CN110335017A - One kind being based on BIM project amount charging Informatization Cooperative working method - Google Patents
One kind being based on BIM project amount charging Informatization Cooperative working method Download PDFInfo
- Publication number
- CN110335017A CN110335017A CN201910516825.1A CN201910516825A CN110335017A CN 110335017 A CN110335017 A CN 110335017A CN 201910516825 A CN201910516825 A CN 201910516825A CN 110335017 A CN110335017 A CN 110335017A
- Authority
- CN
- China
- Prior art keywords
- project amount
- payment
- bim
- bill
- quantities
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q40/00—Finance; Insurance; Tax strategies; Processing of corporate or income taxes
- G06Q40/12—Accounting
- G06Q40/125—Finance or payroll
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Accounting & Taxation (AREA)
- Finance (AREA)
- Human Resources & Organizations (AREA)
- General Business, Economics & Management (AREA)
- Marketing (AREA)
- Entrepreneurship & Innovation (AREA)
- Physics & Mathematics (AREA)
- Economics (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Development Economics (AREA)
- Data Mining & Analysis (AREA)
- Technology Law (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Tourism & Hospitality (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The present invention relates to one kind be based on BIM project amount charging Informatization Cooperative working method, 1) establish BIM model;2) component project amount is extracted;3) bill of quantities is entered into BIM+GIS project management system;4) BIM model is associated with bill of quantities;5) successively selection, typing component project amount to be batched;6) bill of quantities is associated with component quality inspection data;7) metering summarizes application, application form for cash advances in bill of quantities;8) metering summarizes examination & approval;9) payment summarizes application;10) payment summarizes examination & approval;11) output meets the computation payment report of archiving requirements;12) papery version report is printed, for the application of engineering funds computation payment, filing.The present invention solves the problems such as existing extensive management during Traditional project computation payment, control of investment difficulty is big.
Description
Technical field
The present invention relates to project amount charging technical fields, are based on BIM project amount charging more specifically to one kind
Informatization Cooperative working method.
Background technique
It is premise and foundation of the employer to contractor's payment contract price in the correct metering of project amount.Computation payment is answered
Meet following three basic principles: (1) being measured by the project amount that contractor actually accomplishes during performing someone's duty under the contract;(2)
For not meeting the engineering of contract documents requirement, contractor exceeds construction drawing range or the work because doing over again caused by contractor's reason
Cheng Liang is not measured;(3) if occurring leakage item, quantities calculation deviation and change in the work in discovery bill of quantities causes work
The increase and decrease of journey amount should be adjusted factually, correct to measure;(4) component examination is unqualified, component is not checked and accepted does not allow to measure.
Traditional project computation payment executes, extensive management according to by the bill of quantities of minimum unit of subdivisional work, difficult
To be accurately determined the project amount that contractor actually accomplishes during performing someone's duty under the contract, it cannot be guaranteed that contractor's scheduled fun Shen
Please when the project amount submitted without departing from construction drawing range, less can ensure that not occurring leaking item, quantities calculation deviation etc. asks
Topic.
BIM (architecture information model), which is integrated with, builds all geometrical model information, unit performance and functional requirement, will
All information integrations in one construction project entire lifetime into buildings model, to the effect of construction industry technological innovation and
Meaning has obtained being widely recognized as industry in the world.On the one hand, traditional two dimensional drafting is converted to three-dimensional high-precision
Information model is spent, engineering-built information can efficiently, be completely transmitted.On the other hand, each side is taken part in building in virtual three based on BIM
On dimension word platform, it is more advantageous to exchange and management, avoids asymmetry and information island in construction information transmittance process
It generates.
Bill of quantities is refine to each engineering component by BIM project management system, realizes each component project amount
With the one-to-one correspondence of drawing and BIM model engineering amount, allow each component amount of having can be according to, it is valuable to ask, realize the essence of component grade
ZOOM analysis.Meanwhile can uniquely be recorded using BIM model and intuitively show engineering component metering state, prevent component from repeating to count
Amount, maintains strict control over management of investment pass.
Summary of the invention
(1) technical problems to be solved
In order to solve the above problem of the prior art, it is information-based based on BIM project amount charging that the invention proposes one kind
Collaboration working method solves existing extensive management during Traditional project computation payment, the problems such as control of investment difficulty is big.
(2) technical solution
In order to achieve the above object, the main technical schemes that the present invention uses include:
Design a kind of based on BIM project amount charging Informatization Cooperative working method, which is characterized in that this method include with
Lower step:
Step 1): BIM model is established;
Step 2): component project amount is extracted;
Step 3): bill of quantities is entered into BIM+GIS project management system;
Step 4): BIM model is associated with bill of quantities;
Step 5): successively selection, typing component project amount to be batched;
Step 6): bill of quantities is associated with component quality inspection data;
Step 7): metering summarizes application, application form for cash advances in bill of quantities;
Step 8): metering summarizes examination & approval;
Step 9): payment summarizes application;
Step 10): payment summarizes examination & approval;
Step 11): output meets the computation payment report of archiving requirements;
Step 12): printing papery version report, for the application of engineering funds computation payment, filing.
Preferably, in the step 2), the component project amount includes bright column, composition component in bill of quantities
The project amount of a variety of materials, the component project amount summarize the basic data of application as metering in step 7);With based on modeling
The project amount rapidly extracting plug-in unit of software development extracts component project amount.
Preferably, in the step 4), by each BIM model interaction to affiliated engineering in BIM project management system
It measures in inventory item.
Preferably, in the step 5), component project amount to be batched is selected using two methods of single choice and batch selection,
The component project amount to be batched refers to current period metering element, for the component engineering actually accomplished in progress payment requisition cycle
Amount, the project amount do not allow more than the component project amount extracted from BIM model in step 2).
Preferably, in the step 7), expense includes the items of bright column in bill of quantities in the bill of quantities
Expense.
Preferably, in the step 8), supervisor, owner's unit successively audit the metering of construction party current period and summarize application
Data, workflow examination and approval terminate, and complete the bill of quantities application form for cash advances of construction party current period.
Preferably, in the step 9), it is described payment summarize for by examination & approval metering summarize the amount of money on the basis of,
Based on contract, code requirement core increases or examines and makes cuts the outer expense of inventory, wherein it includes but is not limited to price adjustment, material that core, which increases expense,
Poor, change in the work, Construction Claim expense are adjusted, the expense of examining and making cuts includes but is not limited to preserving capital, quality assurance gold, penalty, prepayment
Money button time, contractual line expense.
Preferably, in the step 10), supervisor, owner's unit, which successively audit, modifies construction party current period branch pays
Total request for data, workflow examination and approval terminate, and complete the payment electronic flow application of construction party current period progress payment.
Preferably, in the step 11), the computation payment report includes but is not limited to every in current period computation payment
The information of expense detail and auditor's signature, examination and approval authority's stamped signature.
(3) beneficial effect
The beneficial effects of the present invention are: the present invention solve existing extensive management during Traditional project computation payment,
The problems such as control of investment difficulty is big.
Detailed description of the invention
Fig. 1 is a kind of flow diagram based on BIM project amount charging Informatization Cooperative working method.
Specific embodiment
In order to preferably explain the present invention, in order to understand, with reference to the accompanying drawing, by specific embodiment, to this hair
It is bright to be described in detail.
As shown in Figure 1, the present invention provides one kind based on BIM project amount charging Informatization Cooperative working method, this method
Specifically includes the following steps:
Step 1): BIM model is established.
Step 2): component project amount is extracted.The component project amount includes bright column, composition component in bill of quantities
The project amount of a variety of materials, the project amount summarize the basic data of application as metering, prevent the application of contractor's excess or super model
Application is enclosed, can be extracted with the project amount rapidly extracting plug-in unit developed based on modeling software.
Step 3): bill of quantities is entered into BIM+GIS project management system.
Step 4): BIM model is associated with bill of quantities.The BIM model is associated with bill of quantities refers to BIM mould
Inner link between type and bill of quantities.By each BIM model interaction to affiliated project amount in BIM project management system
In inventory item.
Step 5): successively selection, typing component project amount to be batched.In the embodiment of the present invention, using single choice and it can criticize
Two methods of amount selection select current period metering element.The component project amount to be batched is practical in progress payment requisition cycle
The component project amount of completion, the project amount do not allow more than the component project amount extracted from BIM model in step 2).
Step 6): bill of quantities is associated with component quality inspection data.
Step 7): metering summarizes application, application form for cash advances in bill of quantities.Expense includes engineering in the bill of quantities
Measure the general expenses of bright column in inventory.
Step 8): metering summarizes examination & approval.The metering summarizes examination & approval and refers to that supervisor, owner's unit successively audit construction
Square current period metering summarizes request for data.Workflow examination and approval terminates, and completes the bill of quantities application form for cash advances of construction party current period.
Step 9): payment summarizes application.The payment, which summarizes, to be referred on the basis of summarizing the amount of money by the metering examined,
Based on contract, code requirement, core increase or examine and make cuts the outer expense of inventory.It mainly includes that price adjustment, material tune be poor, engineering that core, which increases expense,
The expenses such as change, Construction Claim, expense of examining and making cuts mainly include preserving capital, quality assurance gold, penalty, advance payment button time, promise breaking
Remission expense.
Step 10): payment summarizes examination & approval.The payment summarizes examination & approval and refers to that supervisor, owner's unit successively audit, repair
Change the payment of construction party current period and summarizes request for data.Workflow examination and approval terminates, and completes construction party current period progress payment payment electron stream
Journey application.
Step 11): output meets the computation payment report of archiving requirements.The computation payment report includes current period metering branch
The information such as general expenses detail and auditor's signature, examination and approval authority's stamped signature in paying.
Step 12): printing papery version report, for the application of engineering funds computation payment, filing.
The present invention is wanted according to the correlation in standard GB/T 50500-2013 " construction project valuating engineering work load with bill "
Design is sought, increases computation payment functional module in having been provided with the BIM informationization project management system using function.
The present invention is suitable for following engineering type: various types of infrastructure such as municipal administration, highway, bridge, water transport, railway
Engineering, different engineering types need to require to develop different metering branch according to the engineering type computation payment application and archive format
Pay printout report.
The embodiment of the present invention is described in attached drawing, but the invention is not limited to above-mentioned specific embodiment parties
Formula, the above mentioned embodiment is only schematical, rather than restrictive, and those skilled in the art are in this hair
Under bright enlightenment, without breaking away from the scope protected by the purposes and claims of the present invention, many forms can be also made, this
It is belonged within protection of the invention a bit.
Claims (9)
1. one kind is based on BIM project amount charging Informatization Cooperative working method, which is characterized in that this method includes following step
It is rapid:
Step 1): BIM model is established;
Step 2): component project amount is extracted;
Step 3): bill of quantities is entered into BIM+GIS project management system;
Step 4): BIM model is associated with bill of quantities;
Step 5): successively selection, typing component project amount to be batched;
Step 6): bill of quantities is associated with component quality inspection data;
Step 7): metering summarizes application, application form for cash advances in bill of quantities;
Step 8): metering summarizes examination & approval;
Step 9): payment summarizes application;
Step 10): payment summarizes examination & approval;
Step 11): output meets the computation payment report of archiving requirements;
Step 12): printing papery version report, for the application of engineering funds computation payment, filing.
2. as described in claim 1 a kind of based on BIM project amount charging Informatization Cooperative working method, it is characterised in that:
In the step 2), the component project amount includes the engineering of a variety of materials of bright column, composition component in bill of quantities
Amount, the component project amount summarize the basic data of application as metering in step 7);With the engineering developed based on modeling software
It measures rapidly extracting plug-in unit and extracts component project amount.
3. as described in claim 1 a kind of based on BIM project amount charging Informatization Cooperative working method, it is characterised in that:
In the step 4), in BIM project management system by each BIM model interaction into affiliated bill of quantities item.
4. as described in claim 1 a kind of based on BIM project amount charging Informatization Cooperative working method, it is characterised in that:
In the step 5), component project amount to be batched, the component to be batched are selected using two methods of single choice and batch selection
Project amount refers to current period metering element, and for the component project amount actually accomplished in progress payment requisition cycle, which does not permit
It perhaps is more than the component project amount extracted from BIM model in step 2).
5. described in claim 1 a kind of based on BIM project amount charging Informatization Cooperative working method, it is characterised in that:
In the step 7), expense includes the general expenses of bright column in bill of quantities in the bill of quantities.
6. described in claim 1 a kind of based on BIM project amount charging Informatization Cooperative working method, it is characterised in that:
In the step 8), supervisor, owner's unit successively audit the metering of construction party current period and summarize request for data, and workflow examination and approval terminates
Then complete the bill of quantities application form for cash advances of construction party current period.
7. described in claim 1 a kind of based on BIM project amount charging Informatization Cooperative working method, it is characterised in that:
Based on contract, code requirement in the step 9), the payment summarizes on the basis of summarizing the amount of money by the metering of examination & approval,
Core increases or examines and makes cuts the outer expense of inventory, wherein it includes but is not limited to that price adjustment, material tune be poor, change in the work, construction that core, which increases expense,
Claim expense, the expense of examining and making cuts include but is not limited to preserving capital, quality assurance gold, penalty, advance payment button time, contractual line expense
With.
8. described in claim 1 a kind of based on BIM project amount charging Informatization Cooperative working method, it is characterised in that:
In the step 10), supervisor, owner's unit, which successively audited, modifies the payment of construction party current period summarizes request for data, and process is examined
Criticizing terminates then to complete the payment electronic flow application of construction party current period progress payment.
9. described in claim 1 a kind of based on BIM project amount charging Informatization Cooperative working method, it is characterised in that:
In the step 11), the computation payment report includes but is not limited to general expenses detail and auditor in current period computation payment
The information of signature, examination and approval authority's stamped signature.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910516825.1A CN110335017A (en) | 2019-06-14 | 2019-06-14 | One kind being based on BIM project amount charging Informatization Cooperative working method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910516825.1A CN110335017A (en) | 2019-06-14 | 2019-06-14 | One kind being based on BIM project amount charging Informatization Cooperative working method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110335017A true CN110335017A (en) | 2019-10-15 |
Family
ID=68140644
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910516825.1A Pending CN110335017A (en) | 2019-06-14 | 2019-06-14 | One kind being based on BIM project amount charging Informatization Cooperative working method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110335017A (en) |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111061805A (en) * | 2019-11-19 | 2020-04-24 | 四川高路交通信息工程有限公司 | Information management service platform applied to highway construction |
CN111160764A (en) * | 2019-12-27 | 2020-05-15 | 昆明海巍科技有限公司 | Material difference adjustment management control system, control method and computer |
CN111598731A (en) * | 2020-03-27 | 2020-08-28 | 广联达科技股份有限公司 | Intelligent adjustment system and method for man-machine price difference in engineering settlement |
CN112307548A (en) * | 2020-11-02 | 2021-02-02 | 中国电建集团华东勘测设计研究院有限公司 | BIM-based rail transit construction visualization progress management method and system |
CN112330264A (en) * | 2020-09-27 | 2021-02-05 | 中国三峡建设管理有限公司 | Hydropower engineering contract execution four-time management method |
CN112989459A (en) * | 2021-02-22 | 2021-06-18 | 上海市城市建设设计研究总院(集团)有限公司 | BIM measurement deduction and inspection method based on inventory item |
CN113094794A (en) * | 2021-04-21 | 2021-07-09 | 四川省交通建设集团股份有限公司 | Automatic metering and accounting method and system based on BIM and GIS technology |
CN113591188A (en) * | 2021-07-26 | 2021-11-02 | 广州市建筑科学研究院集团有限公司 | BIM-based project progress and project payment management system and method |
CN113706086A (en) * | 2020-05-22 | 2021-11-26 | 成晟 | Bridge construction quality measurement change progress plan management data structure design |
CN113868753A (en) * | 2021-12-06 | 2021-12-31 | 深圳市城市交通规划设计研究中心股份有限公司 | Intelligent metering method and device for building engineering, computing equipment and storage medium |
CN115114695A (en) * | 2021-03-18 | 2022-09-27 | 广东博智林机器人有限公司 | Component determination method, component determination device, electronic equipment and storage medium |
CN113591188B (en) * | 2021-07-26 | 2024-10-25 | 广州市建筑科学研究院集团有限公司 | Engineering progress and engineering money payment management system and method based on BIM |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101504741A (en) * | 2009-02-18 | 2009-08-12 | 路桥集团国际建设股份有限公司 | Intelligent metering management system and method for construction engineering |
US20150310136A1 (en) * | 2014-04-24 | 2015-10-29 | WD Partners, Inc. | Architectural design dashboard |
CN108416701A (en) * | 2018-03-06 | 2018-08-17 | 湖南建工集团有限公司 | A kind of processing method of the Engineering Project Construction real data based on BIM |
US20180349522A1 (en) * | 2017-06-05 | 2018-12-06 | Siteaware Systems Ltd. | Adaptive Modeling of Buildings During Construction |
CN109447481A (en) * | 2018-10-31 | 2019-03-08 | 广西路桥工程集团有限公司 | A kind of live cost monitoring system and method based on threedimensional model |
CN109785018A (en) * | 2019-03-21 | 2019-05-21 | 广州翔实工程咨询有限公司 | Automatic budget and balance method and system based on BIM |
-
2019
- 2019-06-14 CN CN201910516825.1A patent/CN110335017A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101504741A (en) * | 2009-02-18 | 2009-08-12 | 路桥集团国际建设股份有限公司 | Intelligent metering management system and method for construction engineering |
US20150310136A1 (en) * | 2014-04-24 | 2015-10-29 | WD Partners, Inc. | Architectural design dashboard |
US20180349522A1 (en) * | 2017-06-05 | 2018-12-06 | Siteaware Systems Ltd. | Adaptive Modeling of Buildings During Construction |
CN108416701A (en) * | 2018-03-06 | 2018-08-17 | 湖南建工集团有限公司 | A kind of processing method of the Engineering Project Construction real data based on BIM |
CN109447481A (en) * | 2018-10-31 | 2019-03-08 | 广西路桥工程集团有限公司 | A kind of live cost monitoring system and method based on threedimensional model |
CN109785018A (en) * | 2019-03-21 | 2019-05-21 | 广州翔实工程咨询有限公司 | Automatic budget and balance method and system based on BIM |
Cited By (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111061805A (en) * | 2019-11-19 | 2020-04-24 | 四川高路交通信息工程有限公司 | Information management service platform applied to highway construction |
CN111160764A (en) * | 2019-12-27 | 2020-05-15 | 昆明海巍科技有限公司 | Material difference adjustment management control system, control method and computer |
CN111598731A (en) * | 2020-03-27 | 2020-08-28 | 广联达科技股份有限公司 | Intelligent adjustment system and method for man-machine price difference in engineering settlement |
CN113706086A (en) * | 2020-05-22 | 2021-11-26 | 成晟 | Bridge construction quality measurement change progress plan management data structure design |
CN112330264A (en) * | 2020-09-27 | 2021-02-05 | 中国三峡建设管理有限公司 | Hydropower engineering contract execution four-time management method |
CN112330264B (en) * | 2020-09-27 | 2024-07-26 | 中国三峡建设管理有限公司 | Four-time simultaneous management method for hydropower engineering contract execution |
CN112307548A (en) * | 2020-11-02 | 2021-02-02 | 中国电建集团华东勘测设计研究院有限公司 | BIM-based rail transit construction visualization progress management method and system |
CN112989459A (en) * | 2021-02-22 | 2021-06-18 | 上海市城市建设设计研究总院(集团)有限公司 | BIM measurement deduction and inspection method based on inventory item |
CN112989459B (en) * | 2021-02-22 | 2023-04-07 | 上海市城市建设设计研究总院(集团)有限公司 | BIM measurement deduction and inspection method based on inventory item |
CN115114695A (en) * | 2021-03-18 | 2022-09-27 | 广东博智林机器人有限公司 | Component determination method, component determination device, electronic equipment and storage medium |
CN113094794A (en) * | 2021-04-21 | 2021-07-09 | 四川省交通建设集团股份有限公司 | Automatic metering and accounting method and system based on BIM and GIS technology |
CN113591188A (en) * | 2021-07-26 | 2021-11-02 | 广州市建筑科学研究院集团有限公司 | BIM-based project progress and project payment management system and method |
CN113591188B (en) * | 2021-07-26 | 2024-10-25 | 广州市建筑科学研究院集团有限公司 | Engineering progress and engineering money payment management system and method based on BIM |
CN113868753B (en) * | 2021-12-06 | 2022-08-12 | 深圳市城市交通规划设计研究中心股份有限公司 | Intelligent metering method and device for building engineering, computing equipment and storage medium |
CN113868753A (en) * | 2021-12-06 | 2021-12-31 | 深圳市城市交通规划设计研究中心股份有限公司 | Intelligent metering method and device for building engineering, computing equipment and storage medium |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110335017A (en) | One kind being based on BIM project amount charging Informatization Cooperative working method | |
CN108564207B (en) | BIM-based construction engineering intelligent bidding decision management system | |
CN103136626B (en) | The online management method of engineering project | |
CN104217362B (en) | The method of score-clearing system and off-line transaction based on internet communication, online i.e. time-division account | |
CN107481137A (en) | A kind of network loan system | |
CN103021219A (en) | Intelligent simulation system for power ERP service | |
CN109409634A (en) | A method of the metering of Grid Construction Project project amount is carried out based on project management APP | |
CN113656505B (en) | Digitization of distributed project management system and method for synchronizing data thereof | |
CN106127398A (en) | A kind of construction costs being applicable to project of transmitting and converting electricity calculates system | |
CN113610486A (en) | Project cost accounting method | |
Özen et al. | Empirical Analysis of the Effect of foreign trade in Computer and communication services on Economic Growth in India | |
CN110472961A (en) | Business is deducted fees the execution method and device of operation | |
CN114154862A (en) | Engineering cost automatic allocation method and system based on engineering whole-process management | |
Owais et al. | Readiness and challenges for applying IFRS 17 (insurance contracts): The case of Jordanian insurance companies | |
CN105787633A (en) | System and method for processing concurrent examining and approving flow | |
CN116151940A (en) | Bid performance fusion system based on blockchain | |
CN108876577A (en) | The system that multilingual mobile visualization collects processing information | |
CN116777655A (en) | Highway engineering construction total price contractor metering management system and method | |
CN111179094A (en) | Block chain-based certificate transfer management method | |
CN108921682A (en) | A kind of processing method of value-added tax, device and system | |
CN109345363A (en) | A kind of land value-added tax settlement auditing system and method | |
Mêda et al. | Towards Software Integration in the Construction Industry–ERP and ICIS Case Study | |
Perera et al. | A comparative study of construction cost and commercial management services in the UK and China. | |
CN206178965U (en) | A information -based management system for power communication | |
CN112651700A (en) | Payroll bonus dispensing system based on blockchain technology and central bank digital currency |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |