CN110322125A - Urban ecological planning partition method and system - Google Patents

Urban ecological planning partition method and system Download PDF

Info

Publication number
CN110322125A
CN110322125A CN201910533900.5A CN201910533900A CN110322125A CN 110322125 A CN110322125 A CN 110322125A CN 201910533900 A CN201910533900 A CN 201910533900A CN 110322125 A CN110322125 A CN 110322125A
Authority
CN
China
Prior art keywords
assessment
assessment models
vegetation type
shrub
partition method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910533900.5A
Other languages
Chinese (zh)
Inventor
李华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Huanong University Urban And Rural Planning And Design Institute Co Ltd
Original Assignee
Wuhan Huanong University Urban And Rural Planning And Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Huanong University Urban And Rural Planning And Design Institute Co Ltd filed Critical Wuhan Huanong University Urban And Rural Planning And Design Institute Co Ltd
Priority to CN201910533900.5A priority Critical patent/CN110322125A/en
Publication of CN110322125A publication Critical patent/CN110322125A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • G06Q50/26Government or public services

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Economics (AREA)
  • Tourism & Hospitality (AREA)
  • General Physics & Mathematics (AREA)
  • Marketing (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Theoretical Computer Science (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Game Theory and Decision Science (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of urban ecological planning partition method and systems, are related to town planning, obtain the vegetation type of target area, call the assessment models being adapted with vegetation type;Obtain the parameter value of each estimation items of assessment models;According to assessment models and acquired parameter value calculation assessed value;Based on the assessed value size for calculating each vegetation type of gained, assessment total score is calculated according to overall evaluation model;Ecological zoning is divided according to assessment total score.Matched assessment models are called according to vegetation type, targetedly carry out further evaluation and planning, it is more accurate, estimation items according to assessment models get parms value, reduce the acquisition of independent parameter, improve assessment efficiency, and after the value that gets parms, being directly substituted into after assessment models calculate can be obtained assessed value, the assessed value of each vegetation type is carried out later to summarize calculating assessment total score according to overall evaluation model, according to how much division ecological zonings of assessment total score, whole process is more scientific and efficient.

Description

Urban ecological planning partition method and system
Technical field
The present invention relates to town plannings, more specifically, it relates to a kind of urban ecological planning partition method and system.
Background technique
Ecological planning is applied ecology principle, using living environment's Sustainable Development as target, to weather modification work into Row coordinates perfect planning type.
Urban ecological planning is with ecological and urban ecology principle for guidance, to realize the pass of city human and environment For the purpose of the balance coordination of system, a kind of planning type of optimal urban environment is created for city dweller.
Urban construction is controlled using ratio of green space, afforestation coverage rate in existing urban green system planning.This is from certain journey The ratio in greenery patches is controlled on degree, however but has ignored the different greenlands such as lawn, shrub and arbor with different size of ecology Benefit cannot treat different things as the same.In order to improve greenery patches ecological functions, greenery patches intension is constrained, is advised it is proposed that being suitable for town and country ecology The green capacity rate index system drawn, to guide urban ecological planning to pay attention to greenery patches ecological benefits, reasonable disposition Qiao's shrub group.
Green dose rate plan model be in green capacity rate index system to urban planning and construction land used outside, reflected with leaf area index A kind of space planning method of the greenery patches ecological benefits as control Green Space Construction index.It calculates target by green quantity algorithm model Total green amount of region status is covered in conjunction with the development & construction intensity of urban planning with the phytobiocoenose type and greening for planning selection The characteristics such as rate calculate and plan green dose rate, thus to control the greenery patches community design of urban green space system ecological planning.
Leaf area index LAI (also referred to as green dose rate): total leaf area of unit area implants 1/2.The green amount of individual plants Rate calculation formula:
Gv=4*Ga/ (π CD), wherein the total green amount of Ga--- planning construction, CD--- crown diameter
The green dose rate calculation formula in plot:
Gr=Ga/S, wherein the total green amount of Ga--- planning construction, S--- block area
It is exactly at present Singapore's Wang Wen gift about green dose rate project study representativeness to combine building floor area ratio and leaf area index It is proposed green plot ratio.Refer to propose the conception of LAI value to target plot, target is reached by technological means and design method LAI value, to accomplish energy saving, conservation of nature landscape and design the effect of intelligent building.The method more inquire into how Reach higher green plot ratio by design, low-carbon environment-friendly allows people to enjoy green landscape.As in urban ecological planning In, the green amount of status how is combined, the green dose rate in plot is scientifically planned as far as possible, green dose rate index system is established, to instruct city Green space design not yet refers to.
Summary of the invention
In view of the deficiencies of the prior art, the present invention intends to provide a kind of urban ecological planning partition method and System has the advantages that scientific and efficient program and district.
To achieve the above object, the present invention provides the following technical scheme that
In a first aspect, a kind of urban ecological planning partition method is provided, including
The vegetation type of target area is obtained, the assessment models being adapted with vegetation type are called;
Obtain the parameter value of each estimation items of assessment models;
According to assessment models and acquired parameter value calculation assessed value;
Based on the assessed value size for calculating each vegetation type of gained, assessment total score is calculated according to overall evaluation model;
Ecological zoning is divided according to assessment total score.
By adopting the above technical scheme, first obtain target area possessed by vegetation type, according to vegetation type call with The assessment models to match, targetedly carry out further evaluation and planning, more precisely, the estimation items according to assessment models Get parms value, reduces the acquisition of independent parameter, improves assessment efficiency, and after the value that gets parms, is directly substituted into assessment Model can be obtained assessed value after calculating, and further increase assessment efficiency, later by the assessed value of each vegetation type according to general comment Estimate model and summarize calculating assessment total score, according to how much division ecological zonings of assessment total score, whole process it is more scientific and Efficiently.
Further, the vegetation type includes arbor, shrub and herbaceous plant.
By adopting the above technical scheme, vegetation type is divided into arbor, shrub and herbaceous plant, type is less without more Assessment models, and cover most frequently seen plants, statistical science.
Further, the assessment models of the arbor are
Ga arbor=
Further, the assessment models of the shrub are
Ga shrub=aH-b.
Further, the herbal assessment models are
Ga draft=LAI*S, wherein LAI=1.6.
Further, the overall evaluation model is
The plot Ga=Ga arbor+Ga shrub+Ga draft.
Second aspect, provides a kind of urban ecological planning partition system, including processor and memory, and the memory is deposited Instruction set is contained to call for the processor to implement function such as:
The vegetation type of target area is obtained, the assessment models being adapted with vegetation type are called;
Obtain the parameter value of each estimation items of assessment models;
According to assessment models and acquired parameter value calculation assessed value;
Based on the assessed value size for calculating each vegetation type of gained, assessment total score is calculated according to overall evaluation model;
Ecological zoning is divided according to assessment total score.
By adopting the above technical scheme, first obtain target area possessed by vegetation type, according to vegetation type call with The assessment models to match, targetedly carry out further evaluation and planning, more precisely, the estimation items according to assessment models Get parms value, reduces the acquisition of independent parameter, improves assessment efficiency, and after the value that gets parms, is directly substituted into assessment Model can be obtained assessed value after calculating, and further increase assessment efficiency, later by the assessed value of each vegetation type according to general comment Estimate model and summarize calculating assessment total score, according to how much division ecological zonings of assessment total score, whole process it is more scientific and Efficiently.
Further, the vegetation type includes arbor, shrub and herbaceous plant.
By adopting the above technical scheme, vegetation type is divided into arbor, shrub and herbaceous plant, type is less without more Assessment models, and cover most frequently seen plants, statistical science.
Further, the assessment models of the arbor are configured to
Ga arbor=
The assessment models of the shrub are
Ga shrub=aH-b;
The herbal assessment models are configured to
Ga draft=LAI*S, wherein LAI=1.6.
Further, the overall evaluation model is configured to
The plot Ga=Ga arbor+Ga shrub+Ga draft.
In conclusion the invention has the following advantages:
1. first obtaining vegetation type possessed by target area, matched assessment models are called according to vegetation type, are had Further evaluation and planning are targetedly carried out, more precisely;
The value 2. estimation items according to assessment models get parms, reduces the acquisition of independent parameter, improves assessment efficiency;
3. being directly substituted into after assessment models calculate can be obtained assessed value after the value that gets parms, assessment effect is further increased Rate carries out the assessed value of each vegetation type according to overall evaluation model to summarize calculating assessment total score later, according to assessment total score How many to divide ecological zoning, whole process is more scientific and efficient.
Detailed description of the invention
Fig. 1 is the flow diagram of ecological planning partition method in the present invention;
Fig. 2 is the functional block diagram of ecological planning partition system in the present invention.
In figure: 1, processor;2, memory.
Specific embodiment
With reference to the accompanying drawings and embodiments, the present invention will be described in detail.
This specific embodiment is only explanation of the invention, is not limitation of the present invention, those skilled in the art Member can according to need the modification that not creative contribution is made to the present embodiment after reading this specification, but as long as at this All by the protection of Patent Law in the scope of the claims of invention.
Embodiment 1
A kind of urban ecological planning partition method, referring to Fig.1, including step S101 to step S105.
Step S101: obtaining the vegetation type of target area, calls the assessment models being adapted with vegetation type.
The mode of acquisition is provides the plant that vegetation type is for selection, and selection target region has to user of service Type then obtains the selection result of user of service, and vegetation type includes arbor, shrub and herbaceous plant.Each vegetation type is equal With specific assessment models, the assessment models and vegetation type are adapted, for example, the assessment models of arbor are
Ga arbor=, wherein DBH is the diameter of a cross-section of a tree trunk 1.3 meters above the ground, and calculation formula is
.Wherein t is the age of tree.
The assessment models of shrub are
Ga shrub=aH-b.Wherein, H is plant height.
Herbal assessment models are
Ga draft=LAI*S, wherein LAI=1.6.
More than, a1, a2, a3, b1, b2, b3, MSE1, MSE2, MSE3 are related coefficient.
Step S102: the parameter value of each estimation items of assessment models is obtained.
Obtain the parameter value of each estimation items in above-mentioned called model.
Step S103: according to assessment models and acquired parameter value calculation assessed value.
The size of assessed value is calculated separately using the correspondence parameter value of each assessment models and acquisition.
Step S104: based on the assessed value size for calculating each vegetation type of gained, it is total that assessment is calculated according to overall evaluation model Point.
Wherein, overall evaluation model is the plot Ga=Ga arbor+Ga shrub+Ga draft.
Step S105: ecological zoning is divided according to assessment total score.
The assessment result of all types of plants is made full use of, the total assessment total score of needle set, which comprehensively considers, to be planned, more section It learns.
Embodiment 2
A kind of urban ecological planning partition system, referring to Fig. 2, including processor and memory, memory is stored with instruction set confession Processor is called to implement function such as:
The vegetation type of target area is obtained, the assessment models being adapted with vegetation type are called;
Obtain the parameter value of each estimation items of assessment models;
According to assessment models and acquired parameter value calculation assessed value;
Based on the assessed value size for calculating each vegetation type of gained, assessment total score is calculated according to overall evaluation model;
Ecological zoning is divided according to assessment total score.
Vegetation type includes arbor, shrub and herbaceous plant.
The assessment models of arbor are configured to
Ga arbor=
The assessment models of shrub are
Ga shrub=aH-b;
Herbal assessment models are configured to
Ga draft=LAI*S, wherein LAI=1.6.
Overall evaluation model is configured to
The plot Ga=Ga arbor+Ga shrub+Ga draft.
The above is only a preferred embodiment of the present invention, protection scope of the present invention is not limited merely to above-mentioned implementation Example, all technical solutions belonged under thinking of the present invention all belong to the scope of protection of the present invention.It should be pointed out that for the art Those of ordinary skill for, several improvements and modifications without departing from the principles of the present invention, these improvements and modifications It should be regarded as protection scope of the present invention.

Claims (10)

1. a kind of urban ecological planning partition method, it is characterised in that: including
The vegetation type of target area is obtained, the assessment models being adapted with vegetation type are called;
Obtain the parameter value of each estimation items of assessment models;
According to assessment models and acquired parameter value calculation assessed value;
Based on the assessed value size for calculating each vegetation type of gained, assessment total score is calculated according to overall evaluation model;
Ecological zoning is divided according to assessment total score.
2. urban ecological planning partition method according to claim 1, it is characterised in that: the vegetation type includes Qiao Wood, shrub and herbaceous plant.
3. urban ecological planning partition method according to claim 2, it is characterised in that: the assessment models of the arbor are
Ga arbor=
4. urban ecological planning partition method according to claim 3, it is characterised in that: the assessment models of the shrub are
Ga shrub=aH-b.
5. urban ecological planning partition method according to claim 4, it is characterised in that: the herbal assessment mould Type is
Ga draft=LAI*S, wherein LAI=1.6.
6. urban ecological planning partition method according to claim 5, it is characterised in that: the overall evaluation model is
The plot Ga=Ga arbor+Ga shrub+Ga draft.
7. a kind of urban ecological planning partition system, it is characterised in that: including processor and memory, the memory is stored with Instruction set is called for the processor to implement function such as:
The vegetation type of target area is obtained, the assessment models being adapted with vegetation type are called;
Obtain the parameter value of each estimation items of assessment models;
According to assessment models and acquired parameter value calculation assessed value;
Based on the assessed value size for calculating each vegetation type of gained, assessment total score is calculated according to overall evaluation model;
Ecological zoning is divided according to assessment total score.
8. urban ecological planning partition method according to claim 7 and system, it is characterised in that: the vegetation type packet Include arbor, shrub and herbaceous plant.
9. urban ecological planning partition method according to claim 8 and system, it is characterised in that: the assessment of the arbor Model is configured to
Ga arbor=
The assessment models of the shrub are
Ga shrub=aH-b;
The herbal assessment models are configured to
Ga draft=LAI*S, wherein LAI=1.6.
10. urban ecological planning partition method according to claim 9 and system, it is characterised in that: the overall evaluation mould Type is configured to
The plot Ga=Ga arbor+Ga shrub+Ga draft.
CN201910533900.5A 2019-06-19 2019-06-19 Urban ecological planning partition method and system Pending CN110322125A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910533900.5A CN110322125A (en) 2019-06-19 2019-06-19 Urban ecological planning partition method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910533900.5A CN110322125A (en) 2019-06-19 2019-06-19 Urban ecological planning partition method and system

Publications (1)

Publication Number Publication Date
CN110322125A true CN110322125A (en) 2019-10-11

Family

ID=68119875

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910533900.5A Pending CN110322125A (en) 2019-06-19 2019-06-19 Urban ecological planning partition method and system

Country Status (1)

Country Link
CN (1) CN110322125A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114003999A (en) * 2021-11-05 2022-02-01 重庆西恒工程咨询有限公司 BIM-based sponge city green space planning method, intelligent terminal and storage medium

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102640644A (en) * 2012-04-28 2012-08-22 清华大学 Method utilizing green quantity rate model for urban and rural ecological planning
CN102722635A (en) * 2012-04-28 2012-10-10 清华大学 Greening construction index model method for urban and rural ecological planning

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102640644A (en) * 2012-04-28 2012-08-22 清华大学 Method utilizing green quantity rate model for urban and rural ecological planning
CN102722635A (en) * 2012-04-28 2012-10-10 清华大学 Greening construction index model method for urban and rural ecological planning

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114003999A (en) * 2021-11-05 2022-02-01 重庆西恒工程咨询有限公司 BIM-based sponge city green space planning method, intelligent terminal and storage medium
CN114003999B (en) * 2021-11-05 2023-12-22 西恒工程咨询集团有限公司 BIM-based sponge city green land planning method, intelligent terminal and storage medium

Similar Documents

Publication Publication Date Title
CN104460582B (en) A kind of Internet of Things intelligent irrigation fertilising control method and system based on fuzzy control
CN104656617B (en) Environmental control of greenhouse system and method based on Internet of Things and cloud computing technology
Kruuse The green space factor and the green points system
CN110889553B (en) Real-time water distribution method based on optimization strategy
CN105897912B (en) A kind of Intelligent irrigation system and its working method
CN106212217B (en) Intelligent precision irrigation control system
CN112700035B (en) Optimization method for regional scale crop partition water and fertilizer management mode
CN108958329A (en) A kind of trickle irrigation water-fertilizer integrated intelligent decision-making technique
CN106804384A (en) A kind of Agriculture Field intelligent-induction irrigation system
CN105724030A (en) Construction method for ecological healthcare plant community
CN105746154A (en) Water and fertilizer integrated planting method of greenhouse strawberries
CN109511530A (en) A kind of irrigation system and method for plant
CN110322125A (en) Urban ecological planning partition method and system
CN109258417A (en) A kind of automatic irrigation method
CN109451944A (en) A kind of multiple degrees of freedom Multifunctional precision fertilizing device
CN107155777B (en) Elaeagnus angustifolia forest biological enclosing wall cultivation technical method
CN106970997A (en) Huizhou traditional settlement landscape characteristic index analysis method
CN106818419A (en) A kind of water-fertilizer-pesticide integrated control method with Changes in weather
CN102640644B (en) Method utilizing green quantity rate model for urban and rural ecological planning
CN113207653B (en) Automatic drip irrigation accurate water applying method and system based on rotation irrigation group
CN110210716A (en) Based on urban green space quality-price model Valuation Method and device
CN105594437A (en) Urban planning method based on green plot ratio control technology
CN102893778B (en) Rice leaf age water-saving cultivation method
CN209643511U (en) A kind of irrigation system for plant
Ding Ecological garden plant configuration method based on attribute analytic hierarchy process model

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20191011

RJ01 Rejection of invention patent application after publication