CN110454209A - interval tunnel jet fan installation and maintenance platform and installation and maintenance method - Google Patents

interval tunnel jet fan installation and maintenance platform and installation and maintenance method Download PDF

Info

Publication number
CN110454209A
CN110454209A CN201910733331.9A CN201910733331A CN110454209A CN 110454209 A CN110454209 A CN 110454209A CN 201910733331 A CN201910733331 A CN 201910733331A CN 110454209 A CN110454209 A CN 110454209A
Authority
CN
China
Prior art keywords
jet blower
installation
plate
zinc
running tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910733331.9A
Other languages
Chinese (zh)
Inventor
刘亮
秦久运
尚宪贵
张涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Crrc Electromechanical Technology Co ltd
Original Assignee
Suzhou CRRC Construction Engineering Co Ltd
CRRC Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou CRRC Construction Engineering Co Ltd, CRRC Construction Engineering Co Ltd filed Critical Suzhou CRRC Construction Engineering Co Ltd
Priority to CN201910733331.9A priority Critical patent/CN110454209A/en
Publication of CN110454209A publication Critical patent/CN110454209A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F1/00Ventilation of mines or tunnels; Distribution of ventilating currents
    • E21F1/006Ventilation at the working face of galleries or tunnels
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F1/00Ventilation of mines or tunnels; Distribution of ventilating currents
    • E21F1/08Ventilation arrangements in connection with air ducts, e.g. arrangements for mounting ventilators
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F17/00Methods or devices for use in mines or tunnels, not covered elsewhere
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16FSPRINGS; SHOCK-ABSORBERS; MEANS FOR DAMPING VIBRATION
    • F16F15/00Suppression of vibrations in systems; Means or arrangements for avoiding or reducing out-of-balance forces, e.g. due to motion
    • F16F15/02Suppression of vibrations of non-rotating, e.g. reciprocating systems; Suppression of vibrations of rotating systems by use of members not moving with the rotating systems
    • F16F15/04Suppression of vibrations of non-rotating, e.g. reciprocating systems; Suppression of vibrations of rotating systems by use of members not moving with the rotating systems using elastic means

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • General Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Acoustics & Sound (AREA)
  • Aviation & Aerospace Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The invention discloses an interval tunnel jet fan installation and maintenance platform.A concrete platform is arranged at a position needing to install a jet fan in an interval tunnel to divide the interval tunnel into an upper layer and a lower layer of a jet fan installation area and a train passing area; the top plate of the interval tunnel is pre-buried with a person safety rope hook and an equipment lifting hook, the equipment lifting hook is positioned right above an equipment lifting device and a manhole, the jet fan is provided with a shock absorber, the top of the jet fan is lifted on the top plate of the interval tunnel through a steel wire rope, and the bottom of the jet fan is fixedly installed on a concrete platform. Meanwhile, the invention also discloses an installation and maintenance method of the interval tunnel jet fan. The problem of the interval tunnel efflux fan security of suspension type installation and poor stability, installation and maintenance maintain inconvenient is solved.

Description

Running tunnel jet blower installation and repairing platform and installation and repairing method
Technical field
The present invention relates to the installation of urban track traffic underground section tunnel jet blower and operation maintenance field, tools Body is related to a kind of installation and repairing method of the jet blower installation and repairing platform for running tunnel and jet blower.
Background technique
Jet blower is the widely used ventilation equipment in the running tunnel of the undergrounds such as railway traffic engineering, is used to induce Air-flow achievees the purpose that assist section ventilation.
Currently, jet blower is in running tunnel, and it is different with the spatial dimension that can vertically construct in transverse direction according to civil engineering, it adopts There are two types of the mounting means taken.When section local environment position, civil engineering is wider in running tunnel transverse direction boundary of works area, after construction When interval space can meet vehicle gauge requirement, installed using side formula (landing);When running tunnel transverse direction boundary of works area is limited, erect When wider to boundary of works area, installed using ceiling mounting type.
Side formula (landing) installation is usually that basis is reserved on the ground at tunnel wall edge, and jet blower passes through channel steel bracket On the basis of being mounted on, and reinforced in tunnel wall side;Ceiling mounting type installation is to be hung in tunnel top by the fixed branch of chemical anchor bolts Frame, then jet blower is installed on suspension and support.
Since fast running will form Piston Action Wind to train in running tunnel, the frequent of Piston Action Wind disturbs blower itself in addition The vibration of operation is installed compared to side formula (landing), and the safety that ceiling mounting type installs jet blower is poor.Meanwhile ceiling mounting type is installed The vertical clear height in tunnel in section is generally 7m or so where jet blower, the installation to jet blower and the maintenance in operation stage It is all extremely inconvenient with maintenance.
Summary of the invention
Present invention seek to address that ceiling mounting type installation section tunnel jet blower safety and stability is poor, installs and runing The problem of stage maintenance and maintenance inconvenience.
For this purpose, the technical scheme adopted by the invention is as follows: a kind of running tunnel jet blower installation and repairing platform, in section Setting concrete platform is needed to install at the position of jet blower in tunnel, and running tunnel is divided into jet blower installing zone and column Vehicle is provided with equipment hoisting and manhole by area's upper layer and lower layer on the concrete platform, and steps on sky cover board equipped with anti-and be used for Lid closes the equipment hoisting and manhole, ladder is housed in wherein one side wall of the train by area, and ladder steps on sky cover board with anti- Positioned at the same side of running tunnel, climbing bracelet is additionally provided on the side wall of the equipment hoisting and manhole;The running tunnel Top plate on be embedded with personnel safety rope hook and equipment lifting hook, and equipment lifting hook is located at the surface of equipment hoisting and manhole, The jet blower bottom carries damper, and the top of jet blower is lifted on the top plate of running tunnel by wirerope, is penetrated The damper of flow fan bottom is fixedly mounted on concrete platform.
Two pieces of time intervals are fixed with by chemical anchor bolts on the top plate of the running tunnel as a preferred embodiment of the above solution, First zinc-plated junction steel plate of distribution, is welded with the first lifting lug on each first zinc-plated junction steel plate, before the top of jet blower Interval is welded with two the second lifting lugs afterwards, and the first lifting lug, which is connected with the second ipsilateral lifting lug by the same wirerope, to be realized and penetrate The lifting of flow fan, the distance of two the first lifting lugs are greater than the distance of two the second lifting lugs, so that two wirerope are in angle cloth It sets;By chemical anchor bolts fixation, there are four the second zinc-plated connecting plate in rectangular layout, the jet streams on the concrete platform The damper of blower bottom is welded on the second zinc-plated connecting plate.Two by front and back, the top of jet blower is in angle arrangement Oblique pull wirerope is lifted, and bottom is fixedly mounted by four welding positions, wire rope inclined-pulling lifting, to jet blower except perpendicular Histogram to pulling force outside, there are also the component of horizontal direction, and the component of horizontal direction be avoided that jet blower generate it is slight before After shake, the disturbance of Piston Action Wind that fast running in train interval tunnel generates to jet blower can be further decreased, make jet stream Assembling is more solid and reliable;First zinc-plated junction steel plate has antirust function, fixes in conjunction with chemical anchor bolts, service life It is long.
Further preferably, each first zinc-plated junction steel plate equipped with displacement sensor, sensor sensing plate and Sensor mount;The sensor sensing plate is L-shaped, and upper end is welded on the first zinc-plated junction steel plate, and lower end is hanging;Institute Stating sensor mount is the integrated frame surrounded by upper level board, lower horizontal board and side plate, and displacement sensor is inserted from top to bottom On the mounting hole of lower horizontal board and by nut check, upper level board is fixed on the top plate of running tunnel by fastener On, the lower end of displacement sensor is test side and is reserved with initial installation gap between sensor sensing plate, works as displacement sensing When device can't detect the signal of sensor sensing plate, it can be alarmed by the alarm being equipped with.
Meanwhile the invention also discloses a kind of installation and repairing methods of running tunnel jet blower, comprising the following steps:
The first step when civil construction, needs to install and makes concrete platform at the position of jet blower in running tunnel, Running tunnel is divided into jet blower installing zone and train and passes through area's upper layer and lower layer;Equipment is arranged on the concrete platform to hang Dress and manhole, and be equipped with it is anti-step on sky cover board for cover close the equipment hoisting and manhole, pass through the wherein one side wall in area in train Upper installing ladder, and ladder steps on the same side that sky cover board is located at running tunnel with anti-;It is embedded on the top plate of the running tunnel Personnel safety rope hook and equipment lifting hook, and equipment lifting hook is located at the surface of equipment hoisting and manhole;
Two piece of first zinc-plated junction steel plate is fixed on the top of running tunnel by second step by chemical anchor bolts time interval On plate, four the second zinc-plated connecting plates are fixed on concrete platform by chemical anchor bolts in distributed rectangular;
The jet blower that bottom carries damper is transported to coagulation by equipment lifting hook, equipment hoisting and manhole by third step After native platform, the installation climbing bracelet on the side wall of equipment hoisting and manhole, installation personnel is climbed up by ladder and climbing bracelet Concrete platform, while by the safety rope hanging of installation personnel on personnel safety rope hook, then will prevent that stepping on sky cover board covers;
4th step welds the damper of jet blower bottom and four the second zinc-plated connecting plates one by one, meanwhile, each First lifting lug is respectively welded on first zinc-plated junction steel plate, is welded two second in the top time interval of jet blower and is hung Ear, the distances of two the first lifting lugs are greater than the distance of two the second lifting lugs, then with wirerope by the first lifting lug and ipsilateral second Lifting lug connection, which is connected, realizes the lifting of jet blower, and two wirerope after lifting are arranged in angle;Each first plating For zinc junction steel plate equipped with displacement sensor, sensor sensing plate and sensor mount, the sensor sensing plate is in " L " Shape, upper end are welded on the first zinc-plated junction steel plate, and lower end is hanging, and the sensor mount is by upper level board, lower level The integrated frame that plate and side plate surround, displacement sensor are inserted on the mounting hole of lower horizontal board from top to bottom and pass through nut lock Tightly, upper level board is fixed on the top plate of running tunnel by fastener, the lower end of displacement sensor be test side and with sensing Initial installation gap is reserved between device tablet;After the installation is completed, installation personnel leaves coagulation by climbing bracelet and ladder Native platform;
5th step is reported by the alarm of outfit when displacement sensor can't detect the signal of sensor sensing plate When alert, alternatively, repair and maintenance personnel pass through ladder and climbing when tunnel operation stage needing regular maintenance jet blower Bracelet climbs up concrete platform, while by the safety rope hanging of repair and maintenance personnel on personnel safety rope hook, then steps on sky for anti- Cover board covers;After maintenance, repair and maintenance personnel leave concrete platform by climbing bracelet and ladder.
Beneficial effects of the present invention:
(1) running tunnel is divided by upper layer and lower layer by the concrete platform being separately provided, the running tunnel energy after layering Reduce disturbance of the Piston Action Wind of train fast running generation to jet blower;
(2) jet blower bottom carries damper, while the top of jet blower is lifted on running tunnel by wirerope Top plate on, bottom is fixedly mounted on concrete platform, is exclusively used in the limited situation of running tunnel transverse direction boundary of works area, is compared Existing ceiling mounting type installation, stability and safety significantly improve;
(3) for installing with repair and maintenance personnel, concrete platform, equipment lifting hook, equipment hoisting and manhole, ladder And climbing bracelet creates convenient equipment mode of transport and operating space, personnel safety rope hook and anti-sky cover board of stepping on provide work Safety prevention measure when industry.
Detailed description of the invention
Fig. 1 is scheme of installation of the jet blower on running tunnel jet blower installation and repairing platform.
Fig. 2 is the side view after jet blower installation.
Fig. 3 is the welding schematic diagram of jet blower and the second zinc-plated connecting plate.
Fig. 4 is the connection schematic diagram of the second lifting lug and wirerope on jet blower.
Fig. 5 is the scheme of installation of displacement sensor.
Specific embodiment
By way of example and in conjunction with the accompanying drawings, the invention will be further described:
In conjunction with shown in Fig. 1-Fig. 5, a kind of running tunnel jet blower installation and repairing platform needs to pacify in running tunnel 1 It fills and concrete platform 3 is set at the position of jet blower 2.Running tunnel 1 is divided into jet blower installing zone 1a by concrete platform 3 With train by area 1b upper layer and lower layer, upper layer is for installing jet blower, and lower layer is for train passage.
Be provided with equipment hoisting and manhole on concrete platform 3, and equipped with it is anti-step on sky cover board 4 for cover conjunction equipment hoisting And manhole.In train by being equipped with ladder 5 in the wherein one side wall of area 1b, ladder 5 and anti-step on sky cover board 4 and be located at running tunnel Climbing bracelet 6 is additionally provided on the side wall of the same side, equipment hoisting and manhole.
It is embedded with personnel safety rope hook 7 on the top plate of running tunnel 1 and equipment lifting hook 8, equipment lifting hook 8 are hung positioned at equipment The surface of dress and manhole.2 bottom of jet blower carries damper 2a, and the top of jet blower 2 is lifted on area by wirerope 9 Between tunnel 1 top plate on, the damper 2a of 2 bottom of jet blower is fixedly mounted on concrete platform 3.
Preferably, the first zinc-plated of two pieces of time intervals distribution is fixed with by chemical anchor bolts on the top plate of running tunnel 1 Junction steel plate 10 is welded with the first lifting lug on each first zinc-plated junction steel plate 10.The top time interval of jet blower 2 is welded There are two the second lifting lug, the first lifting lug, which is connected with the second ipsilateral lifting lug by same wirerope 9, realizes hanging for jet blower 2 Dress.The distance of two the first lifting lugs is greater than the distance of two the second lifting lugs, so that two wirerope 9 are arranged in angle.
By chemical anchor bolts fixation, there are four the second zinc-plated connecting plate 11 in rectangular layout, jet streams on concrete platform 3 The bottom vibration absorber 2a of blower 2 is welded on the second zinc-plated connecting plate 11.
Each first zinc-plated junction steel plate 10 is equipped with displacement sensor 12, sensor sensing plate 13 and sensor mount 14.Sensor sensing plate 13 is L-shaped, and upper end is welded on the first zinc-plated junction steel plate 10, and lower end is hanging.Sensor mount 14 be the integrated frame surrounded by upper level board, lower horizontal board and side plate.Displacement sensor 12 is inserted into lower level from top to bottom On the mounting hole of plate and by nut check, upper level board is fixed on the top plate of running tunnel 1 by fastener, displacement sensing The lower end of device 12 is test side and is reserved with initial installation gap between sensor sensing plate 13, installs displacement sensor 12 Before, it is first put into ranging standard cushion plate 15 on sensor sensing plate 13, lower end and the ranging standard pad of displacement sensor 12 are installed The fitting of plate 15 indicates to be installed in place, and installation is moved back except ranging standard cushion plate 15.
When displacement sensor 12 can't detect the signal of sensor sensing plate 13, show the first zinc-plated junction steel plate 10 with Gap between 1 top plate of running tunnel is more than setting value, and jet blower stability reduces, and can be reported by the alarm being equipped with It is alert.
A kind of installation and repairing method of running tunnel jet blower, comprising the following steps:
When civil construction, it is flat to need to install in running tunnel 1 production concrete at the position of jet blower 2 for the first step Running tunnel 1 is divided into jet blower installing zone 1a and train and passes through area 1b upper layer and lower layer by platform 3;It is arranged on concrete platform 3 Equipment hoisting and manhole, and be equipped with it is anti-step on sky cover board 4 for cover close equipment hoisting and manhole, pass through wherein the one of area 1b in train Ladder 5 is installed on side wall, and ladder 5 steps on the same side that sky cover board 4 is located at running tunnel with anti-;It is pre- on the top plate of running tunnel 1 It is embedded with personnel safety rope hook 7 and equipment lifting hook 8, and equipment lifting hook 8 is located at the surface of equipment hoisting and manhole.
Two piece of first zinc-plated junction steel plate 10 is fixed on running tunnel 1 by chemical anchor bolts time interval by second step Top plate on, four the second zinc-plated connecting plates 11 are fixed on concrete platform 3 by chemical anchor bolts in distributed rectangular.
The jet blower 2 that bottom carries damper 2a is transported to by third step by equipment lifting hook 8, equipment hoisting and manhole After concrete platform 3, the installation climbing bracelet 6 on the side wall of equipment hoisting and manhole, installation personnel passes through ladder 5 and climbing hand Ring 6 climbs up concrete platform 3, while by the safety rope hanging of installation personnel on personnel safety rope hook 7, then steps on sky cover board for anti- 4 cover.Jet blower 2 is transported to after concrete platform 3, climbing bracelet 6 is installed again, is avoided that in hoisting process that jet blower 2 is knocked Touch climbing bracelet 6.
4th step welds the bottom vibration absorber 2a of jet blower 2 and four the second zinc-plated connecting plates 11 one by one, meanwhile, First lifting lug is respectively welded on each first zinc-plated junction steel plate 10, welds two in the top time interval of jet blower 2 A second lifting lug, the distance of two the first lifting lugs are greater than the distance of two the second lifting lugs, then with wirerope 9 by the first lifting lug and together The second lifting lug connection of side, which is connected, realizes the lifting of jet blower 2, and two wirerope 9 after lifting are arranged in angle.
Each first zinc-plated junction steel plate 10 is equipped with displacement sensor 12, sensor sensing plate 13 and sensor mount 14.Sensor sensing plate 13 is L-shaped, and upper end is welded on the first zinc-plated junction steel plate 10, and lower end is hanging.Sensor mount 14 be the integrated frame surrounded by upper level board, lower horizontal board and side plate.Displacement sensor 12 is inserted into lower level from top to bottom On the mounting hole of plate and by nut check, upper level board is fixed on the top plate of running tunnel 1 by fastener.Displacement sensing The lower end of device 12 is test side and is reserved with initial installation gap between sensor sensing plate 13;After the installation is completed, people is installed Member leaves concrete platform 3 by climbing bracelet 6 and ladder 5.
5th step, when displacement sensor 12 can't detect the signal of sensor sensing plate 13, by the alarm of outfit into When row alarm, alternatively, repair and maintenance personnel pass through ladder 5 when tunnel operation stage needing regular maintenance jet blower 2 Concrete platform 3 is climbed up with climbing bracelet 6, while by the safety rope hanging of repair and maintenance personnel on personnel safety rope hook 7, then It will prevent that stepping on sky cover board 4 covers.
When being overhauled for the signal that displacement sensor 12 can't detect sensor sensing plate 13, pass through new chemical anchors Gap between first zinc-plated junction steel plate 10 and 1 top plate of running tunnel is adjusted to zero by bolt;After maintenance, repair and maintenance people Member leaves concrete platform 3 by climbing bracelet 6 and ladder 5.

Claims (4)

1. a kind of running tunnel jet blower installation and repairing platform, it is characterised in that: need to install jet stream in running tunnel (1) Running tunnel (1) is divided into jet blower installing zone (1a) by setting concrete platform (3) at the position of blower (2) and train passes through Area (1b) upper layer and lower layer are provided with equipment hoisting and manhole on the concrete platform (3), and step on sky cover board (4) equipped with anti- The equipment hoisting and manhole are closed for covering, ladder (5) are housed in wherein one side wall of the train by area (1b), and ladder (5) the same side that sky cover board (4) is located at running tunnel is stepped on anti-, be additionally provided with climbing on the side wall of the equipment hoisting and manhole Bracelet (6);Personnel safety rope hook (7) and equipment lifting hook (8) are embedded on the top plate of the running tunnel (1), and equipment is hung Hook (8) is located at the surface of equipment hoisting and manhole, and the bottom of the jet blower (2) carries damper (2a), jet blower (2) top is lifted on the top plate of running tunnel (1) by wirerope (9), and the damper (2a) of jet blower (2) bottom is solid Dingan County is on concrete platform (3).
2. running tunnel jet blower installation and repairing platform described in accordance with the claim 1, it is characterised in that: the running tunnel (1) on top plate by chemical anchor bolts be fixed with two pieces of time intervals distribution the first zinc-plated junction steel plate (10), each first The first lifting lug is welded on zinc-plated junction steel plate (10), the top time interval of jet blower (2) is welded with two the second lifting lugs, First lifting lug and the second ipsilateral lifting lug are connected by the same wirerope (9) realizes the lifting of jet blower (2), two the The distance of one lifting lug is greater than the distance of two the second lifting lugs, so that two wirerope (9) are arranged in angle;The concrete platform (3) by chemical anchor bolts fixation, there are four the second zinc-plated connecting plate (11) in rectangular layout, jet blower (2) bottoms on Damper (2a) be welded on the second zinc-plated connecting plate (11).
3. running tunnel jet blower installation and repairing platform according to claim 2, it is characterised in that: each described first Zinc-plated junction steel plate (10) is equipped with displacement sensor (12), sensor sensing plate (13) and sensor mount (14);It is described Sensor sensing plate (13) is L-shaped, and upper end is welded on the first zinc-plated junction steel plate (10), and lower end is hanging;The sensor Mounting rack (14) is the integrated frame surrounded by upper level board, lower horizontal board and side plate, and displacement sensor (12) is inserted from top to bottom On the mounting hole of lower horizontal board and by nut check, upper level board is fixed on the top of running tunnel (1) by fastener On plate, the lower end of displacement sensor (12) is reserved with for test side and between sensor sensing plate (13) initial installation gap, When displacement sensor (12) can't detect the signal of sensor sensing plate (13), can be alarmed by the alarm being equipped with.
4. a kind of installation and repairing method of running tunnel jet blower, which comprises the following steps:
The first step, when civil construction, production concrete is flat at the position that needs to install jet blower (2) in running tunnel (1) Running tunnel (1) is divided into jet blower installing zone (1a) and train and passes through area (1b) upper layer and lower layer by platform (3);In the coagulation Equipment hoisting and manhole are set on native platform (3), and be equipped with it is anti-step on sky cover board (4) for cover the conjunction equipment hoisting and manhole, In train by installing ladder (5) in the wherein one side wall of area (1b), and ladder (5) and anti-step on sky cover board (4) and be located at section tunnel The same side in road;Personnel safety rope hook (7) and equipment lifting hook (8), and equipment are embedded on the top plate of the running tunnel (1) Suspension hook (8) is located at the surface of equipment hoisting and manhole;
Two piece of first zinc-plated junction steel plate (10) is fixed on running tunnel (1) by chemical anchor bolts time interval by second step Top plate on, four the second zinc-plated connecting plates (11) are fixed on concrete platform (3) in distributed rectangular by chemical anchor bolts On;
Third step transports the jet blower (2) that bottom carries damper (2a) by equipment lifting hook (8), equipment hoisting and manhole To after concrete platform (3), installation climbing bracelet (6) on the side wall of equipment hoisting and manhole, installation personnel passes through ladder (5) It is climbed up concrete platform (3) with climbing bracelet (6), while by the safety rope hanging of installation personnel on personnel safety rope hook (7), It will prevent that stepping on sky cover board (4) covers again;
4th step welds the damper (2a) of jet blower (2) bottom and four the second zinc-plated connecting plates (11), together one by one When, one the first lifting lug of each welding on each first zinc-plated junction steel plate (10), in the top time interval of jet blower (2) Weld two the second lifting lugs, the distances of two the first lifting lugs is greater than the distance of two the second lifting lugs, then with wirerope (9) by first Lifting lug, which connect to be connected with the second ipsilateral lifting lug, realizes the lifting of jet blower (2), and two wirerope (9) after lifting are in folder Angle arrangement;Each first zinc-plated junction steel plate (10) is equipped with displacement sensor (12), sensor sensing plate (13) and passes Sensor mounting rack (14), the sensor sensing plate (13) is L-shaped, and upper end is welded on the first zinc-plated junction steel plate (10), Lower end is hanging, and the sensor mount (14) is the integrated frame surrounded by upper level board, lower horizontal board and side plate, and displacement passes Sensor (12) is inserted on the mounting hole of lower horizontal board from top to bottom and by nut check, and upper level board is fixed by fastener On the top plate of running tunnel (1), the lower end of displacement sensor (12) is for test side and pre- between sensor sensing plate (13) There are initial installation gaps;After the installation is completed, installation personnel leaves concrete platform by climbing bracelet (6) and ladder (5) (3);
5th step, when displacement sensor (12) can't detect the signal of sensor sensing plate (13), by the alarm of outfit into When row alarm, alternatively, repair and maintenance personnel are by climbing when tunnel operation stage needing regular maintenance jet blower (2) Concrete platform (3) are climbed up in terraced (5) and climbing bracelet (6), while by the safety rope hanging of repair and maintenance personnel in personnel safety rope It links up on (7), then will prevent that stepping on sky cover board (4) covers;After maintenance, repair and maintenance personnel pass through climbing bracelet (6) and ladder (5) concrete platform (3) are left.
CN201910733331.9A 2019-08-09 2019-08-09 interval tunnel jet fan installation and maintenance platform and installation and maintenance method Pending CN110454209A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910733331.9A CN110454209A (en) 2019-08-09 2019-08-09 interval tunnel jet fan installation and maintenance platform and installation and maintenance method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910733331.9A CN110454209A (en) 2019-08-09 2019-08-09 interval tunnel jet fan installation and maintenance platform and installation and maintenance method

Publications (1)

Publication Number Publication Date
CN110454209A true CN110454209A (en) 2019-11-15

Family

ID=68485675

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910733331.9A Pending CN110454209A (en) 2019-08-09 2019-08-09 interval tunnel jet fan installation and maintenance platform and installation and maintenance method

Country Status (1)

Country Link
CN (1) CN110454209A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110847946A (en) * 2019-12-24 2020-02-28 山西省交通科技研发有限公司 Mounting bracket and mounting method for jet fan of long and large highway tunnel
CN111550275A (en) * 2020-04-26 2020-08-18 中铁二院工程集团有限责任公司 Unidirectional ventilation system driven by piston wind and control method
CN112554945A (en) * 2020-11-19 2021-03-26 浙江上风高科专风实业股份有限公司 Multi-protection anti-seismic hanging bracket for preventing carrying pole beam from falling
CN116575967A (en) * 2023-05-10 2023-08-11 华能云南滇东能源有限责任公司 Mine ventilation system and device

Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20100038922A (en) * 2008-10-07 2010-04-15 그린컨기술주식회사 Ventilating device of arch type tunnel
JP2013148049A (en) * 2012-01-23 2013-08-01 Panasonic Corp Jet fan falling prediction system
CN203635333U (en) * 2013-12-11 2014-06-11 中铁第四勘察设计院集团有限公司 Metro interval tunnel ventilating dust removal structure
CN204024693U (en) * 2014-07-17 2014-12-17 上虞广通风机有限公司 A kind of tunnel jet blower
CN204060711U (en) * 2014-08-12 2014-12-31 中交隧道工程局有限公司 Single-tube double-layer tunnel structure
CN104500123A (en) * 2014-12-22 2015-04-08 中国葛洲坝集团第三工程有限公司 Rapid ventilation and smoke exhausting device and method for construction period of long-distance tunnel
CN105066862A (en) * 2015-07-15 2015-11-18 招商局重庆交通科研设计院有限公司 Tunnel suspension fan base stability on-line detection method and system based on displacement measurement
KR101587275B1 (en) * 2015-06-08 2016-01-20 (주)맥이앤피 The subway ventilation system having vertical double-layer ventilation structure
CN205401173U (en) * 2015-12-28 2016-07-27 郑真阳 Special ventilation blower of tunnel construction
CN107503961A (en) * 2017-07-21 2017-12-22 天津中隧通风机有限公司 The large fan for tunnel being easily installed
CN207145286U (en) * 2017-08-28 2018-03-27 内蒙古兴泰建设集团有限公司 Large axial flow fan ceiling mounting type mounting bracket
CN207762024U (en) * 2018-01-05 2018-08-24 安徽华铁科技有限公司 A kind of tunnel smoke-discharging and ventilating wind turbine
CN210564612U (en) * 2019-08-09 2020-05-19 苏州中车建设工程有限公司 Interval tunnel jet fan installation and maintenance platform

Patent Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20100038922A (en) * 2008-10-07 2010-04-15 그린컨기술주식회사 Ventilating device of arch type tunnel
JP2013148049A (en) * 2012-01-23 2013-08-01 Panasonic Corp Jet fan falling prediction system
CN203635333U (en) * 2013-12-11 2014-06-11 中铁第四勘察设计院集团有限公司 Metro interval tunnel ventilating dust removal structure
CN204024693U (en) * 2014-07-17 2014-12-17 上虞广通风机有限公司 A kind of tunnel jet blower
CN204060711U (en) * 2014-08-12 2014-12-31 中交隧道工程局有限公司 Single-tube double-layer tunnel structure
CN104500123A (en) * 2014-12-22 2015-04-08 中国葛洲坝集团第三工程有限公司 Rapid ventilation and smoke exhausting device and method for construction period of long-distance tunnel
KR101587275B1 (en) * 2015-06-08 2016-01-20 (주)맥이앤피 The subway ventilation system having vertical double-layer ventilation structure
CN105066862A (en) * 2015-07-15 2015-11-18 招商局重庆交通科研设计院有限公司 Tunnel suspension fan base stability on-line detection method and system based on displacement measurement
CN205401173U (en) * 2015-12-28 2016-07-27 郑真阳 Special ventilation blower of tunnel construction
CN107503961A (en) * 2017-07-21 2017-12-22 天津中隧通风机有限公司 The large fan for tunnel being easily installed
CN207145286U (en) * 2017-08-28 2018-03-27 内蒙古兴泰建设集团有限公司 Large axial flow fan ceiling mounting type mounting bracket
CN207762024U (en) * 2018-01-05 2018-08-24 安徽华铁科技有限公司 A kind of tunnel smoke-discharging and ventilating wind turbine
CN210564612U (en) * 2019-08-09 2020-05-19 苏州中车建设工程有限公司 Interval tunnel jet fan installation and maintenance platform

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110847946A (en) * 2019-12-24 2020-02-28 山西省交通科技研发有限公司 Mounting bracket and mounting method for jet fan of long and large highway tunnel
CN111550275A (en) * 2020-04-26 2020-08-18 中铁二院工程集团有限责任公司 Unidirectional ventilation system driven by piston wind and control method
CN112554945A (en) * 2020-11-19 2021-03-26 浙江上风高科专风实业股份有限公司 Multi-protection anti-seismic hanging bracket for preventing carrying pole beam from falling
CN116575967A (en) * 2023-05-10 2023-08-11 华能云南滇东能源有限责任公司 Mine ventilation system and device
CN116575967B (en) * 2023-05-10 2024-01-26 华能云南滇东能源有限责任公司 Mine ventilation system and device

Similar Documents

Publication Publication Date Title
CN110454209A (en) interval tunnel jet fan installation and maintenance platform and installation and maintenance method
CN109911770B (en) Construction method for hoisting gantry crane
CN201722910U (en) Moveable rail type climbing ladder
CN105297639B (en) Multifunctional hydraulic lifting system and construction method thereof
CN202359510U (en) Multi-functional working vehicle for concrete anti-collision guardrail of bridge
CN210564612U (en) Interval tunnel jet fan installation and maintenance platform
CN208830717U (en) It is a kind of equipped with the concrete climbing apparatus for hanging platform diagonal brace
CN104790300B (en) Set a roof beam in place by a kind of flexible pier platform and its construction method
CN111474887A (en) Building engineering environment monitoring device
CN218706213U (en) Pedestrian bridge structure of belt conveyor
CN110748347A (en) Rapid installation method for ultra-deep vertical shaft equipment
CN106320698A (en) Rotary wall attaching device for high-rise building hydraulic climbing formwork construction
CN205712818U (en) A kind of lightweight integrally assembling staircase
CN213389731U (en) Flexible anti-falling channel for box girder construction of overpass bridge
CN106167214A (en) The girder structures of a kind of traction machine without machine room and installation method
CN208201644U (en) Suspension type safety work hanger
KR102002911B1 (en) Hit and falling prevention system of gangform
CN215107217U (en) Scaffold with safety protection net
CN202250088U (en) Well casing installing worktable
CN211200495U (en) Equipment capable of measuring deep horizontal displacement of side wall of foundation pit by utilizing laser
CN217028982U (en) Mining underground flame retardant air door limiting and interlocking device
KR20130032463A (en) Sliding hinge apparatus for setting segments of suspension bridge of impact type
CN209163623U (en) A kind of construction site Guardwall structures
CN109698482A (en) A kind of suspension type monorail traffic box beam side light cable-laying gear and method
CN213960167U (en) Rail transit elevated section security protection equipment installation component

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 214104 room 301-218, block a, Xidong chuangrong building, No. 78, Danshan Road, anzhen street, Xishan District, Wuxi City, Jiangsu Province

Applicant after: Jiangsu CRRC Urban Development Co.,Ltd.

Applicant after: CRRC CONSTRUCTION ENGINEERING Co.,Ltd.

Address before: 215000 NO.115 Yinsheng Road, Shengpu Town, Suzhou Industrial Park, Jiangsu Province

Applicant before: SUZHOU CHINA VEHICLE CONSTRUCTION ENGINEERING Co.,Ltd.

Applicant before: CRRC CONSTRUCTION ENGINEERING Co.,Ltd.

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20221201

Address after: 226017 Free Seat Office Area, Floor 3, Building 11A, Zilang Science and Technology City, No. 60 Chongzhou Avenue, Nantong, Jiangsu Province (No. A21)

Applicant after: Jiangsu CRRC Electromechanical Technology Co.,Ltd.

Address before: 214104 room 301-218, block a, Xidong chuangrong building, No. 78, Danshan Road, anzhen street, Xishan District, Wuxi City, Jiangsu Province

Applicant before: Jiangsu CRRC Urban Development Co.,Ltd.