CN205224514U CN201520751997.4U CN201520751997U CN205224514U CN 205224514 U CN205224514 U CN 205224514U CN 201520751997 U CN201520751997 U CN 201520751997U CN 205224514 U CN205224514 U CN 205224514U
Authority
CN
China
Prior art keywords
floor tiles
mortar layer
floor
layer
dry
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520751997.4U
Other languages
Chinese (zh)
Inventor
章银祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Jinyu Mortar Co Ltd
China Building Materials Academy CBMA
Original Assignee
Beijing Jinyu Mortar Co Ltd
China Building Materials Academy CBMA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Jinyu Mortar Co Ltd, China Building Materials Academy CBMA filed Critical Beijing Jinyu Mortar Co Ltd
Priority to CN201520751997.4U priority Critical patent/CN205224514U/en
Application granted granted Critical
Publication of CN205224514U publication Critical patent/CN205224514U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Floor Finish (AREA)

Abstract

本实用新型设计了一种地面砖的铺贴结构,该结构是由基层(1)、干硬性地面砂浆层(2)、地面砖专用界面砂浆层(3)、地面砖(4)和填缝剂(5)组成,在基层(1)上面为干硬性地面砂浆层(2),在干硬性地面砂浆层(2)上面为地面砖专用界面砂浆层(3),地面砖专用界面砂浆层(3上面为地面砖(4),地面砖(4)之间的缝隙为填缝剂(5)。该铺贴结构的特点是:拉伸粘结强度高;不易开裂;既提高了地面砖专用界面砂浆(3)硬化体的抗裂性、抗冻性,也提高了其拉伸粘结强度,从而使得地面砖不易空鼓。填缝剂(5)又是含聚合物的柔性材料,使得环境变化时,地面砖(4)之间不会直接硬碰硬,从而可有效避免地面砖(4)拱起现象。

The utility model designs a paving structure of floor tiles, which is composed of a base layer (1), a dry and hard floor mortar layer (2), a special interface mortar layer for floor tiles (3), floor tiles (4) and caulking agent (5), on the base (1) is a dry hard ground mortar layer (2), on the dry hard ground mortar layer (2) is a special interface mortar layer (3) for floor tiles, and a special interface mortar layer for floor tiles ( 3. Floor tiles (4) are on the top, and the gaps between the floor tiles (4) are joint fillers (5). The characteristics of this paving structure are: high tensile bond strength; not easy to crack; The crack resistance and frost resistance of the hardened body of the interface mortar (3) also improves its tensile bond strength, so that the floor tiles are not easy to hollow. The joint filler (5) is also a flexible material containing polymers, which makes When the environment changes, the floor tiles (4) will not directly bump into each other, thereby effectively avoiding the phenomenon that the floor tiles (4) are arched.

Description

一种地面砖的铺贴结构A paving structure of floor tiles

技术领域 technical field

本实用新型涉及到一种建筑工程结构的设计范畴,具体地讲,涉及到一种地面砖的铺贴结构的设计范畴。 The utility model relates to a design category of a building engineering structure, in particular to a design category of a paving structure of floor tiles.

背景技术 Background technique

在建筑工程中,地面砖的使用面积越来越大。但是空鼓、开裂的想象却屡见不鲜。这与材料及施工都有密切的关系。传统的地面砖施工是:(1)在清理干净的基层地面上摊铺干硬性地面砂浆;(2)预铺地面砖,用干硬性地面砂浆找平,并压实地面砂浆;(3)移走预铺的地面砖;(4)在压实、找平的干硬性地面砂浆上,浇注薄层水泥净浆;(4)放回被移走的预铺地面砖。由于水泥净浆本身的收缩大、保水率低,使其容易粉化、开裂,从而导致地砖空鼓、开裂,引起工程失败。 In construction projects, the use of floor tiles is increasing. But empty, cracked imaginations are not uncommon. This has a close relationship with materials and construction. The traditional floor brick construction is: (1) spread dry hard ground mortar on the cleaned base floor; (2) pre-pave ground brick, level it with dry hard ground mortar, and compact the ground mortar; (3) remove Pre-paved floor tiles; (4) pour a thin layer of cement slurry on the compacted and leveled dry hard ground mortar; (4) put back the removed pre-paved floor tiles. Due to the large shrinkage and low water retention rate of the cement paste itself, it is easy to pulverize and crack, resulting in hollowing and cracking of the floor tiles, resulting in project failure.

目前市场上推行的改进方法是:将水泥净浆改成地面砖粘结砂浆,其施工工艺是:(1)在清理干净的基层地面上摊铺干硬性地面砂浆;(2)预铺地面砖,用干硬性地面砂浆找平,并压实地面砂浆;(3)移走预铺的地面砖;(4)在被移走的预铺地面砖背面涂抹地面砖粘结砂浆;(4)放回已背涂粘结砂浆的地面砖。这种方法的缺点是:(1)将地面砖粘结砂浆涂抹到大规格的地砖上不容易;(2)要将地面砖粘结砂浆在地面砖背面涂抹均匀更难,因此,铺贴后的地面砖下面容易空鼓;(3)地面砖粘结砂浆的涂抹厚度较大,费料、费钱;(4)地面砖表面找平较难。 The improvement method currently on the market is: change the cement slurry into a ground brick bonding mortar, and the construction process is: (1) paving dry hard ground mortar on the cleaned base floor; (2) pre-laying ground bricks , level with dry hard ground mortar, and compact the ground mortar; (3) remove the pre-paved floor tiles; (4) apply floor tile bonding mortar on the back of the removed pre-paved floor tiles; (4) put them back Floor tiles that have been backcoated with bonded mortar. The disadvantages of this method are: (1) it is not easy to apply the floor tile adhesive mortar to the large-sized floor tiles; (2) it is more difficult to apply the floor tile adhesive mortar evenly on the back of the floor tiles, so after paving It is easy to hollow under the floor tiles; (3) the thickness of the floor tile bonding mortar is relatively large, which consumes materials and money; (4) it is difficult to level the surface of the floor tiles.

实用新型内容 Utility model content

本实用新型的目的是设计一种地面砖的铺贴结构,以减少地面砖工程空鼓、开裂的现象。 The purpose of the utility model is to design a floor tile paving structure to reduce hollowing and cracking of the floor tile project.

实现本实用新型的一种地面砖的铺贴结构是由基层(1)、干硬性地面砂浆层(2)、地面砖界面砂浆层(3)、地面砖(4)和填缝剂(5)组成,在基层(1)上面为干硬性地面砂浆层(2),在干硬性地面砂浆层(2)上面为地面砖界面砂浆层(3),地面砖界面砂浆层(3上面为地面砖(4),地面砖(4)之间的缝隙为填缝剂(5)。其中,地面砖界面砂浆层(3)是由水泥、活性掺和料、聚合物胶粉、保水增稠材料、细集料、憎水剂组成,具体配比依地面砖的吸水率、规格及使用环境而变化;它为工厂预混好的干混砂浆,在施工现场加水后,用机器搅拌成稀糊状浆料。填缝剂(5)也为工厂预混好的聚合物水泥干混砂浆,在施工现场加水后,用机器搅拌成稠度合适的浆料,使用时宽度大于2mm。 The paving structure of a kind of ground brick that realizes the utility model is made up of base (1), dry and hard ground mortar layer (2), ground brick interface mortar layer (3), ground brick (4) and caulking agent (5) It consists of a dry hard ground mortar layer (2) above the base layer (1), a ground brick interface mortar layer (3) above the dry hard ground mortar layer (2), and a ground brick interface mortar layer (3) above the ground brick ( 4), the gap between the floor tiles (4) is a caulking agent (5). Wherein, the floor tile interface mortar layer (3) is made of cement, active admixture, polymer rubber powder, water-retaining thickening material, fine Composition of aggregate and water repellent, the specific ratio varies according to the water absorption rate, specifications and use environment of the floor tiles; it is a dry-mixed mortar pre-mixed in the factory, and after adding water at the construction site, it is stirred into a thin paste by a machine The caulking agent (5) is also a polymer cement dry-mixed mortar premixed in the factory. After adding water at the construction site, it is stirred by a machine to form a slurry with a suitable consistency, and the width is greater than 2mm when used.

地面砖铺贴时:在清理干净的基层(1)上摊铺干硬性地面砂浆层(2);预铺地面砖(4),用干硬性地面砂浆找平,并压实干硬性地面砂浆;移走预铺的地面砖(4);在压实、找平的干硬性地面砂浆层(2)上,浇注一薄层地面砖专用界面砂浆层(3),摊平;移回之前移走的预铺地砖(4),找平;用填缝剂(5)填缝。 When laying ground tiles: pave the dry hard ground mortar layer (2) on the cleaned base (1); pre-pave the ground bricks (4), level them with dry hard ground mortar, and compact the dry hard ground mortar; remove Pre-laid ground tiles (4); on the compacted and leveled dry hard ground mortar layer (2), pour a thin layer of special interface mortar layer (3) for ground tiles, and spread it; move back the previously removed pre-paved Floor tiles (4), level; fill the joints with sealant (5).

本设计的一种地面砖的铺贴结构,其地面砖界面砂浆层(3)为单组份干混砂浆,很容易在施工现场加水搅拌成均匀的稀糊状浆料,又由于搅拌出的浆料流动性很好,很容易浇注、摊平,使得地面砖(4)回放时很容易找平;由于地面砖界面砂浆层(3)浆料中,水泥含量比水泥净浆小得多,因此其收缩、开裂、“泛碱”的可能性小得多;由于地面砖界面砂浆层(3)中含有保水增稠剂,使得界面砂浆浆料的保水率比水泥净浆的大得多,其水分不易被干硬性地面砂浆层(2)等吸走,保证了其中的水泥得以充分水化,从而使得界面砂浆硬化体的拉伸粘结强度高,不易粉化、开裂;保水增稠剂还能大量引气,既降低了地面砖专用界面砂浆层(3)浆料的容重、节约了材料、提高了施工性,又降低了界面砂浆硬化体的弹性模量,提高了其柔性和抗冻性,使其不易开裂;由于地面砖界面砂浆层(3)中含有聚合物胶粉,在地面砖界面砂浆层(3)浆料中的水分越来越少,一是由于自身含有的水泥水化过程吸水,二是干硬性地面砂浆层(2)吸水,三是地面砖(4)吸水,四是向环境失水时,聚合物失水成膜,既提高了地面砖界面砂浆层(3)硬化体的抗裂性、抗冻性,也提高了其拉伸粘结强度,从而使得地面砖不易空鼓;地面砖界面砂浆层(3)中掺加的憎水剂、活性掺和料,可提高工程的抗冻性、抗“泛碱性”;地面砖界面砂浆层(3)的颜色可调,从而可满足多种工程的需要;稀糊状的地面砖界面砂浆层(3)浆料仅约1mm厚,大大节约了资源;由于地面砖界面砂浆层(3)中含有保水增稠材料和聚合物胶粉,使其柔性较好、粘结力较高,使得因环境作用而使地面砖(4)有位移时,地面砖(4)与地面砖界面砂浆层(3)之间不易空鼓、脱开;由于界面砂浆被搅拌成稀糊状,施工时容易进入其下的干硬性地面砂浆层(2)内部,且其自身又含有聚合物胶粉,使其与干硬性地面砂浆层(2)之间有较高的粘结力,因而,二者之间不易空鼓、脱开。由于地面砖(4)间的接缝大于2mm,填缝剂(5)又是含聚合物的柔性材料,使得环境变化时,地面砖(4)之间不会直接硬碰硬,从而可有效避免地面砖(4)拱起现象。 In this design of a paving structure for floor tiles, the interface mortar layer (3) of the floor tiles is a single-component dry-mixed mortar, which can be easily mixed with water at the construction site to form a uniform thin paste slurry, and because the stirred The fluidity of the slurry is very good, it is easy to pour and level, so that the floor tile (4) is easy to level when it is played back; since the cement content in the slurry of the interface mortar layer (3) of the floor tile is much smaller than that of the cement paste, Its shrinkage, cracking, and "pan-alkali" are much less likely; because the floor tile interface mortar layer (3) contains a water-retaining thickener, the water retention rate of the interface mortar slurry is much greater than that of cement paste, and its Moisture is not easily absorbed by the dry hard ground mortar layer (2), which ensures that the cement in it can be fully hydrated, so that the tensile bond strength of the interface mortar hardened body is high, and it is not easy to pulverize and crack; the water-retaining thickener also It can entrain a large amount of air, which not only reduces the bulk density of the special interface mortar layer (3) for floor tiles, saves materials, improves the workability, but also reduces the elastic modulus of the hardened body of the interface mortar, and improves its flexibility and frost resistance. properties, so that it is not easy to crack; because the floor tile interface mortar layer (3) contains polymer powder, the moisture in the floor tile interface mortar layer (3) slurry is getting less and less, one is due to the cement water contained in itself The second is that the dry hard ground mortar layer (2) absorbs water, the third is that the floor tiles (4) absorb water, and the fourth is that when the water is lost to the environment, the polymer loses water to form a film, which not only improves the surface brick interface mortar layer (3) ) The crack resistance and frost resistance of the hardened body also improves its tensile bond strength, so that the floor tiles are not easy to hollow; the water repellent and active admixture added to the floor tile interface mortar layer (3) , can improve the frost resistance and anti-"pan-alkaline" of the project; the color of the floor tile interface mortar layer (3) can be adjusted, so as to meet the needs of various projects; the thin paste floor tile interface mortar layer (3) The slurry is only about 1mm thick, which greatly saves resources; because the floor tile interface mortar layer (3) contains water-retaining thickening materials and polymer rubber powder, it has good flexibility and high cohesive force, so that it will not be damaged due to environmental effects. When the floor tiles (4) are displaced, the gap between the floor tiles (4) and the interface mortar layer (3) of the floor tiles is not easy to be hollowed out or disengaged; since the interface mortar is stirred into a thin paste, it is easy to enter the ground below it during construction. The inside of the dry hard ground mortar layer (2), and it itself contains polymer rubber powder, so that it has a relatively high cohesive force with the dry hard ground mortar layer (2), so that it is not easy to be hollowed out between the two , Take off. Since the joints between the floor tiles (4) are greater than 2 mm, and the joint filler (5) is a flexible material containing polymer, when the environment changes, the floor tiles (4) will not directly bump into each other, thereby effectively avoiding the ground Brick (4) arching phenomenon.

附图说明 Description of drawings

图1为一种地面砖的铺贴结构示意图。 Fig. 1 is a schematic diagram of a paving structure of floor tiles.

图中:1-基层;2-干硬性地面砂浆层;3-地面砖界面砂浆层;4-地面砖;5-填缝剂。 In the figure: 1-base layer; 2-dry hard ground mortar layer; 3-ground brick interface mortar layer; 4-ground brick; 5-sealing agent.

具体实施方式 detailed description

下面结合附图对实现地面砖的铺贴结构进一步说明。 Below in conjunction with accompanying drawing, realize the paving structure of floor tile to further illustrate.

本实用新型的一种地面砖的铺贴结构是由基层(1)、干硬性地面砂浆层(2)、地面砖界面砂浆层(3)、地面砖(4)和填缝剂(5)组成。地面砖铺贴时:在清理干净的基层(1)上摊铺干硬性地面砂浆层(2);预铺地面砖(4),用干硬性地面砂浆层(2)找平,并压实干硬性地面砂浆层(2);移走预铺的地面砖(4);在压实、找平的干硬性地面砂浆层(2)上,浇注薄层地面砖界面砂浆层(3)浆料,摊平;移回之前移走的预铺地面砖(4),找平;用填缝剂(5)填缝。 A floor tile paving structure of the utility model is composed of a base layer (1), a dry and hard floor mortar layer (2), a floor tile interface mortar layer (3), a floor tile (4) and a caulking agent (5) . When laying ground tiles: pave the dry hard ground mortar layer (2) on the cleaned base (1); pre-pave the ground bricks (4), level with the dry hard ground mortar layer (2), and compact the dry hard ground The mortar layer (2); remove the pre-laid floor tiles (4); on the compacted and leveled dry and hard ground mortar layer (2), pour the thin-layer floor tile interface mortar layer (3) slurry, and spread out; Move back the previously removed pre-laid floor tiles (4) and level; fill the joints with grout (5).

Claims (1)

1. the paving structure of a floor tile, it is characterized in that: the paving structure of floor tile is made up of basic unit (1), dry floor sand pulp layer (2), floor tile boundary mortar layer (3), floor tile (4) and gap filler (5), it is dry floor sand pulp layer (2) on basic unit (1), it is floor tile boundary mortar layer (3) on dry floor sand pulp layer (2), floor tile boundary mortar layer (3) is floor tile (4) above, and the gap between floor tile (4) is gap filler (5).
CN201520751997.4U 2015-09-24 2015-09-24 Structure is pasted by shop of floor tile Active CN205224514U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520751997.4U CN205224514U (en) 2015-09-24 2015-09-24 Structure is pasted by shop of floor tile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520751997.4U CN205224514U (en) 2015-09-24 2015-09-24 Structure is pasted by shop of floor tile

Publications (1)

Publication Number Publication Date
CN205224514U true CN205224514U (en) 2016-05-11

Family

ID=55899589

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520751997.4U Active CN205224514U (en) 2015-09-24 2015-09-24 Structure is pasted by shop of floor tile

Country Status (1)

Country Link
CN (1) CN205224514U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110792180A (en) * 2019-11-15 2020-02-14 李东锋 Damp-proof construction method for toilet

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110792180A (en) * 2019-11-15 2020-02-14 李东锋 Damp-proof construction method for toilet

Similar Documents

Publication Publication Date Title
CN103011731A (en) Dual-purpose adhesive for adhering tiles and filling seams
CN104211357B (en) A kind of low alkalinity tile adhesives of improvement
CN109370483A (en) A kind of strength is water-fast ceramic tile gum and preparation and construction method
CN107601985A (en) A kind of ceramic tile interface agent
WO2015035840A1 (en) Three-in-one mosaic adhesive for pasting, seam-filling and water-resisting
CN205224514U (en) Structure is pasted by shop of floor tile
CN108191317A (en) For autoclave aerated concrete building block and the thin layer special masonry mortar of light-duty building block
CN201520933U (en) a plastic runway
CN105625669A (en) Vitrified tile paving structure and paving method thereof
CN204645456U (en) waterproof wall tile structure
CN103774696A (en) Construction process of cement-based permeable-crystallization type waterproof material
CN108049286A (en) A kind of volleyball court terrace and its preparation process
JP4315260B1 (en) Method for repairing concrete placing surface and premix mortar containing water retaining material
CN204112547U (en) A kind of accomodation ground
CN204356736U (en) A kind of anti-accumulation of salt in the surface soil pond stone material paving structure
CN110054449A (en) A kind of ceramic tile bond, preparation method and application method
CN205577324U (en) Vitrified tile spreads and pastes structure
CN108457461B (en) Rapid tile paving method
CN104878672A (en) Stone-planted cement concrete bridge deck paving structure and method
CN110130643B (en) Construction process for plastic and flax ground
CN110409747B (en) Ground waterproofing construction method
CN106517943A (en) Wallboard binder and preparation method thereof
CN209456827U (en) Floating floor decorating structure
CN208733692U (en) A kind of construction of new-old concrete connects waterproof construction at raft
CN208533945U (en) A kind of flexible assembly floor tile

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant