CN110512823A - Levelling dose of a kind of ground quick-drying and based on levelling dose of the floor leveling construction technology - Google Patents
Levelling dose of a kind of ground quick-drying and based on levelling dose of the floor leveling construction technology Download PDFInfo
- Publication number
- CN110512823A CN110512823A CN201910761112.1A CN201910761112A CN110512823A CN 110512823 A CN110512823 A CN 110512823A CN 201910761112 A CN201910761112 A CN 201910761112A CN 110512823 A CN110512823 A CN 110512823A
- Authority
- CN
- China
- Prior art keywords
- levelling
- dose
- drying
- ground
- ground quick
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- C—CHEMISTRY; METALLURGY
- C04—CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
- C04B—LIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
- C04B28/00—Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F15/00—Flooring
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Architecture (AREA)
- Structural Engineering (AREA)
- Ceramic Engineering (AREA)
- Civil Engineering (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Inorganic Chemistry (AREA)
- Materials Engineering (AREA)
- Organic Chemistry (AREA)
- Floor Finish (AREA)
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
The present invention provides a kind of levelling dose of ground quick-drying and based on levelling dose of the floor leveling construction technology, this levelling dose as unit of parts by weight, include following raw material: cement, yellow sand, leak stopping king, water, the above raw material is proportionally uniformly mixed, it is sufficiently stirred, form levelling dose of ground quick-drying, it is based on levelling dose of the floor leveling construction technology, it is levelling by leveling tool first, levelling edge strip is installed in levelling position below wall, levelling dose of ground quick-drying be mixed evenly is laid on and needs levelling ground, according to the height of the levelling edge strip, the ground quick-drying is struck off for levelling dose.The present invention solidifies fast, at low cost, speed of application is fast levelling dose of ground quick-drying by proportionally deploying common construction material in the market to be formed, and it provides based on levelling dose of the construction technology, the efficiency of floor leveling is greatly improved, there is practicability, be conducive to promote the use of.
Description
Technical field
The present invention relates to floor leveling technical field, levelling dose of specifically a kind of ground quick-drying and based on levelling dose of the ground
The levelling construction technology in face.
Background technique
Based on the development of assembled finishing, whole kitchen and integral vacuum toilet are existing generally using whole chassis as ground
There is the floor leveling of assembled kitchen and assembled toilet generally to use mechanical structured member, levelling bracket adjusts level, this
Kind mode meets the theory of assembled finishing, and scene is clean and tidy clean, and speed of application is fast, but high expensive, foot-operated to have hollowing sense, makes
It is bad with experience sense.
Summary of the invention
The technical problem to be solved by the present invention is to overcome the existing defects, provides a kind of levelling dose of ground quick-drying and based on should
Levelling dose of floor leveling construction technology, by will proportionally deploy common construction material in the market, formed solidification it is fast, at
This is low, speed of application is fast levelling dose of ground quick-drying, and provide based on levelling dose of the construction technology, greatly improve ground
Levelling efficiency has practicability, is conducive to promote the use of.
In order to solve the above-mentioned technical problems, the present invention provides a kind of levelling dose of ground quick-drying and based on levelling dose of the ground
The levelling construction technology in face, this levelling dose as unit of parts by weight, include following raw material: 25-35 part of cement, 8-12 parts of yellow sand, block up
King 2-6 parts of leakage, the above raw material is proportionally uniformly mixed, is sufficiently stirred, and water mixing is added, stirs evenly it, forms ground
Levelling dose of face quick-drying, based on levelling dose of the floor leveling construction technology the following steps are included:
Step 1: by leveling tool determine floor leveling position and levelling dose of ground quick-drying of laying height;
Step 2: levelling edge strip is installed in levelling position below wall;
Step 3: the above raw material being proportionally uniformly mixed, is sufficiently stirred, and water mixing is added, stirs evenly it for use;
Step 4: levelling dose of ground quick-drying be mixed evenly is laid on and needs levelling ground, according to the levelling side
The ground quick-drying is struck off for levelling dose, that is, completes the levelling of the ground by the height of item.
Further, levelling dose of parts by weight of the ground quick-drying are unit, include following raw material: 30 parts of cement, yellow sand 10
Part, 3 parts of leak stopping king, the above raw material is mixed, and is added water and stirred uniformly, is formed levelling dose of the ground quick-drying.
Further, in the step of construction technology four, levelling dose of the ground quick-drying is struck off by ruler.
Further, in the step of construction technology four, levelling dose of the ground quick-drying under the levelling edge strip
Horizontal line is concordant.
Further, from adding water to be mixed, the construction duration completed to construction is not more than levelling dose of the ground quick-drying
15 minutes.
With the application of the invention, will common construction material, including cement, yellow sand, leak stopping king in the market, proportionally deploy,
Water is added to stir evenly, forms fast, the at low cost, speed of application of solidification is fast, to trample feel good levelling dose of ground quick-drying, and provide
Based on levelling dose of the construction technology, the efficiency of floor leveling is greatly improved, there is practicability, be conducive to promote the use of.
Detailed description of the invention
Attached drawing is used to provide further understanding of the present invention, and constitutes part of specification, with reality of the invention
It applies example to be used to explain the present invention together, not be construed as limiting the invention.In the accompanying drawings:
Fig. 1 is the schematic cross-section of floor leveling of the present invention.
Specific embodiment
Below in conjunction with attached drawing of the invention, technical solution of the present invention is clearly and completely described, it is clear that institute
Description is only a part of the embodiment of the present invention, instead of all the embodiments, based on the embodiments of the present invention, this field
Those of ordinary skill's every other embodiment obtained without making creative work, belongs to protection of the present invention
Range.
Embodiment one: of the invention levelling dose of a kind of ground quick-drying, this levelling dose as unit of parts by weight, include following original
Material: the above raw material is proportionally uniformly mixed, is sufficiently stirred, adds by 25-35 parts of cement, 8-12 parts of yellow sand, 2-6 parts of leak stopping king
Enter water mixing, stir evenly it, forms levelling dose of ground quick-drying;As shown in Figure 1, being constructed based on levelling dose of the floor leveling
Technique the following steps are included:
Step 1: by leveling tool determine floor leveling position and levelling dose 1 of ground quick-drying of laying height;
Step 2: levelling edge strip 3 is installed in levelling position below wall 2;
Step 3: cement, yellow sand, leak stopping king being proportionally uniformly mixed, are sufficiently stirred, and water mixing is added, and keep its stirring equal
It is even, form ground quick-drying levelling dose 1 for use;
Step 4: levelling dose 1 of ground quick-drying be mixed evenly is laid on and needs levelling ground, according to the levelling side
The height of item 3 strikes off the ground quick-drying for levelling dose 1 by ruler, levelling dose 1 of the ground quick-drying with it is described levelling
The lower horizontal line 31 of edge strip 3 is concordant, that is, completes the levelling of the ground, and standing 15-50 minutes is solidifiable.
Embodiment two: unlike above-described embodiment one, fetching determines the raw material of component: 30 parts of cement, is blocked up 10 parts of yellow sand
3 parts of king of leakage, the above raw material is mixed, and is added water and stirred uniformly, levelling dose of the ground quick-drying is formed, according to one institute of embodiment
The construction technology stated solidifies for 30 minutes, can install ground chassis on its surface.
Working principle of the present invention is as follows: using existing construction material in the market, gathers materials on the spot, it is proportionally mixed
It closes, adds water and stirs and uniformly form levelling dose of ground quick-drying, by deployed levelling dose of good size of the amount of being laid on of ground quick-drying
Ground strikes off its surface, to its solidification.
In conclusion levelling dose of a kind of ground quick-drying and based on levelling dose of the floor leveling construction technology, by by city
Common construction material is proportionally deployed on field, and formation solidification is fast, at low cost, speed of application is fast, tramples the good ground of feel
Levelling dose of quick-drying, and provide based on levelling dose of the construction technology, the efficiency of floor leveling is greatly improved, is had practical
Property, be conducive to promote the use of.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with
A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding
And modification, the scope of the present invention is defined by the appended.
Claims (5)
1. levelling dose of a kind of ground quick-drying and based on levelling dose of the floor leveling construction technology, which is characterized in that this levelling dose
As unit of parts by weight, include following raw material: 25-35 parts of cement, 8-12 parts of yellow sand, 2-6 parts of leak stopping king, by the above raw material according to
Ratio is uniformly mixed, and is sufficiently stirred, and water mixing is added, stirs evenly it, forms levelling dose of ground quick-drying, is based on this levelling dose
Floor leveling construction technology the following steps are included:
Step 1: the position of floor leveling and the laying height of floor leveling agent are determined by leveling tool;
Step 2: levelling edge strip is installed in levelling position below wall;
Step 3: cement, yellow sand, leak stopping king being proportionally uniformly mixed, are sufficiently stirred, and water mixing is added, and keep its stirring equal
It is even stand-by;
Step 4: levelling dose of ground quick-drying be mixed evenly is laid on and needs levelling ground, according to the levelling side
The ground quick-drying is struck off for levelling dose, that is, completes the levelling of the ground by the height of item.
2. levelling dose of ground quick-drying according to claim 1 and based on levelling dose of the floor leveling construction technology, special
Sign is that levelling dose of parts by weight of the ground quick-drying are unit, includes following raw material: 30 parts of cement, 10 parts of yellow sand, leak stopping king 3
Part, the above raw material is mixed, adds water and stirs uniformly, forms levelling dose of the ground quick-drying.
3. levelling dose of ground quick-drying according to claim 1 and based on levelling dose of the floor leveling construction technology, special
In the step of sign is, the construction technology four, levelling dose of the ground quick-drying is struck off by ruler.
4. levelling dose of ground quick-drying according to claim 1 and based on levelling dose of the floor leveling construction technology, special
In the step of sign is, the construction technology four, levelling dose of the ground quick-drying concordant with the lower horizontal line of the levelling edge strip.
5. levelling dose of ground quick-drying according to claim 1 and based on levelling dose of the floor leveling construction technology, special
Sign is that levelling dose of the ground quick-drying, from adding water to be mixed, to the construction duration of construction completion, is not more than 15 points
Clock.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910761112.1A CN110512823A (en) | 2019-08-17 | 2019-08-17 | Levelling dose of a kind of ground quick-drying and based on levelling dose of the floor leveling construction technology |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910761112.1A CN110512823A (en) | 2019-08-17 | 2019-08-17 | Levelling dose of a kind of ground quick-drying and based on levelling dose of the floor leveling construction technology |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110512823A true CN110512823A (en) | 2019-11-29 |
Family
ID=68626476
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910761112.1A Pending CN110512823A (en) | 2019-08-17 | 2019-08-17 | Levelling dose of a kind of ground quick-drying and based on levelling dose of the floor leveling construction technology |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110512823A (en) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101196071A (en) * | 2007-12-28 | 2008-06-11 | 中设建工集团有限公司 | Anti-leakage construction process for inclined roof |
CN106285003A (en) * | 2015-06-02 | 2017-01-04 | 蒋中华 | Gypsum Fibrosum metope casting construction method |
CN206599990U (en) * | 2017-01-25 | 2017-10-31 | 上海二十冶建设有限公司 | The one-time-concreting mould at underground structrue engineering exterior wall arc negative and positive angle |
CN207063131U (en) * | 2017-03-03 | 2018-03-02 | 广州市江达潜水疏浚工程有限公司 | A kind of drainpipe front end water plugging structure |
-
2019
- 2019-08-17 CN CN201910761112.1A patent/CN110512823A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101196071A (en) * | 2007-12-28 | 2008-06-11 | 中设建工集团有限公司 | Anti-leakage construction process for inclined roof |
CN106285003A (en) * | 2015-06-02 | 2017-01-04 | 蒋中华 | Gypsum Fibrosum metope casting construction method |
CN206599990U (en) * | 2017-01-25 | 2017-10-31 | 上海二十冶建设有限公司 | The one-time-concreting mould at underground structrue engineering exterior wall arc negative and positive angle |
CN207063131U (en) * | 2017-03-03 | 2018-03-02 | 广州市江达潜水疏浚工程有限公司 | A kind of drainpipe front end water plugging structure |
Non-Patent Citations (1)
Title |
---|
阳小群等: "《装饰装修工程施工》", 31 January 2016, 北京理工大学出版社 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103011731A (en) | Dual-purpose adhesive for adhering tiles and filling seams | |
CN106381796B (en) | A kind of concrete permeable road surface, its laying method and its maintenance restorative procedure | |
CN104631829B (en) | Technique for high-precision leveling of structural flooring | |
CN110512823A (en) | Levelling dose of a kind of ground quick-drying and based on levelling dose of the floor leveling construction technology | |
CN103058608B (en) | Monocomponent elastic waterproof putty and construction method thereof | |
CN106836310B (en) | A kind of building basement external wall waterproof construction method | |
CN108558305A (en) | The inorganic tile gap filler and preparation method thereof of squeezing and coating construction | |
CN104264953A (en) | Support, paving method for ground stone and cement mortar stirring and conveying all-in-one machine | |
CN214785730U (en) | Novel ceramic tile leveler | |
CN205577261U (en) | Civil engineering constructs pillar | |
CN212026357U (en) | Extrusion type embedded rubber waterstop | |
CN207959745U (en) | Perron | |
CN110424672A (en) | A kind of quick levelling assembled ground system and its construction technology | |
CN114059741A (en) | Anti-cracking ceramic floor material and assembled floor paving structure | |
CN208533939U (en) | A kind of pavement system | |
CN105625686A (en) | Process for laying prefabricated compound floor tiles | |
CN100545121C (en) | Cement floor hardening agent and construction technology thereof | |
CN205224514U (en) | Structure is pasted by shop of floor tile | |
CN2921162Y (en) | Integrated composite layer floor | |
CN109516740A (en) | The dedicated clay of the levelling integrated construction of floor tile paving and its construction method | |
CN111910897A (en) | Cement mortar leveling fixing support structure and construction method | |
CN212897630U (en) | Self-leveling mortar construction laying equipment | |
CN111058348B (en) | Road construction method by road nail | |
CN211313235U (en) | Waterborne epoxy cement mortar terrace | |
CN102995914B (en) | A kind of method for mending building wall body slit |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information |
Address after: No.44 and No.42, building 2, Fuxing Tianchi mansion, 132 Jiancai Road, Tianchi Avenue, Tianchi town, Lezhi county, Ziyang City, Sichuan Province, 641500 Applicant after: Zhongke Zhuchuang (Sichuan) Technology Co.,Ltd. Address before: NO.201, 2nd floor, building 1, Huadu, Xinyi, no.6, Section 1, Huayang Avenue, Tianfu New District, Chengdu, Sichuan 610000 Applicant before: Chengdu Science and Technology Co.,Ltd. |
|
CB02 | Change of applicant information | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20191129 |
|
WD01 | Invention patent application deemed withdrawn after publication |