CN110385771A CN201910742719.5A CN201910742719A CN110385771A CN 110385771 A CN110385771 A CN 110385771A CN 201910742719 A CN201910742719 A CN 201910742719A CN 110385771 A CN110385771 A CN 110385771A
Authority
CN
China
Prior art keywords
station
moulding
boxs
moulding box
same time
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910742719.5A
Other languages
Chinese (zh)
Other versions
CN110385771B (en
Inventor
赵阴雷
扈宝军
梁雨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tongyu Jiayi Science And Technology Environmental Protection Building Material Co Ltd
Original Assignee
Tongyu Jiayi Science And Technology Environmental Protection Building Material Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tongyu Jiayi Science And Technology Environmental Protection Building Material Co Ltd filed Critical Tongyu Jiayi Science And Technology Environmental Protection Building Material Co Ltd
Priority to CN201910742719.5A priority Critical patent/CN110385771B/en
Publication of CN110385771A publication Critical patent/CN110385771A/en
Application granted granted Critical
Publication of CN110385771B publication Critical patent/CN110385771B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B13/00Feeding the unshaped material to moulds or apparatus for producing shaped articles; Discharging shaped articles from such moulds or apparatus
    • B28B13/02Feeding the unshaped material to moulds or apparatus for producing shaped articles
    • B28B13/0215Feeding the moulding material in measured quantities from a container or silo
    • B28B13/023Feeding the moulding material in measured quantities from a container or silo by using a feed box transferring the moulding material from a hopper to the moulding cavities
    • B28B13/025Feeding the moulding material in measured quantities from a container or silo by using a feed box transferring the moulding material from a hopper to the moulding cavities the feed box being vibrated, e.g. to promote discharging of the material
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B5/00Producing shaped articles from the material in moulds or on moulding surfaces, carried or formed by, in, or on conveyors irrespective of the manner of shaping
    • B28B5/04Producing shaped articles from the material in moulds or on moulding surfaces, carried or formed by, in, or on conveyors irrespective of the manner of shaping in moulds moved in succession past one or more shaping stations
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B5/00Producing shaped articles from the material in moulds or on moulding surfaces, carried or formed by, in, or on conveyors irrespective of the manner of shaping
    • B28B5/06Producing shaped articles from the material in moulds or on moulding surfaces, carried or formed by, in, or on conveyors irrespective of the manner of shaping in moulds on a turntable

Abstract

The invention discloses a kind of continuously shaped high-strength concrete article process of six station of wet process, it is characterised in that: station 1, station 2, station 3, station 4, station 5 and station 6 is equipped on a circumference, adjacent two station interval is equal;1 process of station: 1) lower moulding box water guide bottom plate 3 lower moulding box 2 on it is laid with filter paper piece 7,2) quantitative downward moulding box 2 pours fluidity concrete bottom material 4;3) the uniform concrete bottom material 4 of low frequency microvibration;2 process of station: precompressed concrete bottom material 4;3 process of station: quantitative downward moulding box 2 pours fluidity concrete fabric 5;4 process of station: 1) precompressed concrete fabric 5,2) it is laid with the filtering scraps of paper 7;5 process of station: 1) press machine drives upper die head 1 to decline, and upper die head 1 squeezes concrete bottom material 4 and fabric 5 in lower moulding box, and extra mixing water is squeezed out;2) mixing water that vacuum pump drainage squeezes out;6 process of station: 1) product suppressed is deviate from from lower moulding box 2;2) vacuum suction product and stacking.

Description

A kind of continuously shaped high-strength concrete article process of six station of wet process
Technical field
The present invention relates to a kind of continuously shaped high-strength concrete article process of six station of wet process, belong to wet process concrete product Field shaping technique.
Background technique
There are mainly two types of modes for traditional concrete product production: one is mixed using the almost nil dry of the slump Solidifying soil, such dry concrete is placed in steel die, high-frequency vibration and pressurization by concrete product forming machine, Concrete product shape required for dry concrete in mold is compressed into, concrete product after molding is from mold Abjection, is transported to curing kilns together with the Special support plate under concrete product and is conserved;Second is existed using the slump The plastic concrete of 50-90mm, also some using the slump 100-150mm fluidity concrete, by plastic concrete or Fluidity concrete is poured into special plastic mold, is vibrated by high frequency vibrating tamper, is made concrete compaction, gas is discharged, Concrete strength is improved, after the completion of vibrating, cannot demould, be conserved at once, until the intensity of concrete product reaches Design strength 50% or more when can demould, just can guarantee molding concrete product well-tended appearance, without breakage.With city The development of city construction and environmental protection, needs to produce instead of the high intensity of lithotome, high frost resistance, extremely low water absorption rate, anti-deicing salt The concrete product of the road of corrosion, municipal particular/special requirement, using above-mentioned traditional concrete product production method and mould Tool is impossible.Common drawback existing for the above two molding concrete product of traditional approach is: 1) in identical cooperation Its concrete product intensity is low than in the case where;2) compactness bottom, dry concrete product, plastic concrete product, flowing There is hole in property concrete product;3) high production cost needs that a variety of additives are added in process of production, such as water-reducing agent, morning Strong agent, antifreeze, release agent etc.;4) water absorption rate is high;5) resistance to deicing salt performance is poor;6) high-frequency vibration and high frequency tamping noise pollution Seriously;7) high-frequency vibration coarse-fine aggregate damages mold serious, and die life shortens, and product cost increases etc..
In order to overcome above-mentioned conventional method that cannot produce the technological deficiency of strong concrete product, the new period is adapted to height Intensity, the burn into of resistance to deicing salt low water absorption, high frost resistance high-end concrete product needs, it is intended to design a kind of wet process six The continuously shaped high-strength concrete article process of station, with plastic concrete or fluidity concrete, use is small, low frequency shakes Dynamic, high pressure compression moulding, upper die head 1 and lower moulding box 2 are respectively equipped with vacuum pump drainage and squeeze water installations and automatic guide water of compaction dress It sets, the water of compaction suppressed (clear water) is discharged and is transported to recovery channel, cycling and reutilization, it is ensured that cement slurry remains in In concrete product, the high-strength concrete product after high pressure compression moulding can demould immediately, and production efficiency is high, and high pressure is pressed into The type period is no more than 30 seconds, and product compactness is higher by the compactness of the concrete product using conventional method and traditional moulds production 20% or more.
Summary of the invention
It is an object of the invention to: it is lacked to overcome above-mentioned conventional method that cannot produce high-strength concrete article technology It falls into, adapts to the new period to high intensity, the burn into of resistance to deicing salt low absorptivity, the high-end concrete product needs of high frost resistance;Attempt to set A kind of continuously shaped high-strength concrete article process of six station of wet process is counted, with plastic concrete or fluidity concrete, is used Small, low-frequency vibration, high pressure compression moulding, upper die head 1 are equipped with vacuum pump drainage and squeeze water installations, and lower moulding box 2 is equipped with automatic guide Water installations are squeezed, the water of compaction suppressed (clear water) pumps out and be transported to recovery channel, cycling and reutilization, it is ensured that cement slurry is still It is so retained in concrete product, the high-strength concrete product after high pressure compression moulding can demould immediately, and production efficiency is high, fills out The China Bu Liao high intensity, high density, high frost resistance, high-impermeable are produced using concrete plastic concrete and fluidity concrete The blank of the high-end concrete product of property.
The technical scheme of the present invention is realized as follows: a kind of continuously shaped high-strength concrete product side of six station of wet process Method: it sets in a circuferential spacing there are six station: being station 1, station 2, station 3, station 4, station 5 and station 6 respectively, it is adjacent Two station intervals are equal;
It is equipped with the identical rotary turnplate 6 in a center of circle in six station of circumference, is uniformly set in the rotary turnplate 6 There are six rectangle square hole, a lower moulding box 2 is set in each rectangle square hole;It is equipped with a vertical connection shaft 8 in its center;
Under the rotation for being located at station 1 right above moulding box 2, accurate measurement, cloth dress equipped with fluidity concrete bottom material 4 It sets, is arranged right below low-frequency vibration table at it;Prepressing device is equipped with right above moulding box 2 under the rotation for being located at station 2, its just Lower section is equipped with support platform;Under the rotation for being located at station 3 right above moulding box 2, the accurate meter equipped with fluidity concrete fabric 5 Amount, distribution device;Under the rotation for being located at station 4 right above moulding box 2, it is equipped with prepressing device, it is flat to be arranged right below support at it Platform;Under the rotation for being located at station 5 right above moulding box 2, it is equipped with large tonnage pressing machine, vacuum is provided on oil cylinder of press machine Pump drainage squeeze water installations upper die head 1, its be arranged right below with guide squeeze water installations support platform;It is being located at station 6 Rotation under right above moulding box 2, the palletizing apparatus equipped with the high-strength concrete product that vacuum suction suppresses is set immediately below it There is concrete product liftout attachment;
In the process that station 1 is completed: 1) being laid with filter paper piece 7,2 on the lower moulding box water guide bottom plate 3 in lower moulding box 2) essence Really the metering downward moulding box 2 of distribution device pours fluidity concrete bottom material 4,3) low frequency microvibration, uniform flow concrete Bottom material 4;
In the process that station 2 is completed: prepressing device decline, precompressed are located at the fluidity concrete bottom material 4 in lower moulding box 2;
In the process that station 3 is completed: accurate measurement distribution device is to the lower moulding box for being already equipped with fluidity concrete bottom material 4 2 pour fluidity concrete fabric 5;
In the process that station 4 is completed: 1) prepressing device declines, precompressed concrete fabric 5,2) in fluidity concrete fabric 5 layers of upper laying filter paper piece 7;
In the process that station 5 is completed: 1) large tonnage pressing machine drives under the upper die head 1 for squeezing water installations equipped with vacuum pump drainage It is down in 2 die cavity of lower moulding box equipped with concrete mix, upper die head 1 squeezes the fluidity concrete in lower moulding box 2 after pressurization Extra mixing water is squeezed out, makes concrete compaction by bottom material 4 and fluidity concrete fabric 5;2) it can be generated in extrusion process crowded Water is pressed, the vacuum pump drainage of upper die head 1 squeezes water installations and the water of compaction of lower 2 top of moulding box is pumped to recovery channel;Lower moulding box 2 The water of compaction of lower section squeezes water installations using equipped with automatic guide by several vertical through-holes of lower moulding box water guide bottom plate 3 Support platform be discharged to recovery channel, recycling;
In the process that station 6 is completed: 1) concrete product suppressed is together with the lower moulding box water guide bottom plate 3 one being located under it It rises and is ejected from lower moulding box 2;2) the good high-strength concrete product of vacuum adsorption molding is offline and stacking;
A kind of process flow of the continuously shaped high-strength concrete article process of six station of wet process is as follows: in order to describe conveniently, It is No. 1 moulding box, No. 2 moulding boxs, No. 3 moulding boxs, No. 4 moulding boxs, 5 by six be uniformly located in rotary turnplate 6 lower 2 number consecutivelies of moulding box Number moulding box, No. 6 moulding boxs;When just starting production, six moulding boxs are blank state;
When rotary turnplate 6 rotates first time (angle of rotation is 60 °), No. 1 moulding box goes to station 1, completes station 1 and advises Fixed process;(- No. 6 moulding boxs of No. 2 moulding boxs are blank state);
When rotary turnplate 6 rotates second, No. 1 moulding box goes to station 2, completes process as defined in station 2;It is same with this When, No. 2 moulding boxs go to station 1, complete process as defined in station 1;(- No. 6 moulding boxs of No. 3 moulding boxs are blank state);
When rotary turnplate 6 rotates third time, No. 1 moulding box goes to station 3, completes process as defined in station 3;It is same with this When, No. 2 moulding boxs go to station 2, complete process as defined in station 2;At the same time, No. 3 moulding boxs go to station 1, complete station 1 and advise Fixed process;(- No. 6 moulding boxs of No. 4 moulding boxs are blank state);
When rotary turnplate 6 rotates the 4th time, No. 1 moulding box goes to station 4, completes process as defined in station 4;It is same with this When, No. 2 moulding boxs go to station 3, complete process as defined in station 3;At the same time, No. 3 moulding boxs go to station 2, complete station 2 and advise Fixed process;At the same time, No. 4 moulding boxs go to station 1, complete process as defined in station 1;(- No. 6 moulding boxs of No. 5 moulding boxs are vacant State);
When rotary turnplate 6 rotates the 5th time, No. 1 moulding box goes to station 5, completes process as defined in station 5;It is same with this When, No. 2 moulding boxs go to station 4, complete process as defined in station 4;At the same time, No. 3 moulding boxs go to station 3, complete station 3 and advise Fixed process;At the same time, No. 4 moulding boxs go to station 2, complete process as defined in station 2;At the same time, No. 5 moulding boxs go to work Process as defined in station 1 is completed in position 1;(No. 6 moulding boxs are blank state);
When rotary turnplate 6 rotates the 6th time (completion rotates a circle), No. 1 moulding box goes to station 6, completes station 6 and provides Process;At the same time, No. 2 moulding boxs go to station 5, complete process as defined in station 5;At the same time, No. 3 moulding boxs go to station 4, complete process as defined in station 4;At the same time, No. 4 moulding boxs go to station 3, complete process as defined in station 3;At the same time, No. 5 moulding boxs go to station 2, complete process as defined in station 2;At the same time, No. 6 moulding boxs go to station 1, complete station 1 and provide Process;
When the second circle first time of rotation of rotary turnplate 6, No. 1 moulding box goes to station 1, completes process as defined in station 1;With This simultaneously, No. 2 moulding boxs go to station 6, complete process as defined in station 6;At the same time, No. 3 moulding boxs go to station 5, complete work Process as defined in position 5;At the same time, No. 4 moulding boxs go to station 4, complete process as defined in station 4;At the same time, No. 5 moulding boxs Station 3 is gone to, process as defined in station 3 is completed;At the same time, No. 6 moulding boxs go to station 2, complete process as defined in station 2;
So in cycles, rotary turnplate 6 drives six lower moulding boxs 2 to continue rotation to go down, thus realize continuously at The purpose of type high-strength concrete product.
Detailed description of the invention:
Fig. 1 be a kind of continuously shaped high-strength concrete article process of six station of wet process of the present invention use upper mould head 1, The structure of lower moulding box 2, correlation stereoscopic schematic diagram;
Fig. 2 is the lower mould case 2 that a kind of continuously shaped high-strength concrete article process of six station of wet process of the present invention uses Schematic top plan view;
Fig. 3 is that a kind of six stations of the continuously shaped high-strength concrete article process of six station of wet process of the present invention and rotation turn The position of six lower moulding boxs 2 on disk 6, correlation, the process flow schematic top plan view of production method;
Fig. 4 is that a kind of six stations of the continuously shaped high-strength concrete article process of six station of wet process of the present invention and rotation turn Six lower moulding boxs 2 on disk 6, successively rotation passes through the track schematic diagram of six stations;
Fig. 5 is a kind of continuously shaped high-strength concrete article process of six station of wet process of the present invention, completes station 1 and provides process Afterwards, the A-A diagrammatic cross-section of lower moulding box 2;
Fig. 6 is a kind of continuously shaped high-strength concrete article process of six station of wet process of the present invention, completes station 2 and provides process Afterwards, the A-A diagrammatic cross-section of lower moulding box 2;
Fig. 7 is a kind of continuously shaped high-strength concrete article process of six station of wet process of the present invention, completes station 3 and provides process Afterwards, the A-A diagrammatic cross-section of lower moulding box 2;
Fig. 8 is a kind of continuously shaped high-strength concrete article process of six station of wet process of the present invention, completes station 4 and provides process Afterwards, the A-A diagrammatic cross-section of lower moulding box 2;
Fig. 9 is a kind of continuously shaped high-strength concrete article process of six station of wet process of the present invention, completes station 5 and provides process Afterwards, the A-A diagrammatic cross-section of lower moulding box 2;
Figure 10 is a kind of continuously shaped high-strength concrete article process of six station of wet process of the present invention, completes station 6 and provides work After sequence, the A-A diagrammatic cross-section of lower moulding box 2;
In figure: 1 is upper die head
2 be lower moulding box
3 be lower moulding box water guide bottom plate
4 be fluidity concrete bottom material
5 be fluidity concrete fabric
6 be rotary turnplate
7 be the filtering scraps of paper
8 be vertical connection shaft
Specific embodiment
The invention is realized in this way 1~Figure 10 is described further with reference to the accompanying drawing: a kind of six station of wet process is continuous Molding high-strength concrete article process: station there are six setting in a circuferential spacing: being station 1, station 2, station 3, work respectively Position 4, station 5 and station 6, adjacent two station interval are equal;
It is equipped with the identical rotary turnplate 6 in a center of circle in six station of circumference, is uniformly set in the rotary turnplate 6 There are six rectangle square hole, a lower moulding box 2 is set in each rectangle square hole;It is equipped with a vertical rotating shaft 8 in its center, Vertical connection shaft 8;
Under the rotation for being located at station 1 right above moulding box 2, accurate measurement, cloth dress equipped with fluidity concrete bottom material 4 It sets, is arranged right below low-frequency vibration table at it;Prepressing device is equipped with right above moulding box 2 under the rotation for being located at station 2, its just Lower section is equipped with support platform;Under the rotation for being located at station 3 right above moulding box 2, the accurate meter equipped with fluidity concrete fabric 5 Amount, distribution device;Under the rotation for being located at station 4 right above moulding box 2, it is equipped with prepressing device, it is flat to be arranged right below support at it Platform;Under the rotation for being located at station 5 right above moulding box 2, it is equipped with large tonnage pressing machine, vacuum is provided on oil cylinder of press machine Pump drainage squeeze water installations upper die head 1, its be arranged right below with automatic guide squeeze water installations support platform;It is being located at work Under the rotation of position 6 right above moulding box 2, the palletizing apparatus equipped with the high-strength concrete product that vacuum suction suppresses, its just under Side is equipped with concrete product liftout attachment;
In the process that station 1 is completed: 1) being laid with filter paper piece 7,2 on the lower moulding box water guide bottom plate 3 in lower moulding box 2) essence Really the metering downward moulding box 2 of distribution device pours fluidity concrete bottom material 4,3) low frequency microvibration, uniform flow concrete Bottom material 4;
In the process that station 2 is completed: prepressing device decline, precompressed are located at the solidifying native bottom material 4 of the mobility in lower moulding box 2;
In the process that station 3 is completed: accurate measurement distribution device is to the lower moulding box for being already equipped with fluidity concrete bottom material 4 2 pour fluidity concrete fabric 5;
In the process that station 4 is completed: 1) prepressing device declines, precompressed concrete fabric 5,2) in fluidity concrete fabric 5 layers of upper laying filter paper piece 7;
In the process that station 5 is completed: 1) large tonnage pressing machine drives under the upper die head 1 for squeezing water installations equipped with vacuum pump drainage It is down in 2 die cavity of lower moulding box equipped with concrete mix, upper die head 1 squeezes the fluidity concrete in lower moulding box 2 after pressurization Extra mixing water is squeezed out, makes concrete compaction by bottom material 4 and fluidity concrete fabric 5;2) it can be generated in extrusion process crowded Water is pressed, the vacuum pump drainage of upper die head 1 squeezes water installations and the water of compaction of lower 2 top of moulding box is pumped to recovery channel;Lower moulding box 2 The water of compaction of lower section squeezes water installations using equipped with automatic guide by several vertical through-holes of lower moulding box water guide bottom plate 3 Support platform be discharged to recovery channel, recycling;
In the process that station 6 is completed: 1) concrete product suppressed is together with the lower moulding box water guide bottom plate 3 one being located under it It rises and is ejected from lower moulding box 2;2) the good high-strength concrete product of vacuum adsorption molding is offline and stacking;
A kind of process flow of the continuously shaped high-strength concrete article process of six station of wet process is as follows: in order to describe conveniently, It is No. 1 moulding box, No. 2 moulding boxs, No. 3 moulding boxs, No. 4 moulding boxs, 5 by six be uniformly located in rotary turnplate 6 lower 2 number consecutivelies of moulding box Number moulding box, No. 6 moulding boxs;When just starting production, six moulding boxs are blank state;
When rotary turnplate 6 rotates first time (angle of rotation is 60 °), No. 1 moulding box goes to station 1, completes station 1 and advises Fixed process;(- No. 6 moulding boxs of No. 2 moulding boxs are blank state);
When rotary turnplate 6 rotates second, No. 1 moulding box goes to station 2, completes process as defined in station 2;It is same with this When, No. 2 moulding boxs go to station 1, complete process as defined in station 1;(- No. 6 moulding boxs of No. 3 moulding boxs are blank state);
When rotary turnplate 6 rotates third time, No. 1 moulding box goes to station 3, completes process as defined in station 3;It is same with this When, No. 2 moulding boxs go to station 2, complete process as defined in station 2;At the same time, No. 3 moulding boxs go to station 1, complete station 1 and advise Fixed process;(- No. 6 moulding boxs of No. 4 moulding boxs are blank state);
When rotary turnplate 6 rotates the 4th time, No. 1 moulding box goes to station 4, completes process as defined in station 4;It is same with this When, No. 2 moulding boxs go to station 3, complete process as defined in station 3;At the same time, No. 3 moulding boxs go to station 2, complete station 2 and advise Fixed process;At the same time, No. 4 moulding boxs go to station 1, complete process as defined in station 1;(- No. 6 moulding boxs of No. 5 moulding boxs are vacant State);
When rotary turnplate 6 rotates the 5th time, No. 1 moulding box goes to station 5, completes process as defined in station 5;It is same with this When, No. 2 moulding boxs go to station 4, complete process as defined in station 4;At the same time, No. 3 moulding boxs go to station 3, complete station 3 and advise Fixed process;At the same time, No. 4 moulding boxs go to station 2, complete process as defined in station 2;At the same time, No. 5 moulding boxs go to work Process as defined in station 1 is completed in position 1;(No. 6 moulding boxs are blank state);
When rotary turnplate 6 rotates the 6th time (completion rotates a circle), No. 1 moulding box goes to station 6, completes station 6 and provides Process;At the same time, No. 2 moulding boxs go to station 5, complete process as defined in station 5;At the same time, No. 3 moulding boxs go to station 4, complete process as defined in station 4;At the same time, No. 4 moulding boxs go to station 3, complete process as defined in station 3;At the same time, No. 5 moulding boxs go to station 2, complete process as defined in station 2;At the same time, No. 6 moulding boxs go to station 1, complete station 1 and provide Process;
When the second circle first time of rotation of rotary turnplate 6, No. 1 moulding box goes to station 1, completes process as defined in station 1;With This simultaneously, No. 2 moulding boxs go to station 6, complete process as defined in station 6;At the same time, No. 3 moulding boxs go to station 5, complete work Process as defined in position 5;At the same time, No. 4 moulding boxs go to station 4, complete process as defined in station 4;At the same time, No. 5 moulding boxs Station 3 is gone to, process as defined in station 3 is completed;At the same time, No. 6 moulding boxs go to station 2, complete process as defined in station 2;
So in cycles, rotary turnplate 6 drives six lower moulding boxs 2 to continue rotation to go down, thus realize continuously at The purpose of type high-strength concrete product.
The beneficial effect comprise that:
1) present invention changes traditional concrete product production technology mode;
2) it can be produced using the present invention instead of the high intensity of lithotome, high frost resistance, extremely low water absorption rate, anti-deicing salt The high-strength concrete product of the road of corrosion, municipal particular/special requirement reduces the exploitation to lithotome, ring is effectively protected Border and resource;
3) big, non-porous using concrete product intensity height produced by the invention, density in the case where identical match ratio Gap, coefficient of softing are high;
4) it can be recycled in production process without dust, without high-frequency vibration noise, concrete mixing water, production process pair Environment does not pollute;
5) production cost has been saved without adding water-reducing agent, early strength agent, antifreeze, release agent etc. in production process;
6) low frequency microvibration damages mold small, and die life extends;
7) do not need traditional dry concrete production of articles Special support plate and plastic concrete production of articles it is dedicated Plastics diaphragm capsule has saved a large amount of capital investment, reduces the fixed cost of concrete product;The present invention is conventional concrete system Product production method and technological change substitution, have pole vast market prospect.

Claims (1)

1. a kind of continuously shaped high-strength concrete article process of six station of wet process, it is characterised in that: be equipped in a circuferential spacing Six stations: being station 1, station 2, station 3, station 4, station 5 and station 6 respectively, and adjacent two station interval is equal;
The identical rotary turnplate (6) in a center of circle is equipped in six station of circuferential spacing, in the rotary turnplate (6) Even to set there are six rectangle square hole, each rectangle square hole is interior to be arranged a lower moulding box (2);One is equipped in its center vertically to connect Spindle (8);
Under the rotation for being located at station 1 right above moulding box (2), it is equipped with accurate measurement, the cloth dress of fluidity concrete bottom material (4) It sets, is arranged right below low-frequency vibration table at it;Prepressing device is equipped with right above moulding box (2) under the rotation for being located at station 2, at it It is arranged right below support platform;Under the rotation for being located at station 3 right above moulding box (2), it is equipped with fluidity concrete fabric (5) Accurate measurement, distribution device;Under the rotation for being located at station 4 right above moulding box (2), it is equipped with prepressing device, is set immediately below it There is support platform;Under the rotation for being located at station 5 right above moulding box (2), it is equipped with large tonnage pressing machine, is set on oil cylinder of press machine Set with vacuum pump drainage squeeze water installations upper die head (1), its be arranged right below with automatic guide squeeze water installations support Platform;Under the rotation for being located at station 6 right above moulding box (2), the stacking dress equipped with the concrete product that vacuum suction suppresses It sets, is arranged right below product liftout attachment at it;
In the process that station 1 is completed: 1) lower moulding box water guide bottom plate (3) lower moulding box (2) on it is laid with filter paper piece (7), 2) The downward moulding box of accurate measurement distribution device (2) pours fluidity concrete bottom material (4), and 3) low frequency microvibration, uniform flow Concrete bottom material (4);
In the process that station 2 is completed: prepressing device decline, precompressed are located at the fluidity concrete bottom material (4) in lower moulding box (2);
In the process that station 3 is completed: accurate measurement distribution device is to the lower moulding box for being already equipped with fluidity concrete bottom material (4) (2) fluidity concrete fabric (5) are poured;
In the process that station 4 is completed: 1) prepressing device declines, precompressed concrete fabric (5), 2) in fluidity concrete fabric (5) filter paper piece (7) are laid on layer;
In the process that station 5 is completed: 1) large tonnage pressing machine oil cylinder drives the upper die head that water installations are squeezed equipped with vacuum pump drainage (1), it drops in lower moulding box (2) die cavity equipped with concrete mix, upper die head (1) squeezes in lower moulding box (2) after pressurization Extra mixing water is squeezed out, makes concrete compaction by fluidity concrete bottom material (4) and fluidity concrete fabric (5);2) it squeezes Water of compaction can be generated during pressure, the vacuum pump drainage of upper die head (1) squeezes water installations for the water of compaction pump drainage above lower moulding box (2) To recovery channel;Water of compaction below lower moulding box (2) by several vertical through-holes of lower moulding box water guide bottom plate (3), using The support platform for squeezing water installations equipped with automatic guide is discharged to recovery channel, recycling;
In the process that station 6 is completed: 1) concrete product suppressed is together with the lower moulding box water guide bottom plate (3) being located under it It is ejected from lower moulding box (2);2) the good high-strength concrete product of vacuum adsorption molding is offline and stacking;
A kind of process flow of the continuously shaped high-strength concrete article process of six station of wet process is as follows: in order to describe conveniently, will revolve Lower moulding box (2) number consecutively of six to walk around on disk (6) is No. 1 moulding box, No. 2 moulding boxs, No. 3 moulding boxs, No. 4 moulding boxs, No. 5 moulding boxs, 6 Number moulding box.When just starting production, six moulding boxs are blank state entirely;
When rotary turnplate (6) rotate first time (angle of rotation is 60 °), No. 1 moulding box goes to station 1, completes station 1 and provides Process;(- No. 6 moulding boxs of No. 2 moulding boxs are blank state);
When rotary turnplate (6) rotate second, No. 1 moulding box goes to station 2, completes process as defined in station 2;At the same time, 2 Number moulding box goes to station 1, completes process as defined in station 1;(- No. 6 moulding boxs of No. 3 moulding boxs are blank state);
When rotary turnplate (6) rotate third time, No. 1 moulding box goes to station 3, completes process as defined in station 3;At the same time, 2 Number moulding box goes to station 2, completes process as defined in station 2;At the same time, No. 3 moulding boxs go to station 1, complete as defined in station 1 Process;(- No. 6 moulding boxs of No. 4 moulding boxs are blank state);
When rotary turnplate (6) rotate the 4th time, No. 1 moulding box goes to station 4, completes process as defined in station 4;At the same time, 2 Number moulding box goes to station 3, completes process as defined in station 3;At the same time, No. 3 moulding boxs go to station 2, complete as defined in station 2 Process;At the same time, No. 4 moulding boxs go to station 1, complete process as defined in station 1;(- No. 6 moulding boxs of No. 5 moulding boxs are vacant shape State);
When rotary turnplate (6) rotate the 5th time, No. 1 moulding box goes to station 5, completes process as defined in station 5;At the same time, 2 Number moulding box goes to station 4, completes process as defined in station 4;At the same time, No. 3 moulding boxs go to station 3, complete as defined in station 3 Process;At the same time, No. 4 moulding boxs go to station 2, complete process as defined in station 2;At the same time, No. 5 moulding boxs go to station 1, Complete process as defined in station 1;(No. 6 moulding boxs are blank state);
When rotary turnplate (6) rotate the 6th time (completion rotates a circle), No. 1 moulding box goes to station 6, completes as defined in station 6 Process;At the same time, No. 2 moulding boxs go to station 5, complete process as defined in station 5;At the same time, No. 3 moulding boxs go to station 4, Complete process as defined in station 4;At the same time, No. 4 moulding boxs go to station 3, complete process as defined in station 3;At the same time, 5 Number moulding box goes to station 2, completes process as defined in station 2;At the same time, No. 6 moulding boxs go to station 1, complete as defined in station 1 Process;
When the second circle first time of rotary turnplate (6) rotation, No. 1 moulding box goes to station 1, completes process as defined in station 1;With this Meanwhile No. 2 moulding boxs go to station 6, complete process as defined in station 6;At the same time, No. 3 moulding boxs go to station 5, complete station 5 Defined process;At the same time, No. 4 moulding boxs go to station 4, complete process as defined in station 4;At the same time, No. 5 moulding boxs are gone to Station 3 completes process as defined in station 3;At the same time, No. 6 moulding boxs go to station 2, complete process as defined in station 2;So In cycles, a rotary turnplate (6) drives six lower moulding boxs (2) to continue to rotate, to realize continuously shaped high-strength mixed The purpose of solidifying soil product.
CN201910742719.5A 2019-08-14 2019-08-14 Method for continuously forming high-strength concrete product by six stations through wet process Active CN110385771B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910742719.5A CN110385771B (en) 2019-08-14 2019-08-14 Method for continuously forming high-strength concrete product by six stations through wet process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910742719.5A CN110385771B (en) 2019-08-14 2019-08-14 Method for continuously forming high-strength concrete product by six stations through wet process

Publications (2)

Publication Number Publication Date
CN110385771A true CN110385771A (en) 2019-10-29
CN110385771B CN110385771B (en) 2020-11-27

Family

ID=68288630

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910742719.5A Active CN110385771B (en) 2019-08-14 2019-08-14 Method for continuously forming high-strength concrete product by six stations through wet process

Country Status (1)

Country Link
CN (1) CN110385771B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111516130A (en) * 2020-05-11 2020-08-11 廊坊海斯建材机械有限公司 Wet forming machine
CN111716511A (en) * 2020-07-01 2020-09-29 杭州企势科技有限公司 Ceramic mud blank raw material quantifying device and application thereof
CN114474819A (en) * 2022-01-12 2022-05-13 中国矿业大学 Device and method for quickly dehydrating coal gasification fine slag and demolding molded blocks by continuously applying vacuum force and pressure

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2311706A1 (en) * 1973-03-09 1974-09-12 Haege Fa Georg Concrete plate moulding press - with magazine type upper and lower mould holders
US5141429A (en) * 1989-07-10 1992-08-25 Beheermaatschappij De Boer Nijmegen B.V. Device for working a supply of clay to mouldings adapted for firing hand mould bricks
CN2825252Y (en) * 2005-04-01 2006-10-11 王海清 Extrusion forming machine for concrete building block
CN1850470A (en) * 2006-05-16 2006-10-25 张继忠 Gypsum block continuous production apparatus capable of adjusting thickness
CN200998881Y (en) * 2006-12-07 2008-01-02 北京市丰台区云岗云宇机电设备厂 Swinging type building block processing center
EP2017049A2 (en) * 2007-07-17 2009-01-21 Progress Maschinen & Automation AG Apparatus for manufacturing prefabricated concrete elements with an assembly line
CN104552596A (en) * 2015-01-09 2015-04-29 北京瑞图科技发展有限公司 High-compactness concrete product molding machine
CN104772819A (en) * 2015-04-27 2015-07-15 西安银马实业发展有限公司 Forming equipment system for artificial imitating stone brick (plate) with combined type unit modules
CN105437355A (en) * 2015-12-21 2016-03-30 李仰水 Dry-wet forming method and device for an artificial stone
CN109227894A (en) * 2018-10-25 2019-01-18 西安银马实业发展有限公司 A kind of moulding box flow system with supporting plate
CN109676750A (en) * 2019-01-21 2019-04-26 福建泉工股份有限公司 Full-automatic ashlar brick machine and brick-making method

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2311706A1 (en) * 1973-03-09 1974-09-12 Haege Fa Georg Concrete plate moulding press - with magazine type upper and lower mould holders
US5141429A (en) * 1989-07-10 1992-08-25 Beheermaatschappij De Boer Nijmegen B.V. Device for working a supply of clay to mouldings adapted for firing hand mould bricks
CN2825252Y (en) * 2005-04-01 2006-10-11 王海清 Extrusion forming machine for concrete building block
CN1850470A (en) * 2006-05-16 2006-10-25 张继忠 Gypsum block continuous production apparatus capable of adjusting thickness
CN200998881Y (en) * 2006-12-07 2008-01-02 北京市丰台区云岗云宇机电设备厂 Swinging type building block processing center
EP2017049A2 (en) * 2007-07-17 2009-01-21 Progress Maschinen & Automation AG Apparatus for manufacturing prefabricated concrete elements with an assembly line
CN104552596A (en) * 2015-01-09 2015-04-29 北京瑞图科技发展有限公司 High-compactness concrete product molding machine
CN104772819A (en) * 2015-04-27 2015-07-15 西安银马实业发展有限公司 Forming equipment system for artificial imitating stone brick (plate) with combined type unit modules
CN105437355A (en) * 2015-12-21 2016-03-30 李仰水 Dry-wet forming method and device for an artificial stone
CN109227894A (en) * 2018-10-25 2019-01-18 西安银马实业发展有限公司 A kind of moulding box flow system with supporting plate
CN109676750A (en) * 2019-01-21 2019-04-26 福建泉工股份有限公司 Full-automatic ashlar brick machine and brick-making method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111516130A (en) * 2020-05-11 2020-08-11 廊坊海斯建材机械有限公司 Wet forming machine
CN111516130B (en) * 2020-05-11 2021-08-10 廊坊海斯建材机械有限公司 Wet forming machine
CN111716511A (en) * 2020-07-01 2020-09-29 杭州企势科技有限公司 Ceramic mud blank raw material quantifying device and application thereof
CN114474819A (en) * 2022-01-12 2022-05-13 中国矿业大学 Device and method for quickly dehydrating coal gasification fine slag and demolding molded blocks by continuously applying vacuum force and pressure

Also Published As

Publication number Publication date
CN110385771B (en) 2020-11-27

Similar Documents

Publication Publication Date Title
CN110385771A (en) A kind of continuously shaped high-strength concrete article process of six station of wet process
CN100463788C (en) Material distribution method of marbling imitated ceramic brick and material distribution equipment
CN110385781A (en) A kind of six station of wet process molding high-strength concrete product equipment
CN110919843A (en) Baking-free brick production device
CN210616845U (en) Prefabricated component is with mixing earth mixer
CN107226662A (en) A kind of large dosage heavy blast furnace slag complex sand base water-permeable brick and its high efficiency preparation method
CN209521037U (en) A kind of novel wall building brick block shaping device
CN87103091A (en) Brick panel
CN210679114U (en) Six station shaping high-strength concrete goods equipment of wet process
CN110370428A (en) A kind of wet production high-strength concrete product particular manufacturing craft
CN214136535U (en) Cement brick forming mechanism for block brick machine
CN210791388U (en) Cement product forming machine
CN209633357U (en) Light composite wall board assembly line
CN112871057A (en) Novel wall material processing equipment
CN207710996U (en) A kind of green brick forming machine
CN106217584B (en) The device of mechanization clay molding
CN207915713U (en) A kind of block forming machine
CN210679070U (en) Special mould for producing high-strength concrete product by wet method
CN211104697U (en) Composite water permeable brick press forming device
CN204976958U (en) Vacuum vibrating compaction device
CN209718070U (en) A kind of resin concrete cast mineral die casting equipment
CN208451879U (en) The prefabricated board assembly line of cobblestone concrete bossage
CN113414863A (en) Bench formwork vibration pressure brickmaking equipment based on foundation pit soil mixture
CN219522454U (en) Building road brick moulding-die apparatus for producing
CN105437356B (en) A kind of preparation method of imitative stone composite concrete products

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 137 200 Hujiadian Park, Tongyu County Economic Development Zone, Baicheng City, Jilin Province

Applicant after: Tongyu Jiayi Technology Co., Ltd

Address before: 137 200 Hujiadian Park, Tongyu County Economic Development Zone, Baicheng City, Jilin Province

Applicant before: TONGYU JIAYI TECHNOLOGY ENVIRONMENTAL PROTECTION BUILDING MATERIALS Co.,Ltd.

CB02 Change of applicant information
GR01 Patent grant
GR01 Patent grant