CN203635333U - Metro interval tunnel ventilating dust removal structure - Google Patents

Metro interval tunnel ventilating dust removal structure Download PDF

Info

Publication number
CN203635333U
CN203635333U CN201320827005.2U CN201320827005U CN203635333U CN 203635333 U CN203635333 U CN 203635333U CN 201320827005 U CN201320827005 U CN 201320827005U CN 203635333 U CN203635333 U CN 203635333U
Authority
CN
China
Prior art keywords
electrostatic precipitator
dust removal
interlayer
tunnel
ventilation structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201320827005.2U
Other languages
Chinese (zh)
Inventor
熊胜益
徐志恒
张军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Siyuan Survey and Design Group Co Ltd
Southwest Survey and Design Co Ltd of China Railway Siyuan Survey and Design Group Co Ltd
Original Assignee
China Railway Siyuan Survey and Design Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Siyuan Survey and Design Group Co Ltd filed Critical China Railway Siyuan Survey and Design Group Co Ltd
Priority to CN201320827005.2U priority Critical patent/CN203635333U/en
Application granted granted Critical
Publication of CN203635333U publication Critical patent/CN203635333U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Electrostatic Separation (AREA)

Abstract

The utility model discloses a metro interval tunnel ventilating dust removal structure which comprises an interlayer arranged on the top of a tunnel, an electrostatic precipitator arranged in the interlayer, a flushing mechanism and a water collection mechanism, wherein the interlayer is separated into a left end and a right end by a partition wall in the tunnel; the opening direction in each end is parallel to the running direction of locomotives in service in the metro interval tunnel; the electrostatic precipitator can be flushed by the flushing mechanism; the water collection mechanism comprises a draining basin and a draining pump; mud-containing wastewater generated by flushing the electrostatic precipitator flows into the draining basin; the draining pump is arranged in the draining basin, and the water in the draining basin is discharged. The metro interval tunnel ventilating dust removal structure has the advantages that the dust removal cleaning cost is saved, the maintenance is convenient, piston air can be effectively utilized, and extra power is not needed.

Description

A kind of subway sectional tunnel dust removal by ventilation structure
Technical field
The utility model relates to air cleaning process field, is specially a kind of subway sectional tunnel dust removal by ventilation structure.
Background technology
Most of city underground underground interval One's name is legion completely, although can producing piston effect when high-speed cruising in tunnel, train contributes to reduce particle concentration, but due to Piston Action Wind and extraneous actual effect ventilation volume limited, and in running tunnel, exist uncontrollable particle to distribute source, such as train is long-term and the fricative particle of rail, when train driving, tailstock negative pressure is from the higher outside air of piston vent suction dust content, the particle that interval concrete surface weathering produces and some artificial dust producing etc., while causing operator to accumulate over a long period significantly because of running tunnel endoparticle substrate concentration, just can adopt special dedusting washing and cleaning operation, on the one hand, if the dust in tunnel is too large, the particle suspending in air is too many, can allow passenger not feel well.On the other hand, if the dust in tunnel is too many, also can have influence on the degree of getting a clear view of train driver, traffic safety is caused to certain accident potential.Metro operation company mainly adopts extraordinary dedusting cleaning Vehicle (claiming again " track washer "), with the form of annual test, running tunnel is carried out to dedusting cleaning at present, to travel in orbit lower than the speed per hour of 5 kilometers, then complete the flushing work in tunnel by the mode of pressure-air and hydraulic giant combination, though this method can obtain the effect of effective reduction particle concentration, but, there is scavenging period length, expend numerous shortcomings such as ample resources and impact operation in the comparison that seems " heaviness ".
Summary of the invention
The purpose of this utility model is to solve the problems of the technologies described above, provide a kind of and save dedusting cleaning cost, maintenance conveniently, Piston Action Wind can effectively be utilized and without extra power, make full use of the remaining space of tunnel expanding reach (between installing zone, jet blower is used), the subway sectional tunnel dust removal by ventilation structure that dust removal process is effective.
Summary of the invention of the present utility model is that a kind of subway sectional tunnel dust removal by ventilation structure, comprises and be arranged at the interlayer of tunnel top and be arranged at electrostatic precipitator, flushing machine, the Shou Shui mechanism in described interlayer; Described interlayer two ends have opening, and the direction of opening parallels with the direction of traffic of locomotive in service in subway sectional tunnel; Described flushing machine can rinse electrostatic precipitator, and Shou Shui mechanism comprises blowoff basin, draining pump, rinses electrostatic precipitator water and flows into blowoff basin, and draining pump is arranged in blowoff basin, blowoff basin water is discharged.
One of preferred version of the present utility model, the installation clearance between electrostatic precipitator and interlayer, tunnel top is by shutoff, and the dust-contained airflow that enters interlayer can only pass through electrostatic precipitator.
One of preferred version of the present utility model, blowoff basin comprises mud sump, collecting-tank, and mud sump is collected and is rinsed electrostatic precipitator current, and mud sump water flows into collecting-tank completely afterwards, and draining pump is located in collecting-tank.
One of preferred version of the present utility model, in described interlayer, before and after electrostatic precipitator, two sides are respectively equipped with an air pressure determinator, and air pressure determinator is the air pressure of the real time measure electrostatic precipitator two sides respectively, and air pressure determinator and controller are electrically connected.
One of preferred version of the present utility model, draining pump is the submersible sewage pump that carries backwash.
The utility model has the advantage of, simple in structure, effectively to utilize Piston Action Wind and without extra power, make full use of tunnel expanding reach remaining space, dust removal process is effective.
Accompanying drawing explanation
Fig. 1 is the utility model fundamental diagram.
Fig. 2 is the utility model plane.
Fig. 3 is the utility model drawing in side sectional elevation.
Fig. 4 is the utility model profilograph.
In figure: the direction 3 of interlayer 1, electrostatic precipitator 2, locomotive in service, tunnel top 4, draining pump 5, mud sump 6, collecting-tank 7, air pressure determinator 8, Piston Action Wind 9.
The specific embodiment
Below in conjunction with accompanying drawing, the utility model is further described.
Dust removal by ventilation structure comprises and is arranged at the interlayer 1 of tunnel top 4 and is arranged at electrostatic precipitator 2, flushing machine, the Shou Shui mechanism in described interlayer 1; Interlayer 1 two ends have opening, the direction of opening parallels with the direction of traffic 3 of locomotive in service in subway sectional tunnel, be respectively equipped with an air pressure determinator 8 in interior electrostatic precipitator 2 front and back two sides of interlayer 1, air pressure determinator 8 is the air pressure of the real time measure electrostatic precipitator 2 two sides respectively, and air pressure determinator 8 is electrically connected with controller; Installation clearance between electrostatic precipitator 2 and interlayer 1, tunnel top 4 is by shutoff, and the dust-contained airflow (Piston Action Wind 9) that enters interlayer 1 can only pass through electrostatic precipitator 2; Flushing machine can rinse electrostatic precipitator 2, Shou Shui mechanism comprises blowoff basin, draining pump 5, draining pump 5 is for carrying the submersible sewage pump of backwash, blowoff basin comprises mud sump 6, collecting-tank 7, mud sump 6 is collected and is rinsed electrostatic precipitator 2 current, mud sump 6 water flow into collecting-tank 7 completely afterwards, and draining pump 5 is located in collecting-tank 7.
When work, enter the piston air quantity in tunnel expanding reach equipment interlayer 1 by ground iron hoop control simulation softward (being called for short " SES ") calculative determination, calculate the wind area excessively of dedusting panel according to the requirement of electrostatic precipitator filter dirt wind speed, carry out rational lectotype selection, electrostatic precipitator 2 joins with station comprehensive monitoring system, realizes the real-time monitoring and control of equipment.According to gauge and dust collecting process requirement, reasonably determine the interior relevant device of interlayer 1 and the arrangement of pipeline and the structural thickness of interlayer 1 plate, and interlayer 1 structural slab is carried out to structurally waterproof design, interlayer 1 platform arranges dash platform, access path and certain hydraulic gradient, platform surface requires smooth, smooth, and tunnel-side arranges maintenance steel cat ladder.Cross wind area according to the electrostatic precipitator 2 after type selecting, by 2L/m2 configuration wash water amount; Draw the feed pipe of a DN25 as the water-supply source of flushing machine by contiguous station, tubing adopts external galvanized layer plastic-lined steel pipe, and flushing machine washing pressure is by being not less than 0.1Mpa design; In tunnel expanding reach Nei Sheshoushui mechanism, Shou Shui mechanism is divided into two lattice, the first lattice be aim at rinse electrostatic precipitator use mud sump 6, for process rinse after contain mud waste water; The second lattice collecting-tank 7, collecting-tank 7 is collected the waste water after the overflow of mud sump precipitation, utilizes draining pump 5 to discharge after collection.Draining pump 5 adopts the submersible sewage pump that carries backwash, before the each startup of submersible sewage pump, all first carries out backwash, partial product is stored in to the sludge agitation of collecting-tank 7, is then communicated with waste water and gets rid of together; Consider limited space between Close Tunnel, drainpipe is set separately and is unfavorable for that between Close Tunnel, gauge is arranged, therefore by waste water house steward between pump drain pipe access area, utilize interval waste pipe to be expelled to pressure outside waste water well; Real monitoring when the air pressure of electrostatic precipitator 2 two sides is carried out that electrostatic precipitator 2 two sides are provided with air pressure determinator 8, judges whether fault or cleaning of deduster according to the signal of electrostatic precipitator 2 two side air pressure differences feedbacks.
In sum, be only the preferred embodiment of the utility model, do not limit protection domain of the present utility model with this, all equivalences of doing according to the utility model the scope of the claims and description change and modify, within being all the scope that the utility model patent contains.

Claims (5)

1. a subway sectional tunnel dust removal by ventilation structure, is characterized in that: described dust removal by ventilation structure comprises and is arranged at the interlayer of tunnel top and is arranged at electrostatic precipitator, flushing machine, the Shou Shui mechanism in described interlayer; Described interlayer two ends have opening, and the direction of opening parallels with the direction of locomotive in service in subway sectional tunnel; Described flushing machine can rinse electrostatic precipitator, and Shou Shui mechanism comprises blowoff basin, draining pump, rinses electrostatic precipitator water and flows into blowoff basin, and draining pump is arranged in blowoff basin, blowoff basin water is discharged.
2. a kind of subway sectional tunnel dust removal by ventilation structure according to claim 1, is characterized in that: the space between described electrostatic precipitator and interlayer, tunnel top is by shutoff, and the gas that enters interlayer can only pass through electrostatic precipitator.
3. a kind of subway sectional tunnel dust removal by ventilation structure according to claim 1, it is characterized in that: described blowoff basin comprises mud sump, collecting-tank, mud sump is collected and is rinsed electrostatic precipitator current, and mud sump water flows into collecting-tank completely afterwards, and draining pump is located in collecting-tank.
4. a kind of subway sectional tunnel dust removal by ventilation structure according to claim 1, it is characterized in that: in described interlayer, electrostatic precipitator two sides are respectively equipped with an air pressure determinator, air pressure determinator is the air pressure of the real time measure electrostatic precipitator two sides respectively, and air pressure determinator and controller are electrically connected.
5. a kind of subway sectional tunnel dust removal by ventilation structure according to claim 1, is characterized in that: described draining pump is the submersible sewage pump that carries backwash.
CN201320827005.2U 2013-12-11 2013-12-11 Metro interval tunnel ventilating dust removal structure Expired - Lifetime CN203635333U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320827005.2U CN203635333U (en) 2013-12-11 2013-12-11 Metro interval tunnel ventilating dust removal structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320827005.2U CN203635333U (en) 2013-12-11 2013-12-11 Metro interval tunnel ventilating dust removal structure

Publications (1)

Publication Number Publication Date
CN203635333U true CN203635333U (en) 2014-06-11

Family

ID=50866615

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320827005.2U Expired - Lifetime CN203635333U (en) 2013-12-11 2013-12-11 Metro interval tunnel ventilating dust removal structure

Country Status (1)

Country Link
CN (1) CN203635333U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104475252A (en) * 2014-12-04 2015-04-01 佛山市科蓝环保科技股份有限公司 Tunnel air purification device
CN104948216A (en) * 2015-06-04 2015-09-30 浙江海洋学院 Dual-use water draining and air exhausting grill for tunnel
CN110454209A (en) * 2019-08-09 2019-11-15 苏州中车建设工程有限公司 interval tunnel jet fan installation and maintenance platform and installation and maintenance method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104475252A (en) * 2014-12-04 2015-04-01 佛山市科蓝环保科技股份有限公司 Tunnel air purification device
CN104948216A (en) * 2015-06-04 2015-09-30 浙江海洋学院 Dual-use water draining and air exhausting grill for tunnel
CN110454209A (en) * 2019-08-09 2019-11-15 苏州中车建设工程有限公司 interval tunnel jet fan installation and maintenance platform and installation and maintenance method

Similar Documents

Publication Publication Date Title
KR100797057B1 (en) Dust removal system for subway tunnel using mist and air curtain
CN203635333U (en) Metro interval tunnel ventilating dust removal structure
CN201535709U (en) Rain test device for overall rail passenger car
CN103612643B (en) Train washing water process reuse method and device
CN107469592B (en) Subway tunnel air environment purification system and operation method thereof
CN207078132U (en) A kind of Automatic Car Wash
CN102296554A (en) Separable automatic road guardrail wiping machine
CN206012558U (en) A kind of building site vehicle self-stripping system
JP2010188813A (en) Saddle type monorail vehicle
CN203820240U (en) Outdoor self-draining cargo lift
CN208309478U (en) Combined cleaning vehicle
CN206328716U (en) A kind of subway tunnel cleans waterwheel
CN206874284U (en) A kind of motor vehicle and non-motor vehicle and the shield tunnel section arrangement deposited
CN105113447A (en) Dry-wet dual-purpose cleaning and dust absorption vehicle
CN201082706Y (en) Construction site vehicle-washing bench
CN209475861U (en) A kind of mine high-effective dust-removing machine
CN206501831U (en) Intelligent vehicle washing system
CN205706613U (en) A kind of vehicle tyre flushing device
CN206289578U (en) Tunnel cleaning vehicle
CN212619235U (en) Subway ventilation air conditioner drainage device
CN207523666U (en) High Pressure-washing apparatus flusher
CN110241721B (en) Environment-friendly bridge easy to discharge sewage
CN205737450U (en) A kind of vicarious water circulation is from rinsing automobile-washing groove device
CN203417497U (en) Peripheral transmission-type scraping suction dredge
CN205973848U (en) Dregs car cleaning tank

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180522

Address after: 650206 Kunming, Guandu, Yunnan province Guandu town Guangfu Road 5349, Yinhai Cherry Blossom happiness square F

Co-patentee after: CHINA RAILWAY SIYUAN SURVEY AND DESIGN GROUP Co.,Ltd.

Patentee after: CHINA RAILWAY SIYUAN GROUP SOUTHWEST SURVEY AND DESIGN Co.,Ltd.

Address before: 430063 No. 745, Ping Yuan Road, Yangyuan, Wuchang, Wuhan, Hubei

Patentee before: CHINA RAILWAY SIYUAN SURVEY AND DESIGN GROUP Co.,Ltd.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20140611