CN110295620A - The fast accurate installation method of large-scale space division device overall skid-mounted formula ice chest - Google Patents

The fast accurate installation method of large-scale space division device overall skid-mounted formula ice chest Download PDF

Info

Publication number
CN110295620A
CN110295620A CN201910581516.2A CN201910581516A CN110295620A CN 110295620 A CN110295620 A CN 110295620A CN 201910581516 A CN201910581516 A CN 201910581516A CN 110295620 A CN110295620 A CN 110295620A
Authority
CN
China
Prior art keywords
ice chest
foundation
bolt
cold box
mold
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910581516.2A
Other languages
Chinese (zh)
Other versions
CN110295620B (en
Inventor
马启升
李鹏
王春雨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Shanghai Ershiye Construction Co Ltd
Original Assignee
China MCC20 Group Corp Ltd
Shanghai Ershiye Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC20 Group Corp Ltd, Shanghai Ershiye Construction Co Ltd filed Critical China MCC20 Group Corp Ltd
Priority to CN201910581516.2A priority Critical patent/CN110295620B/en
Publication of CN110295620A publication Critical patent/CN110295620A/en
Application granted granted Critical
Publication of CN110295620B publication Critical patent/CN110295620B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/44Foundations for machines, engines or ordnance
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D33/00Testing foundations or foundation structures

Abstract

The present invention relates to the installing area of large scale equipment, the fast accurate installation method of specifically a kind of large-scale space division device overall skid-mounted formula ice chest;It is characterized in that, comprising: according to cold box foundation cushion cap plan view line setting, mark foundation bolt position;Foundation bolt is fixed by group with reinforced bracket;Cold box foundation is poured and is conserved;According to each component of drawing processing and fabricating positioning measurement mold;Positioning measurement mold steel skeleton is in place, steel form is put into foundation bolt, welds after leveling;Positioning measurement mold is integrally hung out, connection bolt is removed, transports ice chest composing room back;Whole ice chest bottom plate production is carried out according to the screwhole position on card slot again assembled mold;Ice chest bottom plate screw hole, which is marched into the arena, to be checked and adjusts in place.This method strengthens the corresponding relationship between cold box foundation foundation bolt and ice chest bed bolt hole, reduces in cold box foundation work progress to the rigors of foundation bolt installation accuracy.

Description

The fast accurate installation method of large-scale space division device overall skid-mounted formula ice chest
Technical field
The present invention relates to the installing area of large scale equipment, specifically a kind of large-scale space division device overall skid-mounted formula ice chest it is fast The accurate installation method of speed.
Background technique
In recent years, promotion of the petrochemical industry to space division gas demand promotes gradually changing for making oxygen by air separation technology Into with it is perfect.Large-scale overall skid-mounted formula ice chest relies on its incomparable huge advantage in terms of construction quality, safety, progress, It is increasingly becoming the mainstream of large-scale space division device, new challenge also is proposed to the reform of construction technology.Large Air Separation Devices entirety ice chest Not only specification is big, quantity is more for the fixed foundation bolt used, requires also very the whole precision between foundation bolt Height, the offset of any one foundation bolt all can cause whole ice chest in place.And cold box foundation pour vibrate, concrete support Shield is shunk and the strange land of ice chest bottom plate processes the uncontrollable offset that can all lead to foundation bolt or bolt hole.
In existing traditional construction technology, usually using design drawing as foundation, on the one hand in cold box foundation construction, by force The installation accuracy and stability of pre-embedded anchoring bolts are adjusted, the positioning of reduction bolt, concrete vibrating and maintenance as far as possible was shunk Installation deviation in journey.On the other hand, it is desirable that composing room carry out the fabrication and installation of ice chest bottom plate when, bed bolt hole site with set Meter requires the high accuracy of position.The deformation generated in control welding and installation process as far as possible.But either cold box foundation is applied Foundation bolt deformation during work or the welding deformation in ice chest bottom plate assembling process, all have very strong uncontrollability, Once it is cumulative deflection occur, will lead to whole ice chest can not be in place.If continued to increase to the two deformation amount controlling requirement, It will cause the increased costs of geometry times.And relative to the deviation requirement between the two and design drawing, whether whole ice chest can Fast accurate is in place, and it is accurate right between ice chest bed bolt hole and cold box foundation pre-embedded anchoring bolts group that more aspects are It should be related to.
Summary of the invention
It is an object of the invention to overcome drawbacks described above, providing one kind can ensure that ice chest is in place, and bed bolt hole is smooth Be put into foundation bolt, complete the fast accurate of whole ice chest method in place.
In order to achieve the above object, the present invention is implemented as follows:
A kind of fast accurate installation method of large-scale space division device overall skid-mounted formula ice chest, comprising:
Step 1, foundation cold box foundation cushion cap plan view line setting, mark foundation bolt position;
Foundation bolt is fixed by group using reinforced bracket for step 2, prevents vibration from deforming;
Step 3, cold box foundation are poured and are conserved;
Step 4, according to each component of drawing processing and fabricating positioning measurement mold;
Positioning measurement mold steel skeleton is in place by step 5, and steel form is put into foundation bolt, welds after leveling;
Step 6 integrally hangs out positioning measurement mold, removes connection bolt, transports ice chest composing room back;
Step 7 checks ice chest column root-plate hole location according to again assembled positioning measurement mold;
Step 8, ice chest bottom plate are marched into the arena review;
Step 9, whole ice chest adjust in place;
Wherein,
Cold box foundation foundation bolt position mark in step 1 is on cold box foundation bed course, using total station or other benchmark Measuring tool, according to cold box foundation cushion cap floor plan by each foundation bolt position line setting on bed course, it is desirable that every Catercorner length is surveyed between two foundation bolts and design requirement error is not greater than 2mm;
The fixed support of ice chest pre-embedded anchoring bolts in step 2, is to use angle steel after foundation bolt straightening in place, will to each group Reinforcement is fixed in foot bolt point upper layer and lower layer, controls every group of inner bolt relative position by determining hole steel plate, it is desirable that every group of bolt Between relative position deviation be not more than 7mm;
Cold box foundation in step 3 pours maintenance, concrete vibrating and basic maintenance contraction distortion when being to cold box foundation construction It is controlled, after cold box foundation reaches curing condition requirement, foundation bolt fixation steel plate can be removed;
Cold box foundation pre-embedded bolt positioning measurement mold in step 4, consider convenient transportation, reinforcing bar set a roof beam in place can a point three parts combine Splicing, and steel seal number is marked for distinguishing on truss-steel beam, wherein mould steel framework beam is for measuring record cold box foundation each group Relative position between foundation bolt, mould template are used to measure the relative position in record each group between foundation bolt;
In step 5, mold truss-steel beam is in place by figure requirement first, mould template is then put into foundation bolt;Use steelframe Beam holds up mould template from bottom, adjusts mould template surface in the same horizontal absolute altitude, template is weldingly fixed on truss-steel beam On, after weld seam natural cooling, check adjusts all templates on the same horizontal plane absolute altitude again;
In step 6, positioning mold is integrally hung out to foundation bolt position, is placed on ground grading, checks each component number of mold, And the diagonal bolt hole in repetition measurement part away from data and draws schematic diagram record, in case ice chest checks bed bolt hole after marching into the arena;Remove mold Bolt is connected, template is returned into ice chest composing room;
In step 7, workshop is bolted assembled mold, and according to diebolt according to steelframe beam assembly connecting plate groove position Hole site makes ice chest bottom plate;
In step 8, after ice chest is marched into the arena, ice chest bed bolt pitch of holes is checked, is further ensured that ice chest bed bolt hole and ice chest The accuracy of basic foundation bolt;
Ice chest lifting in step 9 is in place, after determining ice chest installation direction according to ice chest drawing, arrange special messenger to every group of bolt into Row nurse adjusts ice chest screwhole position by tools such as scaffolding steel pipe, flitches, while ice chest being kept to stablize, to all bolts It is slowly in place when corresponding screw hole.
The accuracy and stabilization of pre-embedded anchoring bolts when this method ensures that cold box foundation is constructed by angle steel fixing support rack Property, effectively prevent vibrate deformation and the contraction distortion in concreting and maintenance processes.Meanwhile whole ice chest lower margin spiral shell The use of anchoring position Measurement die, which can accurately react cold box foundation foundation bolt relative position, gives ice chest composing room, guarantees The accurate positioning in ice chest bed bolt hole, the bed bolt hole repetition measurement after ice chest is marched into the arena then further ensure that ice chest is disposable Accuracy in place;Ensure that the safe and efficient smooth lifting of skid-mounted type ice chest is in place, greatly reduce in hoisting process there may be Bottom plate reaming risk, ensure that ice chest precisely it is in place safely and fast.
Detailed description of the invention
Fig. 1 is the step schematic diagram of this construction method.
Specific embodiment
The present invention is further illustrated below by way of specific embodiment.
As shown in Figure 1, a kind of fast accurate installation method of large-scale space division device overall skid-mounted formula ice chest, comprising:
Step 1, foundation cold box foundation cushion cap plan view line setting, mark foundation bolt position;
Foundation bolt is fixed by group using reinforced bracket for step 2, prevents vibration from deforming;
Step 3, cold box foundation are poured and are conserved;
Step 4, according to each component of drawing processing and fabricating positioning measurement mold;
Positioning measurement mold steel skeleton is in place by step 5, and steel form is put into foundation bolt, welds after leveling;
Step 6 integrally hangs out positioning measurement mold, removes connection bolt, transports ice chest composing room back;
Step 7 checks ice chest column root-plate hole location according to again assembled positioning measurement mold;
Step 8, ice chest bottom plate are marched into the arena review;
Step 9, whole ice chest adjust in place;
Wherein,
Cold box foundation foundation bolt position mark in step 1 is on cold box foundation bed course, using total station or other benchmark Measuring tool, according to cold box foundation cushion cap floor plan by each foundation bolt position line setting on bed course, it is desirable that every Catercorner length is surveyed between two foundation bolts and design requirement error is not greater than 2mm;
The fixed support of ice chest pre-embedded anchoring bolts in step 2, is to use angle steel after foundation bolt straightening in place, will to each group Reinforcement is fixed in foot bolt point upper layer and lower layer, controls every group of inner bolt relative position by determining hole steel plate, it is desirable that every group of bolt Between relative position deviation be not more than 7mm;
Cold box foundation in step 3 pours maintenance, concrete vibrating and basic maintenance contraction distortion when being to cold box foundation construction It is controlled, after cold box foundation reaches curing condition requirement, foundation bolt fixation steel plate can be removed;
Cold box foundation pre-embedded bolt positioning measurement mold in step 4, consider convenient transportation, reinforcing bar set a roof beam in place can a point three parts combine Splicing, and steel seal number is marked for distinguishing on truss-steel beam, wherein mould steel framework beam is for measuring record cold box foundation each group Relative position between foundation bolt, mould template are used to measure the relative position in record each group between foundation bolt;
In step 5, mold truss-steel beam is in place by figure requirement first, mould template is then put into foundation bolt;Use steelframe Beam holds up mould template from bottom, adjusts mould template surface in the same horizontal absolute altitude, template is weldingly fixed on truss-steel beam On, after weld seam natural cooling, check adjusts all templates on the same horizontal plane absolute altitude again;
In step 6, positioning mold is integrally hung out to foundation bolt position, is placed on ground grading, checks each component number of mold And repetition measurement part angle steel joint range data and draw schematic diagram record, in case ice chest march into the arena after check bed bolt hole;Mold is removed to connect Template is returned to ice chest composing room by connecting bolt;
In step 7, workshop is bolted assembled mold, and according to diebolt according to steelframe beam assembly connecting plate groove position Hole site makes ice chest bottom plate;
In step 8, after ice chest is marched into the arena, ice chest bed bolt pitch of holes is checked, is further ensured that ice chest bed bolt hole and ice chest The accuracy of basic foundation bolt;
Ice chest lifting in step 9 is in place, after determining ice chest installation direction according to ice chest drawing, arrange special messenger to every group of bolt into Row nurse adjusts ice chest screwhole position by tools such as scaffolding steel pipe, flitches, while ice chest being kept to stablize, to all bolts It is slowly in place when corresponding screw hole.
The accuracy and stabilization of pre-embedded anchoring bolts when this method ensures that cold box foundation is constructed by angle steel fixing support rack Property, effectively prevent vibrate deformation and the contraction distortion in concreting and maintenance processes.Meanwhile whole ice chest lower margin spiral shell The use of anchoring position Measurement die, which can accurately react cold box foundation foundation bolt relative position, gives ice chest composing room, guarantees The accurate positioning in ice chest bed bolt hole, the bed bolt hole repetition measurement after ice chest is marched into the arena then further ensure that ice chest is disposable Accuracy in place;Ensure that the safe and efficient smooth lifting of skid-mounted type ice chest is in place, greatly reduce in hoisting process there may be Bottom plate reaming risk, ensure that ice chest precisely it is in place safely and fast.

Claims (1)

1. a kind of fast accurate installation method of large-scale space division device overall skid-mounted formula ice chest, characterized in that include:
Step 1, foundation cold box foundation cushion cap plan view line setting, mark foundation bolt position;
Foundation bolt is fixed by group using reinforced bracket for step 2, prevents vibration from deforming;
Step 3, cold box foundation are poured and are conserved;
Step 4, according to each component of drawing processing and fabricating positioning measurement mold;
Positioning measurement mold steel skeleton is in place by step 5, and steel form is put into foundation bolt, welds after leveling;
Step 6 integrally hangs out positioning measurement mold, removes connection bolt, transports ice chest composing room back;
Step 7 checks ice chest column root-plate hole location according to again assembled positioning measurement mold;
Step 8, ice chest bottom plate are marched into the arena review;
Step 9, whole ice chest adjust in place;
Wherein,
Cold box foundation foundation bolt position mark in step 1 is on cold box foundation bed course, using total station or other benchmark Measuring tool, according to cold box foundation cushion cap floor plan by each foundation bolt position line setting on bed course, it is desirable that every Catercorner length is surveyed between two foundation bolts and design requirement error is not greater than 2mm;
The fixed support of ice chest pre-embedded anchoring bolts in step 2, is to use angle steel after foundation bolt straightening in place, will to each group Reinforcement is fixed in foot bolt point upper layer and lower layer, controls every group of inner bolt relative position by determining hole steel plate, it is desirable that every group of bolt Between relative position deviation be not more than 7mm;
Cold box foundation in step 3 pours maintenance, concrete vibrating and basic maintenance contraction distortion when being to cold box foundation construction It is controlled, after cold box foundation reaches curing condition requirement, foundation bolt fixation steel plate can be removed;
Cold box foundation pre-embedded bolt positioning measurement mold in step 4, consider convenient transportation, reinforcing bar set a roof beam in place can a point three parts combine Splicing, and steel seal number is marked for distinguishing on truss-steel beam, wherein mould steel framework beam is for measuring record cold box foundation each group Relative position between foundation bolt, mould template are used to measure the relative position in record each group between foundation bolt;
In step 5, mold truss-steel beam is in place by figure requirement first, mould template is then put into foundation bolt;Use steelframe Beam holds up mould template from bottom, adjusts mould template surface in the same horizontal absolute altitude, template is weldingly fixed on truss-steel beam On, after weld seam natural cooling, check adjusts all templates on the same horizontal plane absolute altitude again;
In step 6, positioning mold is integrally hung out to foundation bolt position, is placed on ground grading, checks each component number of mold, And schematic diagram record is drawn to corner bolt range data in Measurement die part, in case ice chest checks bed bolt hole after marching into the arena;Remove mould Tool connection bolt, returns to ice chest composing room for template;
In step 7, workshop is bolted assembled mold, and according to diebolt according to steelframe beam assembly connecting plate groove position Hole site makes ice chest bottom plate;
In step 8, after ice chest is marched into the arena, ice chest bed bolt pitch of holes is checked, is further ensured that ice chest bed bolt hole and ice chest The accuracy of basic foundation bolt;
Ice chest lifting in step 9 is in place, after determining ice chest installation direction according to ice chest drawing, arrange special messenger to every group of bolt into Row nurse adjusts ice chest screwhole position by tools such as scaffolding steel pipe, flitches, while ice chest being kept to stablize, to all bolts It is slowly in place when corresponding screw hole.
CN201910581516.2A 2019-06-29 2019-06-29 Rapid and accurate positioning method for integral skid-mounted cold box of large air separation device Active CN110295620B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910581516.2A CN110295620B (en) 2019-06-29 2019-06-29 Rapid and accurate positioning method for integral skid-mounted cold box of large air separation device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910581516.2A CN110295620B (en) 2019-06-29 2019-06-29 Rapid and accurate positioning method for integral skid-mounted cold box of large air separation device

Publications (2)

Publication Number Publication Date
CN110295620A true CN110295620A (en) 2019-10-01
CN110295620B CN110295620B (en) 2021-03-26

Family

ID=68029711

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910581516.2A Active CN110295620B (en) 2019-06-29 2019-06-29 Rapid and accurate positioning method for integral skid-mounted cold box of large air separation device

Country Status (1)

Country Link
CN (1) CN110295620B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111963411A (en) * 2020-07-22 2020-11-20 上海二十冶建设有限公司 Quick mounting method for skid-mounted air compressor unit of large air separation device
CN112431217A (en) * 2020-12-03 2021-03-02 上海二十冶建设有限公司 Construction method of large skid-mounted cold box pile-free anti-seismic raft foundation
CN113958801A (en) * 2021-10-09 2022-01-21 中国化学工程第六建设有限公司 Column base bottom plate separated large-scale integral cold box and installation method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2927097A1 (en) * 2008-05-23 2009-08-07 Air Liquide Cylindrical load-bearing pile for supporting circular reservoir of air separation and liquefaction plant, has pile head including anchoring element that anchors element i.e. circular reservoir, of separation and liquefaction plant to head
CN104785904A (en) * 2015-04-01 2015-07-22 中石化工建设有限公司 Technology for installing pre-buried bolts to large-scale air separation device cold box
CN105298139A (en) * 2015-09-22 2016-02-03 上海十三冶建设有限公司 Modular mounting method of large space division cooling box steel structure
CN109340510A (en) * 2018-10-18 2019-02-15 杭州杭氧化医工程有限公司 Air separation cooling box basis foot anchor mounting structure and its installation method
CN109720976A (en) * 2018-12-28 2019-05-07 上海二十冶建设有限公司 The installation method of overall skid-mounted formula ice chest in Large Air Separation Devices engineering

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2927097A1 (en) * 2008-05-23 2009-08-07 Air Liquide Cylindrical load-bearing pile for supporting circular reservoir of air separation and liquefaction plant, has pile head including anchoring element that anchors element i.e. circular reservoir, of separation and liquefaction plant to head
CN104785904A (en) * 2015-04-01 2015-07-22 中石化工建设有限公司 Technology for installing pre-buried bolts to large-scale air separation device cold box
CN105298139A (en) * 2015-09-22 2016-02-03 上海十三冶建设有限公司 Modular mounting method of large space division cooling box steel structure
CN109340510A (en) * 2018-10-18 2019-02-15 杭州杭氧化医工程有限公司 Air separation cooling box basis foot anchor mounting structure and its installation method
CN109720976A (en) * 2018-12-28 2019-05-07 上海二十冶建设有限公司 The installation method of overall skid-mounted formula ice chest in Large Air Separation Devices engineering

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111963411A (en) * 2020-07-22 2020-11-20 上海二十冶建设有限公司 Quick mounting method for skid-mounted air compressor unit of large air separation device
CN112431217A (en) * 2020-12-03 2021-03-02 上海二十冶建设有限公司 Construction method of large skid-mounted cold box pile-free anti-seismic raft foundation
CN113958801A (en) * 2021-10-09 2022-01-21 中国化学工程第六建设有限公司 Column base bottom plate separated large-scale integral cold box and installation method thereof
CN113958801B (en) * 2021-10-09 2023-02-17 中国化学工程第六建设有限公司 Column base bottom plate separated large-scale integral cold box and installation method thereof

Also Published As

Publication number Publication date
CN110295620B (en) 2021-03-26

Similar Documents

Publication Publication Date Title
CN110295620A (en) The fast accurate installation method of large-scale space division device overall skid-mounted formula ice chest
CN102943565B (en) Construction method of large-sized arc-shaped wall
CN106320715B (en) A kind of construction method of installation of the I-shaped inclined-plane built-in fitting of large size
CN105586833B (en) Stiff skeleton steel reinforcement cage global formation large-scale cast-in-place tall pier and thin wall construction method
CN110409799B (en) Wind tunnel fair-faced concrete construction process
CN105926672A (en) Mined metro station steel pipe column construction method
CN105926958B (en) A kind of installation method for the sill anchor combined support frame for being used for high-rise building steel construction shear wall and outline border suspension column
CN102720362A (en) Construction technology of high-precision reinforced concrete reaction wall
CN103074872A (en) Gate slot construction method and device for gate
CN204849798U (en) Rag bolt fixed bolster
CN106223623A (en) Steel construction box arched roof truss installation method
CN216006947U (en) Fabricated verticality adjusting operation frame for one-pile one-column steel pipe column by reverse construction method
CN106759943A (en) A kind of pre-assembled Anchor Bolts in Steel Column Bases structure
CN102777044A (en) Hoisting method of steel-structured spraying layer of urea prilling tower
CN212104166U (en) Accurate positioning device for embedded bolt of safety injection box of nuclear power station
CN113482322A (en) Aluminum formwork and wood formwork combined construction method for non-standard layer structure
CN112282353A (en) High-precision formwork construction method for cast-in-situ bare concrete wind tunnel
CN112458905A (en) Splicing adjustment method for prefabricated capping beam and prefabricated stand column
CN111549815A (en) Steel structure foundation bolt pre-embedding construction method
CN105735228A (en) Construction method and installation accuracy control method of rack systems of high-lift rack climbing type ship lift
CN212612045U (en) Cushion cap reserved rib positioning frame
CN114856195A (en) Post-pouring construction method for floor slab at building pipe well
CN112536911B (en) Integral construction method for prefabricated stand column of bridge
CN107893537A (en) High-precision concrete leveling unit and construction method
CN108385987A (en) The construction method of installation of thin and long shafts steel column and its matching used steel sleeve

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant