CN110497194A - A kind of zinc set component assembling equipment - Google Patents
A kind of zinc set component assembling equipment Download PDFInfo
- Publication number
- CN110497194A CN110497194A CN201910786103.8A CN201910786103A CN110497194A CN 110497194 A CN110497194 A CN 110497194A CN 201910786103 A CN201910786103 A CN 201910786103A CN 110497194 A CN110497194 A CN 110497194A
- Authority
- CN
- China
- Prior art keywords
- feed mechanism
- zinc
- spring leaf
- plate
- zinc set
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- HCHKCACWOHOZIP-UHFFFAOYSA-N Zinc Chemical compound [Zn] HCHKCACWOHOZIP-UHFFFAOYSA-N 0.000 title claims abstract description 130
- 239000011701 zinc Substances 0.000 title claims abstract description 129
- 229910052725 zinc Inorganic materials 0.000 title claims abstract description 129
- 230000007246 mechanism Effects 0.000 claims abstract description 186
- 238000007789 sealing Methods 0.000 claims abstract description 48
- 238000007689 inspection Methods 0.000 claims abstract description 21
- 238000012360 testing method Methods 0.000 claims abstract description 20
- 238000007599 discharging Methods 0.000 claims description 44
- 230000005693 optoelectronics Effects 0.000 claims description 41
- 238000004064 recycling Methods 0.000 claims description 12
- 230000033001 locomotion Effects 0.000 claims description 10
- 238000009434 installation Methods 0.000 claims description 7
- 230000005622 photoelectricity Effects 0.000 claims description 4
- 230000007704 transition Effects 0.000 claims description 3
- 239000000463 material Substances 0.000 abstract description 16
- 238000012797 qualification Methods 0.000 abstract description 3
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 30
- 229910052742 iron Inorganic materials 0.000 description 15
- 238000004080 punching Methods 0.000 description 12
- 239000007787 solid Substances 0.000 description 4
- 238000001514 detection method Methods 0.000 description 3
- 238000000034 method Methods 0.000 description 3
- 235000014676 Phragmites communis Nutrition 0.000 description 2
- 206010044565 Tremor Diseases 0.000 description 2
- 230000005540 biological transmission Effects 0.000 description 2
- 238000007664 blowing Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 230000008569 process Effects 0.000 description 2
- 230000001739 rebound effect Effects 0.000 description 2
- 230000009466 transformation Effects 0.000 description 2
- 230000009471 action Effects 0.000 description 1
- 238000013459 approach Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000000903 blocking effect Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 230000007423 decrease Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- 230000003993 interaction Effects 0.000 description 1
- 238000010409 ironing Methods 0.000 description 1
- 239000010687 lubricating oil Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 239000002994 raw material Substances 0.000 description 1
- 230000001360 synchronised effect Effects 0.000 description 1
- 238000011144 upstream manufacturing Methods 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23P—METAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
- B23P19/00—Machines for simply fitting together or separating metal parts or objects, or metal and non-metal parts, whether or not involving some deformation; Tools or devices therefor so far as not provided for in other classes
- B23P19/001—Article feeders for assembling machines
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23P—METAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
- B23P21/00—Machines for assembling a multiplicity of different parts to compose units, with or without preceding or subsequent working of such parts, e.g. with programme control
- B23P21/004—Machines for assembling a multiplicity of different parts to compose units, with or without preceding or subsequent working of such parts, e.g. with programme control the units passing two or more work-stations whilst being composed
- B23P21/006—Machines for assembling a multiplicity of different parts to compose units, with or without preceding or subsequent working of such parts, e.g. with programme control the units passing two or more work-stations whilst being composed the conveying means comprising a rotating table
Abstract
The present invention relates to automatic assembly equipment technical fields, equipment is assembled more particularly to a kind of zinc set component, it include industrial host, ten station index dials and the zinc being arranged around ten station index dials cover feed mechanism, spring leaf feed mechanism, spring leaf inspection body, pressure ring feed mechanism, sealing ring feed mechanism, sorting mechanism, wherein between zinc set feed mechanism and spring leaf feed mechanism, between pressure ring feed mechanism and sealing ring feed mechanism, testing agency is provided between sealing ring feed mechanism and sorting mechanism, ten station index dials, zinc covers feed mechanism, testing agency, spring leaf feed mechanism, spring leaf inspection body, pressure ring feed mechanism, sealing ring feed mechanism and sorting mechanism are electrically connected with industrial host;The equipment can automatically assemble zinc set component and detect assembling quality automatically, be effectively saved human and material resources, while improving qualification rate.
Description
Technical field
The present invention relates to automatic assembly equipment technical fields, and in particular to a kind of zinc set component assembling equipment.
Background technique
Current zinc set component includes zinc set, spring leaf, pressure ring and rubber ring, and there has been no for automatic currently on the market
The equipment for assembling zinc set component.
Chinese patent CN202507038U discloses a kind of rubber ring and zinc covers automatic assembling apparatus, is related to mechanical device,
Automatic assembling apparatus is covered more particularly to rubber ring and zinc.Including base plate, a bracket, peace in bracket are installed above base plate
It is covered equipped with zinc and places track;Cylinder I is vertically installed on above base plate, the piston rod connection guiding mechanism of cylinder I;Cylinder I I is horizontal
To being installed on above cylinder I, rubber ring placement mechanism is installed on cylinder I I piston rod;Bracket upper horizontal is equipped with air cylinder group
III, air cylinder group IV are vertically installed on air cylinder group III piston rod;The piston-rod lower end of air cylinder group IV installs air cylinder group V, cylinder
Group V piston-rod lower end installation zinc set assembles formed punch with rubber ring, and zinc set and rubber ring assembly formed punch lower end installation assembly formed punch are solid
Determine part.
The device of the patent disclosure is simply possible to use in automatic assembling rubber ring and zinc set, is not suitable for the modern more parts of complexity
Zinc covers component.
Summary of the invention
The purpose of the present invention is to provide a kind of zinc set components to assemble equipment, which can automatically assemble zinc set component
And assembling quality is detected automatically, human and material resources are effectively saved, while improving qualification rate.
To achieve this purpose, the present invention adopts the following technical scheme:
A kind of zinc set component assembling equipment is provided, includes industrial host, ten station index dials and is indexed around ten stations
The zinc of disk setting covers feed mechanism, spring leaf feed mechanism, spring leaf inspection body, pressure ring feed mechanism, sealing ring feeder
Structure, sorting mechanism, wherein between zinc set feed mechanism and spring leaf feed mechanism, pressure ring feed mechanism and sealing ring feed mechanism
Between, be provided with testing agency between sealing ring feed mechanism and sorting mechanism, ten station index dials, zinc set feed mechanism,
Testing agency, spring leaf feed mechanism, spring leaf inspection body, pressure ring feed mechanism, sealing ring feed mechanism and sorting mechanism
It is electrically connected with industrial host.
As a kind of a kind of preferred embodiment of zinc set component assembling equipment, ten station index dials include rotary disk, precision
Electrical turntable, positioning column and support ring, rotary disk are fixedly mounted on the working end of electric precise turntable, the rotation of electric precise turntable
Shaft is vertically arranged, and the outer on rotary disk is provided with multiple vertical location holes for running through rotary disk, and positioning column can vertical sliding
Ground is mounted on positioning hole, and support ring is arranged around electric precise turntable, and support ring is located at turn around the underface of disk, support ring
Top surface is divided into the first plane and the second plane of fan ring-shaped, and the height of the first plane is higher than the height of the second plane, and first is flat
Pass through chamfered transition between face and the second plane;
Under feeding and installation condition, the bottom end of positioning column is abutted on the first plane, and the top of positioning column is located at turn around disk
Top face, under discharge status, the bottom end of positioning column is connected in the second plane, and the top of positioning column is located at turn around the top of disk
Below face.
As a kind of a kind of preferred embodiment of zinc set component assembling equipment, the top surface of support ring is provided with around support ring
For axis vertical to the annular groove of lower recess, the bottom end of positioning column is provided with the rotary table that bottom is arranged downward, under working condition, circle
The side of platform is connected to the edge of annular groove.
As a kind of a kind of preferred embodiment of zinc set component assembling equipment, the top of positioning column is provided with chamfering.
As a kind of a kind of preferred embodiment of zinc set component assembling equipment, it includes vibrating disk, feeding that zinc, which covers feed mechanism,
Guide rail, vibration motor, the first cylinder slide unit, the second cylinder slide unit, first straight line driver, push-in plug and pusher sleeve;
The discharge end of vibrating disk is connected to the feeding end of loading guide, and loading guide is fixedly mounted on the work of vibration motor
End, the first cylinder slide unit is horizontally disposed, and the second cylinder slide unit is vertically arranged, and it is sliding that the second cylinder slide unit is fixedly mounted on the first cylinder
The work department of platform, first straight line driver and pusher sleeve are fixedly mounted on the work department of the second cylinder slide unit, first straight line
The operative orientation of driver is arranged straight down, and push-in plug is fixedly mounted on the working end of first straight line driver, pusher
Sleeve is set in the outside of push-in plug;
Under feeding state, the bottom end of push-in plug is located at the subjacent of pusher sleeve, push-in to insert under blanking state
The bottom end of head is located above the bottom surface of pusher sleeve;
Pressure ring feed mechanism, the structure of sealing ring feed mechanism are identical as zinc set feed mechanism.
As a kind of a kind of preferred embodiment of zinc set component assembling equipment, testing agency includes optoelectronic switch bracket and light
Electric switch, optoelectronic switch bracket tip upside down on the surface of positioning column, and optoelectronic switch is fixedly mounted on optoelectronic switch bracket, photoelectricity
The operation interval of switch is located at the surface of the motion track of positioning column, and optoelectronic switch is electrically connected with industrial host;Optoelectronic switch
Bracket includes riser, connecting plate and diffusing reflection plate, and riser and diffusing reflection plate are vertically arranged, and connecting plate is horizontally disposed, connection
The both ends of plate are separately connected riser and diffusing reflection plate, and riser and diffusing reflection plate are folded in the motion track two sides of positioning column, photoelectricity
Switch is fixedly mounted on riser, and horizontally toward diffusing reflection plate is arranged the operative orientation of optoelectronic switch.
As a kind of a kind of preferred embodiment of zinc set component assembling equipment, spring leaf inspection body includes that the 4th cylinder is sliding
Platform and close switch, the operative orientation of the 4th cylinder slide unit are arranged straight down, and it is sliding to be fixedly mounted on the 4th cylinder close to switch
The work department of platform, the operative orientation close to switch are arranged straight down.
As a kind of a kind of preferred embodiment of zinc set component assembling equipment, sorting mechanism includes discharging platform, baffle and determines
The side of ten station index dials, the work of the face height of discharging platform and ten station index dials is arranged in position screw, discharging platform
Face height is concordant, and one end of baffle is rotatably installed in discharging platform, and the free end of baffle is located at the work of ten station index dials
The surface in face, positioning screw is fixedly mounted in discharging platform and positioning screw is connected to the side of baffle.
As a kind of a kind of preferred embodiment of zinc set component assembling equipment, discharging platform includes discharging plate, discharging inclined-plane
And discharge port plate, discharging plate are close to the setting of ten station index dials, the working face height of the height for the plate that discharges and ten station index dials
Degree is concordant, and the height of discharge port plate is lower than the height of discharging plate, and discharging plate is connected with discharge port plate by the inclined-plane that discharges, and discharging is put down
The shaft extended straight up and multiple threaded holes are provided on plate, baffle is rotatably installed in shaft, and positioning screw is solid
Dingan County is installed therein in a threaded hole.
As a kind of zinc set component assembling equipment a kind of preferred embodiment, sorting mechanism further include have recycling platform, gas blow pipe,
High-pressure pump and solenoid valve, solenoid valve are electrically connected with industrial host, and the side of discharging platform is arranged in recycling platform, and recycling platform includes
Blanking bucket and recovering tray, the feeding end of blanking bucket are close to the setting of ten station index dials, and the feeding end of recovering tray is located at blanking bucket and goes out
Expect the underface at end, blanking bucket is fixedly mounted on recovering tray, and gas blow pipe is suspended on the top of ten station index dial working faces, blows
The feeding end of the operative orientation of tracheae towards blanking bucket is arranged, and gas blow pipe, solenoid valve, high-pressure pump are linked in sequence.
Beneficial effects of the present invention:
Firstly, zinc covers feed mechanism in zinc set installation to the jig of ten station index dials, then ten stations indexing is spiraled
Turn so that zinc set successively by spring leaf feed mechanism, spring leaf inspection body, pressure ring feed mechanism, sealing ring feed mechanism and
Sorting mechanism, by spring leaf riveting inside zinc set, subsequent spring leaf inspection body detection spring piece is spring leaf feed mechanism
No installation is in place, and then pressure ring is connected to zinc set top by pressure ring feed mechanism, and then sealing ring feed mechanism is by sealing ring card
It connects on pressure ring top, finished product is sorted finally by sorting mechanism, wherein zinc is covered by zinc set feed mechanism and spring
Between piece feed mechanism, between pressure ring feed mechanism and sealing ring feed mechanism, between sealing ring feed mechanism and sorting mechanism
When pass through whether different testing agency's detection zinc sets, pressure ring and sealing ring are installed in place, when testing agency and spring leaf respectively
When inspection body detects that one in zinc set, spring leaf, pressure ring and sealing ring is fitted without in place, testing agency and spring leaf
Inspection body sends a signal to industrial host, and industrial host is numbered to the jig, when the jig is moved to sorting mechanism, sorting
Finished product on the jig is moved at one and waits staff's recycling by mechanism, and qualified product is sorted mechanism and is moved to another place etc.
It is collected to staff.
1, the equipment can automatically assemble zinc set component, be effectively saved human and material resources;
2, the equipment can automatically detect assembling quality, be effectively saved manpower, while improving qualification rate.
Detailed description of the invention
In order to illustrate the technical solution of the embodiments of the present invention more clearly, will make below to required in the embodiment of the present invention
Attached drawing is briefly described.It should be evident that drawings described below is only some embodiments of the present invention, for
For those of ordinary skill in the art, without creative efforts, it can also be obtained according to these attached drawings other
Attached drawing.
Fig. 1 is the perspective view of zinc set component;
Fig. 2 is the stereogram exploded view of zinc set component;
Fig. 3 is a kind of top view of zinc set component assembling equipment described in the embodiment of the present invention;
Fig. 4 is a kind of first perspective view of zinc set component assembling equipment described in the embodiment of the present invention;
Fig. 5 is a kind of second perspective view of zinc set component assembling equipment described in the embodiment of the present invention;
Fig. 6 is a kind of part-structure exploded view of zinc set component assembling equipment described in the embodiment of the present invention;
Fig. 7 is partial enlarged view at the A of Fig. 6;
Fig. 8 is a kind of ten station index dial perspective views of zinc set component assembling equipment described in the embodiment of the present invention;
Fig. 9 is a kind of ten station index dial stereogram exploded views of zinc set component assembling equipment described in the embodiment of the present invention;
Figure 10 is a kind of zinc set feed mechanism perspective view of zinc set component assembling equipment described in the embodiment of the present invention;
Figure 11 is that a kind of spring leaf feed mechanism first of zinc set component assembling equipment described in the embodiment of the present invention is three-dimensional
Figure;
Figure 12 is that a kind of spring leaf feed mechanism second of zinc set component assembling equipment described in the embodiment of the present invention is three-dimensional
Figure;
Figure 13 is a kind of spring leaf feed mechanism cross-sectional view of zinc set component assembling equipment described in the embodiment of the present invention;
Figure 14 is partial enlarged view at the B of Figure 13;
Figure 15 is partial enlarged view at the C of Figure 13;
In figure:
1, zinc covers component;1a, zinc set;1b, spring leaf;1c, pressure ring;1d, sealing ring;
2, ten station index dial;2a, rotary disk;2a1, location hole;2b, electric precise turntable;2c, positioning column;2c1, circle
Platform;2c2, chamfering;2d, support ring;2d1, the first plane;2d2, the second plane;2d3, annular groove;
3, zinc covers feed mechanism;3a, loading guide;3b, vibration motor;3c, the first cylinder slide unit;3d, the second cylinder are sliding
Platform;3e, first straight line driver;3f, push-in plug;3g, pusher sleeve;
4, testing agency;4a, optoelectronic switch bracket;4a1, riser;4a2, connecting plate;4a3, diffusing reflection plate;4b, photoelectricity are opened
It closes;
5, spring leaf feed mechanism;5a, workbench;5a1, material guide;5a2, material gib block;5a3, material-dropping hole;
5b, cross bar;5c, upright bar;5d, the first guide rod;5e, the second guide rod;5f, discharge mechanism;5f1, shaft;5f2, discharge plate;
5f3, ring flange;5f4, servo motor;5f5, retarder;5g, step feeder;5g1, third cylinder slide unit;5g2, second
Linear actuator;5g3, spring leaf fixture;5h, punching riveting mechanism;5h1, column;5h2, top plate;5h3, third linear drives
Device;5h4, upper mold;5h5, lower die;5h6, movable plate;5h7, guide post;5h8, nut;5h9, spring;5i, receiving mechanism;
6, spring leaf inspection body;6a, the 4th cylinder slide unit;6b, close switch;
7, pressure ring feed mechanism;
8, sealing ring feed mechanism;
9, sorting mechanism;9a, discharging platform;9a1, discharging plate;9a2, discharging inclined-plane;9a3, discharge port plate;9a4, shaft;
9a5, threaded hole;9b, baffle;9c, positioning screw;9d, recycling platform;9d1, blanking bucket;9d2, recovering tray;9e, gas blow pipe.
Specific embodiment
To further illustrate the technical scheme of the present invention below with reference to the accompanying drawings and specific embodiments.
Wherein, the drawings are for illustrative purposes only and are merely schematic diagrams, rather than pictorial diagram, should not be understood as to this
The limitation of patent;Embodiment in order to better illustrate the present invention, the certain components of attached drawing have omission, zoom in or out, not
Represent the size of actual product;It will be understood by those skilled in the art that certain known features and its explanation may be omitted and be in attached drawing
It is understood that.
The same or similar label correspond to the same or similar components in the attached drawing of the embodiment of the present invention;It is retouched in of the invention
In stating, it is to be understood that closed if there is the orientation of the instructions such as term " on ", "lower", "left", "right", "inner", "outside" or position
System is merely for convenience of description of the present invention and simplification of the description to be based on the orientation or positional relationship shown in the drawings, rather than indicates
Or imply that signified device or element must have a particular orientation, be constructed and operated in a specific orientation, therefore retouch in attached drawing
The term for stating positional relationship only for illustration, should not be understood as the limitation to this patent, for the common skill of this field
For art personnel, the concrete meaning of above-mentioned term can be understood as the case may be.
In the description of the present invention unless specifically defined or limited otherwise, if there are the indicate indicators such as term " connection "
Between connection relationship, which shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or at
One;It can be mechanical connection, be also possible to be electrically connected;Can be directly connected, can also indirectly connected through an intermediary,
It can be the connection of two components interiors or the interaction relationship of two components.For those of ordinary skill in the art and
Speech, can understand the concrete meaning of above-mentioned term in the present invention with concrete condition.
Referring to figs. 1 to a kind of zinc set component assembling equipment shown in figure 15, component 1, zinc set are covered for automatically assembling zinc
Component 1 includes that zinc set 1a, spring leaf 1b, pressure ring 1c and sealing ring 1d, the spring leaf 1b riveting of sequence from low to uper part connection exist
Zinc covers among the inner ring of 1a, and pressure ring 1c is connected to the top of zinc set 1a and the bottom surface of pressure ring 1c and is connected to the top surface of spring leaf 1b
On, sealing ring 1d is connected to the top of pressure ring 1c;It include industrial host, ten station index dials 2 and circular ten station index dials 2
The zinc of setting covers feed mechanism 3, spring leaf feed mechanism 5, spring leaf inspection body 6, pressure ring feed mechanism 7, sealing ring feeding
Mechanism 8, sorting mechanism 9, wherein between zinc set feed mechanism 3 and spring leaf feed mechanism 5, pressure ring feed mechanism 7 and sealing ring
Between feed mechanism 8, it is provided with testing agency 4 between sealing ring feed mechanism 8 and sorting mechanism 9, ten station index dials 2,
Zinc covers feed mechanism 3, testing agency 4, spring leaf feed mechanism 5, spring leaf inspection body 6, pressure ring feed mechanism 7, sealing ring
Feed mechanism 8 and sorting mechanism 9 are electrically connected with industrial host.
Industrial host is used to cover feed mechanism 3, spring leaf feed mechanism 5, pressure ring feeder to ten station index dials 2, zinc
Structure 7, sealing ring feed mechanism 8 and sorting mechanism 9 issue signal, while receiving from testing agency 4 and spring leaf check machine
The signal of structure 6, ten station index dials 2, zinc set feed mechanism 3, spring leaf feed mechanism 5, pressure ring feed mechanism 7, on sealing ring
Material mechanism 8 and sorting mechanism 9 work according to the signal that industrial host is sent;
Ten station index dials 2 for mobile material to next station, zinc set feed mechanism 3 be used to install zinc set 1a to
On the jig of ten station index dials 2, spring leaf feed mechanism 5 is used for by spring leaf 1b riveting inside zinc set 1a, pressure ring feeding
Mechanism 7 is used to for pressure ring 1c being connected to the zinc set top 1a, and sealing ring feed mechanism 8 is used to for sealing ring 1d to be connected to the top pressure ring 1c
End, sorting mechanism 9 is for discharging and sub-elects rejected product.
Ten station index dials 2 include rotary disk 2a, electric precise turntable 2b, positioning column 2c and support ring 2d, rotary disk
2a is fixedly mounted on the working end of electric precise turntable 2b, and the rotary shaft of electric precise turntable 2b is vertically arranged, on rotary disk 2a
Outer be provided with multiple vertical location hole 2a1 for running through rotary disk 2a, positioning column 2c can be mounted on location hole to vertical sliding
In 2a1, support ring 2d is arranged around electric precise turntable 2b, and support ring 2d is located at turn around the underface of disk 2a, support ring 2d's
Top surface is divided into the height of the first plane 2d1 and the second plane 2d2, the first plane 2d1 of fan ring-shaped higher than the second plane 2d2's
Highly, pass through chamfered transition between the first plane 2d1 and the second plane 2d2;
Under feeding and installation condition, the bottom end of positioning column 2c is connected on the first plane 2d1, and the top of positioning column 2c is located at
The top face of rotary disk 2a, under discharge status, the bottom end of positioning column 2c is connected on the second plane 2d2, the top of positioning column 2c
End is located at turn around below the top surface of disk 2a.
It is provided with 20 location hole 2a1 on rotary disk 2a, every two location hole 2a1 is a station, on rotary disk 2a
It is equipped with ten stations altogether, electric precise turntable 2b drives rotary disk 2a rotation so that location hole 2a1 drives 20 positioning columns
2c is moved to different stations, when positioning column 2c is moved to zinc set feed mechanism 3, testing agency 4, spring leaf feed mechanism 5, bullet
When the working end of reed inspection body 6, pressure ring feed mechanism 7 and sealing ring feed mechanism 8, the bottom end of positioning column 2c is connected to
On one plane 2d1, the top of positioning column 2c is stretched out on the top surface of rotary disk 2a at this time, so that 1a is covered as jig clamping zinc,
When positioning column 2c is moved to the working end of sorting mechanism 9, the bottom end of positioning column 2c is connected on the second plane 2d2, fixed at this time
The top of position column 2c is located at turn around under the top surface of disk 2a, so that the zinc set component 1 being completed is able to be sorted mechanism 9
It is removed from rotary disk 2a.
The top surface of support ring 2d is provided with the axis vertical around support ring 2d to the annular groove 2d3 of lower recess, positions
The bottom end of column 2c is provided with the rotary table 2c1 that bottom is arranged downward, and under working condition, the side of rotary table 2c1 is connected to annular groove
The edge of 2d3.
The frictional force in face and face between positioning column 2c and support ring 2d is changed into rotary table 2c1 and annular by annular groove 2d3
Frictional force between groove 2d3 between face and line generates radial trembling, simultaneously during being effectively prevented positioning column 2c movement
It is filled with lubricating oil inside annular groove 2d3, the frictional force between rotary table 2c1 and annular groove 2d3 is further reduced, into one
Step reduces the trembling generated in positioning column 2c moving process.
The top of positioning column 2c is provided with chamfering 2c2.
Chamfering 2c2 is used to reduce the resistance that zinc set 1a is inserted on positioning column 2c.
It includes vibrating disk, loading guide 3a, vibration motor 3b, the first cylinder slide unit 3c, the second gas that zinc, which covers feed mechanism 3,
Cylinder slide unit 3d, first straight line driver 3e, push-in plug 3f and pusher sleeve 3g;
The discharge end of vibrating disk is connected to the feeding end of loading guide 3a, and loading guide 3a is fixedly mounted on vibration motor 3b
Working end, the first cylinder slide unit 3c is horizontally disposed, and the second cylinder slide unit 3d is vertically arranged, and the second cylinder slide unit 3d is fixedly mounted
In the work department of the first cylinder slide unit 3c, first straight line driver 3e and pusher sleeve 3g are fixedly mounted on the second cylinder slide unit
The operative orientation of the work department of 3d, first straight line driver 3e is arranged straight down, and push-in plug 3f is fixedly mounted on first
The working end of linear actuator 3e, pusher sleeve 3g are set in the outside of push-in plug 3f;
Under feeding state, the bottom end of push-in plug 3f is located at the subjacent of pusher sleeve 3g, fast to insert under blanking state
The bottom end of formula plug 3f is located above the bottom surface of pusher sleeve 3g;
Pressure ring feed mechanism 7, the structure of sealing ring feed mechanism 8 are identical as zinc set feed mechanism 3.
First cylinder slide unit 3c is the uniaxial single pole cylinder slide unit being oriented to by guide rail and guide groove, and the second cylinder slide unit 3d is
The uniaxial single pole cylinder slide unit being oriented to by guide post and guide sleeve, first straight line driver 3e is twin shaft double-rod cylinder, push-in
Plug 3f is general quick plug, and push-in plug 3f is suitable for being rapidly inserted into the inner ring of zinc set 1a and by its clamping;
When work, zinc set 1a is continuously transferred on loading guide 3a by vibrating disk, and zinc covers 1a in vibration motor 3b
Under the action of be moved to loading guide 3a close to one end of ten station index dials 2, then the first cylinder slide unit 3c task driven
Two cylinder slide unit 3d are moved to the surface of loading guide 3a discharge end, and then first straight line driver 3e task driven is push-in
Plug 3f stretches out below pusher sleeve 3g, then the push-in plug 3f and pusher sleeve 3g of the second cylinder slide unit 3d task driven
Synchronous decline, push-in plug 3f are inserted into the inner ring of zinc set 1a and by its clampings, and then the second cylinder slide unit 3d resets, and first
Cylinder slide unit 3c task driven the second cylinder slide unit 3d is moved to the surface of positioning column 2c, the second cylinder slide unit 3d task driven
Push-in plug 3f and pusher sleeve 3g is moved down so that zinc set 1a is inserted on positioning column 2c and the bottom of pusher sleeve 3g
Face is connected on the top surface of zinc set 1a, and subsequent first straight line driver 3e resets so that push-in plug 3f returns to pusher sleeve 3g
Inside, zinc set 1a can not be moved by pusher sleeve 3g fixation, so that zinc set 1a is detached from push-in plug 3f and is clamped on
On positioning column 2c.
Testing agency 4 includes optoelectronic switch bracket 4a and optoelectronic switch 4b, and optoelectronic switch bracket 4a tips upside down on positioning column
The surface of 2c, optoelectronic switch 4b are fixedly mounted on optoelectronic switch bracket 4a, and the operation interval of optoelectronic switch 4b is located at positioning
The surface of the motion track of column 2c, optoelectronic switch 4b are electrically connected with industrial host;Optoelectronic switch bracket 4a includes riser
4a1, connecting plate 4a2 and diffusing reflection plate 4a3, riser 4a1 and diffusing reflection plate 4a3 are vertically arranged, and connecting plate 4a2 is horizontally disposed,
The both ends of connecting plate 4a2 are separately connected riser 4a1 and diffusing reflection plate 4a3, riser 4a1 and diffusing reflection plate 4a3 is folded in positioning column
The motion track two sides of 2c, optoelectronic switch 4b are fixedly mounted on riser 4a1, and the operative orientation of optoelectronic switch 4b is horizontally toward overflow
Reflecting plate 4a3 setting.
Optoelectronic switch bracket 4a makes its vacantly surface in rotary disk 2a for fixing optoelectronic switch 4b, and positioning column 2c is moved
When dynamic below the operation interval of optoelectronic switch 4b, when work, zinc set 1a, pressure ring 1c and the sealing ring installed on positioning column 2c
1d sequentially passes through the operation interval of three optoelectronic switch 4b, and optoelectronic switch 4b is the electric switch that diffuses, and concrete model is platform nation
TB12J-D15N1, zinc cover the middle line of optoelectronic switch 4b height and zinc set 1a between feed mechanism 3 and spring leaf feed mechanism 5
Concordantly, the optoelectronic switch 4b height between pressure ring feed mechanism 7 and sealing ring feed mechanism 8 is concordant with the middle line of pressure ring 1c, close
Optoelectronic switch 4b height between seal feed mechanism 8 and sorting mechanism 9 is concordant with the middle line of sealing ring 1d, off working state
Under, the optoelectronic switch 4b light issued is reflected to optoelectronic switch 4b, the signal that optoelectronic switch 4b is generated always by diffusing reflection plate 4a3
It is constant, when zinc, which covers 1a, pressure ring 1c or sealing ring 1d, to be passed through between optoelectronic switch 4b and diffusing reflection plate 4a3, optoelectronic switch 4b hair
Light out by zinc set 1a, pressure ring 1c or sealing ring 1d reflection so that optoelectronic switch 4b generate signal change, work
Owner's machine judges whether zinc set 1a, pressure ring 1c or sealing ring 1d have been assembled to according to the signal intensity that optoelectronic switch 4b is issued
Position.
05 includes workbench 5a, cross bar 5b, upright bar 5c, discharge mechanism 5f, step feeder 5g, punching riveting mechanism
5h and receiving mechanism 5i;Workbench 5a is horizontally disposed, and cross bar 5b is horizontally arranged at the side of workbench 5a, and upright bar 5c is vertically-mounted
In the side of workbench 5a, cross bar 5b and upright bar 5c form L bracket, and one end of cross bar 5b and upright bar 5c are solid with workbench 5a
Fixed connection, discharge mechanism 5f are fixedly mounted on the free end of cross bar 5b, and receiving mechanism 5i is fixedly mounted on the free end of upright bar 5c,
Step feeder 5g is fixedly mounted on the feed end of workbench 5a, and punching riveting mechanism 5h is fixedly mounted on going out for workbench 5a
Expect end.
Upstream process is punched strip iron sheet in advance, the interior shape of spring leaf is punched out on strip iron sheet, simultaneously
By the edge ironing of spring leaf, then the strip iron sheet after processing is rolled into a roll to be installed to the working end of discharge mechanism 5f,
Strip iron sheet sets out from discharge mechanism 5f to be sequentially passed through step feeder 5g and is punched the working end of riveting mechanism 5h, then
Wound by receiving mechanism 5i, step feeder 5g by the spring tablet raw material on discharge mechanism 5f towards punching riveting mechanism 5h
Direction conveying, punching riveting mechanism 5h by the pre- punching spring leaf on strip iron sheet be punched and riveting zinc cover 1a in
Portion.
Discharge mechanism 5f includes shaft 5f1 and discharge plate 5f2, and shaft 5f1 is rotatably installed in the hanging of cross bar 5b
End, shaft 5f1 is horizontally disposed, and discharge plate 5f2 is fixedly mounted on shaft 5f1.
Step feeder 5g pulls the forward movement of strip iron sheet, and discharge plate 5f2 rotates on cross bar 5b therewith, from
And blowing.
The both ends of shaft 5f1 are provided with the ring flange for being clamped in the two sides discharge plate 5f2 and being fixedly connected with discharge plate 5f2
5f3。
Ring flange 5f3 is for limiting discharge plate 5f2 moving radially on shaft 5f1.
Cross bar 5b is fixedly installed with servo motor 5f4 and retarder 5f5, servo motor far from discharge mechanism 5f's on one side
The output shaft of 5f4 is sequentially connected by retarder 5f5 and shaft 5f1.
Servo motor 5f4 work drives shaft 5f1 rotation by retarder 5f5, so that discharge plate 5f2 is rotated with
Blowing.
The structure of receiving mechanism 5i is identical as discharge mechanism 5f structure.
Strip iron sheet after receiving mechanism 5i will be punched spring leaf is wound.
It is provided on the top surface workbench 5a below discharge mechanism 5f and is horizontally toward punched the direction riveting mechanism 5h
The material guide 5a1 of extension, step feeder 5g include third cylinder slide unit 5g1, second straight line driver 5g2 and bullet
Reed fixture 5g3, third cylinder slide unit 5g1 are fixedly mounted on workbench 5a and straddle the two sides of material guide 5a1,
The operative orientation of third cylinder slide unit 5g1 is parallel to the length direction of material guide 5a1, and second straight line driver 5g2 is fixed
It is mounted on the work department of third cylinder slide unit 5g1, the operative orientation of second straight line driver 5g2 is arranged straight down, spring leaf
Fixture 5g3 is fixedly mounted on the working end of second straight line driver 5g2.
Strip iron sheet is in material guide 5a1 internal transmission, and the side of material guide 5a1 is for guiding strip iron
The moving direction of skin, when step feeder 5g works, second straight line driver 5g2 driving spring piece fixture 5g3 is moved down
Across the inner ring of strip iron sheet upper spring piece 1b, then third cylinder slide unit 5g1 drives second straight line driver 5g2 towards punching
The direction for cutting out riveting mechanism 5h is mobile, so that strip iron sheet be pullled towards punching riveting mechanism 5h, then second straight line is driven
Dynamic device 5g2 is successively resetted with third cylinder slide unit 5g1 start under together with feeding process.
It is provided on the top surface workbench 5a and is located at the lower section punching riveting mechanism 5h and the horizontally toward direction discharge mechanism 5f
The multiple material gib block 5a2 extended.
Strip iron sheet transmits between the inner wall of material gib block 5a2, and the side wall of material gib block 5a2 is for guiding strip
The moving direction of shape iron sheet.
Being punched riveting mechanism 5h includes column 5h1, top plate 5h2, third linear actuator 5h3, upper mold 5h4 and lower die
5h5, column 5h1 are vertically installed on the top surface of workbench 5a, and top plate 5h2 is horizontally arranged at the top of column 5h1, upper mold 5h4
It can be mounted on to vertical sliding on column 5h1, lower die 5h5 is fixedly mounted on workbench 5a, is provided with under on workbench 5a
The material-dropping hole 5a3 of the punching connection of mould 5h5, third linear actuator 5h3 are fixedly mounted on top plate 5h2, third linear drives
The working end of device 5h3 run through straight down top plate 5h2 and with upper mold 5h4 elastic connection.
Third linear actuator 5h3 is uniaxial single pole cylinder, column 5h1, top plate 5h2, third linear actuator 5h3, on
Mould 5h4 and lower die 5h5 is combined into common press machine, and third linear actuator 5h3 task driven upper mold 5h4 is towards lower die 5h5
Direction it is mobile, the spring leaf 1b on strip iron sheet is punched by the punching of the formed punch and lower die 5h5 of upper mold 5h4,
So that spring leaf 1b passes through material-dropping hole 5a3 and moves down and by riveting in the inside of zinc set 1a.
Being punched riveting mechanism 5h further includes having movable plate 5h6, guide post 5h7, nut 5h8 and spring 5h9, third linear drives
The working end of device 5h3 is fixedly connected with movable plate 5h6, and movable plate 5h6 can be mounted on to vertical sliding on column 5h1, guide post 5h7
It is fixedly mounted on the top of upper mold 5h4, guide post 5h7 is slidably matched through movable plate 5h6 and with movable plate 5h6, and nut 5h8 is solid
Dingan County is on guide post 5h7, and nut 5h8 is located at the one end of movable plate 5h6 far from upper mold 5h4, and spring 5h9 is set in guide post 5h7
On, the both ends of spring 5h9 are connected to respectively on upper mold 5h4 and movable plate 5h6.
Third linear actuator 5h3 task driven movable plate 5h6 is mobile towards the direction of upper mold 5h4, and upper mold 5h4 is in spring
It is moved down under the rebound effect of 5h9, when third linear actuator 5h3 resets, movable plate 5h6 is moved up, and upper mold 5h4 exists
Restore the distance between movable plate 5h6 under the rebound effect of spring 5h9, is pulled open between upper mold 5h4 and movable plate 5h6 to pole
Range line from when, movable plate 5h6 be connected on nut 5h8 stop movement, by guide post 5h7 guide upper mold 5h4 moving direction it is same
When drive upper mold 5h4 movement that can be effectively prevented from third linear actuator 5h3 and generate excessive rush to coiled strip by spring 5h9
Cutting out power causes zinc set 1a to be damaged.
It further include thering is the first guide rod 5d and the second guide rod 5e, the first guide rod 5d and the second equal level of guide rod 5e to set
It sets, the first guide rod 5d is fixedly mounted on the side on workbench 5a and being located at punching riveting mechanism 5h discharge end, the second guiding
Bar 5e is fixedly mounted on the feeding end side on upright bar 5c and being located at receiving mechanism 5i, and the second guide rod 5e is located at the first guide rod
The surface of 5d.
Strip iron sheet be punched out the guiding for passing through the first guide rod 5d and the second guide rod 5e after spring leaf 1b so that
It is wound after transmission direction transformation 180 degree by receiving mechanism 5i.
Spring leaf inspection body 6 includes the 4th cylinder slide unit 6a and close switch 6b, the work of the 4th cylinder slide unit 6a
Direction is arranged straight down, and the work department of the 4th cylinder slide unit 6a is fixedly mounted on close to switch 6b, close to the work of switch 6b
Direction is arranged straight down.
4th cylinder slide unit 6a is twin shaft double-rod cylinder slide unit, and the 4th cylinder slide unit 6a task driven is downward close to switch 6b
It is mobile, it is Shanghai work inductance approach switch LJ12A3-4-Z/BY sensor close to switch 6b, moves down insertion close to switch 6b
Into the inner ring of zinc set 1a and close to spring leaf 1b, sense that spring leaf 1b then sends a signal to industrial host close to switch 6b,
Industrial host judges that spring leaf 1b assembling is qualified, does not issue signal then when incuding close to switch 6b less than spring leaf 1b, industry
The spring leaf 1b assembling of host judgement herein is unqualified.
Sorting mechanism 9 includes discharging platform 9a, baffle 9b and positioning screw 9c, and discharging platform 9a is arranged in ten station index dials
2 side, the face height of discharging platform 9a is concordant with the face height of ten station index dials 2, and one end of baffle 9b can revolve
It is mounted on discharging platform 9a with turning, the free end of baffle 9b is located at the surface of ten station index dials, 2 working face, positioning screw 9c
It is fixedly mounted on discharging platform 9a and positioning screw 9c is connected to the side of baffle 9b.
Zinc set component 1 be completed after as the moving in rotation of rotary disk 2a is to the side of discharging platform 9a, positioning column at this time
2c is located at turn around below the top surface of disk 2a, and zinc, which covers component 1, can not be continued and pushed by subsequent zinc set component 1 by baffle 9b blocking
Onto the working face of discharging platform 9a, to complete to discharge, the side that positioning screw 9c is connected to baffle 9b prevents it from arbitrarily revolving
Turn.
Discharging platform 9a includes discharging plate 9a1, discharging inclined-plane 9a2 and discharge port plate 9a3, and discharging plate 9a1 is close to ten works
Position index dial 2 is arranged, and the height for the plate 9a1 that discharges is concordant with the face height of ten station index dials 2, the height of discharge port plate 9a3
Height of the degree lower than discharging plate 9a1, discharging plate 9a1 and discharge port plate 9a3 are connected by the inclined-plane 9a2 that discharges, and discharge plate 9a1
On be provided with the shaft 9a4 extended straight up and multiple threaded hole 9a5, baffle 9b is rotatably installed on shaft 9a4, fixed
Position screw 9c is fixedly mounted in one of threaded hole 9a5.
Zinc set component 1 is guided by baffle 9b to discharging plate 9a1 after being completed, and then zinc covers component 1 along discharging
Inclined-plane 9a2, which is slided on discharge port plate 9a3, waits staff to collect, and shaft 9a4 is for carrying baffle 9b and can go out
It is rotated on material plate 9a1, positioning screw 9c may be mounted at the rotation angle in any one threaded hole 9a5 so as to adjust baffle 9b
Degree, so that they can work normally.
Sorting mechanism 9 further includes having recycling platform 9d, gas blow pipe 9e, high-pressure pump and solenoid valve, solenoid valve and industrial host
The side of discharging platform 9a is arranged in electrical connection, recycling platform 9d, and recycling platform 9d includes blanking bucket 9d1 and recovering tray 9d2, blanking bucket
The feeding end of 9d1 is close to the setting of ten station index dials 2, the feeding end of recovering tray 9d2 be located at blanking bucket 9d1 discharge end just under
Side, blanking bucket 9d1 are fixedly mounted on recovering tray 9d2, and gas blow pipe 9e is suspended on the top of ten station index dials, 2 working face, blows
The feeding end of the operative orientation of tracheae 9e towards blanking bucket 9d1 are arranged, and gas blow pipe 9e, solenoid valve, high-pressure pump are linked in sequence.
When being marked as underproof station and being moved to the side for recycling platform 9d, industrial host sends a signal to electromagnetism
Valve, solenoid valve are opened, and high-pressure pump output high-pressure gas gives gas blow pipe 9e, gas blow pipe 9e that the zinc on unqualified station is covered component
1 is blown to blanking bucket 9d1, and rejected product is fallen into waiting staff on recovering tray 9d2 by blanking bucket 9d1 and recycled.
The working principle of the invention:
Zinc set 1a is installed to the jig of ten station index dials 2 firstly, zinc covers feed mechanism 3, then ten stations index
Disk 2 rotates so that zinc set 1a successively passes through spring leaf feed mechanism 5, spring leaf inspection body 6, pressure ring feed mechanism 7, sealing ring
Feed mechanism 8 and sorting mechanism 9, spring leaf feed mechanism 5 cover spring leaf 1b riveting inside 1a in zinc, subsequent spring leaf inspection
Whether 6 detection spring piece 1b of mechanism installs in place, and then pressure ring 1c is connected to the zinc set top 1a by pressure ring feed mechanism 7, then
Sealing ring 1d is connected to the top pressure ring 1c by sealing ring feed mechanism 8, is sorted finally by sorting mechanism 9 to finished product,
Middle zinc set 1a by between zinc set feed mechanism 3 and spring leaf feed mechanism 5, pressure ring feed mechanism 7 and sealing ring feeder
Between structure 8, between sealing ring feed mechanism 8 and sorting mechanism 9 when pass through different testing agency 4 respectively and detect zinc set 1a, pressure
Ring 1c and sealing ring 1d whether install in place, when testing agency 4 and spring leaf inspection body 6 detect zinc set 1a, spring leaf 1b,
One in pressure ring 1c and sealing ring 1d when being fitted without in place, testing agency 4 and spring leaf inspection body 6 send a signal to work
Owner's machine, industrial host gives jig number, when the jig is moved to sorting mechanism 9, sorting mechanism 9 by the jig at
Product, which are moved at one, waits staff's recycling, and qualified product is sorted mechanism 9 and is moved to another place's waiting staff's collection.
It is to be understood that above-mentioned specific embodiment is only that presently preferred embodiments of the present invention and institute's application technology are former
Reason.It will be understood by those skilled in the art that various modifications, equivalent replacement, variation etc. can also be done to the present invention.But this
A little transformation, all should be within protection scope of the present invention without departing from spirit of the invention.In addition, present specification and power
Some terms used in sharp claim are not limitation, it is only for convenient for description.
Claims (10)
1. a kind of zinc set component assembles equipment, which is characterized in that include industrial host, ten station index dials (2) and circular ten
Zinc set feed mechanism (3) of station index dial (2) setting, spring leaf feed mechanism (5), spring leaf inspection body (6), on pressure ring
Expect mechanism (7), sealing ring feed mechanism (8), sorting mechanism (9), wherein zinc set feed mechanism (3) and spring leaf feed mechanism
(5) between, between pressure ring feed mechanism (7) and sealing ring feed mechanism (8), sealing ring feed mechanism (8) and sorting mechanism (9)
Between be provided with testing agency (4), ten station index dials (2), zinc set feed mechanism (3), testing agency (4), on spring leaf
Expect that mechanism (5), spring leaf inspection body (6), pressure ring feed mechanism (7), sealing ring feed mechanism (8) and sorting mechanism (9) are equal
It is electrically connected with industrial host.
2. a kind of zinc set component according to claim 1 assembles equipment, which is characterized in that ten station index dials (2) include
There are rotary disk (2a), electric precise turntable (2b), positioning column (2c) and support ring (2d), rotary disk (2a) is fixedly mounted on precision
The rotary shaft of the working end of electrical turntable (2b), electric precise turntable (2b) is vertically arranged, the outer setting on rotary disk (2a)
There are multiple vertical location holes (2a1) for running through rotary disk (2a), positioning column (2c) can be mounted on to vertical sliding location hole (2a1)
Interior, support ring (2d) is arranged around electric precise turntable (2b), and support ring (2d) is located at turn around the underface of disk (2a), support ring
The top surface of (2d) is divided into the first plane (2d1) and the second plane (2d2) of fan ring-shaped, and the height of the first plane (2d1) is higher than
The height of second plane (2d2) passes through chamfered transition between the first plane (2d1) and the second plane (2d2);
Under feeding and installation condition, the bottom end of positioning column (2c) is connected on the first plane (2d1), the top position of positioning column (2c)
Under the top face of rotary disk (2a), discharge status, the bottom end of positioning column (2c) is connected on the second plane (2d2), positioning
The top of column (2c) is located at turn around below the top surface of disk (2a).
3. a kind of zinc set component according to claim 2 assembles equipment, which is characterized in that the top surface of support ring (2d) is arranged
There is annular groove (2d3) of the axis vertical of circular support ring (2d) to lower recess, the bottom end of positioning column (2c) is provided with bottom
The rotary table (2c1) being arranged downward, under working condition, the side of rotary table (2c1) is connected to the edge of annular groove (2d3).
4. a kind of zinc set component according to claim 2 assembles equipment, which is characterized in that the top of positioning column (2c) is arranged
There is chamfering (2c2).
5. a kind of zinc set component according to claim 1 assembles equipment, which is characterized in that zinc covers feed mechanism (3) and includes
There are vibrating disk, loading guide (3a), vibration motor (3b), the first cylinder slide unit (3c), the second cylinder slide unit (3d), first straight line
Driver (3e), push-in plug (3f) and pusher sleeve (3g);
The discharge end of vibrating disk is connected to the feeding end of loading guide (3a), and loading guide (3a) is fixedly mounted on vibration motor
The working end of (3b), the first cylinder slide unit (3c) is horizontally disposed, and the second cylinder slide unit (3d) is vertically arranged, the second cylinder slide unit
(3d) is fixedly mounted on the work department of the first cylinder slide unit (3c), and first straight line driver (3e) and pusher sleeve (3g) are fixed
It is mounted on the work department of the second cylinder slide unit (3d), the operative orientation of first straight line driver (3e) is arranged straight down, fast to insert
Formula plug (3f) is fixedly mounted on the working end of first straight line driver (3e), and pusher sleeve (3g) is set in push-in plug
The outside of (3f);
Under feeding state, the bottom end of push-in plug (3f) is located at the subjacent of pusher sleeve (3g), fast to insert under blanking state
The bottom end of formula plug (3f) is located above the bottom surface of pusher sleeve (3g);
Pressure ring feed mechanism (7), the structure of sealing ring feed mechanism (8) are identical as zinc set feed mechanism (3).
6. a kind of zinc set component according to claim 2 assembles equipment, which is characterized in that testing agency (4) includes light
Electric switch bracket (4a) and optoelectronic switch (4b), optoelectronic switch bracket (4a) tip upside down on the surface of positioning column (2c), and photoelectricity is opened
It closes (4b) to be fixedly mounted on optoelectronic switch bracket (4a), the operation interval of optoelectronic switch (4b) is located at the movement of positioning column (2c)
The surface of track, optoelectronic switch (4b) are electrically connected with industrial host;Optoelectronic switch bracket (4a) includes riser (4a1), connects
Fishplate bar (4a2) and diffusing reflection plate (4a3), riser (4a1) and diffusing reflection plate (4a3) are vertically arranged, and connecting plate (4a2) level is set
It sets, the both ends of connecting plate (4a2) are separately connected riser (4a1) and diffusing reflection plate (4a3), riser (4a1) and diffusing reflection plate (4a3)
The motion track two sides of positioning column (2c) are folded in, optoelectronic switch (4b) is fixedly mounted on riser (4a1), optoelectronic switch (4b)
Operative orientation horizontally toward diffusing reflection plate (4a3) be arranged.
7. a kind of zinc set component according to claim 1 assembles equipment, which is characterized in that spring leaf inspection body (6) packet
It has included the 4th cylinder slide unit (6a) and close to switch (6b), the operative orientation of the 4th cylinder slide unit (6a) is arranged straight down, connects
Nearly switch (6b) is fixedly mounted on the work department of the 4th cylinder slide unit (6a), and the operative orientation close to switch (6b) is set straight down
It sets.
8. a kind of zinc set component according to claim 1 assembles equipment, which is characterized in that sorting mechanism (9) includes out
Expect that the side in ten station index dials (2), discharging platform is arranged in platform (9a), baffle (9b) and positioning screw (9c), discharging platform (9a)
The face height of (9a) is concordant with the face height of ten station index dials (2), and one end of baffle (9b) is rotatably mounted
On discharging platform (9a), the free end of baffle (9b) is located at the surface of ten station index dial (2) working faces, positioning screw (9c)
It is fixedly mounted on discharging platform (9a) and positioning screw (9c) is connected to the side of baffle (9b).
9. a kind of zinc set component according to claim 8 assembles equipment, which is characterized in that discharging platform (9a) includes discharging
The setting of ten station index dials (2) is close in plate (9a1), discharging inclined-plane (9a2) and discharge port plate (9a3), discharging plate (9a1), out
Expect that the height of plate (9a1) is concordant with the face height of ten station index dials (2), the height of discharge port plate (9a3) is lower than discharging
The height of plate (9a1), discharges plate (9a1) and discharge port plate (9a3) is by discharging inclined-plane (9a2) connection, discharges plate (9a1)
On be provided with the shaft (9a4) extended straight up and multiple threaded holes (9a5), baffle (9b) is rotatably installed in shaft
On (9a4), positioning screw (9c) is fixedly mounted in one of threaded hole (9a5).
10. a kind of zinc set component according to claim 1 assembles equipment, which is characterized in that sorting mechanism (9) further includes having
Platform (9d), gas blow pipe (9e), high-pressure pump and solenoid valve are recycled, solenoid valve is electrically connected with industrial host, recycling platform (9d) setting
In the side of discharging platform (9a), recycling platform (9d) includes blanking bucket (9d1) and recovering tray (9d2), the pan feeding of blanking bucket (9d1)
The setting of ten station index dials (2) is close at end, and the feeding end of recovering tray (9d2) is located at the underface of blanking bucket (9d1) discharge end, falls
Charging basket (9d1) is fixedly mounted on recovering tray (9d2), and gas blow pipe (9e) is suspended on the top of ten station index dial (2) working faces,
The feeding end of the operative orientation of gas blow pipe (9e) towards blanking bucket (9d1) is arranged, and gas blow pipe (9e), solenoid valve, high-pressure pump are suitable
Sequence connection.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910786103.8A CN110497194A (en) | 2019-08-23 | 2019-08-23 | A kind of zinc set component assembling equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910786103.8A CN110497194A (en) | 2019-08-23 | 2019-08-23 | A kind of zinc set component assembling equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110497194A true CN110497194A (en) | 2019-11-26 |
Family
ID=68589163
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910786103.8A Pending CN110497194A (en) | 2019-08-23 | 2019-08-23 | A kind of zinc set component assembling equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110497194A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111843435A (en) * | 2020-08-12 | 2020-10-30 | 杭州丰衡机电有限公司 | Automatic stud pressing equipment for assembling and processing case |
CN112059604A (en) * | 2020-09-14 | 2020-12-11 | 靳红艳 | A carousel formula intelligence rigging equipment that is used for tap to fall spiral shell O type circle |
CN115055932A (en) * | 2022-07-01 | 2022-09-16 | 东莞市振亮精密科技有限公司 | Assembling device for automatic switch and fixing piece |
CN117206901A (en) * | 2023-11-07 | 2023-12-12 | 江苏亨昇科技有限公司 | Full-process automatic assembly line |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001030121A (en) * | 1999-07-23 | 2001-02-06 | Toyota Motor Corp | Fastening and pressing-in device |
CN105499991A (en) * | 2016-01-15 | 2016-04-20 | 宁波新邦工具有限公司 | Rotating disc type rapid connector assembling machine |
CN105834740A (en) * | 2016-05-18 | 2016-08-10 | 宁波盛达阳光气动机械有限公司 | Multi-station automatic assembly machine for valve rod sealing rings |
CN206997114U (en) * | 2017-07-10 | 2018-02-13 | 三威塑胶电子(珠海)有限公司 | Product automatic screening equipment |
CN108422193A (en) * | 2018-05-22 | 2018-08-21 | 东莞市宣友机械有限公司 | Bearing automatic assembling |
CN110091168A (en) * | 2019-05-24 | 2019-08-06 | 宁波力品格自动化科技有限公司 | A kind of piston installing mechanism of air spring piston bar assembly |
CN211072549U (en) * | 2019-08-23 | 2020-07-24 | 宁波英特灵气动科技有限公司 | Zinc set subassembly equipment |
-
2019
- 2019-08-23 CN CN201910786103.8A patent/CN110497194A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001030121A (en) * | 1999-07-23 | 2001-02-06 | Toyota Motor Corp | Fastening and pressing-in device |
CN105499991A (en) * | 2016-01-15 | 2016-04-20 | 宁波新邦工具有限公司 | Rotating disc type rapid connector assembling machine |
CN105834740A (en) * | 2016-05-18 | 2016-08-10 | 宁波盛达阳光气动机械有限公司 | Multi-station automatic assembly machine for valve rod sealing rings |
CN206997114U (en) * | 2017-07-10 | 2018-02-13 | 三威塑胶电子(珠海)有限公司 | Product automatic screening equipment |
CN108422193A (en) * | 2018-05-22 | 2018-08-21 | 东莞市宣友机械有限公司 | Bearing automatic assembling |
CN110091168A (en) * | 2019-05-24 | 2019-08-06 | 宁波力品格自动化科技有限公司 | A kind of piston installing mechanism of air spring piston bar assembly |
CN211072549U (en) * | 2019-08-23 | 2020-07-24 | 宁波英特灵气动科技有限公司 | Zinc set subassembly equipment |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111843435A (en) * | 2020-08-12 | 2020-10-30 | 杭州丰衡机电有限公司 | Automatic stud pressing equipment for assembling and processing case |
CN112059604A (en) * | 2020-09-14 | 2020-12-11 | 靳红艳 | A carousel formula intelligence rigging equipment that is used for tap to fall spiral shell O type circle |
CN115055932A (en) * | 2022-07-01 | 2022-09-16 | 东莞市振亮精密科技有限公司 | Assembling device for automatic switch and fixing piece |
CN115055932B (en) * | 2022-07-01 | 2023-11-07 | 东莞市振亮精密科技有限公司 | Assembling device for automatic switch and fixing piece |
CN117206901A (en) * | 2023-11-07 | 2023-12-12 | 江苏亨昇科技有限公司 | Full-process automatic assembly line |
CN117206901B (en) * | 2023-11-07 | 2024-01-19 | 江苏亨昇科技有限公司 | Full-process automatic assembly line |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110497194A (en) | A kind of zinc set component assembling equipment | |
CN108356522A (en) | Hinge arm component automatic assembling machine | |
CN105499995A (en) | Fuel pump production line | |
CN110509054A (en) | A kind of spring leaf feed mechanism of zinc set component assembling equipment | |
CN101956766A (en) | Full-automatic assembling machine of bearing retainer | |
CN106449237A (en) | Toggle switch assembling detection equipment | |
CN114152878B (en) | Motor test equipment | |
CN108405353B (en) | Ball detects sorting unit and method | |
CN217167392U (en) | Automatic assembling equipment for door lock motor | |
CN105758307A (en) | Forging part detection device and method | |
CN206343883U (en) | A kind of mechanism for sorting of bearing assembly machine | |
CN201786946U (en) | Full-automatic assembly machine for bearing keeper | |
CN205448969U (en) | Forge a detection device | |
CN208178908U (en) | Hinge arm component automatic assembling machine | |
CN107599426B (en) | Lipstick cover automatic assembly system and method | |
CN114273913A (en) | Automatic installation machine for automobile seat slide rail screw rod and working method | |
CN210070992U (en) | Be used for NB-iot thing networking product reliability detection device | |
CN212823834U (en) | Automatic assembly line for brake coils | |
CN108747355A (en) | A kind of production system of car horn component Automated assembly | |
CN208628827U (en) | A kind of hydraulic tappet automatic assembly equipment | |
CN211072549U (en) | Zinc set subassembly equipment | |
CN106787486A (en) | Automobile generator rotor assembly equipment | |
CN209124397U (en) | A kind of silver contact detection device switching copper sheet | |
CN106670125A (en) | Pearl feeding-detecting and sorting device | |
CN210967777U (en) | Spring leaf feeding mechanism of zinc set subassembly equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |