CN110349049A - A kind of distribution maintenance automatic work licensing system and method - Google Patents

A kind of distribution maintenance automatic work licensing system and method Download PDF

Info

Publication number
CN110349049A
CN110349049A CN201910507379.8A CN201910507379A CN110349049A CN 110349049 A CN110349049 A CN 110349049A CN 201910507379 A CN201910507379 A CN 201910507379A CN 110349049 A CN110349049 A CN 110349049A
Authority
CN
China
Prior art keywords
distribution
module
maintenance
goes
completion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910507379.8A
Other languages
Chinese (zh)
Other versions
CN110349049B (en
Inventor
张欢欢
阮志杰
彭镇华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Power Grid Co Ltd
Zhongshan Power Supply Bureau of Guangdong Power Grid Co Ltd
Original Assignee
Guangdong Power Grid Co Ltd
Zhongshan Power Supply Bureau of Guangdong Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Power Grid Co Ltd, Zhongshan Power Supply Bureau of Guangdong Power Grid Co Ltd filed Critical Guangdong Power Grid Co Ltd
Priority to CN201910507379.8A priority Critical patent/CN110349049B/en
Publication of CN110349049A publication Critical patent/CN110349049A/en
Application granted granted Critical
Publication of CN110349049B publication Critical patent/CN110349049B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/20Administration of product repair or maintenance
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/70Smart grids as climate change mitigation technology in the energy generation sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Economics (AREA)
  • Theoretical Computer Science (AREA)
  • Tourism & Hospitality (AREA)
  • Health & Medical Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • Marketing (AREA)
  • General Business, Economics & Management (AREA)
  • Strategic Management (AREA)
  • Physics & Mathematics (AREA)
  • Water Supply & Treatment (AREA)
  • Primary Health Care (AREA)
  • Public Health (AREA)
  • General Health & Medical Sciences (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention relates to a kind of distribution maintenance automatic work licensing system and method, the system includes data read module, distribution maintenance single list block, data memory module, goes into operation and apply for module, the permissions module that goes into operation, completion application module, completion termination block and reminding module;The process of entire work permit can be completed by system by staff, work permit registration form is submitted without plant maintenance unit, reduce the workload of equipment run unit personnel, the workload of dispatching desk audit is reduced simultaneously, it improves work efficiency and power supply reliability, avoiding black phone work permit system can be only done the deficiency of a work permit task in the same time.

Description

A kind of distribution maintenance automatic work licensing system and method
Technical field
The present invention relates to power domains, overhaul automatic work licensing system more particularly, to a kind of distribution.
Background technique
As China's economy grows continuously and fast, electric system, which continues to develop, grows, and the workload of distribution net equipment maintenance is in Existing exponential growth trend.In the work permit that traditional distribution net equipment overhauls, plant maintenance unit needs to carry out work in advance Make license registration form and submit distribution scheduling, after distribution net equipment has a power failure turn maintenance, distribution scheduling person is according to work permit registration form Information corresponding license formality is fulfiled with work responsible person by phone.
And the shortcomings that phone works licensing system, is that the same time can be only done a work permit task, and operates Peak period be easy to cause phone " traffic congestion ", seriously affects working efficiency and power supply reliability;In addition, the phone of high frequency time is in distribution Dispatcher carries out the period incoming call that high-intensitive, high focus is ordered and has interrupted that distribution scheduling platform is orderly rigorous to be ordered to operate, Operational risk is increased, is easy to cause distribution scheduling employee to slip, or even operation error occur, leads to pernicious maloperation or mistake Operation jeopardizes the person and grid equipment safety.
Summary of the invention
In order to solve the deficiency that the work permit of distribution net equipment maintenance traditional in the prior art is permitted by phone, The present invention relates to a kind of distributions to overhaul automatic work licensing system;
A kind of distribution maintenance automatic work licensing system, including data read module, distribution overhaul single list block, data Memory module goes into operation and applies for module, the permissions module that goes into operation, completion application module, completion termination block and reminding module;
The data read module, which is used to read the distribution maintenance forms data in electric power networks and transfers data to, matches Net overhauls in single list block;
It is described go into operation apply module for submit the application that goes into operation request into the permissions module that goes into operation;
The described permissions module that goes into operation is requested for automatic application of permitting to go into operation;
The completion application module is for submitting completion application request into completion termination block;
The completion termination block is for the completion application request that terminates automatically;
The distribution overhauls single list block and is used for integral data read module, goes into operation and apply for module, go into operation and permit mould Block, completion application module, the data for the termination block that completes simultaneously are shown;
Single list block, data storage mould are overhauled in read module, distribution to the data memory module for storing data Block goes into operation and applies for module, the permissions module that goes into operation, completion application module, the data for the termination block that completes;
The reminding module be used to carry out staff the single automatic license of distribution maintenance termination prompting.
Preferably, the data in the electric power networks include distribution maintenance forms data and operation ticket data;Described matches Net maintenance forms data include: applying unit, maintenance odd numbers, approval Ting electricity telegram in reply the time, approval the work Kai Shi end time, Scope of power outage, action;The operation order state include it is pending, execute in, filed;The job schedule includes Four processes: have a power failure, go into operation, complete, send a telegram in reply.
Preferably, the permissions module that goes into operation includes automatic license and artificial license both of which.
Preferably, the automatic license, which must satisfy the following conditions, just can trigger condition: 1, the single state of distribution maintenance is It is pending;2, this distribution maintenance associated power failure operation ticket state of request slip is to have filed;3, the application time is gone into operation greater than distribution Overhaul the attack time of the approval of request slip.
Preferably, the reminding module includes that the single prompting permitted automatically of distribution maintenance and distribution maintenance list are automatic eventually The prompting of knot;The single automatic license of the distribution maintenance is reminded after system agrees to go into operation application request automatically, to remind distribution Dispatcher's distribution maintenance is single licensed;The single automatic termination of the distribution maintenance is reminded as when system agrees to Shen of completing automatically After please requesting, remind distribution scheduling person's distribution maintenance is single to terminate.
The present invention also provides a kind of distributions to overhaul automatic work Licensing Methods, and the method is based on described above System, comprising the following steps:
Step S1: data read module reads maintenance forms data and operation ticket data from electric system, and distribution maintenance is single List block generates distribution and overhauls single-row table, and power failure link in the four processes of the job schedule in single-row table is overhauled in distribution State is that the single associated power failure operation ticket of distribution maintenance is not filed;The state for the link that goes into operation is that application goes into operation;The shape for the link that completes State is not apply completing;The state of telegram in reply link is that the single associated telegram in reply operation order of distribution maintenance is not filed;
Step S2: distribution scheduling person grasps according to the action-item of the single associated power failure operation ticket of the distribution maintenance Field Force that orders Make, files the single associated power failure operation ticket of distribution maintenance after end of operation, the work of single list block is overhauled in distribution at this time The state for making the power failure link of progress becomes the single associated power failure operation ticket of distribution maintenance and has filed;
Step S3: when work responsible person sees that the state of the power failure link of the job schedule in single list block is overhauled in distribution When becoming the single associated power failure operation ticket of distribution maintenance and having filed, confirmation distribution overhaul single information it is errorless after, apply for mould going into operation Submit the application request that goes into operation in block, the state that the link that goes into operation in single list block is overhauled in distribution at this time become having applied going into operation but It is unlicensed;
Step S4: the permissions module that goes into operation judges whether to meet " it is pending that single state is overhauled in distribution ", " this distribution maintenance Shen Please single associated power failure operation ticket state be to have filed ", " application time that goes into operation overhauled greater than distribution request slip approval work Three conditions of time started ", if satisfied, the permissions module that goes into operation is permitted automatically, reminding module reminds distribution scheduling person's distribution inspection Repair that request slip is licensed, the state that the job schedule in single list block is overhauled in distribution at this time becomes having permitted;When being unsatisfactory for Any of the above-described condition, work responsible person can not be gone into operation by the permissions module submission that goes into operation applies for request;
Step S5: after distribution service work, work responsible person's confirmation distribution service information is errorless and in completion module Submit completion application request into completion application module after safety measure confirmation part logging data in the middle, the maintenance of distribution at this time The Status Change of completion link in single list block is to have applied going into operation but not terminate;
Step S6: when satisfaction " it is in execution that single state is overhauled in distribution " condition, completion termination block terminates automatically, reminds mould Block reminds distribution scheduling person's distribution maintenance request slip to terminate, and the job schedule in single list block is overhauled in distribution at this time The state of completion link becomes having terminated;When being unsatisfactory for condition, work responsible person can not submit completion Shen by completion module It please request;
Step S7: distribution scheduling person grasps according to the action-item of the single associated telegram in reply operation order of the distribution maintenance Field Force that orders Make, files the single associated telegram in reply operation order of distribution maintenance after end of operation.Distribution at this time is overhauled in single list block The state of the telegram in reply link of job schedule is that the single associated telegram in reply operation order of distribution maintenance has been filed.
Compared with prior art, the beneficial effect of technical solution of the present invention is:
The present invention provides a kind of automatic licensing systems of distribution net equipment service work and method, staff to be by system The process of achievable entire work permit submits work permit registration form without plant maintenance unit, reduces equipment run unit The workload of personnel, while the workload of dispatching desk audit is reduced, it improves work efficiency and power supply reliability, avoids tradition Phone works licensing system can be only done the deficiency of a work permit task in the same time.
Detailed description of the invention
Fig. 1 is system construction drawing of the invention.
Fig. 2 is business process map of the invention.
Specific embodiment
The attached figures are only used for illustrative purposes and cannot be understood as limitating the patent;
In order to better illustrate this embodiment, the certain components of attached drawing have omission, zoom in or out, and do not represent actual product Size;
To those skilled in the art, it is to be understood that certain known features and its explanation, which may be omitted, in attached drawing 's.
The following further describes the technical solution of the present invention with reference to the accompanying drawings and examples.
Embodiment 1
As shown in Figure 1, automatic work licensing system is overhauled in a kind of distribution, including data read module, distribution maintenance are single-row Table module, data memory module go into operation and apply for module, the permissions module that goes into operation, completion application module, completion termination block and mention Awake module;
The data read module, which is used to read the distribution maintenance forms data in electric power networks and transfers data to, matches Net overhauls in single list block;
It is described go into operation apply module for submit the application that goes into operation request into the permissions module that goes into operation;
The described permissions module that goes into operation is requested for automatic application of permitting to go into operation;
The completion application module is for submitting completion application request into completion termination block;
The completion termination block is for the completion application request that terminates automatically;
The distribution overhauls single list block and is used for integral data read module, goes into operation and apply for module, go into operation and permit mould Block, completion application module, the data for the termination block that completes simultaneously are shown;
Single list block, data storage mould are overhauled in read module, distribution to the data memory module for storing data Block goes into operation and applies for module, the permissions module that goes into operation, completion application module, the data for the termination block that completes;
The reminding module be used to carry out staff the single automatic license of distribution maintenance termination prompting.
As a preferred embodiment, the data in the electric power networks include distribution maintenance forms data and operation order Data;The distribution maintenance forms data includes: applying unit, maintenance odd numbers, the Ting electricity telegram in reply time of approval, approval work Start end time, scope of power outage, action;The operation order state include it is pending, execute in, filed;It is described Job schedule include four processes: have a power failure, go into operation, complete, send a telegram in reply.
As a preferred embodiment, the permissions module that goes into operation includes two kinds of moulds of automatic license and artificial license Formula.
As a preferred embodiment, the automatic license must satisfy the following conditions and just can trigger condition: 1, matching It is pending that net, which overhauls single state,;2, this distribution maintenance associated power failure operation ticket state of request slip is to have filed;3, go into operation Shen It please be greater than the attack time of the approval of distribution maintenance request slip the time.
As a preferred embodiment, the reminding module includes the single prompting permitted automatically of distribution maintenance and matches The single prompting to terminate automatically of net maintenance;The described single automatic license of distribution maintenance is reminded as when system application of agreeing to go into operation automatically is asked After asking, remind distribution scheduling person's distribution maintenance single licensed;The single automatic termination of the distribution maintenance is reminded to work as system It is automatic to agree to that completion is applied after requesting, remind distribution scheduling person's distribution maintenance is single to terminate.
Embodiment 2
As shown in Fig. 2, the present invention also provides a kind of distributions to overhaul automatic work Licensing Methods, the method is based on above-mentioned The system, comprising the following steps:
Step S1: data read module reads maintenance forms data and operation ticket data from electric system, and distribution maintenance is single List block generates distribution and overhauls single-row table, and power failure link in the four processes of the job schedule in single-row table is overhauled in distribution State is that the single associated power failure operation ticket of distribution maintenance is not filed;The state for the link that goes into operation is that application goes into operation;The shape for the link that completes State is not apply completing;The state of telegram in reply link is that the single associated telegram in reply operation order of distribution maintenance is not filed;
Step S2: distribution scheduling person grasps according to the action-item of the single associated power failure operation ticket of the distribution maintenance Field Force that orders Make, files the single associated power failure operation ticket of distribution maintenance after end of operation, the work of single list block is overhauled in distribution at this time The state for making the power failure link of progress becomes the single associated power failure operation ticket of distribution maintenance and has filed;
Step S3: when work responsible person sees that the state of the power failure link of the job schedule in single list block is overhauled in distribution When becoming the single associated power failure operation ticket of distribution maintenance and having filed, confirmation distribution overhaul single information it is errorless after, apply for mould going into operation Submit the application request that goes into operation in block, the state that the link that goes into operation in single list block is overhauled in distribution at this time become having applied going into operation but It is unlicensed;
Step S4: the permissions module that goes into operation judges whether to meet " it is pending that single state is overhauled in distribution ", " this distribution maintenance Shen Please single associated power failure operation ticket state be to have filed ", " application time that goes into operation overhauled greater than distribution request slip approval work Three conditions of time started ", if satisfied, the permissions module that goes into operation is permitted automatically, reminding module reminds distribution scheduling person's distribution inspection Repair that request slip is licensed, the state that the job schedule in single list block is overhauled in distribution at this time becomes having permitted;When being unsatisfactory for Any of the above-described condition, work responsible person can not be gone into operation by the permissions module submission that goes into operation applies for request;
Step S5: after distribution service work, work responsible person's confirmation distribution service information is errorless and in completion module Submit completion application request into completion application module after safety measure confirmation part logging data in the middle, the maintenance of distribution at this time The Status Change of completion link in single list block is to have applied going into operation but not terminate;
Step S6: when satisfaction " it is in execution that single state is overhauled in distribution " condition, completion termination block terminates automatically, reminds mould Block reminds distribution scheduling person's distribution maintenance request slip to terminate, and the job schedule in single list block is overhauled in distribution at this time The state of completion link becomes having terminated;When being unsatisfactory for condition, work responsible person can not submit completion Shen by completion module It please request;
Step S7: distribution scheduling person grasps according to the action-item of the single associated telegram in reply operation order of the distribution maintenance Field Force that orders Make, files the single associated telegram in reply operation order of distribution maintenance after end of operation.Distribution at this time is overhauled in single list block The state of the telegram in reply link of job schedule is that the single associated telegram in reply operation order of distribution maintenance has been filed.
The same or similar label correspond to the same or similar components;
The terms describing the positional relationship in the drawings are only for illustration, should not be understood as the limitation to this patent;
Obviously, the above embodiment of the present invention be only to clearly illustrate example of the present invention, and not be pair The restriction of embodiments of the present invention.For those of ordinary skill in the art, may be used also on the basis of the above description To make other variations or changes in different ways.There is no necessity and possibility to exhaust all the enbodiments.It is all this Made any modifications, equivalent replacements, and improvements etc., should be included in the claims in the present invention within the spirit and principle of invention Protection scope within.

Claims (6)

1. automatic work licensing system is overhauled in a kind of distribution, which is characterized in that overhaul single-row table including data read module, distribution Module, data memory module go into operation and apply for module, the permissions module that goes into operation, completion application module, completion termination block and prompting Module;
The data read module is used to read the distribution maintenance forms data in electric power networks and transfers data to distribution inspection It repairs in single list block;
It is described go into operation apply module for submit the application that goes into operation request into the permissions module that goes into operation;
The described permissions module that goes into operation is requested for automatic application of permitting to go into operation;
The completion application module is for submitting completion application request into completion termination block;
The completion termination block is for the completion application request that terminates automatically;
The distribution overhaul single list block for integral data read module, go into operation and apply for the module, permissions module that goes into operation, complete Work application module, the data for the termination block that completes simultaneously are shown;
The data memory module for storing data overhaul single list block, data memory module, open by read module, distribution Work application module, the permissions module that goes into operation, completion application module, the data for the termination block that completes;
The reminding module be used to carry out staff the single automatic license of distribution maintenance termination prompting.
2. automatic work licensing system is overhauled in a kind of distribution according to claim 1, which is characterized in that the power network Data in network include distribution maintenance forms data and operation ticket data;The distribution maintenance forms data includes: applying unit, inspection Repair odd numbers, approval power failure telegram in reply the time, approval work start end time, scope of power outage, action;The operation Ticket state include it is pending, execute in, filed;The job schedule includes four processes: having a power failure, goes into operation, completing, is multiple Electricity.
3. automatic work licensing system is overhauled in a kind of distribution according to claim 2, which is characterized in that described goes into operation perhaps Can module include automatic license and artificial license both of which.
4. automatic work licensing system is overhauled in a kind of distribution according to claim 3, which is characterized in that described is permitted automatically The following conditions, which can be must satisfy, just can trigger condition: 1, it is pending that single state is overhauled in distribution;2, this distribution maintenance request slip closes The power failure operation ticket state of connection is to have filed;3, when work of the application time greater than the approval of distribution maintenance request slip that goes into operation starts Between.
5. automatic work licensing system is overhauled in a kind of distribution according to claim 4, which is characterized in that the prompting mould Block includes the single prompting permitted automatically of distribution maintenance and the single prompting to terminate automatically of distribution maintenance;The distribution maintenance is single certainly Dynamic license is reminded after system agrees to go into operation application request automatically, to remind distribution scheduling person's distribution maintenance single licensed; The single automatic termination of the distribution maintenance reminds after system agrees to completion application request automatically, to remind distribution scheduling person that this is matched Net maintenance is single to have terminated.
6. automatic work Licensing Methods are overhauled in a kind of distribution, the method is based on the described in any item systems of the claims 1~5 System, which comprises the following steps:
Step S1: data read module reads maintenance forms data and operation ticket data from electric system, and single-row table is overhauled in distribution Module generates distribution and overhauls single-row table, and the state of power failure link in the four processes of the job schedule in single-row table is overhauled in distribution Do not file for the single associated power failure operation ticket of distribution maintenance;The state for the link that goes into operation is that application goes into operation;Completion link state be Do not apply completing;The state of telegram in reply link is that the single associated telegram in reply operation order of distribution maintenance is not filed;
Step S2: distribution scheduling person operates according to the action-item of the single associated power failure operation ticket of the distribution maintenance Field Force that orders, The single associated power failure operation ticket of distribution maintenance is filed after end of operation, distribution at this time overhaul the work of single list block into The state of the power failure link of degree becomes the single associated power failure operation ticket of distribution maintenance and has filed;
Step S3: when work responsible person sees that the state of the power failure link of the job schedule in the single list block of distribution maintenance becomes When the single associated power failure operation ticket of distribution maintenance has been filed, after the single information of confirmation distribution maintenance is errorless, apply in module going into operation Submission, which goes into operation, applies for request, and the state that the link that goes into operation in single list block is overhauled in distribution at this time becomes having applied going into operation but not permitted It can;
Step S4: the permissions module that goes into operation judges whether to meet " it is pending that single state is overhauled in distribution ", " this distribution maintenance request slip Associated power failure operation ticket state is to have filed ", " work of approval of the application time greater than distribution maintenance request slip that goes into operation starts Three conditions of time ", if satisfied, the permissions module that goes into operation is permitted automatically, reminding module reminds distribution scheduling person's distribution to overhaul Shen Please singly licensed, the state that the job schedule in single list block is overhauled in distribution at this time becomes having permitted;It is above-mentioned when being unsatisfactory for Either condition, work responsible person can not be gone into operation by the permissions module submission that goes into operation applies for request;
Step S5: after distribution service work, work responsible person's confirmation distribution service information is errorless and in completion module Safety measure confirmation part logging data after submit completion application request to completion application module in, distribution at this time maintenance it is single-row The Status Change of completion link in table module is to have applied going into operation but not terminate;
Step S6: when satisfaction " it is in execution that single state is overhauled in distribution " condition, completion termination block terminates automatically, and reminding module mentions Distribution scheduling person's distribution maintenance request slip of waking up has terminated, and the completion of the job schedule in single list block is overhauled in distribution at this time The state of link becomes having terminated;When being unsatisfactory for condition, work responsible person can not submit completion to ask by completion module It asks;
Step S7: distribution scheduling person operates according to the action-item of the single associated telegram in reply operation order of the distribution maintenance Field Force that orders, The single associated telegram in reply operation order of distribution maintenance is filed after end of operation.The work in single list block is overhauled in distribution at this time The state of the telegram in reply link of progress is that the single associated telegram in reply operation order of distribution maintenance has been filed.
CN201910507379.8A 2019-06-12 2019-06-12 Automatic work permission system and method for distribution network overhaul Active CN110349049B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910507379.8A CN110349049B (en) 2019-06-12 2019-06-12 Automatic work permission system and method for distribution network overhaul

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910507379.8A CN110349049B (en) 2019-06-12 2019-06-12 Automatic work permission system and method for distribution network overhaul

Publications (2)

Publication Number Publication Date
CN110349049A true CN110349049A (en) 2019-10-18
CN110349049B CN110349049B (en) 2023-05-26

Family

ID=68181882

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910507379.8A Active CN110349049B (en) 2019-06-12 2019-06-12 Automatic work permission system and method for distribution network overhaul

Country Status (1)

Country Link
CN (1) CN110349049B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113095784A (en) * 2021-04-15 2021-07-09 广东电网有限责任公司 Automatic issuing method, device and storage medium for electronic handover list
CN114037103A (en) * 2021-12-13 2022-02-11 深圳供电局有限公司 Main network overhauls single flow intelligence execution system
CN114139734A (en) * 2021-11-01 2022-03-04 武汉钢铁有限公司 Maintenance management method, server, medium and equipment
CN114154663A (en) * 2021-12-14 2022-03-08 深圳供电局有限公司 Main network overhauls single flow intelligence processing system

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101794410A (en) * 2009-12-31 2010-08-04 甘肃省电力公司定西供电公司 Power grid intelligent dispatching operation sheet generating system based on drawing environment
CN102097859A (en) * 2010-09-02 2011-06-15 广东省电力调度中心 Power grid dispatching intelligentized and instruction informationized working platform
CN203406903U (en) * 2013-02-22 2014-01-22 广东电网公司中山供电局 Distribution network scheduling instruction processing system based on technology of mobile communication
CN108876140A (en) * 2018-06-12 2018-11-23 广东电网有限责任公司 A kind of dispatching method, device, server and the medium of power communication maintenance task
CN109034659A (en) * 2018-08-22 2018-12-18 广东电网有限责任公司 A kind of grid dispatching management system
CN109299855A (en) * 2018-08-24 2019-02-01 国网天津市电力公司 A kind of communicating for power information scheduling system and its dispatching method
CN109740973A (en) * 2019-02-28 2019-05-10 广东电网有限责任公司 A kind of power communication intelligent scheduling platform

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101794410A (en) * 2009-12-31 2010-08-04 甘肃省电力公司定西供电公司 Power grid intelligent dispatching operation sheet generating system based on drawing environment
CN102097859A (en) * 2010-09-02 2011-06-15 广东省电力调度中心 Power grid dispatching intelligentized and instruction informationized working platform
CN203406903U (en) * 2013-02-22 2014-01-22 广东电网公司中山供电局 Distribution network scheduling instruction processing system based on technology of mobile communication
CN108876140A (en) * 2018-06-12 2018-11-23 广东电网有限责任公司 A kind of dispatching method, device, server and the medium of power communication maintenance task
CN109034659A (en) * 2018-08-22 2018-12-18 广东电网有限责任公司 A kind of grid dispatching management system
CN109299855A (en) * 2018-08-24 2019-02-01 国网天津市电力公司 A kind of communicating for power information scheduling system and its dispatching method
CN109740973A (en) * 2019-02-28 2019-05-10 广东电网有限责任公司 A kind of power communication intelligent scheduling platform

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113095784A (en) * 2021-04-15 2021-07-09 广东电网有限责任公司 Automatic issuing method, device and storage medium for electronic handover list
CN113095784B (en) * 2021-04-15 2024-02-13 广东电网有限责任公司 Electronic handover list automatic issuing method, device and storage medium
CN114139734A (en) * 2021-11-01 2022-03-04 武汉钢铁有限公司 Maintenance management method, server, medium and equipment
CN114037103A (en) * 2021-12-13 2022-02-11 深圳供电局有限公司 Main network overhauls single flow intelligence execution system
CN114154663A (en) * 2021-12-14 2022-03-08 深圳供电局有限公司 Main network overhauls single flow intelligence processing system

Also Published As

Publication number Publication date
CN110349049B (en) 2023-05-26

Similar Documents

Publication Publication Date Title
CN110349049A (en) A kind of distribution maintenance automatic work licensing system and method
CN110956357A (en) Intelligent regulation and control networked interaction system applied to power company
CN108876140B (en) Scheduling method, device, server and medium for power communication maintenance task
CN109034659A (en) A kind of grid dispatching management system
CN108510242B (en) Work order processing method, system and terminal equipment
CN110350655A (en) One kind is ordered system with grid operation ticket sequencing
CN109074538A (en) Digital employee is created in the tissue
CN111047257A (en) Production order management system based on 5G network
CN204856196U (en) Intelligent production line process control system of bearing thing networking
CN109840696B (en) Scheduling work whole process control method and system based on closed-loop management
CN102646220A (en) Multi-network-based manufacturing data real-time process management system and management method in ship manufacturing industry
CN101127102A (en) Contracted life cycle supervision system and method
CN106276457A (en) The method of elevator data management
CN104616108A (en) Method for distributing and recovering electric power overhaul tool
CN112308244A (en) Nuclear power station maintenance license management and control method and device, storage medium and terminal equipment
CN111680916A (en) Electric power distribution virtual dispatcher device and method
CN101799897A (en) Intelligent figure error resistant operation ticket management system
CN110991834A (en) Scheduling system of electric power overhaul task
CN102254414A (en) Embedded automatic meter reading system based on GPRS (Global System for Mobile Communications)
CN202306631U (en) Visual management system for biopharmaceutical factory equipment
JP4739656B2 (en) Parts supply management system with remaining number management
CN109740973A (en) A kind of power communication intelligent scheduling platform
CN110135601A (en) A kind of system and method that distribution scheduling interruption maintenance is permitted indirectly
CN110796842B (en) Mobile meter reading system
CN106991532A (en) AGC information synchronization methods and system between isomery dispatching automation main preparation system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant