CN110335017A - One kind being based on BIM project amount charging Informatization Cooperative working method - Google Patents

One kind being based on BIM project amount charging Informatization Cooperative working method Download PDF

Info

Publication number
CN110335017A
CN110335017A CN201910516825.1A CN201910516825A CN110335017A CN 110335017 A CN110335017 A CN 110335017A CN 201910516825 A CN201910516825 A CN 201910516825A CN 110335017 A CN110335017 A CN 110335017A
Authority
CN
China
Prior art keywords
project amount
payment
bim
bill
quantities
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910516825.1A
Other languages
Chinese (zh)
Inventor
樊金甲
潘国华
宋叶青
魏世桥
孔增增
孟成成
龚赞
杨建峰
翁磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Jiaotong Construction Engineering Co Ltd
CCCC Second Harbor Consultants Co Ltd
Original Assignee
Hangzhou Jiaotong Construction Engineering Co Ltd
CCCC Second Harbor Consultants Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Jiaotong Construction Engineering Co Ltd, CCCC Second Harbor Consultants Co Ltd filed Critical Hangzhou Jiaotong Construction Engineering Co Ltd
Priority to CN201910516825.1A priority Critical patent/CN110335017A/en
Publication of CN110335017A publication Critical patent/CN110335017A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q40/00Finance; Insurance; Tax strategies; Processing of corporate or income taxes
    • G06Q40/12Accounting
    • G06Q40/125Finance or payroll

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Accounting & Taxation (AREA)
  • Finance (AREA)
  • Human Resources & Organizations (AREA)
  • General Business, Economics & Management (AREA)
  • Marketing (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Physics & Mathematics (AREA)
  • Economics (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Development Economics (AREA)
  • Data Mining & Analysis (AREA)
  • Technology Law (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention relates to one kind be based on BIM project amount charging Informatization Cooperative working method, 1) establish BIM model;2) component project amount is extracted;3) bill of quantities is entered into BIM+GIS project management system;4) BIM model is associated with bill of quantities;5) successively selection, typing component project amount to be batched;6) bill of quantities is associated with component quality inspection data;7) metering summarizes application, application form for cash advances in bill of quantities;8) metering summarizes examination & approval;9) payment summarizes application;10) payment summarizes examination & approval;11) output meets the computation payment report of archiving requirements;12) papery version report is printed, for the application of engineering funds computation payment, filing.The present invention solves the problems such as existing extensive management during Traditional project computation payment, control of investment difficulty is big.

Description

One kind being based on BIM project amount charging Informatization Cooperative working method
Technical field
The present invention relates to project amount charging technical fields, are based on BIM project amount charging more specifically to one kind Informatization Cooperative working method.
Background technique
It is premise and foundation of the employer to contractor's payment contract price in the correct metering of project amount.Computation payment is answered Meet following three basic principles: (1) being measured by the project amount that contractor actually accomplishes during performing someone's duty under the contract;(2) For not meeting the engineering of contract documents requirement, contractor exceeds construction drawing range or the work because doing over again caused by contractor's reason Cheng Liang is not measured;(3) if occurring leakage item, quantities calculation deviation and change in the work in discovery bill of quantities causes work The increase and decrease of journey amount should be adjusted factually, correct to measure;(4) component examination is unqualified, component is not checked and accepted does not allow to measure.
Traditional project computation payment executes, extensive management according to by the bill of quantities of minimum unit of subdivisional work, difficult To be accurately determined the project amount that contractor actually accomplishes during performing someone's duty under the contract, it cannot be guaranteed that contractor's scheduled fun Shen Please when the project amount submitted without departing from construction drawing range, less can ensure that not occurring leaking item, quantities calculation deviation etc. asks Topic.
BIM (architecture information model), which is integrated with, builds all geometrical model information, unit performance and functional requirement, will All information integrations in one construction project entire lifetime into buildings model, to the effect of construction industry technological innovation and Meaning has obtained being widely recognized as industry in the world.On the one hand, traditional two dimensional drafting is converted to three-dimensional high-precision Information model is spent, engineering-built information can efficiently, be completely transmitted.On the other hand, each side is taken part in building in virtual three based on BIM On dimension word platform, it is more advantageous to exchange and management, avoids asymmetry and information island in construction information transmittance process It generates.
Bill of quantities is refine to each engineering component by BIM project management system, realizes each component project amount With the one-to-one correspondence of drawing and BIM model engineering amount, allow each component amount of having can be according to, it is valuable to ask, realize the essence of component grade ZOOM analysis.Meanwhile can uniquely be recorded using BIM model and intuitively show engineering component metering state, prevent component from repeating to count Amount, maintains strict control over management of investment pass.
Summary of the invention
(1) technical problems to be solved
In order to solve the above problem of the prior art, it is information-based based on BIM project amount charging that the invention proposes one kind Collaboration working method solves existing extensive management during Traditional project computation payment, the problems such as control of investment difficulty is big.
(2) technical solution
In order to achieve the above object, the main technical schemes that the present invention uses include:
Design a kind of based on BIM project amount charging Informatization Cooperative working method, which is characterized in that this method include with Lower step:
Step 1): BIM model is established;
Step 2): component project amount is extracted;
Step 3): bill of quantities is entered into BIM+GIS project management system;
Step 4): BIM model is associated with bill of quantities;
Step 5): successively selection, typing component project amount to be batched;
Step 6): bill of quantities is associated with component quality inspection data;
Step 7): metering summarizes application, application form for cash advances in bill of quantities;
Step 8): metering summarizes examination & approval;
Step 9): payment summarizes application;
Step 10): payment summarizes examination & approval;
Step 11): output meets the computation payment report of archiving requirements;
Step 12): printing papery version report, for the application of engineering funds computation payment, filing.
Preferably, in the step 2), the component project amount includes bright column, composition component in bill of quantities The project amount of a variety of materials, the component project amount summarize the basic data of application as metering in step 7);With based on modeling The project amount rapidly extracting plug-in unit of software development extracts component project amount.
Preferably, in the step 4), by each BIM model interaction to affiliated engineering in BIM project management system It measures in inventory item.
Preferably, in the step 5), component project amount to be batched is selected using two methods of single choice and batch selection, The component project amount to be batched refers to current period metering element, for the component engineering actually accomplished in progress payment requisition cycle Amount, the project amount do not allow more than the component project amount extracted from BIM model in step 2).
Preferably, in the step 7), expense includes the items of bright column in bill of quantities in the bill of quantities Expense.
Preferably, in the step 8), supervisor, owner's unit successively audit the metering of construction party current period and summarize application Data, workflow examination and approval terminate, and complete the bill of quantities application form for cash advances of construction party current period.
Preferably, in the step 9), it is described payment summarize for by examination & approval metering summarize the amount of money on the basis of, Based on contract, code requirement core increases or examines and makes cuts the outer expense of inventory, wherein it includes but is not limited to price adjustment, material that core, which increases expense, Poor, change in the work, Construction Claim expense are adjusted, the expense of examining and making cuts includes but is not limited to preserving capital, quality assurance gold, penalty, prepayment Money button time, contractual line expense.
Preferably, in the step 10), supervisor, owner's unit, which successively audit, modifies construction party current period branch pays Total request for data, workflow examination and approval terminate, and complete the payment electronic flow application of construction party current period progress payment.
Preferably, in the step 11), the computation payment report includes but is not limited to every in current period computation payment The information of expense detail and auditor's signature, examination and approval authority's stamped signature.
(3) beneficial effect
The beneficial effects of the present invention are: the present invention solve existing extensive management during Traditional project computation payment, The problems such as control of investment difficulty is big.
Detailed description of the invention
Fig. 1 is a kind of flow diagram based on BIM project amount charging Informatization Cooperative working method.
Specific embodiment
In order to preferably explain the present invention, in order to understand, with reference to the accompanying drawing, by specific embodiment, to this hair It is bright to be described in detail.
As shown in Figure 1, the present invention provides one kind based on BIM project amount charging Informatization Cooperative working method, this method Specifically includes the following steps:
Step 1): BIM model is established.
Step 2): component project amount is extracted.The component project amount includes bright column, composition component in bill of quantities The project amount of a variety of materials, the project amount summarize the basic data of application as metering, prevent the application of contractor's excess or super model Application is enclosed, can be extracted with the project amount rapidly extracting plug-in unit developed based on modeling software.
Step 3): bill of quantities is entered into BIM+GIS project management system.
Step 4): BIM model is associated with bill of quantities.The BIM model is associated with bill of quantities refers to BIM mould Inner link between type and bill of quantities.By each BIM model interaction to affiliated project amount in BIM project management system In inventory item.
Step 5): successively selection, typing component project amount to be batched.In the embodiment of the present invention, using single choice and it can criticize Two methods of amount selection select current period metering element.The component project amount to be batched is practical in progress payment requisition cycle The component project amount of completion, the project amount do not allow more than the component project amount extracted from BIM model in step 2).
Step 6): bill of quantities is associated with component quality inspection data.
Step 7): metering summarizes application, application form for cash advances in bill of quantities.Expense includes engineering in the bill of quantities Measure the general expenses of bright column in inventory.
Step 8): metering summarizes examination & approval.The metering summarizes examination & approval and refers to that supervisor, owner's unit successively audit construction Square current period metering summarizes request for data.Workflow examination and approval terminates, and completes the bill of quantities application form for cash advances of construction party current period.
Step 9): payment summarizes application.The payment, which summarizes, to be referred on the basis of summarizing the amount of money by the metering examined, Based on contract, code requirement, core increase or examine and make cuts the outer expense of inventory.It mainly includes that price adjustment, material tune be poor, engineering that core, which increases expense, The expenses such as change, Construction Claim, expense of examining and making cuts mainly include preserving capital, quality assurance gold, penalty, advance payment button time, promise breaking Remission expense.
Step 10): payment summarizes examination & approval.The payment summarizes examination & approval and refers to that supervisor, owner's unit successively audit, repair Change the payment of construction party current period and summarizes request for data.Workflow examination and approval terminates, and completes construction party current period progress payment payment electron stream Journey application.
Step 11): output meets the computation payment report of archiving requirements.The computation payment report includes current period metering branch The information such as general expenses detail and auditor's signature, examination and approval authority's stamped signature in paying.
Step 12): printing papery version report, for the application of engineering funds computation payment, filing.
The present invention is wanted according to the correlation in standard GB/T 50500-2013 " construction project valuating engineering work load with bill " Design is sought, increases computation payment functional module in having been provided with the BIM informationization project management system using function.
The present invention is suitable for following engineering type: various types of infrastructure such as municipal administration, highway, bridge, water transport, railway Engineering, different engineering types need to require to develop different metering branch according to the engineering type computation payment application and archive format Pay printout report.
The embodiment of the present invention is described in attached drawing, but the invention is not limited to above-mentioned specific embodiment parties Formula, the above mentioned embodiment is only schematical, rather than restrictive, and those skilled in the art are in this hair Under bright enlightenment, without breaking away from the scope protected by the purposes and claims of the present invention, many forms can be also made, this It is belonged within protection of the invention a bit.

Claims (9)

1. one kind is based on BIM project amount charging Informatization Cooperative working method, which is characterized in that this method includes following step It is rapid:
Step 1): BIM model is established;
Step 2): component project amount is extracted;
Step 3): bill of quantities is entered into BIM+GIS project management system;
Step 4): BIM model is associated with bill of quantities;
Step 5): successively selection, typing component project amount to be batched;
Step 6): bill of quantities is associated with component quality inspection data;
Step 7): metering summarizes application, application form for cash advances in bill of quantities;
Step 8): metering summarizes examination & approval;
Step 9): payment summarizes application;
Step 10): payment summarizes examination & approval;
Step 11): output meets the computation payment report of archiving requirements;
Step 12): printing papery version report, for the application of engineering funds computation payment, filing.
2. as described in claim 1 a kind of based on BIM project amount charging Informatization Cooperative working method, it is characterised in that: In the step 2), the component project amount includes the engineering of a variety of materials of bright column, composition component in bill of quantities Amount, the component project amount summarize the basic data of application as metering in step 7);With the engineering developed based on modeling software It measures rapidly extracting plug-in unit and extracts component project amount.
3. as described in claim 1 a kind of based on BIM project amount charging Informatization Cooperative working method, it is characterised in that: In the step 4), in BIM project management system by each BIM model interaction into affiliated bill of quantities item.
4. as described in claim 1 a kind of based on BIM project amount charging Informatization Cooperative working method, it is characterised in that: In the step 5), component project amount to be batched, the component to be batched are selected using two methods of single choice and batch selection Project amount refers to current period metering element, and for the component project amount actually accomplished in progress payment requisition cycle, which does not permit It perhaps is more than the component project amount extracted from BIM model in step 2).
5. described in claim 1 a kind of based on BIM project amount charging Informatization Cooperative working method, it is characterised in that: In the step 7), expense includes the general expenses of bright column in bill of quantities in the bill of quantities.
6. described in claim 1 a kind of based on BIM project amount charging Informatization Cooperative working method, it is characterised in that: In the step 8), supervisor, owner's unit successively audit the metering of construction party current period and summarize request for data, and workflow examination and approval terminates Then complete the bill of quantities application form for cash advances of construction party current period.
7. described in claim 1 a kind of based on BIM project amount charging Informatization Cooperative working method, it is characterised in that: Based on contract, code requirement in the step 9), the payment summarizes on the basis of summarizing the amount of money by the metering of examination & approval, Core increases or examines and makes cuts the outer expense of inventory, wherein it includes but is not limited to that price adjustment, material tune be poor, change in the work, construction that core, which increases expense, Claim expense, the expense of examining and making cuts include but is not limited to preserving capital, quality assurance gold, penalty, advance payment button time, contractual line expense With.
8. described in claim 1 a kind of based on BIM project amount charging Informatization Cooperative working method, it is characterised in that: In the step 10), supervisor, owner's unit, which successively audited, modifies the payment of construction party current period summarizes request for data, and process is examined Criticizing terminates then to complete the payment electronic flow application of construction party current period progress payment.
9. described in claim 1 a kind of based on BIM project amount charging Informatization Cooperative working method, it is characterised in that: In the step 11), the computation payment report includes but is not limited to general expenses detail and auditor in current period computation payment The information of signature, examination and approval authority's stamped signature.
CN201910516825.1A 2019-06-14 2019-06-14 One kind being based on BIM project amount charging Informatization Cooperative working method Pending CN110335017A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910516825.1A CN110335017A (en) 2019-06-14 2019-06-14 One kind being based on BIM project amount charging Informatization Cooperative working method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910516825.1A CN110335017A (en) 2019-06-14 2019-06-14 One kind being based on BIM project amount charging Informatization Cooperative working method

Publications (1)

Publication Number Publication Date
CN110335017A true CN110335017A (en) 2019-10-15

Family

ID=68140644

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910516825.1A Pending CN110335017A (en) 2019-06-14 2019-06-14 One kind being based on BIM project amount charging Informatization Cooperative working method

Country Status (1)

Country Link
CN (1) CN110335017A (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111061805A (en) * 2019-11-19 2020-04-24 四川高路交通信息工程有限公司 Information management service platform applied to highway construction
CN111160764A (en) * 2019-12-27 2020-05-15 昆明海巍科技有限公司 Material difference adjustment management control system, control method and computer
CN111598731A (en) * 2020-03-27 2020-08-28 广联达科技股份有限公司 Intelligent adjustment system and method for man-machine price difference in engineering settlement
CN112307548A (en) * 2020-11-02 2021-02-02 中国电建集团华东勘测设计研究院有限公司 BIM-based rail transit construction visualization progress management method and system
CN112330264A (en) * 2020-09-27 2021-02-05 中国三峡建设管理有限公司 Hydropower engineering contract execution four-time management method
CN112989459A (en) * 2021-02-22 2021-06-18 上海市城市建设设计研究总院(集团)有限公司 BIM measurement deduction and inspection method based on inventory item
CN113094794A (en) * 2021-04-21 2021-07-09 四川省交通建设集团股份有限公司 Automatic metering and accounting method and system based on BIM and GIS technology
CN113591188A (en) * 2021-07-26 2021-11-02 广州市建筑科学研究院集团有限公司 BIM-based project progress and project payment management system and method
CN113706086A (en) * 2020-05-22 2021-11-26 成晟 Bridge construction quality measurement change progress plan management data structure design
CN113868753A (en) * 2021-12-06 2021-12-31 深圳市城市交通规划设计研究中心股份有限公司 Intelligent metering method and device for building engineering, computing equipment and storage medium
CN115114695A (en) * 2021-03-18 2022-09-27 广东博智林机器人有限公司 Component determination method, component determination device, electronic equipment and storage medium
CN113591188B (en) * 2021-07-26 2024-10-25 广州市建筑科学研究院集团有限公司 Engineering progress and engineering money payment management system and method based on BIM

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101504741A (en) * 2009-02-18 2009-08-12 路桥集团国际建设股份有限公司 Intelligent metering management system and method for construction engineering
US20150310136A1 (en) * 2014-04-24 2015-10-29 WD Partners, Inc. Architectural design dashboard
CN108416701A (en) * 2018-03-06 2018-08-17 湖南建工集团有限公司 A kind of processing method of the Engineering Project Construction real data based on BIM
US20180349522A1 (en) * 2017-06-05 2018-12-06 Siteaware Systems Ltd. Adaptive Modeling of Buildings During Construction
CN109447481A (en) * 2018-10-31 2019-03-08 广西路桥工程集团有限公司 A kind of live cost monitoring system and method based on threedimensional model
CN109785018A (en) * 2019-03-21 2019-05-21 广州翔实工程咨询有限公司 Automatic budget and balance method and system based on BIM

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101504741A (en) * 2009-02-18 2009-08-12 路桥集团国际建设股份有限公司 Intelligent metering management system and method for construction engineering
US20150310136A1 (en) * 2014-04-24 2015-10-29 WD Partners, Inc. Architectural design dashboard
US20180349522A1 (en) * 2017-06-05 2018-12-06 Siteaware Systems Ltd. Adaptive Modeling of Buildings During Construction
CN108416701A (en) * 2018-03-06 2018-08-17 湖南建工集团有限公司 A kind of processing method of the Engineering Project Construction real data based on BIM
CN109447481A (en) * 2018-10-31 2019-03-08 广西路桥工程集团有限公司 A kind of live cost monitoring system and method based on threedimensional model
CN109785018A (en) * 2019-03-21 2019-05-21 广州翔实工程咨询有限公司 Automatic budget and balance method and system based on BIM

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111061805A (en) * 2019-11-19 2020-04-24 四川高路交通信息工程有限公司 Information management service platform applied to highway construction
CN111160764A (en) * 2019-12-27 2020-05-15 昆明海巍科技有限公司 Material difference adjustment management control system, control method and computer
CN111598731A (en) * 2020-03-27 2020-08-28 广联达科技股份有限公司 Intelligent adjustment system and method for man-machine price difference in engineering settlement
CN113706086A (en) * 2020-05-22 2021-11-26 成晟 Bridge construction quality measurement change progress plan management data structure design
CN112330264A (en) * 2020-09-27 2021-02-05 中国三峡建设管理有限公司 Hydropower engineering contract execution four-time management method
CN112330264B (en) * 2020-09-27 2024-07-26 中国三峡建设管理有限公司 Four-time simultaneous management method for hydropower engineering contract execution
CN112307548A (en) * 2020-11-02 2021-02-02 中国电建集团华东勘测设计研究院有限公司 BIM-based rail transit construction visualization progress management method and system
CN112989459A (en) * 2021-02-22 2021-06-18 上海市城市建设设计研究总院(集团)有限公司 BIM measurement deduction and inspection method based on inventory item
CN112989459B (en) * 2021-02-22 2023-04-07 上海市城市建设设计研究总院(集团)有限公司 BIM measurement deduction and inspection method based on inventory item
CN115114695A (en) * 2021-03-18 2022-09-27 广东博智林机器人有限公司 Component determination method, component determination device, electronic equipment and storage medium
CN113094794A (en) * 2021-04-21 2021-07-09 四川省交通建设集团股份有限公司 Automatic metering and accounting method and system based on BIM and GIS technology
CN113591188A (en) * 2021-07-26 2021-11-02 广州市建筑科学研究院集团有限公司 BIM-based project progress and project payment management system and method
CN113591188B (en) * 2021-07-26 2024-10-25 广州市建筑科学研究院集团有限公司 Engineering progress and engineering money payment management system and method based on BIM
CN113868753B (en) * 2021-12-06 2022-08-12 深圳市城市交通规划设计研究中心股份有限公司 Intelligent metering method and device for building engineering, computing equipment and storage medium
CN113868753A (en) * 2021-12-06 2021-12-31 深圳市城市交通规划设计研究中心股份有限公司 Intelligent metering method and device for building engineering, computing equipment and storage medium

Similar Documents

Publication Publication Date Title
CN110335017A (en) One kind being based on BIM project amount charging Informatization Cooperative working method
CN108564207B (en) BIM-based construction engineering intelligent bidding decision management system
CN103136626B (en) The online management method of engineering project
CN104217362B (en) The method of score-clearing system and off-line transaction based on internet communication, online i.e. time-division account
CN107481137A (en) A kind of network loan system
CN103021219A (en) Intelligent simulation system for power ERP service
CN109409634A (en) A method of the metering of Grid Construction Project project amount is carried out based on project management APP
CN113656505B (en) Digitization of distributed project management system and method for synchronizing data thereof
CN106127398A (en) A kind of construction costs being applicable to project of transmitting and converting electricity calculates system
CN113610486A (en) Project cost accounting method
Özen et al. Empirical Analysis of the Effect of foreign trade in Computer and communication services on Economic Growth in India
CN110472961A (en) Business is deducted fees the execution method and device of operation
CN114154862A (en) Engineering cost automatic allocation method and system based on engineering whole-process management
Owais et al. Readiness and challenges for applying IFRS 17 (insurance contracts): The case of Jordanian insurance companies
CN105787633A (en) System and method for processing concurrent examining and approving flow
CN116151940A (en) Bid performance fusion system based on blockchain
CN108876577A (en) The system that multilingual mobile visualization collects processing information
CN116777655A (en) Highway engineering construction total price contractor metering management system and method
CN111179094A (en) Block chain-based certificate transfer management method
CN108921682A (en) A kind of processing method of value-added tax, device and system
CN109345363A (en) A kind of land value-added tax settlement auditing system and method
Mêda et al. Towards Software Integration in the Construction Industry–ERP and ICIS Case Study
Perera et al. A comparative study of construction cost and commercial management services in the UK and China.
CN206178965U (en) A information -based management system for power communication
CN112651700A (en) Payroll bonus dispensing system based on blockchain technology and central bank digital currency

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20191015