CN109720976A - The installation method of overall skid-mounted formula ice chest in Large Air Separation Devices engineering - Google Patents

The installation method of overall skid-mounted formula ice chest in Large Air Separation Devices engineering Download PDF

Info

Publication number
CN109720976A
CN109720976A CN201811624151.9A CN201811624151A CN109720976A CN 109720976 A CN109720976 A CN 109720976A CN 201811624151 A CN201811624151 A CN 201811624151A CN 109720976 A CN109720976 A CN 109720976A
Authority
CN
China
Prior art keywords
crane
ice chest
lifting
skid
hoisting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811624151.9A
Other languages
Chinese (zh)
Other versions
CN109720976B (en
Inventor
张小华
万赤钢
赵敏芹
余淑昌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Shanghai Ershiye Construction Co Ltd
Original Assignee
China MCC20 Group Corp Ltd
Shanghai Ershiye Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC20 Group Corp Ltd, Shanghai Ershiye Construction Co Ltd filed Critical China MCC20 Group Corp Ltd
Priority to CN201811624151.9A priority Critical patent/CN109720976B/en
Publication of CN109720976A publication Critical patent/CN109720976A/en
Application granted granted Critical
Publication of CN109720976B publication Critical patent/CN109720976B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention relates to the construction fields of Large Air Separation Devices engineering, the installation method of the overall skid-mounted formula ice chest specifically in Large Air Separation Devices engineering;It is characterized in that: the installation method includes determining Hoisting Program with the method for three-dimensional lifting simulation;Make combined type fast hoisting suspender;Road of marching into the arena is changed with storage space to be filled out;Standing position of a crane and travel region basement process;Equipment Foundations, foundation bolt are reviewed;Skid-mounted type ice chest is marched into the arena and is stored;Large scale hoisting machinery erect-position;Hang lifting lockset;Examination is hung;Overturning;In place with adjustment.The present invention, which is realized, lifts the feasibility and accuracy that analogue technique confirms Hoisting Program by three;Combined type fast hoisting special hanger makes to lift more convenient, safe and reliable;Construction efficiency is reduced to be protected from environmental;Reduce the security risk as caused by Standing position of a crane and travel region ground problem;Ensure that the safe and efficient smooth lifting of skid-mounted type ice chest is in place, greatly reduces site workload, effectively shorten construction period.

Description

The installation method of overall skid-mounted formula ice chest in Large Air Separation Devices engineering
Technical field
The present invention relates to the construction fields of Large Air Separation Devices engineering, the overall skid-mounted formula ice chest specifically in Large Air Separation Devices engineering Installation method.
Background technique
With the high speed development of domestic economy, large-scale space division device is obtained in industrial circles such as metallurgy, petrochemical industry, chemical industry and space flight To being widely applied, and the core equipment as making oxygen by air separation, " integration is high, construction period with it for overall skid-mounted formula ice chest Short, installation quality is easy to control " the characteristics of using also will be more and more common.However, current Large Air Separation Devices engineering ice chest device is more Using the loose mail supply of material, on-site consolidation, installed by face or by section by the way of, it is big that there are site workloads, and construction efficiency is low, all Phase is long, equipment installment quality problem not easy to control.
Summary of the invention
It is an object of the invention to overcome drawbacks described above, provide a kind of safe and reliable, duration rationally, quality have guarantor, cost Lower Large Air Separation Devices engineering overall skid-mounted formula ice chest device installation method.
In order to achieve the above object, the present invention is implemented as follows:
A kind of installation method of overall skid-mounted formula ice chest in Large Air Separation Devices engineering, the installation method include
Step 1 determines Hoisting Program with the method for three-dimensional lifting simulation;
Step 2, production combined type fast hoisting suspender;
Step 3 marches into the arena road and storage space is changed and filled out;
Step 4, Standing position of a crane and travel region basement process;
Step 5, Equipment Foundations, foundation bolt are reviewed;
Step 6, skid-mounted type ice chest are marched into the arena and are stored;
Step 7, large scale hoisting machinery erect-position;
Step 8 hangs lifting lockset;
Step 9, examination are hung;
Step 10, overturning;
Step 11, in place with adjustment.
The installation method of overall skid-mounted formula ice chest in the Large Air Separation Devices engineering, comprising:
In step 1, scheme Computer Aided Design is carried out using three-dimensional lifting analogue technique, air separation unit, crane is realized, hangs lockset, peace It fills space environment model to generate, crane, calculates Current Collector Sleave automatic Model Selection, lifts the simplation verification of overall process;
In step 2, combined type fast hoisting suspender includes equalizer bar and the lifting lug that is arranged on equalizer bar, the equalizer bar across Away from and lifting lug position it is determining according to hanging device weight and outer dimension and carry out force analysis and check;
In step 3, Ground Treatment Schemes are determined according to construction field geology situation, will excavate or excavate 2m without compacting region Deep, the foundation trench vibration tamp that will be excavated using road roller carries out back-filling in layers vibration tamp by every layer of 300mm after compacting.Ground Flatness control carries out earth bearing strength test and examination within 5mm after processing after the completion of processing;
In step 4, roadbed paving case when directly walking in the state that main crane does not tear vehicle open, in loop wheel machine revolution range, ground is flat Seamless is real;Crane assembling, erect-position point basis must dig down parameter and be determined according to physical device weight and geological condition, after lower digging Basis is answered smooth, and levelness is less than 5 ‰;When simultaneously in order to meet main crane setting-up trolley ground pressure requirement and lifting and walking Super-starting balance weight trolley tire can even running, crane and setting-up carriage walking region should be laid with steady layer of water, and guarantee smooth;It is auxiliary Help crane crawler crane erect-position point roadbed paving case;
In step 5, the repetition measurement of Equipment Foundations position, geometric dimension and foundation bolt location dimension is carried out before equipment installation, is protected Card position is accurate, and screw thread is intact;
In step 6, before skid-mounted type ice chest is marched into the arena, to ice chest storage area carry out it is smooth, and using road roller roll it is close It is real, it is laid with steel plate or roadbed paving case in ice chest support frame region, ice chest is deposited in above steel plate by 12 support frames;Lifting Before, drawing is transported according to ice chest, 12 support frames are placed into designated position, and using crawler crane counterweight to each pre-pressing bracket 24 hours, sedimentation deviation was not more than 2mm;
In step 7, Standing position of a crane position is drawn in the way of unwrapping wire according to the Standing position of a crane that Hoisting Program calculates at the scene, just Accurately in place in crane;
In step 8, after main and auxiliary crane erect-position, is hung according to the selected rigging of lifting numerical procedure, examined after hanging Look into confirmation;
In step 9, slow lifting means stops being promoted, keep quiet main and auxiliary crane when equipment is higher than support frame 100mm simultaneously The ground of only state 2-5min, the force-bearing situation and loop wheel machine erect-position region that check Current Collector Sleave, equipment lifting lug and apparatus body are heavy Situation drops;
In step 10, device bottom is slowly drop down to by main and auxiliary crane synchronous ascending equipment to bracket highest point, auxiliary crane is detached from Apart from ground 200mm, stop decline;Main crane continues erecting equipment, auxiliary hangs slowly delivery device forward until equipment is erect;
In step 11, ice chest is lifted to basic top position, is arranged special messenger to nurse every group of bolt, is determined all bolts pair It is slowly in place when answering screw hole, in the process, observation ice chest verticality is adjusted using theodolite, and carry out to ice chest using thin backing plate Auxiliary adjustment centering.
The present invention is realized through the three-dimensional feasibility and accuracy for lifting analogue technique and confirming Hoisting Program;Combined type is fast Fast hoisting appliance makes to lift more convenient, safe and reliable;Pass through changing to fill out to reduce and apply to march into the arena road and storage space Work efficiency rate is protected from environmental;Reduce the security risk as caused by Standing position of a crane and travel region ground problem;Ensure to prize The safe and efficient smooth lifting of dress formula ice chest is in place, greatly reduces site workload, effectively shortens construction period, ensure that and apply Working medium amount.
Detailed description of the invention
Fig. 1 Large Air Separation Devices engineering overall skid-mounted formula ice chest device flow of installation.
Specific embodiment
The present invention is further illustrated below by way of specific embodiment.
A kind of installation method of overall skid-mounted formula ice chest in Large Air Separation Devices engineering, the installation method include
Step 1 determines Hoisting Program with the method for three-dimensional lifting simulation;
Step 2, production combined type fast hoisting suspender;
Step 3 marches into the arena road and storage space is changed and filled out;
Step 4, Standing position of a crane and travel region basement process;
Step 5, Equipment Foundations, foundation bolt are reviewed;
Step 6, skid-mounted type ice chest are marched into the arena and are stored;
Step 7, large scale hoisting machinery erect-position;
Step 8 hangs lifting lockset;
Step 9, examination are hung;
Step 10, overturning;
Step 11, in place with adjustment.
The installation method of overall skid-mounted formula ice chest in the Large Air Separation Devices engineering, including
In step 1, scheme Computer Aided Design is carried out using three-dimensional lifting analogue technique, air separation unit, crane is realized, hangs lockset, peace It fills space environment model to generate, crane, calculates Current Collector Sleave automatic Model Selection, lifts the simplation verification of overall process;
In step 2, combined type fast hoisting suspender includes equalizer bar and the lifting lug that is arranged on equalizer bar, the equalizer bar across Away from and lifting lug position it is determining according to hanging device weight and outer dimension and carry out force analysis and check;
In step 3, Ground Treatment Schemes are determined according to construction field geology situation, will excavate or excavate 2m without compacting region Deep, the foundation trench vibration tamp that will be excavated using road roller carries out back-filling in layers vibration tamp by every layer of 300mm after compacting.Ground Flatness control carries out earth bearing strength test and examination within 5mm after processing after the completion of processing;
In step 4, roadbed paving case when directly walking in the state that main crane does not tear vehicle open, in loop wheel machine revolution range, ground is flat Seamless is real;Crane assembling, erect-position point basis must dig down parameter and be determined according to physical device weight and geological condition, after lower digging Basis is answered smooth, and levelness is less than 5 ‰;When simultaneously in order to meet main crane setting-up trolley ground pressure requirement and lifting and walking Super-starting balance weight trolley tire can even running, crane and setting-up carriage walking region should be laid with steady layer of water, and guarantee smooth;It is auxiliary Help crane crawler crane erect-position point roadbed paving case;
In step 5, the repetition measurement of Equipment Foundations position, geometric dimension and foundation bolt location dimension is carried out before equipment installation, is protected Card position is accurate, and screw thread is intact;
In step 6, before skid-mounted type ice chest is marched into the arena, to ice chest storage area carry out it is smooth, and using road roller roll it is close It is real, it is laid with steel plate or roadbed paving case in ice chest support frame region, ice chest is deposited in above steel plate by 12 support frames;Lifting Before, drawing is transported according to ice chest, 12 support frames are placed into designated position, and using crawler crane counterweight to each pre-pressing bracket 24 hours, sedimentation deviation was not more than 2mm;
In step 7, Standing position of a crane position is drawn in the way of unwrapping wire according to the Standing position of a crane that Hoisting Program calculates at the scene, just Accurately in place in crane;
In step 8, after main and auxiliary crane erect-position, is hung according to the selected rigging of lifting numerical procedure, examined after hanging Look into confirmation;
In step 9, slow lifting means stops being promoted, keep quiet main and auxiliary crane when equipment is higher than support frame 100mm simultaneously The ground of only state 2-5min, the force-bearing situation and loop wheel machine erect-position region that check Current Collector Sleave, equipment lifting lug and apparatus body are heavy Situation drops;
In step 10, device bottom is slowly drop down to by main and auxiliary crane synchronous ascending equipment to bracket highest point, auxiliary crane is detached from Apart from ground 200mm, stop decline;Main crane continues erecting equipment, auxiliary hangs slowly delivery device forward until equipment is erect;
In step 11, ice chest is lifted to basic top position, is arranged special messenger to nurse every group of bolt, is determined all bolts pair It is slowly in place when answering screw hole, in the process, observation ice chest verticality is adjusted using theodolite, and carry out to ice chest using thin backing plate Auxiliary adjustment centering.
The present invention is realized through the three-dimensional feasibility and accuracy for lifting analogue technique and confirming Hoisting Program;Combined type is fast Fast hoisting appliance makes to lift more convenient, safe and reliable;Pass through changing to fill out to reduce and apply to march into the arena road and storage space Work efficiency rate is protected from environmental;Reduce the security risk as caused by Standing position of a crane and travel region ground problem;Ensure to prize The safe and efficient smooth lifting of dress formula ice chest is in place, greatly reduces site workload, effectively shortens construction period, ensure that and apply Working medium amount.

Claims (2)

1. the installation method of the overall skid-mounted formula ice chest in a kind of Large Air Separation Devices engineering, it is characterized in that: the installation method includes:
Step 1 determines Hoisting Program with the method for three-dimensional lifting simulation;
Step 2, production combined type fast hoisting suspender;
Step 3 marches into the arena road and storage space is changed and filled out;
Step 4, Standing position of a crane and travel region basement process;
Step 5, Equipment Foundations, foundation bolt are reviewed;
Step 6, skid-mounted type ice chest are marched into the arena and are stored;
Step 7, large scale hoisting machinery erect-position;
Step 8 hangs lifting lockset;
Step 9, examination are hung;
Step 10, overturning;
Step 11, in place with adjustment.
2. the installation method of the overall skid-mounted formula ice chest in Large Air Separation Devices engineering according to claim 1, it is characterized in that:
In step 1, scheme Computer Aided Design is carried out using three-dimensional lifting analogue technique, air separation unit, crane is realized, hangs lockset, peace It fills space environment model to generate, crane, calculates Current Collector Sleave automatic Model Selection, lifts the simplation verification of overall process;
In step 2, combined type fast hoisting suspender includes equalizer bar and the lifting lug that is arranged on equalizer bar, the equalizer bar across Away from and the position of lifting lug determined according to hanging device weight and outer dimension, and carry out force analysis and check;
In step 3, Ground Treatment Schemes are determined according to construction field geology situation, will excavate or excavate 2m without compacting region Deep, the foundation trench vibration tamp that will be excavated using road roller carries out back-filling in layers vibration tamp by every layer of 300mm after compacting;
Flatness control carries out earth bearing strength test and examination within 5mm after basement process after the completion of processing;
In step 4, roadbed paving case when directly walking in the state that main crane does not tear vehicle open, in loop wheel machine revolution range, ground is flat Seamless is real;Crane assembling, erect-position point basis must dig down parameter and be determined according to physical device weight and geological condition, after lower digging Basis is answered smooth, and levelness is less than 5 ‰;When simultaneously in order to meet main crane setting-up trolley ground pressure requirement and lifting and walking Super-starting balance weight trolley tire can even running, crane and setting-up carriage walking region should be laid with steady layer of water, and guarantee smooth;It is auxiliary Help crane crawler crane erect-position point roadbed paving case;
In step 5, the repetition measurement of Equipment Foundations position, geometric dimension and foundation bolt location dimension is carried out before equipment installation, is protected Card position is accurate, and screw thread is intact;
In step 6, before skid-mounted type ice chest is marched into the arena, to ice chest storage area carry out it is smooth, and using road roller roll it is close It is real, it is laid with steel plate or roadbed paving case in ice chest support frame region, ice chest is deposited in above steel plate by 12 support frames;Lifting Before, drawing is transported according to ice chest, 12 support frames are placed into designated position, and using crawler crane counterweight to each pre-pressing bracket 24 hours, sedimentation deviation was not more than 2mm;
In step 7, Standing position of a crane position is drawn in the way of unwrapping wire according to the Standing position of a crane that Hoisting Program calculates at the scene, just Accurately in place in crane;
In step 8, after main and auxiliary crane erect-position, is hung according to the selected rigging of lifting numerical procedure, examined after hanging Look into confirmation;
In step 9, slow lifting means stops being promoted, keep quiet main and auxiliary crane when equipment is higher than support frame 100mm simultaneously The ground of only state 2-5min, the force-bearing situation and loop wheel machine erect-position region that check Current Collector Sleave, equipment lifting lug and apparatus body are heavy Situation drops;
In step 10, device bottom is slowly drop down to by main and auxiliary crane synchronous ascending equipment to bracket highest point, auxiliary crane is detached from Apart from ground 200mm, stop decline;Main crane continues erecting equipment, auxiliary hangs slowly delivery device forward until equipment is erect;
In step 11, ice chest is lifted to basic top position, is arranged special messenger to nurse every group of bolt, is determined all bolts pair It is slowly in place when answering screw hole, in the process, observation ice chest verticality is adjusted using theodolite, and carry out to ice chest using thin backing plate Auxiliary adjustment centering.
CN201811624151.9A 2018-12-28 2018-12-28 Mounting method of integral skid-mounted cold box in large-scale air separation project Active CN109720976B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811624151.9A CN109720976B (en) 2018-12-28 2018-12-28 Mounting method of integral skid-mounted cold box in large-scale air separation project

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811624151.9A CN109720976B (en) 2018-12-28 2018-12-28 Mounting method of integral skid-mounted cold box in large-scale air separation project

Publications (2)

Publication Number Publication Date
CN109720976A true CN109720976A (en) 2019-05-07
CN109720976B CN109720976B (en) 2020-07-28

Family

ID=66296640

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811624151.9A Active CN109720976B (en) 2018-12-28 2018-12-28 Mounting method of integral skid-mounted cold box in large-scale air separation project

Country Status (1)

Country Link
CN (1) CN109720976B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110295620A (en) * 2019-06-29 2019-10-01 上海二十冶建设有限公司 The fast accurate installation method of large-scale space division device overall skid-mounted formula ice chest
CN110360811A (en) * 2019-06-28 2019-10-22 上海二十冶建设有限公司 The integrated installation method of overall skid-mounted formula ice chest
CN110589526A (en) * 2019-08-31 2019-12-20 上海二十冶建设有限公司 Safe unloading method for integral cold box of large air separation device
CN111851296A (en) * 2020-06-22 2020-10-30 中铁北京工程局集团(天津)工程有限公司 Steel beam hoisting method
CN111963411A (en) * 2020-07-22 2020-11-20 上海二十冶建设有限公司 Quick mounting method for skid-mounted air compressor unit of large air separation device
CN112607580A (en) * 2020-12-22 2021-04-06 湖北省大唐安盛建筑工程有限公司 Steel ring reinforced flat car hoisting method
CN114348882A (en) * 2021-12-31 2022-04-15 上海华谊建设有限公司 Hoisting method of refining tower

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201301168Y (en) * 2008-11-07 2009-09-02 中冶东北建设有限公司机械安装工程公司 Cold box plate hoisting spreader device
WO2010033083A1 (en) * 2008-09-19 2010-03-25 Keppel Offshore & Marine Technology Centre Pte Ltd Cargo transfer system
CN204038852U (en) * 2013-08-19 2014-12-24 中冶天工集团有限公司 General lifting appliance for lifting inner container of air separation tower
CN105645278A (en) * 2016-03-31 2016-06-08 中冶建工集团有限公司 Method for mounting crawler cranes in side slope sites
JP2018095363A (en) * 2016-12-09 2018-06-21 株式会社タダノ Work vehicle

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2010033083A1 (en) * 2008-09-19 2010-03-25 Keppel Offshore & Marine Technology Centre Pte Ltd Cargo transfer system
CN201301168Y (en) * 2008-11-07 2009-09-02 中冶东北建设有限公司机械安装工程公司 Cold box plate hoisting spreader device
CN204038852U (en) * 2013-08-19 2014-12-24 中冶天工集团有限公司 General lifting appliance for lifting inner container of air separation tower
CN105645278A (en) * 2016-03-31 2016-06-08 中冶建工集团有限公司 Method for mounting crawler cranes in side slope sites
JP2018095363A (en) * 2016-12-09 2018-06-21 株式会社タダノ Work vehicle

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
程威: "大型空分装置容器安装技术论述", 《科技视界》 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110360811A (en) * 2019-06-28 2019-10-22 上海二十冶建设有限公司 The integrated installation method of overall skid-mounted formula ice chest
CN110295620A (en) * 2019-06-29 2019-10-01 上海二十冶建设有限公司 The fast accurate installation method of large-scale space division device overall skid-mounted formula ice chest
CN110589526A (en) * 2019-08-31 2019-12-20 上海二十冶建设有限公司 Safe unloading method for integral cold box of large air separation device
CN111851296A (en) * 2020-06-22 2020-10-30 中铁北京工程局集团(天津)工程有限公司 Steel beam hoisting method
CN111963411A (en) * 2020-07-22 2020-11-20 上海二十冶建设有限公司 Quick mounting method for skid-mounted air compressor unit of large air separation device
CN112607580A (en) * 2020-12-22 2021-04-06 湖北省大唐安盛建筑工程有限公司 Steel ring reinforced flat car hoisting method
CN114348882A (en) * 2021-12-31 2022-04-15 上海华谊建设有限公司 Hoisting method of refining tower

Also Published As

Publication number Publication date
CN109720976B (en) 2020-07-28

Similar Documents

Publication Publication Date Title
CN109720976A (en) The installation method of overall skid-mounted formula ice chest in Large Air Separation Devices engineering
CN102691294B (en) Construction method of underground continuous wall
CN104975622B (en) Correction and reinforcement method for precast pile foundation of high-rise building
CN103510529B (en) Steel hanging box system for underwater high-rise pile cap construction and construction technology thereof
CN108086340A (en) Open caisson construction structure and construction method thereof
CN103243747B (en) Deviation rectifying method of prestressed concrete pipe pile foundation
CN105672314B (en) A kind of semi-inverse method steel pipe post pile construction method
CN109487822B (en) Method for installing and adjusting steel pipe column in reverse construction and control device
CN105951747B (en) A kind of construction method of the pre-buried lattice column of contrary sequence method
CN113445498A (en) Construction process of karst hole pile foundation in complex geology
CN106436788A (en) Foundation reinforcement and inclination correction method for friction piles of high-rise building
CN104912062A (en) Concrete pile steel pipe column continuous construction method
CN103195058A (en) Multi-casing structure capable of facilitating bridge-pile construction in cavern development areas and construction method thereof
CN102635113A (en) Construction method for hydraulic vibrating sinking pipe cast-in-place piles
CN101476326A (en) Bearing platform prefabrication and construction method
CN105953078A (en) Protection device and protection method of high-pressure gas pipeline
CN107059848A (en) A kind of pile integral construction method
CN110158579A (en) A kind of bored pile construction method
CN102828531A (en) System and construction method for realizing digging and measuring of diaphragm wall trench in geotechnical centrifugal model test
CN107386453A (en) High-rise House on stilts construction method
CN110725163A (en) Composite roadbed device based on existing rail transit roadbed and pile construction method
CN109723062A (en) Heave-load device hanging apparatus and hanging method based on proximity deep foundation pit construction environment
CN109083433A (en) A kind of building inclination rectification reinforcement means
CN205934931U (en) Lid is in same direction as foundation ditch structure of digging way of doing things construction
CN105040992B (en) Reverse inverted-insertion type construction method for structural steel columns

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant