CN110359489B - 一种大型预制管廊顶推施工结构 - Google Patents
一种大型预制管廊顶推施工结构 Download PDFInfo
- Publication number
- CN110359489B CN110359489B CN201910595198.5A CN201910595198A CN110359489B CN 110359489 B CN110359489 B CN 110359489B CN 201910595198 A CN201910595198 A CN 201910595198A CN 110359489 B CN110359489 B CN 110359489B
- Authority
- CN
- China
- Prior art keywords
- pushing
- pipe gallery
- prefabricated pipe
- steel
- piping lane
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title claims abstract description 26
- 238000009434 installation Methods 0.000 claims abstract description 18
- 229910000831 Steel Inorganic materials 0.000 claims description 62
- 239000010959 steel Substances 0.000 claims description 62
- 230000009286 beneficial effect Effects 0.000 abstract description 2
- 238000009435 building construction Methods 0.000 description 1
- 230000008602 contraction Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000010720 hydraulic oil Substances 0.000 description 1
- 239000010687 lubricating oil Substances 0.000 description 1
- 239000011241 protective layer Substances 0.000 description 1
- 239000004575 stone Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/10—Tunnels or galleries specially adapted to house conduits, e.g. oil pipe-lines, sewer pipes ; Making conduits in situ, e.g. of concrete ; Casings, i.e. manhole shafts, access or inspection chambers or coverings of boreholes or narrow wells
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Oil, Petroleum & Natural Gas (AREA)
- Environmental & Geological Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- Chemical & Material Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
一种大型预制管廊顶推施工结构,包括轨道、顶推小车、顶推驱动装置,所述轨道平铺在预制管廊的安装基坑中,所述顶推小车为两个,分别走行在两个轨道上,两个顶推驱动装置分别走行于两个轨道上,并分别驱动连个顶推小车在轨道上行进,大型预制管廊放置于两个顶推小车上。与现有技术相比,本发明的有益效果是:一种大型预制管廊顶推施工结构,采用在基坑中铺设轨道,对大型管廊进行基坑内平移的方式进行安装,顶推小车结构简单,管廊标高易于调整,安装精度高,节省基坑空间,平移方式简单快捷,施工方便效率高。
Description
技术领域
本发明涉及建筑施工领域,尤其涉及一种大型预制管廊顶推施工结构。
背景技术
明挖预制管廊是近年来兴起的先进技术,可大大加快施工进度,降低建设投资。某市综合管廊项目是某省重点工程项目,此工程布遍整个市区,是东北地区首批管廊示范工程。为加快管廊施工进度,该市综合管廊植物园街段部分采用预制管廊,由某集团建筑制品工程公司进行深化设计、制作、安装。
该预制管廊施工地点横跨一条市区主路,只能半幅封闭半幅施工,而且道路下方布满了各种市政管线,针对该工程的复杂情况,对于大型管廊的安装施工,无法采用直接吊装的形式,给施工带来很大的困难。
发明内容
本发明的目的是提供一种大型预制管廊顶推施工结构,采用在基坑中铺设轨道,对大型管廊进行基坑内平移的方式进行安装,顶推小车结构简单,管廊标高易于调整,安装精度高,节省基坑空间,平移方式简单快捷,施工方便效率高,从而解决无法吊装施工安装大型预制管廊的技术难题。
为了达到上述目的,本发明采用以下技术方案实现:
一种大型预制管廊顶推施工结构,包括轨道、顶推小车、顶推驱动装置,所述轨道平铺在预制管廊的安装基坑中,所述顶推小车为两个,分别走行在两个轨道上,两个顶推驱动装置分别走行于两个轨道上,并分别驱动两个顶推小车在轨道上行进,大型预制管廊放置于两个顶推小车上。
所述顶推小车包括钢梁车架、支撑钢管、调节螺杆,调节螺杆铰接在钢梁车架的上端,所述支撑钢管通过螺纹连接调节螺杆,在支撑钢管的上端设有托架,所述托架与大型预制管廊上的吊装钢棒相匹配,钢梁车架走行于轨道上。
在所述大型预制管廊的两侧设有预留吊装孔,在上端的预留吊装孔中插接有吊装钢棒,在下端的预留吊装孔中插接有顶装钢棒。
所述顶推驱动装置包括液压卡轨器、顶推千斤顶,所述液压卡轨器设置在轨道上,所述顶推千斤顶的一端连接液压卡轨器,另一端连接顶推小车。
所述液压卡轨器包括液压缸、定位块、定位板、连杆臂、夹爪,所述定位块与液压缸连接,液压缸的活塞穿过定位块,端部铰接连杆臂,所述定位板固定在定位块上,所述夹爪的支点与定位板铰接,所述连杆臂的另一端与夹爪铰接。
与现有技术相比,本发明的有益效果是:
一种大型预制管廊顶推施工结构,采用在基坑中铺设轨道,对大型管廊进行基坑内平移的方式进行安装,顶推小车结构简单,管廊标高易于调整,安装精度高,节省基坑空间,平移方式简单快捷,施工方便效率高。
本发明的顶推小车对大型预制管廊的吊装位置从下方用支杆顶起,管廊的安装标高通过螺纹调节,精度非常高,而且便于施工。管廊在预应力连接时,架设结构的稳定性非常高,安装误差小。
本发明的顶推驱动装置采用伸缩顶推液压千斤顶与液压卡轨器相结合的形式,通过反复的推拉,推动顶推小车进行,实现大型预制管廊的平移,整个装置占用空间小,施工方便快捷,效率高。
附图说明
图1是本发明中大型预制管廊的基坑吊运图;
图2是大型预制管廊架设到顶推小车上调整标高的顶推示意图;
图3是调整好标高后的大型预制管廊在顶推小车上的架设示意图(侧视图);
图4是图3的主视图;
图5是液压卡轨器的内部结构示意图;
图6是液压卡轨器的内部结构的侧视图。
图中:1-液压夹轨器,1-1液压缸,1-2定位块,1-3活塞,1-4连杆臂,1-5夹爪,1-6滑轨,1-7外壳,1-8定位板,2-轨道,3-顶推千斤顶,4-大型预制管廊,5-吊装钢棒,6-支撑钢管,7-调节螺杆,8-钢梁车架,9-钢垫梁,10-钢垫板,11-细石混凝土防水保护层,12-顶升千斤顶,13-液压油管,14-滚轮,15-预留吊装孔,16-顶推钢棒。
具体实施方式
下面结合附图对本发明的具体实施方式作进一步说明:
见图1-图6,一种大型预制管廊顶推施工结构,包括轨道2、顶推小车、顶推驱动装置,所述轨道2平铺在预制管廊的安装基坑中,所述顶推小车为两个,分别走行在两个轨道2上,两个顶推驱动装置分别走行于两个轨道2上,并分别驱动两个顶推小车在轨道2上行进,大型预制管廊4放置于两个顶推小车上。轨道2为重型钢轨。
所述顶推小车包括钢梁车架8、支撑钢管6、调节螺杆7,调节螺杆7铰接在钢梁车架8的上端,所述支撑钢管6通过螺纹连接调节螺杆7,在支撑钢管6的上端设有托架,所述托架与大型预制管廊4上的吊装钢棒5相匹配,钢梁车架8走行于轨道2上。支撑钢管6与调节螺杆7套接,在调节螺杆7上螺接有高强螺母,支撑钢管6顶在高强螺母上,通过旋拧高强螺母可以调节支撑钢管6与调节螺杆7的相对高度。
钢梁车架8的长度为大型预制管廊4宽度的3-4倍,所述支撑钢管6和调节螺杆7均为两个,两个调节螺杆7对称设置在钢梁车架8的两端,两个调节螺杆7铰接点之间的距离为大型预制管廊4宽度的2-3倍。
钢梁车架8的底部设有与轨道2相匹配的滑轨凹槽,钢梁车架8与轨道2之间填充润滑油,钢梁车架8可以在轨道2上滑动。在钢梁车架8的上端还固定有钢垫梁9。也可以在钢梁车架8底部设置轨道轮,通过轨道轮在轨道2上行走。
在所述大型预制管廊4的两侧设有预留吊装孔15,在上端的预留吊装孔15中插接有吊装钢棒5,在下端的预留吊装孔15中插接有顶装钢棒16。
预留吊装孔15为4个,在大型预制管廊4的上下各设置两个,在同一高度的两个预留吊装孔15对称设置。
还包括顶升千斤顶12,在调整大型预制管廊4安装标高时,通过顶升千斤顶12顶升大型预制管廊4上的顶装钢棒16。
在装配大型预制管廊4时,需要配合使用顶升千斤顶12,先将大型预制管廊通过吊车调运至钢梁车架8的上方,使插接在大型预制管廊4下端的顶装钢棒16放置到钢垫梁9上。然后将顶升千斤顶12放置在钢梁车架8的侧面,顶升千斤顶12顶接顶装钢棒16,并通过顶装钢棒16将大型预制管廊4顶起到安装高度,调整支撑钢管6的高度并通过支撑钢管6上端的托架托住吊装钢棒5。再在顶装钢棒16底部垫上钢垫板10。钢垫板10可以为一个也可以为多个,根据顶装钢棒16的高度而定。
所述顶推驱动装置包括液压卡轨器1、顶推千斤顶3,所述液压卡轨器1设置在轨道2上,所述顶推千斤顶3的一端连接液压卡轨器1,另一端连接顶推小车。顶推千斤顶3连接钢梁车架8。
所述液压卡轨器1包括液压缸1-1、定位块1-2、定位板1-8、连杆臂1-4、夹爪1-5,所述定位块1-2与液压缸1-1连接,液压缸1-1的活塞1-3穿过定位块1-2,端部铰接连杆臂1-4,所述定位板1-8固定在定位块1-2上,所述夹爪1-5为曲柄式的杠杆结构,夹爪1-5的支点与定位板1-8铰接,所述连杆臂1-4的另一端与夹爪1-5铰接。夹爪1-5的内侧形状与轨道相匹配。
通过活塞1-3的伸缩带动夹爪1-5夹紧、松开,在夹爪1-5的两侧还设有滑轨1-6,滑轨1-6设有与轨道2相匹配的滑轨凹槽,使得液压卡轨器1可以在轨道2上滑动。当夹爪1-5夹紧轨道时,伸出顶推千斤顶3,推动钢梁车架8在轨道2上行进;松开夹爪1-5时,缩回顶推千斤顶3,则液压卡轨器1在轨道上行进。重复上述动作,顶推驱动装置就会不断的推进顶推小车和大型预制管廊4平移前进,最终将大型预制管廊4运至安装位置进行预应力连接安装。
本发明通过两个在轨道上行走的钢梁车架8架设大型预制管廊4,并可以调整大型预制管廊4的架设标高,保证大型预制管廊4在基坑中顺利的平移到安装位置,并且保证大型预制管廊4预应力安装时的稳定性及安装精度;降低基坑上端有障碍物时,大型预制管廊4的安装施工难度,提高施工效率,保证施工质量。
Claims (2)
1.一种大型预制管廊顶推施工结构,其特征在于,包括轨道、顶推小车、顶推驱动装置,所述轨道平铺在预制管廊的安装基坑中,所述顶推小车为两个,分别走行在两个轨道上,两个顶推驱动装置分别走行于两个轨道上,并分别驱动两个顶推小车在轨道上行进,大型预制管廊放置于两个顶推小车上;
所述顶推驱动装置包括液压卡轨器、顶推千斤顶,所述液压卡轨器设置在轨道上,所述顶推千斤顶的一端连接液压卡轨器,另一端连接顶推小车;
所述液压卡轨器包括液压缸、定位块、定位板、连杆臂、夹爪,所述定位块与液压缸连接,液压缸的活塞穿过定位块,端部铰接连杆臂,所述定位板固定在定位块上,所述夹爪的支点与定位板铰接,所述连杆臂的另一端与夹爪铰接。
2.根据权利要求1所述的一种大型预制管廊顶推施工结构,其特征在于,所述顶推小车包括钢梁车架、支撑钢管、调节螺杆,调节螺杆铰接在钢梁车架的上端,所述支撑钢管通过螺纹连接调节螺杆,在支撑钢管的上端设有托架,所述托架与大型预制管廊上的吊装钢棒相匹配,钢梁车架走行于轨道上;
在所述大型预制管廊的两侧设有预留吊装孔,在上端的预留吊装孔中插接有吊装钢棒,在下端的预留吊装孔中插接有顶装钢棒。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910595198.5A CN110359489B (zh) | 2019-07-03 | 2019-07-03 | 一种大型预制管廊顶推施工结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910595198.5A CN110359489B (zh) | 2019-07-03 | 2019-07-03 | 一种大型预制管廊顶推施工结构 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110359489A CN110359489A (zh) | 2019-10-22 |
CN110359489B true CN110359489B (zh) | 2024-04-26 |
Family
ID=68217766
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910595198.5A Active CN110359489B (zh) | 2019-07-03 | 2019-07-03 | 一种大型预制管廊顶推施工结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110359489B (zh) |
Citations (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
BE850672A (fr) * | 1976-01-26 | 1977-07-22 | Charbonnages De France | Support unitaire de soutenement marchant |
DE8516946U1 (de) * | 1985-06-11 | 1986-07-03 | Weiss, Benedikt, 4224 Hünxe | Schneidkopf für den Vortrieb vorgefertigter Betonrohre zur Herstellung von Stollen oder Tunneln |
EP0611848A1 (fr) * | 1993-02-19 | 1994-08-24 | Jean Marie Beauthier | Procédé pour la construction d'ouvrages sous un talus de support d'une voie ferrée ou analogue |
JP2003239366A (ja) * | 2002-02-13 | 2003-08-27 | Haneda Concrete Industrial Co Ltd | コンクリートブロック運搬装置 |
CA2426435A1 (en) * | 2002-04-22 | 2003-10-22 | Templeton, Kenly & Co., Inc. | Rail puller |
KR200398755Y1 (ko) * | 2005-07-12 | 2005-10-18 | 한림에코텍 주식회사 | 암거 지지구조 |
KR100623202B1 (ko) * | 2005-11-01 | 2006-09-13 | Stx조선주식회사 | 대형 구조물 이송장치 및 이송방법 |
KR101746031B1 (ko) * | 2016-01-07 | 2017-06-12 | 에이치플러스에코 주식회사 | 강관압입을 이용한 구조물 하부 오염토양 처리시스템 |
CN206646547U (zh) * | 2017-04-07 | 2017-11-17 | 重庆巨龙管业有限公司 | 管廊预制件及装配式综合管廊 |
CN107460888A (zh) * | 2017-09-07 | 2017-12-12 | 鞍山三冶建筑工程有限公司 | 一种混凝土预制管廊的安装结构及方法 |
CN107558314A (zh) * | 2017-09-12 | 2018-01-09 | 中国十九冶集团有限公司 | 利用轨道夹持器转运轨道的方法 |
CN207536671U (zh) * | 2017-12-05 | 2018-06-26 | 天津荣尧智慧科技股份有限公司 | 一种新型管廊运输架 |
CN207553133U (zh) * | 2017-07-28 | 2018-06-29 | 江苏省苏中建设集团股份有限公司 | 一种地下管廊结构 |
CN109610509A (zh) * | 2019-01-29 | 2019-04-12 | 甘肃第七建设集团股份有限公司 | 一种综合管廊自控断面的可调模架系统和施工方法 |
CN210421166U (zh) * | 2019-07-03 | 2020-04-28 | 鞍山三冶建筑工程有限公司 | 一种大型预制管廊顶推施工结构 |
-
2019
- 2019-07-03 CN CN201910595198.5A patent/CN110359489B/zh active Active
Patent Citations (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
BE850672A (fr) * | 1976-01-26 | 1977-07-22 | Charbonnages De France | Support unitaire de soutenement marchant |
DE8516946U1 (de) * | 1985-06-11 | 1986-07-03 | Weiss, Benedikt, 4224 Hünxe | Schneidkopf für den Vortrieb vorgefertigter Betonrohre zur Herstellung von Stollen oder Tunneln |
EP0611848A1 (fr) * | 1993-02-19 | 1994-08-24 | Jean Marie Beauthier | Procédé pour la construction d'ouvrages sous un talus de support d'une voie ferrée ou analogue |
JP2003239366A (ja) * | 2002-02-13 | 2003-08-27 | Haneda Concrete Industrial Co Ltd | コンクリートブロック運搬装置 |
CA2426435A1 (en) * | 2002-04-22 | 2003-10-22 | Templeton, Kenly & Co., Inc. | Rail puller |
KR200398755Y1 (ko) * | 2005-07-12 | 2005-10-18 | 한림에코텍 주식회사 | 암거 지지구조 |
KR100623202B1 (ko) * | 2005-11-01 | 2006-09-13 | Stx조선주식회사 | 대형 구조물 이송장치 및 이송방법 |
KR101746031B1 (ko) * | 2016-01-07 | 2017-06-12 | 에이치플러스에코 주식회사 | 강관압입을 이용한 구조물 하부 오염토양 처리시스템 |
CN206646547U (zh) * | 2017-04-07 | 2017-11-17 | 重庆巨龙管业有限公司 | 管廊预制件及装配式综合管廊 |
CN207553133U (zh) * | 2017-07-28 | 2018-06-29 | 江苏省苏中建设集团股份有限公司 | 一种地下管廊结构 |
CN107460888A (zh) * | 2017-09-07 | 2017-12-12 | 鞍山三冶建筑工程有限公司 | 一种混凝土预制管廊的安装结构及方法 |
CN107558314A (zh) * | 2017-09-12 | 2018-01-09 | 中国十九冶集团有限公司 | 利用轨道夹持器转运轨道的方法 |
CN207536671U (zh) * | 2017-12-05 | 2018-06-26 | 天津荣尧智慧科技股份有限公司 | 一种新型管廊运输架 |
CN109610509A (zh) * | 2019-01-29 | 2019-04-12 | 甘肃第七建设集团股份有限公司 | 一种综合管廊自控断面的可调模架系统和施工方法 |
CN210421166U (zh) * | 2019-07-03 | 2020-04-28 | 鞍山三冶建筑工程有限公司 | 一种大型预制管廊顶推施工结构 |
Also Published As
Publication number | Publication date |
---|---|
CN110359489A (zh) | 2019-10-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104632251A (zh) | 一体浇筑式模板台车和地下通道混凝土浇筑的施工方法 | |
CN204457802U (zh) | 一体浇筑式模板台车 | |
CN103938880A (zh) | 大跨度异形空间网格管桁架整体滑移施工方法 | |
CN106593469A (zh) | 一种用于仰拱施工的台车 | |
CN203213623U (zh) | 滑移导向和纠偏装置 | |
CN107762552B (zh) | Tbm后配套拖车的快速平移台车及方法 | |
CN113152166B (zh) | 跨座式单轨轨道梁滑移架设工装 | |
CN110359492B (zh) | 一种大型预制管廊的施工方法 | |
CN110359489B (zh) | 一种大型预制管廊顶推施工结构 | |
CN210421166U (zh) | 一种大型预制管廊顶推施工结构 | |
CN210421167U (zh) | 一种大型预制管廊的安装平移装置 | |
CN202466543U (zh) | 一种用于平面闸门的液压移动式锁锭装置 | |
CN103806374A (zh) | 装配式公路钢桥整体轨道架设推送系统及架设推送工艺 | |
CN110359491B (zh) | 一种大型预制管廊的安装平移装置 | |
CN110359490B (zh) | 一种大型预制管廊的平移安装方法 | |
CN205934962U (zh) | 用于地下管廊现浇施工的滑移体系 | |
CN102305035B (zh) | 车载式修井机整机对中井口调整装置 | |
CN102587690B (zh) | 一种应用于建筑物平移工程的滚动装置及使用方法 | |
CN211549691U (zh) | 一种用于有限空间内盾构机配套设备的旋转平移升降小车 | |
CN208497288U (zh) | 一种混凝土轨道直梁浇筑模联动开模机构 | |
CN209523777U (zh) | 一种轻型逃生管道跨越仰拱的辅助装置 | |
WO2019075770A1 (zh) | 内拱形托换梁装置 | |
CN214398580U (zh) | 一种管道传送车 | |
CN214875076U (zh) | 一种公路工程用管道搬运装置 | |
CN219263365U (zh) | 一种市政顶管设备用顶管止退结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |