CN110453766A - A kind of water guiding system making up the water supply neutral gear phase - Google Patents

A kind of water guiding system making up the water supply neutral gear phase Download PDF

Info

Publication number
CN110453766A
CN110453766A CN201910783764.5A CN201910783764A CN110453766A CN 110453766 A CN110453766 A CN 110453766A CN 201910783764 A CN201910783764 A CN 201910783764A CN 110453766 A CN110453766 A CN 110453766A
Authority
CN
China
Prior art keywords
construction
hole
water
water supply
neutral gear
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910783764.5A
Other languages
Chinese (zh)
Inventor
康德忠
陈小华
杨鹏
陈经刚
尹琪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ruipaier (yichang) Technology Group Co Ltd
Original Assignee
Ruipaier (yichang) Technology Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ruipaier (yichang) Technology Group Co Ltd filed Critical Ruipaier (yichang) Technology Group Co Ltd
Priority to CN201910783764.5A priority Critical patent/CN110453766A/en
Publication of CN110453766A publication Critical patent/CN110453766A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03BINSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, OR DISTRIBUTING WATER
    • E03B7/00Water main or service pipe systems
    • E03B7/02Public or like main pipe systems
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures

Abstract

The present invention relates to falling zone Treatment process fields, and disclose a kind of water guiding system for making up the water supply neutral gear phase, include the following steps, early-stage preparations, it is familiar with, examine construction drawing and related design data, firsthand information is investigated and analysed, work out working drawing budget and construction budget, work out Design of Construction Organization, the leading organ of construction project to be built project is established simultaneously, determine construction teams and groups, finally according to Design of Construction Organization, it is required according to construction schedule, by title material, specification, mechanical implement, reserve norm, the norm quota of consumption is summarized, compile material, utensil requirement plan, for material stock, warehouse determines, stack required area and tissue ready for shipment in place.This makes up the water guiding system of water supply neutral gear phase, so that still can persistently be supplied water to plant by water supply network, when in the neutral gear phase that nature supplies water so that plant can continue to the case where maintaining growth, being not in water shortage.

Description

A kind of water guiding system making up the water supply neutral gear phase
Technical field
The present invention relates to falling zone Treatment process field, specially a kind of water guiding system for making up the water supply neutral gear phase.
Background technique
River channel below dams are also known as eat and flow zone or fluctuation area, are reservoir seasonality fluctuation in stage and periphery is made to be submerged soil week Phase property exposure in the region of the water surface, before falling zone is formed, the vegetation for being grown in reservoir area two sides is one of natural ecology screen Barrier plays certain interception and filtering function to the pollution especially agricultural non-point source pollution from library bank, what rainwash carried Quite a few is planted digestion and absorption for nitrogen, phosphorus etc., prevents from entering reservoir area water body.
Because the water level of falling zone, in periodically variation, the natural water supply of the plant on falling zone also will appear The neutral gear phase in order to during making up this neutral gear, while ensureing that plant sustains life in water shortage, need to manually arrange water supply pipe Moisturizing is carried out in water shortage to plant, so propose a kind of water guiding system for making up the water supply neutral gear phase.
Summary of the invention
(1) the technical issues of solving
In view of the deficiencies of the prior art, the present invention provides a kind of water guiding system for making up the water supply neutral gear phase, has confession The advantages that water effect is good solves because the water level of falling zone is in periodically variation, plant on falling zone from So supplying water also will appear the neutral gear phase, in order to during making up this neutral gear, while ensure that plant sustains life in water shortage, need artificial Arrangement water supply pipe comes to plant the problem of water shortage carries out moisturizing.
(2) technical solution
To realize the good purpose of above-mentioned water supply effect, the invention provides the following technical scheme: one kind makes up the water supply neutral gear phase Water guiding system, comprising the following steps:
1) early-stage preparations: it is familiar with, examines that construction drawing and related design data, firsthand information are investigated and analysed, compile Working drawing budget processed and construction budget work out Design of Construction Organization, while establishing the leading organ of construction project to be built project, and determination is applied Work team's group requires finally according to Design of Construction Organization according to construction schedule, by title material, specification, mechanical implement, storage Standby quota, the norm quota of consumption are summarized, and material, utensil requirement plan are compiled, and are material stock, warehouse determination, place heap Put required area and tissue ready for shipment;
2) construction part is cleared up: being cleared up the sundries of job location, is guaranteed personnel safety when cleaning;
3) laying and construction of shuting: laying shuting, and shuting is divide into upper part and lower part, and centre is with without husky concrete Cover board separates, and strictly constructs by excavation position, trend and the depth of design document and design drawing, presses setting-out using pneumatic pick Position and projected depth are slotted, and later period water system preformed hole uses hydraulic drill rig pore-creating;
4) slope retaining: progress anchor pole and the construction of dowel beam, when anchor bolt construction first opens up scupper, is then answered in advance Rock anchor basket is arranged in power anchor bolt construction, specific position incessantly attached for abrupt slope and eco-concrete, finally carries out pneumatically placed concrete and applies Work;
5) drainage hole is constructed: being carried out hole location setting-out using total station and theodolite, hole type is marked with red paint, on side Slope carries out drainage hole construction, and five meters of shallow drainage holes use the guide tracked drill hole of drilling machine of YG40 type, and ten meters of deep drainage holes use YQ100B The drilling of type hidden hole drilling, after the completion of drilling, mounting hole interior protection pipe and orifice protecting device bury drainpipe;
6) water supply network is arranged: the arrangement of water supply network presses longitudinal pitch 1 point 5 meter two, laterally encrypts one side Formula assumes diamond in shape arrangement, and when prefabricated pipeline is laid with, longitudinal pipe connects shuting, at the same as far as possible connection anchor bolt construction when the row that beats The seepage point in water hole and slope surface.
Preferably, for the shuting slot position deviation less than 100 millimeters, groove depth deviation is not more than 50 millimeters.
Preferably, the deviation of the drainage hole plan-position is not more than ten centimetres, and the bank error of drainage hole is not more than 1 percent, drainage hole hole depth error is not more than or less than 2 the percent of hole depth.
(3) beneficial effect
Compared with prior art, the present invention provides a kind of water guiding system for making up the water supply neutral gear phase, having following has Beneficial effect:
1, the water guiding system for making up the water supply neutral gear phase passes through a kind of water guiding system for making up the water supply neutral gear phase, packet Following steps are included, early-stage preparations are familiar with, examine that construction drawing and related design data, firsthand information are investigated and analysed, compile Working drawing budget processed and construction budget work out Design of Construction Organization, while establishing the leading organ of construction project to be built project, and determination is applied Work team's group requires finally according to Design of Construction Organization according to construction schedule, by title material, specification, mechanical implement, storage Standby quota, the norm quota of consumption are summarized, and material, utensil requirement plan are compiled, and are material stock, warehouse determination, place heap Required area and tissue ready for shipment are put, construction part cleaning is then carried out, the sundries of job location is cleared up, Guarantee personnel safety when cleaning, then carry out the laying and construction of shuting, lay shuting, shuting is divided into two up and down Point, centre is separated with without husky concrete cover, stringent to carry out by the excavation position of design document and design drawing, trend and depth Construction, is slotted using pneumatic pick by setting-out position and projected depth, and later period water system preformed hole uses hydraulic drill rig pore-creating, The effect of the sundries such as falling rocks, the silt outside isolation is opened on the top of shuting, and lower part is then used to store secondary water, when in water shortage When, the water in shuting is supplied the plant in slope surface, is guaranteed the required water of plant life, help to plant by aqueduct The growth of object.
2, the water guiding system for making up the water supply neutral gear phase, by slope retaining, progress anchor pole and dowel beam first is constructed, Scupper is opened up when anchor bolt construction, then carry out prestressed anchor construction, it is attached for abrupt slope and eco-concrete incessantly it is special Rock anchor basket is arranged in position, finally carries out shotcrete construction, then carries out drainage hole construction, is carried out using total station and theodolite Hole location setting-out marks hole type with red paint, carries out drainage hole construction in side slope, five meters of shallow drainage holes use YG40 type guide rail Churn drilling, ten meters of deep drainage holes are drilled using YQ100B type hidden hole drilling, after the completion of drilling, mounting hole interior protection pipe and aperture Protective device buries drainpipe, and water supply network is then arranged, and the arrangement of water supply network presses longitudinal pitch 1 point 5 meter two, cross It assumes diamond in shape arrangement to one mode of encryption, when prefabricated pipeline is laid with, longitudinal pipe connects shuting, while connection anchor as far as possible The seepage point of the scupper beaten and slope surface can be held when so that being in the nature water supply neutral gear phase by water supply network when bar is constructed Continue and supply water to plant, so that plant can continue to maintain growth.
Specific embodiment
Below in conjunction with the embodiment of the present invention, technical solution in the embodiment of the present invention is clearly and completely retouched It states, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.Based on the present invention In embodiment, every other implementation obtained by those of ordinary skill in the art without making creative efforts Example, shall fall within the protection scope of the present invention.
A kind of embodiment one: water guiding system making up the water supply neutral gear phase, comprising the following steps:
1) early-stage preparations: it is familiar with, examines that construction drawing and related design data, firsthand information are investigated and analysed, compile Working drawing budget processed and construction budget work out Design of Construction Organization, while establishing the leading organ of construction project to be built project, and determination is applied Work team's group requires finally according to Design of Construction Organization according to construction schedule, by title material, specification, mechanical implement, storage Standby quota, the norm quota of consumption are summarized, and material, utensil requirement plan are compiled, and are material stock, warehouse determination, place heap Put required area and tissue ready for shipment;
2) construction part is cleared up: being cleared up the sundries of job location, is guaranteed personnel safety when cleaning;
3) laying and construction of shuting: laying shuting, and shuting is divide into upper part and lower part, and centre is with without husky concrete Cover board separates, and strictly constructs by excavation position, trend and the depth of design document and design drawing, presses setting-out using pneumatic pick Position and projected depth are slotted, and later period water system preformed hole uses hydraulic drill rig pore-creating;
4) slope retaining: progress anchor pole and the construction of dowel beam, when anchor bolt construction first opens up scupper, is then answered in advance Rock anchor basket is arranged in power anchor bolt construction, specific position incessantly attached for abrupt slope and eco-concrete, finally carries out pneumatically placed concrete and applies Work;
5) drainage hole is constructed: being carried out hole location setting-out using total station and theodolite, hole type is marked with red paint, on side Slope carries out drainage hole construction, and five meters of shallow drainage holes use the guide tracked drill hole of drilling machine of YG40 type, and ten meters of deep drainage holes use YQ100B The drilling of type hidden hole drilling, after the completion of drilling, mounting hole interior protection pipe and orifice protecting device bury drainpipe;
6) water supply network is arranged: the arrangement of water supply network presses longitudinal pitch 1 point 5 meter two, laterally encrypts one side Formula assumes diamond in shape arrangement, and when prefabricated pipeline is laid with, longitudinal pipe connects shuting, at the same as far as possible connection anchor bolt construction when the row that beats The seepage point in water hole and slope surface.
For shuting slot position deviation less than 100 millimeters, groove depth deviation is not more than 50 millimeters.
The deviation of drainage hole plan-position is not more than ten centimetres, and the bank error of drainage hole is not more than 1 percent, row Water hole hole depth error is not more than or less than 2 the percent of hole depth.
A kind of embodiment two: water guiding system making up the water supply neutral gear phase, comprising the following steps:
1) early-stage preparations: it is familiar with, examines that construction drawing and related design data, firsthand information are investigated and analysed, compile Working drawing budget processed and construction budget work out Design of Construction Organization, while establishing the leading organ of construction project to be built project, and determination is applied Work team's group requires finally according to Design of Construction Organization according to construction schedule, by title material, specification, mechanical implement, storage Standby quota, the norm quota of consumption are summarized, and material, utensil requirement plan are compiled, and are material stock, warehouse determination, place heap Put required area and tissue ready for shipment;
2) construction part is cleared up: being cleared up the sundries of job location, is guaranteed personnel safety when cleaning;
3) laying and construction of shuting: laying shuting, and shuting is divide into upper part and lower part, and centre is with without husky concrete Cover board separates, and strictly constructs by excavation position, trend and the depth of design document and design drawing, presses setting-out using pneumatic pick Position and projected depth are slotted, and later period water system preformed hole uses hydraulic drill rig pore-creating;
4) slope retaining: progress anchor pole and the construction of dowel beam, when anchor bolt construction first opens up scupper, is then answered in advance Rock anchor basket is arranged in power anchor bolt construction, specific position incessantly attached for abrupt slope and eco-concrete, finally carries out pneumatically placed concrete and applies Work;
5) drainage hole is constructed: being carried out hole location setting-out using total station and theodolite, hole type is marked with red paint, on side Slope carries out drainage hole construction, and five meters of shallow drainage holes use the guide tracked drill hole of drilling machine of YG40 type, and ten meters of deep drainage holes use YQ100B The drilling of type hidden hole drilling, after the completion of drilling, mounting hole interior protection pipe and orifice protecting device bury drainpipe;
6) water supply network is arranged: the arrangement of water supply network presses longitudinal pitch 1 point 5 meter two, laterally encrypts one side Formula assumes diamond in shape arrangement, and when prefabricated pipeline is laid with, longitudinal pipe connects shuting, at the same as far as possible connection anchor bolt construction when the row that beats The seepage point in water hole and slope surface.
For shuting slot position deviation less than 50 millimeters, groove depth deviation is not more than 50 millimeters.
The deviation of drainage hole plan-position is not more than ten centimetres, and the bank error of drainage hole is not more than 1 percent, row Water hole hole depth error is not more than or less than 2 the percent of hole depth.
A kind of embodiment three: water guiding system making up the water supply neutral gear phase, comprising the following steps:
1) early-stage preparations: it is familiar with, examines that construction drawing and related design data, firsthand information are investigated and analysed, compile Working drawing budget processed and construction budget work out Design of Construction Organization, while establishing the leading organ of construction project to be built project, and determination is applied Work team's group requires finally according to Design of Construction Organization according to construction schedule, by title material, specification, mechanical implement, storage Standby quota, the norm quota of consumption are summarized, and material, utensil requirement plan are compiled, and are material stock, warehouse determination, place heap Put required area and tissue ready for shipment;
2) construction part is cleared up: being cleared up the sundries of job location, is guaranteed personnel safety when cleaning;
3) laying and construction of shuting: laying shuting, and shuting is divide into upper part and lower part, and centre is with without husky concrete Cover board separates, and strictly constructs by excavation position, trend and the depth of design document and design drawing, presses setting-out using pneumatic pick Position and projected depth are slotted, and later period water system preformed hole uses hydraulic drill rig pore-creating;
4) slope retaining: progress anchor pole and the construction of dowel beam, when anchor bolt construction first opens up scupper, is then answered in advance Rock anchor basket is arranged in power anchor bolt construction, specific position incessantly attached for abrupt slope and eco-concrete, finally carries out pneumatically placed concrete and applies Work;
5) drainage hole is constructed: being carried out hole location setting-out using total station and theodolite, hole type is marked with red paint, on side Slope carries out drainage hole construction, and five meters of shallow drainage holes use the guide tracked drill hole of drilling machine of YG40 type, and ten meters of deep drainage holes use YQ100B The drilling of type hidden hole drilling, after the completion of drilling, mounting hole interior protection pipe and orifice protecting device bury drainpipe;
6) water supply network is arranged: the arrangement of water supply network presses longitudinal pitch 1 point 5 meter two, laterally encrypts one side Formula assumes diamond in shape arrangement, and when prefabricated pipeline is laid with, longitudinal pipe connects shuting, at the same as far as possible connection anchor bolt construction when the row that beats The seepage point in water hole and slope surface.
For shuting slot position deviation less than 100 millimeters, groove depth deviation is not more than 50 millimeters.
The deviation of drainage hole plan-position is not more than 15 centimetres, and the bank error of drainage hole is not more than 1 percent, Drainage hole hole depth error is not more than or less than 2 the percent of hole depth.
The beneficial effects of the present invention are: this makes up the water guiding system of water supply neutral gear phase, water supply neutral gear is made up by one kind The water guiding system of phase, includes the following steps, early-stage preparations, is familiar with, examines construction drawing and related design data, original money Material is investigated and analysed, and working drawing budget and construction budget are worked out, and works out Design of Construction Organization, while establishing construction project to be built project Leading organ, determine construction teams and groups required finally according to Design of Construction Organization according to construction schedule, by title material, Specification, mechanical implement, reserve norm, the norm quota of consumption are summarized, and material, utensil requirement plan are compiled, be material stock, Area and tissue ready for shipment needed for warehouse is determining, place is stacked, then carry out construction part cleaning, to job location Sundries cleared up, guarantee cleaning when personnel safety, then carry out shuting laying and construction, lay shuting, cut Sink is divide into upper part and lower part, and centre is separated with without husky concrete cover, the stringent excavation position by design document and design drawing It sets, move towards and depth is constructed, slotted using pneumatic pick by setting-out position and projected depth, later period water system preformed hole Using hydraulic drill rig pore-creating, the effect of the sundries such as falling rocks, the silt outside isolation is opened on the top of shuting, and lower part is then used to store up Secondary water is deposited, in water shortage, the water in shuting supplies the plant in slope surface, guarantee plant life by aqueduct Required water facilitates the growth of plant, and by slope retaining, progress anchor pole and the construction of dowel beam first, when anchor bolt construction are opened If scupper, prestressed anchor construction is then carried out, rock anchor is arranged in specific position incessantly attached for abrupt slope and eco-concrete Basket finally carries out shotcrete construction, then carries out drainage hole construction, carries out hole location setting-out using total station and theodolite, uses Red paint marks hole type, carries out drainage hole construction in side slope, and five meters of shallow drainage holes use the guide tracked drill hole of drilling machine of YG40 type, Ten meters of deep drainage holes are drilled using YQ100B type hidden hole drilling, and after the completion of drilling, mounting hole interior protection pipe and orifice protecting device are buried If drainpipe, then water supply network is set, the arrangement of water supply network presses longitudinal pitch 1 point 5 meter two, laterally encrypts one Mode assumes diamond in shape arrangement, when prefabricated pipeline is laid with, longitudinal pipe connects shuting, at the same as far as possible connection anchor bolt construction when beat The seepage point of scupper and slope surface when so that being in the nature water supply neutral gear phase, can be carried out persistently to plant by water supply network It supplies water, so that plant can continue to maintain growth, solves because the water level of falling zone is fallen in periodically variation disappearing The natural water supply of the plant taken also will appear the neutral gear phase, in order to during making up this neutral gear, while ensure plant in water shortage It sustains life, need to manually arrange that water supply pipe comes to plant the problem of water shortage carries out moisturizing.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding And modification, the scope of the present invention is defined by the appended.

Claims (3)

1. a kind of water guiding system for making up the water supply neutral gear phase, which comprises the following steps:
1) early-stage preparations: it is familiar with, examines that construction drawing and related design data, firsthand information are investigated and analysed, establishment is applied The budget of work figure and construction budget work out Design of Construction Organization, while establishing the leading organ of construction project to be built project, determine construction class Group requires finally according to Design of Construction Organization according to construction schedule, fixed by title material, specification, mechanical implement, deposit Volume, the norm quota of consumption are summarized, and material, utensil requirement plan are compiled, and stack institute for material stock, warehouse determination, place The area and tissue ready for shipment needed;
2) construction part is cleared up: being cleared up the sundries of job location, is guaranteed personnel safety when cleaning;
3) laying and construction of shuting: laying shuting, and shuting is divide into upper part and lower part, and centre is with without husky concrete cover It separates, strictly constructs by excavation position, trend and the depth of design document and design drawing, setting-out position is pressed using pneumatic pick It slots with projected depth, later period water system preformed hole uses hydraulic drill rig pore-creating;
4) slope retaining: progress anchor pole and the construction of dowel beam, when anchor bolt construction first opens up scupper, then carries out prestressed anchor Bar construction, specific position incessantly attached for abrupt slope and eco-concrete are arranged rock anchor basket, finally carry out shotcrete construction;
5) drainage hole is constructed: hole location setting-out is carried out using total station and theodolite, marks hole type with red paint, side slope into The construction of row drainage hole, five meters of shallow drainage holes use the guide tracked drill hole of drilling machine of YG40 type, and ten meters of deep drainage holes are latent using YQ100B type Hole drill drilling, after the completion of drilling, mounting hole interior protection pipe and orifice protecting device bury drainpipe;
6) water supply network is arranged: the arrangement of water supply network presses longitudinal pitch 1 point 5 meter two, and laterally the mode of encryption one is in Diamond shape arrangement, when prefabricated pipeline is laid with, longitudinal pipe connects shuting, at the same as far as possible connection anchor bolt construction when the scupper beaten With the seepage point of slope surface.
2. a kind of water guiding system for making up the water supply neutral gear phase according to claim 1, it is characterised in that: the shuting For slot position deviation less than 100 millimeters, groove depth deviation is not more than 50 millimeters.
3. a kind of water guiding system for making up the water supply neutral gear phase according to claim 1, it is characterised in that: the drainage hole The deviation of plan-position is not more than ten centimetres, and the bank error of drainage hole is not more than 1 percent, and drainage hole hole depth error is not More than or less than 2 the percent of hole depth.
CN201910783764.5A 2019-08-23 2019-08-23 A kind of water guiding system making up the water supply neutral gear phase Pending CN110453766A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910783764.5A CN110453766A (en) 2019-08-23 2019-08-23 A kind of water guiding system making up the water supply neutral gear phase

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910783764.5A CN110453766A (en) 2019-08-23 2019-08-23 A kind of water guiding system making up the water supply neutral gear phase

Publications (1)

Publication Number Publication Date
CN110453766A true CN110453766A (en) 2019-11-15

Family

ID=68488790

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910783764.5A Pending CN110453766A (en) 2019-08-23 2019-08-23 A kind of water guiding system making up the water supply neutral gear phase

Country Status (1)

Country Link
CN (1) CN110453766A (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100720929B1 (en) * 2006-11-15 2007-05-23 (주)리종합건축사사무소 Equipment for intercepting sliding of slope inapartment house
CN105544562A (en) * 2015-11-27 2016-05-04 中铁三局集团天津建设工程有限公司 Jet anchor net protection construction process for renovating rock heaps on high and steep slope
CN208136927U (en) * 2018-03-19 2018-11-23 中建三局基础设施建设投资有限公司 A kind of soil cutting side slope supporting construction
CN208724479U (en) * 2018-07-31 2019-04-12 瑞派尔(宜昌)科技集团有限责任公司 Steep slight slope falling zone height plants ecological management structural body in one kind
CN208821291U (en) * 2018-08-27 2019-05-07 重庆大学产业技术研究院 A kind of adaptive vegetation maintenance and slope drainage multi-function device
CN109853590A (en) * 2019-01-23 2019-06-07 昆明理工大学 A kind of device and construction method using rainfall infiltration steep rocky slope slope surface soil moved in improve the original base
CN208965501U (en) * 2018-08-03 2019-06-11 深圳文科园林股份有限公司 One kind being used for high precipitous rock slope Ecosystem restoration system
CN210659957U (en) * 2019-07-24 2020-06-02 瑞派尔(宜昌)科技集团股份有限公司 Anchor rod drilling equipment for slope support

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100720929B1 (en) * 2006-11-15 2007-05-23 (주)리종합건축사사무소 Equipment for intercepting sliding of slope inapartment house
CN105544562A (en) * 2015-11-27 2016-05-04 中铁三局集团天津建设工程有限公司 Jet anchor net protection construction process for renovating rock heaps on high and steep slope
CN208136927U (en) * 2018-03-19 2018-11-23 中建三局基础设施建设投资有限公司 A kind of soil cutting side slope supporting construction
CN208724479U (en) * 2018-07-31 2019-04-12 瑞派尔(宜昌)科技集团有限责任公司 Steep slight slope falling zone height plants ecological management structural body in one kind
CN208965501U (en) * 2018-08-03 2019-06-11 深圳文科园林股份有限公司 One kind being used for high precipitous rock slope Ecosystem restoration system
CN208821291U (en) * 2018-08-27 2019-05-07 重庆大学产业技术研究院 A kind of adaptive vegetation maintenance and slope drainage multi-function device
CN109853590A (en) * 2019-01-23 2019-06-07 昆明理工大学 A kind of device and construction method using rainfall infiltration steep rocky slope slope surface soil moved in improve the original base
CN210659957U (en) * 2019-07-24 2020-06-02 瑞派尔(宜昌)科技集团股份有限公司 Anchor rod drilling equipment for slope support

Similar Documents

Publication Publication Date Title
CN205475263U (en) High steep slope planting structure of open -air metallic ore
CN111021375A (en) Recovery and treatment method for mine geological environment
CN100355511C (en) Water-saving type salina physics-chemistry-biology comprehensive improvement and vegetation construction technique
CN110249813B (en) Method for greening high and steep rocky slope in mining pit
CN105862886B (en) A kind of landfill slopes antiscour ecological afforestation mask and its construction method
CN108812166A (en) A kind of fish-scale pit preparations for afforestation method
CN109315237B (en) Method for greening high and steep rocky slope of mine
CN110800415A (en) Ecological treatment method in Qinba mountain land remediation engineering
CN110453766A (en) A kind of water guiding system making up the water supply neutral gear phase
CN108811874A (en) Root system of plant guide cylinder device and its construction method for side slope protection
CN218027503U (en) Water conservancy ecological wall
CN108130897B (en) A kind of soil basketing method during highway construction
US20230009242A1 (en) Construction Method of Fast-setting Polymer Grouting for Rapid Control of Slope Erosion and Landslide
CN109853461A (en) The ecological restoring method and system of plateau mire wetland erosion ditch
CN1807772A (en) Greening construction structure using single-layered, multilayered nonwoven fabric to protect slope groundmass
CN208064245U (en) A kind of breeding fence net facility network bottom fixing piece
KR100496118B1 (en) Method to keep a green slope surface
CN212992962U (en) Three-dimensional afforestation structure in coastal saline and alkaline land normal position
CN109006213A (en) Restore the method for vegetation plantation on a kind of rock terrace land
CN217460624U (en) Reinforced water guide structure for preventing mine side slope soil covering water and soil loss
CN108293937A (en) A kind of breeding fence net facility network bottom fixing piece
CN203633195U (en) Planting layer structure for historical site region
CN108483527A (en) Mine management system and administering method
CN216920209U (en) Combined ecological slope protection vegetation block
DEAN THE LAKE COPAIS, BOEOTIA, GREECE: ITS DRAINAGE AND DEVELOPMENT.(INCLUDES APPENDIX).

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20191115