal reinforcement or arch steel 6-2 at door and window hole windowsill place, or also above door and window hole, be provided with horizontal reinforcement or arch steel 6-2, or also be provided with horizontal reinforcement 6-2 (Figure 13) in other position, horizontal reinforcement or arch steel 6-2 are connected with longitudinal reinforcement 6-1, or are connected with supporting 1-1-5; Reinforcing bar 6 at indoor and outdoor single steel bar or bi-steel arranged side by side is provided with stirrup 12, and stirrup 12 sockets indoor and outdoor reinforcing bar 6 (stirrup 12 can be two limb hoops or is single hoop);
Illustrate:
1), the reinforcing bar 6 of slip assembling body of wall is not preferably single steel bar because be difficult for coinciding with the center of sliding component, and reinforcing bar 6 is not preferably bi-steel arranged side by side easily and the center of sliding component coincides.
2), when window epithelium absolute altitude is identical with beam, indoor horizontal reinforcing bar or arch steel needn't be set, stirrup is that single hoop directly is connected (as ailing on beam, stainless steel wire is connected with the steel nail take-up strap) with beam.
Reinforcement installation is configured with following 3 kinds, selects one and selects for use:
1), structure supporting parts 1-1 or concrete slab 1-2 heat bridge (Figure 34, Figure 37, Figure 38) are arranged, the termination that is positioned at the longitudinal reinforcement 6-1 of assembling body of wall fixed end is connected with major structure of construction 1, or is connected with structure supporting parts 1-1 or concrete slab 1-2; The longitudinal reinforcement 6-1 other end is connected with sliding component 2;
When 2), structure supporting parts 1-1 or concrete slab 1-2 are incubated outward, the termination that is positioned at the indoor longitudinal reinforcement 6-1-2 of assembling body of wall fixed end is connected with major structure of construction 1, or be connected with structure supporting parts 1-1 or concrete slab 1-2, the termination of outdoor longitudinal reinforcement 6-1-1 is connected with supporting 1-1-5, or be connected (as oblique roof panel, sole plate, it is in order to hang external protection 8 that longitudinal reinforcement 6-1 namely is set) with the major structure of construction 1 of encorbelmenting; The longitudinal reinforcement 6-1 other end is connected with sliding component 2;
The inner and major structure of construction 1 anchoring of described supporting 1-1-5, the position of supporting 1-1-5 is corresponding with the position of assembling body of wall outside longitudinal reinforcement 6-1-1; Described supporting 1-1-5 is the steel truss supporting, the steel truss supporting is provided with brace (Figure 26, Figure 27), or described supporting 1-1-5 is for (cement polymer mortar prevents oblique reinforcing bar distortion and displacement with the fixing diagonal reinforcement of cement polymer mortar, prevent oblique reinforcement corrosion, be applicable to and support hour application of encorbelmenting, generally should not use), or described supporting 1-1-5 is the concrete hanging top supporting; Outdoor longitudinal reinforcement 6-1-1 is connected with supporting 1-1-5, and the external protection 8 of assembling body of wall is hung;
The termination of described longitudinal reinforcement 6-1 becomes the main tie point of assembling body of wall and major structure of construction 1; Described main tie point is connected transmission power with major structure of construction 1 the force direction that is subjected to is the direction of reinforcing bar 6-1 along the longitudinal;
3) or in the topping 8 of the prefabricated panel 15 of assembling body of wall longitudinal reinforcement 6-1* is set also, longitudinal reinforcement 6-1* comprises outdoor longitudinal reinforcement 6-1*-1, indoor longitudinal reinforcement 6-1*-2;
Following 2 kinds of installation constitutions are arranged when longitudinal reinforcement 6-1* is set, select one and select for use:
1., structure supporting parts 1-1 or concrete slab 1-2 heat bridge are arranged, be that structure supporting parts 1-1 or concrete slab 1-2 outer end be not when being incubated, the longitudinal reinforcement 6-1* termination that is positioned at assembling body of wall fixed end is connected with major structure of construction 1, or be connected with structure supporting parts 1-1 or concrete slab 1-2, the longitudinal reinforcement 6-1* other end is anchored in the topping (8);
2., structure supporting parts 1-1 or concrete slab 1-2 are incubated outward; The indoor longitudinal reinforcement 6-1*-2 termination that is positioned at assembling body of wall fixed end is connected with major structure of construction 1, or be connected with structure supporting parts 1-1 or concrete slab 1-2, the outdoor longitudinal reinforcement 6-1*-1 termination that is positioned at assembling body of wall fixed end is connected with supporting 1-1-5, supporting 1-1-5 position is corresponding with longitudinal reinforcement 6-1* (when closeer longitudinal reinforcement 6-1* is set, the setting of supporting 1-1-5 is also closeer, and the working height of prefabricated panel can arrive supporting absolute altitude down; When 1 or 2 longitudinal reinforcement 6-1* are set in the middle of the prefabricated panel, can be used for supporting 1-1-5 and be connected with longitudinal reinforcement 6-1* in middle the leaving certain gaps uncovered by the economic plan 10 of prefabricated panel termination), the longitudinal reinforcement 6-1* other end is anchored in the topping 8; Longitudinal reinforcement 6-1* also is connected (for example about window) with indoor and outdoor horizontal reinforcement or arch steel 6-2;
Longitudinal reinforcement 6-1* also can install at the construction field (site); with stirrup 12 outdoor longitudinal reinforcement 6-1*-1 is connected with indoor longitudinal reinforcement 6-1*-2; and then plaster at prefabricated panel 15 and to form topping 8 (prefabricated panel 15 of installation can be semiproduct; the topping of one half thickness is namely only arranged, and netted tensile materials is pasted in the outside.Plaster behind installation longitudinal reinforcement 6-1* and the stirrup and form whole toppings.), but bother;
The termination of described longitudinal reinforcement 6-1* also is the main tie point of assembling body of wall and major structure of construction 1; Described main tie point is connected transmission power with major structure of construction 1 the force direction that is subjected to is the direction of reinforcing bar 6-1* along the longitudinal.
Embodiment ten: the difference of one of present embodiment and embodiment seven~nine is that the assembling body of wall is connected with major structure of construction 1 takes the following the 1st)~4) anticorrosive measure, or also take the 5th) anticorrosive measure:
1), will be provided with the sandwich layer 3 place local reductions of reinforcing bar 6 or longitudinal reinforcement 6-1* position, increase topping 8 thickness; Or attenuate sandwich layer 3 thickness not, increase topping 8 thickness of reinforcing bar 6 or longitudinal reinforcement 6-1* laterally; The reinforcing bar 6 that described assembling body of wall is installed or also have longitudinal reinforcement 6-1*, supporting 1-1-5, all be positioned under the protection of alkaline topping 8 around connecting ironware and weld seam, topping 8 thickness satisfy the anticorrosion requirement;
2), with major structure of construction 1 and the structure supporting parts 1-1 place of longitudinal reinforcement 6-1 junction be the concrete of after-pouring, or the cement polymer concrete of after-pouring make longitudinal reinforcement 6-1 be positioned at the protection of basic matterial, and the thickness of topping 8 meets the demands; Or at major structure of construction 1 and structure supporting parts 1-1 place is pre-buried or ironware or reinforcing bar are installed in bar planting; with the scene longitudinal reinforcement 6-1 being installed is connected; or be connected with the longitudinal reinforcement 6-1 of prefabricated batten 15-1, longitudinal reinforcement 6-1 is positioned at the operating space of prefabricated batten 15-1 connecting portion and satisfies the thickness requirement that connects back topping 8.
3), pour into topping 8 in the breach 10-1 of supporting 1-1-5 and periphery thereof, topping 8 thickness satisfy the anticorrosion requirement, and protection supporting 1-1-5 prevents corrosion, or on supporting 1-1-5 the brushing corrosion resistant coating;
4), the described stirrup 12 that passes sandwich layer 3 satisfies the anticorrosion requirement;
5), when topping 8 thickness of conventional cement mortar or ordinary concrete are difficult to satisfy anticorrosion and require; topping 8 in reinforcing bar 6 (comprising all reinforcing bars) and the composition sliding component 2 in the certain limit on every side of steel is cement polymer mortar or cement polymer concrete; or also add the silicon ash in cement polymer mortar or the cement polymer concrete, satisfy the anticorrosion requirement.
Other as should satisfy the alkaline-resisting strength retention ratio of standard-required with alkaline-resisting screen cloth, also as using the after heat galvanized electric welded mesh, can protect solder joint by galvanizing, and is anticorrosion good.
Embodiment 11: the difference of one of present embodiment and embodiment seven~ten is that present embodiment also increases following fire protection construction measure, selects for use one of them or collocation to select for use as required, is the 3rd fire protection construction measure of assembling body of wall:
1), the topping on the insulation bar installed of the doorframe and window frame outside satisfies fire endurance and requires (window perimeter walls bulk diffusion in the time of can reducing fire and take place);
2), in the assembling body of wall, increase fire barrier 11, the fire endurance requirement is satisfied in fire barrier 11; As fire barrier 11 for not firing or difficult combustion heat insulating material, fireproof paint, fire prevention glue, cement mortar or concrete, or for the concrete of the cement mortar of modification or modification etc.; Fire barrier 11 be provided with following 2 kinds of modes, according to using needs to select: 1., at interlayer horizontal fire barrier 11-1 is set; 2., in prefabricated panel (15) vertical joint, vertical fire barrier 11-2 is set; Form closed fire compartmentation structure;
Elastic expansion joint 30 (Figure 36) for not firing or difficult combustion heat insulating material, is exactly vertical fire barrier 11-2 by the heat insulating material in the structure atlas, sees Figure 39 it (1), Figure 40 it (1).
3), in the topping of crab-bolt 20 outer ends or the surface fire proofing material is arranged, crab-bolt 20 satisfies the fire endurance requirement; As on the crab-bolt surface or topping surface local brushing fire prevention glue, or fire proofing material is joined in the topping of plastering of certain limit on the crab-bolt.
4), described supporting 1-1-5 satisfies the fire endurance requirement; describedly satisfy the fire endurance requirement (during as the bar planting mounting support at major structure of construction 1 built-in fitting (such as embedded bar) that arrange, that be connected with longitudinal reinforcement 6-1 and longitudinal reinforcement 6-1*; organic chemistry glue does not satisfy the fire endurance requirement and just not allows to use; also have at supporting periphery perfusion topping; just can satisfy the fire endurance requirement again so that the anticorrosion requirement had both been satisfied in supporting.Kill two birds with one stone.If do not establish supporting, then there is not this fire protection construction requirement).
In the window frame of the heat insulation break bridge structure outside insulation bar is installed, the topping on insulation bar surface can be the cement polymer elastic mortar+alkaline-resisting screen cloth that thickens, or the fireproof paint of brushing on the topping, brushing fire prevention glue, satisfies the fire endurance requirement.
About some explanation of the present invention:
1, the condition of installing about the formula that reclines:
Abutment face should satisfy certain width, needs to install the additional part that reclines as not satisfying, as on the beam limit vertical concrete being installed.
2, topping 8 layer of concrete for the cement mortar of modification or modification of the present invention comprise following meaning:
1), add Admixture, flyash, stone flour, silicon ash, waterproof agent, water-loss reducer, resistance and split the cement mortar of fiber and other material modification or the concrete of modification, fiber is split in resistance polypropylene chopped strand, alkali-proof glass chopped strand, basalt fibre and hemp cut etc.
2), also comprise cement polymer mortar or the cement polymer concrete that adds water-loss reducer, macromolecule adhesive formation; And the cement silicon ash polymer mortar or the cement silicon ash polymer concrete that also add the formation of silicon ash.Its effect is: 1., lack than conventional cement mortar or concrete intensity height, crack, the protection reinforcing bar is prevented the better effects if of corroding.It is more favourable particularly to adopt the acrylic ester elastic emulsion preparation of vitrification point lower (10 degree~-20 degree) to contain cement silicon ash polymer elasticity mortar or the cement silicon ash polymer elasticity concrete of silicon ash.2., steel nail is easy to and hammer into securely in the cement polymer elastic mortar, and will connect steel disc with steel nail when making things convenient for door and window to install and the cement polymer elastic mortar fixedly secures; And ordinary mortar is easy to cracking, and the nail steel nail is insecure.
3), also comprise the magnesia cement mortar, can be applicable to the building not high to life requirement.
3, about just prefabricated panel and major structure of construction side fixing with crab-bolt: recommend to adopt the plastics crab-bolt, particularly adopt nailing plastic crab-bolt, the accompanying drawing multilist shows nailing plastic crab-bolt, and plastic outer sleeve should adopt the high-strength polyethylene plastic material.Nailing can be injected and be not less than 50mm in the concrete, and penetrable 6~10mm steel plate is connected (can weld steel sheet on the steel work limit) with steel work, and also available bolt is connected with steel work, but trouble.Nailing plastic crab-bolt does not increase heat transfer, and installation rate is fast, price is low, bonding strength can meet the demands, reduce cost, do not increase heat transfer, good endurance.Nailing plastic crab-bolt as the production of existing Chinese Sichuan Nanshan Shooting Nail Fastening Device Co., Ltd.
4, about the reinforcing bar setting:
1), the indoor and outdoor reinforcing bar is generally and is symmetrical arranged, and can a side be bi-steel arranged side by side also, in addition side is single steel bar, stirrup is triangular in shape to socket; The vertical reinforcing bar reply that slip assembling body of wall is installed claims to arrange (Figure 31 and Figure 41 they (2)).The steel plate of installing on the bi-steel arranged side by side can be installed perpendicular to body of wall by Figure 31, or is installed between the bi-steel.Seam crossing is positioned at post or the shear wall place of major structure of construction, and when outdoor vertical reinforcing bar need be set, outdoor longitudinal reinforcement socketed by stirrup and major structure of construction, needs on post or shear wall embedded bar or ironware to be connected with stirrup;
2), the hole horizontal reinforcement is set and prevents plaster topping cracking of door and window hole corner.Horizontal reinforcement generally can be Ф 4 galvanizing steels, conveniently is connected with the both sides reinforcing bar.When being necessary to arrange the bigger horizontal reinforcement of diameter, horizontal reinforcement and both sides, hole reinforcing bar by be connected steel plate and be welded to connect.Horizontal reinforcement can only be positioned at about the door and window hole, also can be positioned at other position, and when for example Figure 13 had two windows arranged side by side, the horizontal reinforcement between two windows can connect and socket.When window is arc, on-the-spot arc sandwich layer and the arch steel installed.
5, anti-shearing about stirrup setting and assembling body of wall:
For will socketing between the indoor and outdoor reinforcing bar, and for making reinforcing bar in topping, be positioned at accurately position, stirrup need be set; The indoor and outdoor reinforcing bar can increase the safety that prefabricated panel is connected with major structure of construction by socketing with stirrup.Stirrup also has makes the assembling body of wall satisfy the effect of anti-shearing bearing capacity.
The sandwich layer of prefabricated panel should be selected good springiness, good endurance, good heat insulation for use, be easy to bonding heat insulating material.When the EPS plate is sandwich layer, EPS plate tensile strength values is between 0.15~0.24Mpa, with reference to concrete structure sloping section strength calculation formula, it is (for reference that EPS plate tensile strength design load is taken as 0.1Mpa, treat that also the expert confirms in the industry), in most cases, body of wall relies on EPS plate self tensile strength can satisfy anti-shearing requirement, and stirrup only is structure setting.Setting gets final product as the stirrup structure with being equivalent to the stainless Ф 2~Ф 3 soft attitude stainless steel steel wires of Unite States Standard 304#.Though be stirrup with the stainless steel steel wire, little because of diameter, weight is few (Ф 2 stainless steel steel wire weight 25g/m), the intensity height, conduct heat less, soft, that bending is installed is convenient, cost low (price during equal length be about Φ 6 reinforcing bars 60%), and good endurance.
Wall between windows is narrower anti-shearing when not meeting the demands, and needs by Structural Design Requirement anti-shearing stirrup is set, as Figure 13, Figure 30.Consider bending resistance, anti-shearing and normal operating condition requirement, may also need the wall between windows thickening could be satisfied the requirement of structural limits state.Ф 2, Ф 2.5, Ф 3 stainless steel tensile strength of wire values are respectively 1.5KN, 2.4KN, 3.4KN.When sandwich layer is alkaline foam cement, though stirrup can be plain bars, increase diameter, difficult bending, construction inconvenience, increase cost, increase are conducted heat.
6, about the installation of vertical reinforcing bar 6-1 and sliding component 2:
Vertical reinforcing bar 6-1 and the sliding component 2 of assembling body of wall of the present invention arrange at a certain distance, when for example stipulating that vertical reinforcing bar 6-1 and sliding component 2 spacings are not more than 2m, the prefabricated panel of failing to grow up in 2m can directly be installed, connect at seam crossing, or by the hole prefabricated panel 15 is assembled into big plate and installs again, but latter's trouble.
7, according to " alkali-resistant glass fibre screen cloth " JCL841-2007 standard, alkaline-resisting strength retention ratio by alkaline-resisting screen cloth is 75%, alkaline-resisting screen cloth tensile strength design load is about 60% of alkaline-resisting intensity retention, convert the alternative steel area of alkaline-resisting screen cloth, the alternative steel of netted tensile materials are used, and see Table 5.
The alkaline-resisting screen cloth tensile strength of table 5 design load, and the alternative steel area of conversion
Figure BSA00000820441700331
Basalt silk and basalt cloth have been arranged at present, also had the basalt reinforcing bar.The basalt fibre net of basalt silk braiding will appear using undoubtedly.The basalt silk has excellent ageing-resistant, high temperature resistant, anti acid alkali performance energy, excellent mechanical property, will be occurred by the basalt fibre screen cloth of basalt silk braiding.Along with development of science and technology, may also have other net that is suitable for doing netted tensile materials, be applied to combined wall of the present invention.
8, about supporting: supporting essence is that body of wall and major structure of construction 1 are at outdoor main tie point.
The steel truss that the steel truss supporting is made up of steel pole; be that pre-buried installation or bar planting are installed or pre-embedded steel slab is installed all very convenient; if around the steel truss supporting, pour into cement polymer mortar; cement polymer mortar reaches specific thickness; can protect the steel pole of steel truss to avoid corrosion and satisfy the fire endurance requirement; and increase rigidity, avoid steel truss supporting forfeiture stable.At the external corner place of assembling building wall, but mounting support is hung outside the external corner sections vertical reinforcing bar, or the external corner place oblique concrete of 45 degree is set cornices, external corner sections outside vertically reinforcing bar cornice with oblique concrete and be connected.
9, about fire prevention:
General prefabricated panel protective layer thickness 25mm (topping that does not comprise reinforcement location) approximately can satisfy fire endurance requirement in 1 hour, can adjust protective layer thickness by fire endurance as required.
The fire barrier of satisfying the fire endurance requirement can be and reaches certain thickness rock wool, foam cement, thermal insulation mortar, glue powder polyphenyl particle, difficult combustion phenolic resins etc. and do not fire or difficult combustion heat insulating material; If with cement mortar or concrete, or increase heat transfer for the concrete of the cement mortar of modification or modification.Wherein brushing fire prevention glue or fireproof paint are recommended to adopt in the door and window hole fire barrier, or difficult combustion phenolic resins, the labour cost but plaster in the hole of conserve expensive are installed.Employing thermal insulation mortar, glue powder polyphenyl particle are recommended in the fire barrier between interlayer, family, are convenient to adjust place, slit error is installed, and install simply, and price is low.In the combined wall insulation layer fire barrier is set, forms the little subregion structure of a kind of closed fire prevention, significantly reduce fire damage, even rough sledding such as war, blast take place, fire can be controlled in the little subregion of fire prevention.
10, about prefabricated panel, when prefabricated batten is light-duty composite insulation boards, the connectivity problem between the sandwich layer:
When the assembling body of wall is installed, need between the prefabricated panel sandwich layer, and the slit between the prefabricated panel, prefabricated batten sandwich layer seals bondingly mutually, and adhering and sealing is fixing that wallboard seam crack easily takes place for seam crossing, and the assembling body of wall can not form a common primary structure member.
1), slit place is bonding with polyurethane foam glue foaming sealing, the tensile strength of polyurethane foam glue foaming should be not less than EPS plate tensile strength values.Polyurethane foam colloid amount difference is big at present, the tensile strength height that has, and pliability is good, and what have is crisp, does not satisfy tensile strength values.
2), also available cement polymer elasticity mortar is bonding in the non-heating region, also available elastic heat preserving mortar is bonding for heating area, during installation with between the prefabricated thermal insulation wallboard, or the bonding installation of jam-packed between prefabricated thermal insulation wallboard and the prefabricated thermal insulation batten.The elastic heat preserving mortar is that the fine sand in the cement polymer elastic mortar is substituted with glass bead or vitreous pearlite, and is bad because of insulating dry powder mortar elasticity, to adapt to sex change bad, easy to crack, should not use.
11, about the horizontal loading perpendicular to metope:
Prefabricated panel is light-duty composite thermo-insulating wall board; the various materials of light-duty composite thermo-insulating wall board are connected as a single entity; form the primary structure member of an integral body; when protective layer thickness 25mm; the assembling body of wall is from heavy and light, and to the combination of Beijing area wind load combination and horizontal earthquake action and wind load, the two gets its large one; making usefulness is started to control in the wind load combination, and the wind load combined value is horizontal earthquake action and wind load combination 2~2.5 times.To most areas, also be that making usefulness is started to control in the wind load combination.Namely when earthquake intensity was higher than normal chance earthquake one-level, the assembling body of wall self was safe.
When light-duty composite thermo-insulating wall board forms the primary structure member of an integral body, bending resistance can be increased by adjusting core layer thickness and adjusting netted tensile materials specification, only assembling body of wall bending resistance designing requirement can be satisfied mostly with netted tensile materials.1), weak location arranges reinforcing bar at the hole, satisfies the bending resistance designing requirement of cross section, the edge of a wing, hole the purpose that the prefabricated panel seam crossing arranges longitudinal reinforcement is:; 2), when the local interruption of cornicing arranges, the reliability that reinforcing bar increase to like that the assembling body of wall is connected with major structure of construction is set, but wallboard is subjected to not need to consider in the curved design bending resistance effect (because of far) of longitudinal reinforcement apart; 3), the body of wall hanger is installed reinforcing bar need be set; 4), slip assembling body of wall need arrange reinforcing bar.
The situation that horizontal loading is very big is rare, the wind reference pressure 1.8KN/m of China's maximum 2(Xisha), 1.85KN/m 2(Yilan of the island of Taiwan), the prefabricated panel of span 3m freely-supported calculates by building height 30m, considers height coefficient, gustness factor, wind load bodily form coefficient, and the correction factor that has the adverse effect of door and window hole, the horizontal wind load combined value of metope just reaches 8~10.0KN/m when 30m is high 2Huge value, calculated bending moment is very big, may can not satisfy the requirement of bending resistance arrangement of reinforcement with netted tensile materials, this just need arrange longitudinal reinforcement 6-1*.
12, comprise in the time of need satisfying the ultimate limit state designing requirement:
1), the ultimate limit state design is with reference to the regulation of " Code for design of concrete structures " GB50010;
2), serviceability limit state design:
Evidence: sandwich layer EPS plate thickness 140mm, both sides each 30mm of cement mortar protective course thickness, prefabricated panel thickness 200mm, span is the simply supported slab of 3.0m, when composite thermo-insulating wall board forms the primary structure member of an integral body, at vertical load 2.5KN/m 2Under the effect, amount of deflection only is 3mm.When large span and horizontal loading are big, and the light-duty plate of new material should detect deformation values by test, with amount of deflection control in allowed band.
13, determine that assembling body of wall core layer thickness need consider following factor:
1), whether needs to satisfy the ultimate limit state designing requirement.
Increase core layer thickness and help to satisfy bending resistance and anti-shearing, and reduce flexural deformation.
2), satisfy the energy-saving heat preserving requirement.
The minimum thickness requirement of sandwich layer when 3), satisfying the mounting slip member.
4), the permanent construction thickness of wall body will satisfy the comfort requirement.
When assembling body of wall core layer thickness was too thin, Indoor sill was too narrow, and comfort is poor, and the core layer thickness of recommendation permanent construction should not be less than 150mm, and body of wall gross thickness 200mm is to satisfy the requirement of residence comfort.
14, when prefabricated panel is light-duty composite thermo-insulating wall board; how to guarantee the reliability that is connected between assembling body of wall topping and the sandwich layer; make the assembling body of wall can form the primary structure member of an integral body; prolong the durable years of assembling body of wall; make it to be not less than 50 years; prevent and reduce the common quality defect of assembling body of wall topping cracking, except guaranteeing that steel satisfy the anticorrosion requirement, recommend to take following technical measures:
1), establish than the dovetail type groove at tabular sandwich layer such as EPS plate, increases being connected between topping and the sandwich layer.
When processing light-duty composite thermo-insulating wall board with special equipment, the dovetail type groove planted agent in EPS plate bottom scrapes earlier and smears cement polymer mortar, particularly the cement polymer elastic mortar.Cement polymer elastic mortar good springiness, to adapt to the distortion cracking resistance good, or also add the silicon ash in the polyacrylate elastic emulsion, and the small-size effect of silicon ash can increase bonding reliability.
2), take the brushing interfacial agents to build the job practices of topping at high molecular tabular sandwich layer.
Interfacial agents is prepared with synthetic resin emulsion liquid such as polyacrylate dispersion raw material, and the adhesive raw materials in the interfacial agents and the ratio of water should be not less than certain numerical value.Interfacial agents essence is cementing agent, the bonding requirement difference to interfacial agents (or being referred to as bonding adhesive) between the different materials, and for example mutual when bonding between the inorganic material, possible plain-water slurry just satisfies the bonding requirements as interfacial agents.
When qualified, can effectively guarantee that interfacial agents is bonded together topping and sandwich layer at the interfacial agents quality of preparation and brushing quality.Experimental results show that; the EPS plate is cut a hole to such an extent that depression, cement mortar are comminution destruction when knocking the destruction topping with hammer; but bonding interface still bonds; composite plate after this destruction is immersed 24h, freezing 12h in the water; take out again and dissolve, steep again in the entry; multigelation experiment 50 times, bonding interface does not destroy, and illustrates that freeze-thawing resistant and water resistance satisfy instructions for use.
3), to topping watering health, be to prevent that topping is bad because of health, the necessary condition of efflorescence cracking takes place.
4), quality of materials should be qualified.For example qualified core material should be selected for use and satisfy tensile strength values, good springiness, is easy to material bonding, good endurance, and sandwich layer can be to topping cracking formation restrictive function with reliable connection of topping.
5), can partitioning slot need be set in conjunction with decorating; plug elastic packing waterproofing materials in the partitioning slot, the netted tensile materials in the floated coat can be communicated with, and the topping that netted tensile materials is outer and outside finish disconnect; partitioning slot can be used as ornamental strip, can reduce the crack that takes place because of variations in temperature.
The thin heat-preserving wall of plastering that Germany carried out in the seventies, outer mask ftractures, and progressively keeps in repair.They think EPS plate that the 50mm of original installation is thick and meet the demands with the bonding cement polymer mortar adhesive linkage quality of basic unit body of wall.So peeled the thin topping of plastering of cracking off, paste the thick EPS plate of 150~200mm in the above again, think to re-use more than 30 years.This explanation, the cement polymer interfacial agents, the cement polymer mortar durability that be not positioned at the ultraviolet ray irradiation, not degraded by wind and rain can be not less than 60 years.
When 15, assembling body of wall of the present invention was energy-saving wall, prefabricated panel should be composite thermo-insulating wall board; During non-energy-saving wall, prefabricated panel can be concrete slab, lightweight concrete slab etc.
16, the connection that is connected with reinforcing bar of netted tensile materials of the present invention realizes by the following method:
When 1), the prefabricated panel seam crossing is installed prefabricated batten; vertical reinforcing bar 6-1 is arranged in the prefabricated batten; when topping is smeared in the prefabricated batten outside (smearing the cement polymer elastic mortar is advisable); the netted tensile materials of installing overlaps bonding the connection with the side prefabricated panel, thereby prefabricated batten is connected with prefabricated panel.Be netted tensile materials and being connected by the bonding connection of cementitious materials of reinforcing bar.
2), in that the prefabricated panel seam crossing is on-the-spot when reinforcing bar is installed, netted tensile materials is connected with reinforcing bar binding; Add the plaster bonding connection of cementitious materials of topping of reinforcing bar.
17, about selecting wherein a kind in the embodiment two, eight, or 1), 2), 3) plant collocation and share problem:
For prefabricated panel is installed, install for convenient construction, must select to fix with crab-bolt and major structure of construction, because fixed prefabricated panel with crab-bolt, prefabricated panel is just motionless.But for prefabricated batten, because it also has inside and outside vertical reinforcing bar and major structure of construction to fix, therefore not necessarily need to fix with crab-bolt.
18, install about door and window:
The prefabricated batten 15-1 that is positioned at the hole should the pre-buried ironware that is connected with the window level reinforcing bar or reinforcing bar 6-3 (Figure 41).
When door and window is installed, with the installation steel disc on the door and window staggered with Figure 31, Figure 41 they (2) on the steel disc 6-3 that is connected that installs on the reinforcing bar of window limit fix.Connecting steel disc 6-3 can install by Figure 31, also can install by it (1) of figure Figure 41, but Figure 31 and Figure 41 they (2) guarantees thickness of protection tier easily.
The slit between thin covering window frame of insulation and the body of wall should be installed in outside, heat-insulating bridge-cut-off hole.
19, the common assembling body of wall of embodiment of the present invention one~six also can be applicable to shear wall structure; though increased the cost of prefabricated panel; but reduce engineering quantity, the expensive artificial expenditure of minimizing that the outer protection layer is plastered, and can reduce the coefficient of thermal conductivity of heat insulating material.When being applied to shear wall structure, indoor reinforcing bar needn't be set.
When 20, the assembling body of wall of embodiment of the present invention one~six, window are horizontal moulding, between window lower end and the assembling body of wall except with the elaxtic seal sealing, also the slip stop can be set, the slip stop is connected the window lower end with the assembling body of wall of horizontal moulding, then this window can be along with the upper floor slippage, be applied to the house balcony window, and in the body of wall of horizontal moulding.

Claims (10)

1. the assembling body of wall installed of a support, the formula that reclines, it comprises major structure of construction, prefabricated panel; Prefabricated panel is installed on the concrete slab; It is characterized in that,
The described installation with the major structure of construction side formula that reclines is: with beam slab post, the connection of shear wall lateral surface of prefabricated panel and major structure of construction;
To interconnect between the prefabricated panel, co-operation forms a kind of assembling body of wall for the common support of installing in described major structure of construction side, the formula that reclines installation.
2. the assembling body of wall installed of a kind of support according to claim 1, the formula that reclines,
It is characterized in that, it also comprises the structure supporting parts, is provided with the structure supporting parts at the major structure of construction lateral surface, and the structure supporting parts is connected with major structure of construction, described structure supporting parts is to arrange continuously or is the local interruption setting, the described prefabricated panel of structure supporting parts support.
3. a kind of assembling body of wall of installing in major structure of construction side support formula according to claim 1 and 2,
It is characterized in that described assembling body of wall is connected by following one or more modes with major structure of construction:
1), with crab-bolt prefabricated panel and major structure of construction side are fixed;
2), with cementitious materials that prefabricated panel and major structure of construction side is bonding;
3), with cementitious materials that the termination of prefabricated panel and structure supporting parts or concrete slab is bonding, or also be provided with netted tensile materials in the cementitious materials between bonding plane, or be provided with netted tensile materials in the bonding plane between the prefabricated panel up and down; Netted tensile materials is overhanging to be connected with the indoor topping, and netted tensile materials is connected with major structure of construction, or prefabricated panel connects up and down.
4. the assembling body of wall installed of a kind of support according to claim 1 and 2, the formula that reclines,
It is characterized in that it also comprises reinforcing bar and stirrup, or also comprise prefabricated batten;
Reinforcing bar comprises longitudinal reinforcement and horizontal reinforcement or arch steel, or reinforcing bar is the steel hoop that arranges at the door and window hole periphery; Described longitudinal reinforcement comprises outdoor longitudinal reinforcement and indoor longitudinal reinforcement, and horizontal reinforcement or arch steel comprise outdoor horizontal reinforcing bar or arch steel, indoor horizontal reinforcing bar or arch steel, and stirrup sockets the indoor and outdoor reinforcing bar;
When comprising prefabricated batten, prefabricated batten is between prefabricated panel;
Structure supporting parts or the prefabricated batten of concrete slab support, prefabricated batten is connected with the lateral surface of major structure of construction, is connected between prefabricated batten and the prefabricated panel, co-operation;
Longitudinal reinforcement is positioned at the topping at prefabricated panel vertical joint place, or longitudinal reinforcement is positioned at the topping of described prefabricated batten, or in the topping of prefabricated panel longitudinal reinforcement is set also.
5. the assembling body of wall installed of a kind of support according to claim 3, the formula that reclines,
It is characterized in that it also comprises reinforcing bar and stirrup, or also comprise prefabricated batten;
Reinforcing bar comprises longitudinal reinforcement and horizontal reinforcement or arch steel, or reinforcing bar is the steel hoop that arranges at the door and window hole periphery; Described longitudinal reinforcement comprises outdoor longitudinal reinforcement and indoor longitudinal reinforcement, and horizontal reinforcement or arch steel comprise outdoor horizontal reinforcing bar or arch steel, indoor horizontal reinforcing bar or arch steel, and stirrup sockets the indoor and outdoor reinforcing bar;
When comprising prefabricated batten, prefabricated batten is between prefabricated panel;
Structure supporting parts or the prefabricated batten of concrete slab support, prefabricated batten is connected with the lateral surface of major structure of construction, is connected between prefabricated batten and the prefabricated panel, co-operation;
Longitudinal reinforcement is positioned at the topping at prefabricated panel vertical joint place, or longitudinal reinforcement is positioned at the topping of described prefabricated batten, or in the topping of prefabricated panel longitudinal reinforcement is set also.
6. the assembling body of wall installed of a kind of support according to claim 4, the formula that reclines,
It is characterized in that the assembling body of wall is connected with major structure of construction (1) takes the following the 1st)~4) anticorrosive measure, or also take the 5th), 6) anticorrosive measure:
1), in the sandwich layer place local reduction that is provided with reinforcing bar or longitudinal reinforcement position, increase protective layer thickness; Or attenuate core layer thickness not, increase the protective layer thickness of reinforcing bar or longitudinal reinforcement laterally; The reinforcing bar that described assembling body of wall is installed or also have longitudinal reinforcement, supporting, connection ironware and weld seam around all be positioned under the protection of alkaline topping, protective layer thickness satisfies the anticorrosion requirement;
2), with major structure of construction and the structure supporting parts place of longitudinal reinforcement junction be the concrete of after-pouring, or be the cement polymer concrete of after-pouring, make longitudinal reinforcement be positioned at the protection of basic matterial, and the thickness of topping meets the demands; Or at major structure of construction and structure supporting parts place is pre-buried or ironware or reinforcing bar are installed in bar planting, with the scene longitudinal reinforcement being installed is connected, or be connected with the longitudinal reinforcement of prefabricated batten, longitudinal reinforcement is positioned at prefabricated batten) operating space of connecting portion satisfies the thickness requirement of topping;
3), pour into topping in the breach of supporting and periphery thereof, protective layer thickness satisfies the anticorrosion requirement, and protection supporting prevents corrosion, or in supporting the brushing corrosion resistant coating;
4), the described stirrup that passes sandwich layer satisfies the anticorrosion requirement;
5), when the protective layer thickness of conventional cement mortar or ordinary concrete is difficult to satisfy anticorrosion and requires, the topping around reinforcing bar and the weld seam in the certain limit is cement polymer elastic mortar or cement polymer elastic concrete.
7. the assembling body of wall installed of a kind of support according to claim 5, the formula that reclines,
It is characterized in that the assembling body of wall is connected with major structure of construction (1) takes the following the 1st)~4) anticorrosive measure, or also take the 5th), 6) anticorrosive measure:
1), in the sandwich layer place local reduction that is provided with reinforcing bar or longitudinal reinforcement position, increase protective layer thickness; Or attenuate core layer thickness not, increase the protective layer thickness of reinforcing bar or longitudinal reinforcement laterally; The reinforcing bar that described assembling body of wall is installed or also have longitudinal reinforcement, supporting, connection ironware and weld seam around all be positioned under the protection of alkaline topping, protective layer thickness satisfies the anticorrosion requirement;
2), with major structure of construction and the structure supporting parts place of longitudinal reinforcement junction be the concrete of after-pouring, or be the cement polymer concrete of after-pouring, make longitudinal reinforcement be positioned at the protection of basic matterial, and the thickness of topping meets the demands; Or at major structure of construction and structure supporting parts place is pre-buried or ironware or reinforcing bar are installed in bar planting, with the scene longitudinal reinforcement being installed is connected, or be connected with the longitudinal reinforcement of prefabricated batten, longitudinal reinforcement is positioned at prefabricated batten) operating space of connecting portion satisfies the thickness requirement of topping;
3), pour into topping in the breach of supporting and periphery thereof, protective layer thickness satisfies the anticorrosion requirement, and protection supporting prevents corrosion, or in supporting the brushing corrosion resistant coating;
4), the described stirrup that passes sandwich layer satisfies the anticorrosion requirement;
5), when the protective layer thickness of conventional cement mortar or ordinary concrete is difficult to satisfy anticorrosion and requires, the topping around reinforcing bar and the weld seam in the certain limit is cement polymer elastic mortar or cement polymer elastic concrete.
8. the assembling body of wall installed of a support, the formula that reclines, it comprises major structure of construction, prefabricated panel, prefabricated batten, reinforcing bar and stirrup; It is characterized in that it also comprises sliding component;
Prefabricated panel, prefabricated batten are installed on the concrete slab;
The upper end of described prefabricated panel, prefabricated batten or lower end and the connection of major structure of construction side constitute the fixed end of described assembling body of wall, and the other end is the slippage end; Prefabricated panel, prefabricated batten are not connected with post or shear wall;
Sliding component is positioned at the flooring horizontal joint place of prefabricated batten and major structure of construction;
Reinforcing bar comprises longitudinal reinforcement and horizontal reinforcement or arch steel; Described longitudinal reinforcement comprises outdoor longitudinal reinforcement and indoor longitudinal reinforcement, and described horizontal reinforcement or arch steel comprise outdoor horizontal reinforcing bar or arch steel, indoor horizontal reinforcing bar or arch steel; Described longitudinal reinforcement is positioned at the topping of prefabricated panel vertical joint, or longitudinal reinforcement is positioned at the indoor and outdoor topping of prefabricated panel, and stirrup sockets the indoor and outdoor reinforcing bar;
Be connected between prefabricated panel and the prefabricated batten, co-operation forms and is out of shape between a kind of post that contains major structure of construction and the beam, assembling body of wall slip, that support, the formula that reclines are installed.
9. the assembling body of wall installed of a kind of support according to claim 8, the formula that reclines,
It is characterized in that be provided with the structure supporting parts of support prefabricated panel, prefabricated batten at the major structure of construction lateral surface, the structure supporting parts is connected with major structure of construction, described structure supporting parts is to arrange continuously or be the local interruption setting;
Prefabricated panel, prefabricated batten are installed on the structure supporting parts;
Sliding component is positioned at the horizontal joint place of prefabricated batten and structure supporting parts.
10. according to Claim 8 or the assembling body of wall installed of 9 described a kind of supports, the formula that reclines,
It is characterized in that the assembling body of wall is connected according to following one or more modes with major structure of construction:
1), with crab-bolt prefabricated panel, prefabricated batten and major structure of construction side are fixed;
2), with cementitious materials that prefabricated panel, prefabricated batten and major structure of construction side is bonding;
3), with cementitious materials that the fixed end termination of prefabricated panel, prefabricated batten and structure supporting parts or concrete slab is bonding, or be provided with netted tensile materials in the cementitious materials between bonding plane; Netted tensile materials is overhanging to be connected with topping, and netted tensile materials is connected with major structure of construction.
CN 201220675913 2012-12-10 2012-12-10 Bearing-and-leaning type installed assembly wall body Expired - Fee Related CN203174810U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220675913 CN203174810U (en) 2012-12-10 2012-12-10 Bearing-and-leaning type installed assembly wall body

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220675913 CN203174810U (en) 2012-12-10 2012-12-10 Bearing-and-leaning type installed assembly wall body

Publications (1)

Publication Number Publication Date
CN203174810U true CN203174810U (en) 2013-09-04

Family

ID=49071534

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220675913 Expired - Fee Related CN203174810U (en) 2012-12-10 2012-12-10 Bearing-and-leaning type installed assembly wall body

Country Status (1)

Country Link
CN (1) CN203174810U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103469887A (en) * 2013-09-18 2013-12-25 沈阳远大新兴轻质墙体有限公司 Building with unitized exterior wall system
CN103470059A (en) * 2013-09-18 2013-12-25 沈阳远大新兴轻质墙体有限公司 Building construction method for building with unitized exterior wall system
CN103556822A (en) * 2013-10-12 2014-02-05 深圳市建工集团股份有限公司 Construction method of large hollowed-out characters of cast-in-place concrete wall
CN104420550A (en) * 2013-09-02 2015-03-18 吴淑环 Energy-saving heat insulation wall
CN104420549A (en) * 2013-09-11 2015-03-18 吴淑环 Prefabricated heat insulation board
CN104900136A (en) * 2015-05-29 2015-09-09 长沙理工大学 Cable stayed bridge for test, and mounting method
CN106567494A (en) * 2016-10-26 2017-04-19 南昌大学 Prefabricated outer wallboard and assembling method thereof

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104420550A (en) * 2013-09-02 2015-03-18 吴淑环 Energy-saving heat insulation wall
CN104420549A (en) * 2013-09-11 2015-03-18 吴淑环 Prefabricated heat insulation board
CN103469887A (en) * 2013-09-18 2013-12-25 沈阳远大新兴轻质墙体有限公司 Building with unitized exterior wall system
CN103470059A (en) * 2013-09-18 2013-12-25 沈阳远大新兴轻质墙体有限公司 Building construction method for building with unitized exterior wall system
CN103470059B (en) * 2013-09-18 2016-06-15 沈阳远大新兴轻质墙体有限公司 A kind of construction techniques of the building with blocking external wall system
CN103556822A (en) * 2013-10-12 2014-02-05 深圳市建工集团股份有限公司 Construction method of large hollowed-out characters of cast-in-place concrete wall
CN103556822B (en) * 2013-10-12 2015-09-02 深圳市建工集团股份有限公司 The large-scale hollow-out word construction method of a kind of cast-in-place concrete wall
CN104900136A (en) * 2015-05-29 2015-09-09 长沙理工大学 Cable stayed bridge for test, and mounting method
CN106567494A (en) * 2016-10-26 2017-04-19 南昌大学 Prefabricated outer wallboard and assembling method thereof
CN106567494B (en) * 2016-10-26 2019-03-08 南昌大学 A kind of prefabricated outer wall panel and its assembly method

Similar Documents

Publication Publication Date Title
WO2021253808A1 (en) Building technique for low-carbon society in high-technology era
CN203174810U (en) Bearing-and-leaning type installed assembly wall body
CN100464043C (en) Bound-type composite heat-insulation wall with support body
CN103590511A (en) Bearing-reclining-type mounted assembly-type wall
CN202611016U (en) Thermal insulating wall on concrete overhanging eaves board
CN103572866A (en) Assembly type wall
US20140000204A1 (en) Outer thermal insulating composite wall with supporters for outer walls
CN207878960U (en) A kind of construction material for installing high-strength durable fiber cloth or/and plastic film
CN102363984A (en) Plastered insulated compound wall body with nets on both sides
CN203684460U (en) Assembled wall
WO2010105496A1 (en) External heat preservation composite wall of exterior wall with support
CN103225360A (en) Light and heat insulation roof board or floor slab
CN101570981A (en) Composite component of alkaline-resisting mesh cloth plastering
CN202787603U (en) Light-weight heat preservation house roof plate or floor plate
CN102677794A (en) Exterior wall external insulation composite wall provided with support
CN202099896U (en) Heat insulation composite wall body with plaster meshes on two sides
CN104234256A (en) Energy-saving heat-insulating wall body
CN107524248A (en) The high fireproof thermal insulation wall board and its construction method of flexible connection
CN105089149B (en) The edge-on plane system in aluminium alloy house
CN104631650B (en) Screen plate outer wall with heat insulation layer and construction method
WO2012119479A1 (en) Outer insulating composite wall of outer wall
CN105040813B (en) The preceding facade system in aluminium alloy house
CN101793065A (en) Flexible heat-insulating composite wall
CN104420549A (en) Prefabricated heat insulation board
CN104420556A (en) Assembly type energy-saving wall

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130904

Termination date: 20141210

EXPY Termination of patent right or utility model