Prior art keywords
ice chest
lifting
pump box
box
mounted formula
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910574793.0A
Other languages
Chinese (zh)
Inventor
马启升
罗浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai 20 Smelter Construction Co Ltd
China MCC20 Group Corp Ltd
Shanghai Ershiye Construction Co Ltd
Original Assignee
Shanghai 20 Smelter Construction Co Ltd
China MCC20 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai 20 Smelter Construction Co Ltd, China MCC20 Group Corp Ltd filed Critical Shanghai 20 Smelter Construction Co Ltd
Priority to CN201910574793.0A priority Critical patent/CN110360811A/en
Publication of CN110360811A publication Critical patent/CN110360811A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C13/00Other constructional features or details
    • B66C13/04Auxiliary devices for controlling movements of suspended loads, or preventing cable slack
    • B66C13/08Auxiliary devices for controlling movements of suspended loads, or preventing cable slack for depositing loads in desired attitudes or positions
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25JLIQUEFACTION, SOLIDIFICATION OR SEPARATION OF GASES OR GASEOUS OR LIQUEFIED GASEOUS MIXTURES BY PRESSURE AND COLD TREATMENT OR BY BRINGING THEM INTO THE SUPERCRITICAL STATE
    • F25J3/00Processes or apparatus for separating the constituents of gaseous or liquefied gaseous mixtures involving the use of liquefaction or solidification
    • F25J3/02Processes or apparatus for separating the constituents of gaseous or liquefied gaseous mixtures involving the use of liquefaction or solidification by rectification, i.e. by continuous interchange of heat and material between a vapour stream and a liquid stream
    • F25J3/04Processes or apparatus for separating the constituents of gaseous or liquefied gaseous mixtures involving the use of liquefaction or solidification by rectification, i.e. by continuous interchange of heat and material between a vapour stream and a liquid stream for air
    • F25J3/04763Start-up or control of the process; Details of the apparatus used
    • F25J3/04866Construction and layout of air fractionation equipments, e.g. valves, machines
    • F25J3/0489Modularity and arrangement of parts of the air fractionation unit, in particular of the cold box, e.g. pre-fabrication, assembling and erection, dimensions, horizontal layout "plot"

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The present invention relates to a kind of integrated installation methods of overall skid-mounted formula ice chest, comprising the following steps: is tamped, smooth processing to ice chest lifting influence area ground, carries out grinding to cold box foundation and backing plate is arranged;Lifting equipment is in place, and ice chest, which is marched into the arena, unloads, pump box pipe prefabrication;The assembly of ice chest attachment and the assembling of pump box semi-modular;Ice chest lifting is in place, and adjustment is checked and accepted, base mortar;Scaffold building in ice chest, the installation of gap bridge ice chest, pump box, expansion cabinet are in place;It is fixed temporarily support removing, the installation of ice chest attachment, pump box, expansion cabinet Pipe installing;Distributor adjustment, ice chest bottom expanded-sand concrete pour;Process inspection, pipeline pressure test;Blowing pipeline, naked cool tone examination;Scaffold is removed, and is installed every cold plate;Pearlife filling.The present invention can be improved the safety and efficiency of overall skid-mounted formula ice chest installation.

Description

The integrated installation method of overall skid-mounted formula ice chest
Technical field
The invention belongs to the technical fields of ice chest installation, more particularly to a kind of integrated installation side of overall skid-mounted formula ice chest Method.
Background technique
As the increasingly mature and traffic condition of whole ice chest mounting technique constantly improve, domestic emphasis Petrochemical Projects have been Started successively using large-scale overall skid-mounted formula ice chest, the mounting technique of this ice chest has been increasingly becoming Large Air Separation Devices oxygen One important development direction.Relative to the mounting means of traditional ice chest, overall skid-mounted formula ice chest is by site operation emphasis from ice chest The installation of interior conduit tower is transferred to the outer pump box of ice chest, expansion cabinet Pipe installing, the procedure arrangement and resource of traditional construction technology Allotment is no longer desirable for engine request under the new situation.
Summary of the invention
Technical problem to be solved by the invention is to provide a kind of integrated installation methods of overall skid-mounted formula ice chest, improve whole The safety and efficiency of body skid-mounted type ice chest installation.
The technical solution adopted by the present invention to solve the technical problems is to provide a kind of integrated peace of overall skid-mounted formula ice chest Dress method, comprising the following steps:
(1) ice chest lifting influence area ground is tamped, smooth processing, grinding and backing plate cloth is carried out to cold box foundation It sets;
(2) lifting equipment is in place, and ice chest, which is marched into the arena, unloads, pump box pipe prefabrication;
(3) assembly of ice chest attachment and the assembling of pump box semi-modular;
(4) ice chest lifting is in place, and adjustment is checked and accepted, base mortar;
(5) scaffold building in ice chest, the installation of gap bridge ice chest, pump box, expansion cabinet are in place;
(6) ice chest transport support is removed, the installation of ice chest attachment, pump box, expansion cabinet Pipe installing;
(7) distributor adjusts, and ice chest bottom expanded-sand concrete pours;
(8) process inspection, pipeline pressure test;
(9) blowing pipeline, naked cool tone examination;
(10) scaffold is removed, and is installed every cold plate;
(11) pearlife is filled.
In the step (1), ice chest lifting influence area basement process using change fill out, the reinforcing of smooth, underground installation Mode carries out consolidation process to ice chest storage area, ice chest lifting equipment erect-position and travel region, and carries out ground as requested Bearing capacity examination;On ice chest scene storage and dedicated buttress, ice chest buttress position ground carries out precompressed using crane counterweight, and Carry out sedimentation detection, it is desirable that ice chest stores each surface level difference of temporary rest pier and is no more than 5mm, and sedimentation is not more than 2mm.
In the step (2), lifting equipment enters specified lifting region, after ice chest is transported to scene, certainly using hydraulic lifting The technology of unloading is placed on ice chest buttress, is leveled between buttress and transport beam using parallels, and observation buttress sedimentation synchronizes and starts Pump box interior conduit is prefabricated.
In the step (3), after ice chest storage is stablized, ice chest structure platform railing, instrument gantry, bracket is turned round into leg, exhaled It inhales sleeve and successively carries out the integrated assembling in ground, while by ice chest column root-plate shear key grout sealing, ice chest structure finishing coat anti-corrosion It completes;It is synchronous to carry out the assembling of pump box semi-modular, after the completion of pump box pipe prefabrication, in prefabricated workshop by the raffinate around pump box Discharge tube completes assembling.
In the step (4), after ice chest completes ground handling, ice chest is lifted to cold box foundation using double-machine lifting crane, Ice chest verticality is adjusted using parallels, after verticality acceptance(check), lifting equipment tears hook open completely and withdraws from the arena, then fastening bolt, The grouting of suspension column shearing resistance slot.
In the step (5), wherein top ice chest gap bridge connecting box is hung in using crane from top;Bottom ice chest crosses bridging It connects to be promoted using jack to designated position after case slides into installation site with rolling bar and install;Middle part ice chest gap bridge connecting box connecting box benefit Connecting box is lifted into same layer bottom platform with crane, is lifted using jack in place;Synchronous pump box, expansion cabinet use crane Directly lifting is in place.
In the step (6), ice chest transport support, which is removed, is fixed temporarily 3, bracket and main ice chest including tower in argon ice chest Interior tower is fixed temporarily 4, bracket, and tower falsework is fixed using bolt fastening, partially transports because space problem influences bracket Ice chest needs manual cutting to transport;The installation of ice chest attachment includes manually-operated gate on ice chest, analysis evaporator, breather valve, safety top Valve, angle valve control film head installation;In pump box, expansion computer room equipment and pipe fitting synchronize be in full swing.
In the step (7), distributor adjustment refers to cutting distributor head, carries out distributor using laser level measuring instrument Adjustment is checked and accepted, and qualified laggard pedestrian hole blocks welding, flaw detection;It synchronizes and pours ice chest bottom expanded-sand concrete.
In the step (10), after the naked cold passed examination of ice chest, cold box interior scaffold is removed, scaffold is cleared up after removing Sundries in ice chest installs bottom every cold plate.
In the step (11), cold box interior is checked, closes manhole door, is filled in mouthful case ice chest from ice chest top Fill pearlife thermal insulation material.
Beneficial effect
First, the present invention realizes whole ice chest Quick-unloading, it is ensured that ice chest using scene self-control support cooperation parallels adjustment Storage and ground attachment erection stage are steadily safe at the scene.
Second, present invention combination 3 d modeling software increases ground installation workload, realizes whole ice chest attachment and pump box Semi-modular installation.Ice chest periphery platform railing, instrument gantry, the installation for breathing cylinder and antifouling paint brushing are worked whole It is completed before the lifting of body ice chest, amount of high-altitude operation after reducing ice chest in place, while platform turns round leg using the formula of connecing is fastened, and accelerates entirety The installation on ground efficiency of ice chest attachment.
Third, the present invention targetedly carry out scaffold building in ice chest, reduce according to overall skid-mounted formula ice chest feature The workload of scaffold building in ice chest, while the expansion of follow-up work is not influenced.
4th, the mounting means combined using a variety of hanging methods, realize main cold, argon it is cold between multilayer gap bridge ice chest it is fast Speed installation, reduces security risk.
5th, the present invention surrounds whole ice chest installation and pump box, expansion two critical path multiple spots of cabinet Pipe installing are more Face synchronous expansion procedure arrangement improves the level of resources utilization, accelerates ice chest region construction efficiency.
Detailed description of the invention
Fig. 1 is flow chart of the invention.
Specific embodiment
Present invention will be further explained below with reference to specific examples.It should be understood that these embodiments are merely to illustrate the present invention Rather than it limits the scope of the invention.In addition, it should also be understood that, after reading the content taught by the present invention, those skilled in the art Member can make various changes or modifications the present invention, and such equivalent forms equally fall within the application the appended claims and limited Range.
A kind of integrated installation method of overall skid-mounted formula ice chest as shown in Figure 1, comprising the following steps:
(1) ice chest lifts influence area basement process, and cold box foundation grinding, backing plate are checked and accepted;
(2) lifting equipment is in place, ice chest marches into the arena and unloads;Pump box pipe prefabrication;
(3) ice chest attachment is assembled (including platform railing, gantry, paint);The assembling of pump box semi-modular;
(4) ice chest lifting is in place, adjustment is checked and accepted, base mortar;
(5) scaffold building in ice chest;The installation of gap bridge ice chest;Pump box, expansion cabinet are in place
(6) it is fixed temporarily support removing, ice chest attachment installs (valve head, safety valve);Pump box, expansion cabinet Pipe installing.
(7) distributor adjusts;Ice chest bottom expanded-sand concrete pours;
(8) process inspection;Pipeline pressure test;
(9) blowing pipeline, the examination of naked cool tone;
(10) scaffold is removed, is installed every cold plate;
(11) pearlife is filled.
Ice chest lifting influence area basement process in step (1) is filled out, by the way of the reinforcing of smooth, underground installation using changing Consolidation process is carried out to ice chest storage area, ice chest lifting equipment erect-position and travel region, and carries out foundation bearing as requested Force inspecting;Since on ice chest scene storage and temporary rest pier, ice chest buttress position ground can be used crane counterweight and carry out precompressed, And carry out sedimentation detection, it is desirable that ice chest stores each surface level difference of temporary rest pier and is no more than 5mm, and sedimentation is not more than 2mm.Ice chest Basis grinding, backing plate examination, which refer to, arranges ice chest suspension column backing plate according to design requirement, and parallels setting need to meet code requirement, and not Shearing resistance slot must be hindered to be in the milk.
Lifting equipment in the step (2) is in place, ice chest is marched into the arena unloads and refers to and required according to Hoisting Program, considers lifting The sequencing that equipment and ice chest are marched into the arena, reasonable arrangement hoisting machinery and ice chest are marched into the arena, and ice chest is transported to existing using hydraulic tipper It after, is placed on 12 temporary rest piers, temporary rest pier is placed in strict accordance with design position, using pad between buttress and transport beam Iron is leveled, and ice chest storage height control turns round leg, be convenient for successive stage ground group in 1.6m or so, slightly above ice chest platform Dress, observation buttress sedimentation.Synchronous beginning pump box interior conduit is prefabricated.
After ice chest attachment assembly refers to that ice chest is unloaded in the step (3), it will be not present what kelly influenced in hoisting process Platform railing, instrument gantry, bracket are turned round leg etc. and are successively installed in place on ground, are previously-completed in ice chest column root-plate shearing resistance square steel Grout sealing, interim closure plate excision, the work such as finishing coat brushing are completed on ground, and high altitude operation, while ice chest platform are reduced Leg is turned round for the ease of assembly, preferential use, which is fastened, to be connect.
Synchronous progress pump box semi-modular assembling refers to after the completion of pump box pipe prefabrication, can preferentially be existed according to three-dimensional software Prefabricated workshop the residual liquid discharge pipeline around pump box is completed into assembling.
Ice chest lifting is in place in the step (4), adjustment is checked and accepted, base mortar refers to that ice chest completes all ground handlings Afterwards, ice chest is lifted to cold box foundation using double-machine lifting crane, ice chest verticality is adjusted using parallels, for the ease of ice chest tune Whole, after verticality acceptance(check), lifting equipment can tear completely hook open and withdraw from the arena, then fastening bolt, the grouting of suspension column shearing resistance slot.
The purpose of scaffold building is different from traditional ice chest scaffold building in ice chest in the step (5), is mainly used for Ice chest is fixed temporarily support removing and naked cold inspection, so reinforcing platform, scaffold being fixed temporarily backing positions setting It when setting up, takes root from ice chest floor structure beam, pours and create good conditions for subsequent bottom plate expanded-sand concrete.
The installation of gap bridge ice chest include between main cold, argon is cold the place absolute altitude 12.05m, 33.42m, 44.4m, 55.12m count four layers with And plate change ice chest and it is main it is cold between the place 0.58m, 8.13m count two layers, wherein at 55.12m and 8.13m connection ice chest use crane from Top is hung in;It connects to be promoted using jack to designated position after ice chest slides into installation site with rolling bar at 0.58m and install; Connecting box is lifted into same layer bottom platform by connecting box first with crane at 12.05m, 33.42m, 44.4m.It is synchronous pump box, swollen Swollen cabinet is directly lifted in place using crane.
Be fixed temporarily in the step (6) support removing include in argon ice chest tower be fixed temporarily 3, bracket, in main ice chest Tower is fixed temporarily 4, bracket, and tower falsework is all that bolt fastening is fixed, and micro part, which can be related to space problem, influences branch Frame cooling box needs manual cutting to transport, and ice chest attachment installation (valve head, safety valve) is;It carries out on ice chest on 3001-11GN simultaneously There are two manually-operated gates, analyze evaporator, breather valve, top safety valve in-site installation on ice chest, and angle valve controls the installation of film head. In pump box, expansion computer room equipment and pipe fitting synchronize be in full swing.
Distributor adjustment refers to cutting distributor manhole pressure column A80, A81, main condenser A80 in the step (7), low Press tower A85, A86, A87, A88, argon column A81, A82, A83, A84, A85, A86) (it is related to workload: cutting end socket, adjustment, tune Closure after confirming, cleaning degreasing, qualification is examined after whole altogether to weld, detect a flaw);It synchronizes and pours ice chest bottom expanded-sand concrete.
Process inspection in the step (8), pipeline pressure test refer to that cooperation producer carries out 90% and checks and rectify and improve, include pump Case, expansion computer room, main ice chest, argon ice chest, plate change 39 area's Pipe installing quality of ice chest and periphery, after rectifying and improving acceptance(check), point are System carries out pipeline pressure test work.
Blowing pipeline in the step (9), the examination of naked cool tone refer to that cooperation producer carries out the closure of blowing pipeline mouth, practice shooting and The work such as recovery and the naked cold inspection of ice chest.
Scaffold is removed, after cold plate installation refers to the naked cold passed examination of ice chest in the step (10), is removed in ice chest Portion's scaffold must not collide ice chest interior conduit and equipment in demolishing process.Scaffold clears up sundries in ice chest after removing, and installs bottom Portion is every cold plate.
After pearlife filling refers to that cold box interior has checked in the step (11), manhole door is closed, from ice chest top It fills and fills pearlife thermal insulation material in mouthful case ice chest.
The present invention combines whole ice chest construction task variation on the basis of original process, is adjusted and has been improved, used The convenience of overall skid-mounted formula ice chest is adequately utilized in the mode of ice chest attachment installation on ground, is effectively reduced high-altitude work Industry workload, while the wasting of resources is further avoided to the adjustment of ice chest scaffold building mode, by pump box, expansion cabinet pipe Installation task in road considers in advance, guarantees that each system installment work of ice chest advances side by side.Coordinate to construct by each process, maximumlly Overall skid-mounted formula ice chest bring duration and management advantage are brought into play, further shorten whole ice chest installation period and at This control, with good economic efficiency and social benefit.

Claims (10)

1. a kind of integrated installation method of overall skid-mounted formula ice chest, comprising the following steps:
(1) ice chest lifting influence area ground is tamped, smooth processing, grinding is carried out to cold box foundation and backing plate is arranged;
(2) lifting equipment is in place, and ice chest, which is marched into the arena, unloads, pump box pipe prefabrication;
(3) assembly of ice chest attachment and the assembling of pump box semi-modular;
(4) ice chest lifting is in place, and adjustment is checked and accepted, base mortar;
(5) scaffold building in ice chest, the installation of gap bridge ice chest, pump box, expansion cabinet are in place;
(6) ice chest transport support is removed, the installation of ice chest attachment, pump box, expansion cabinet Pipe installing;
(7) distributor adjusts, and ice chest bottom expanded-sand concrete pours;
(8) process inspection, pipeline pressure test;
(9) blowing pipeline, naked cool tone examination;
(10) scaffold is removed, and is installed every cold plate;
(11) pearlife is filled.
2. the integrated installation method of overall skid-mounted formula ice chest according to claim 1, it is characterised in that: in the step (1), Ice chest lifting influence area basement process be using change fill out, by the way of the reinforcing of smooth, underground installation to ice chest storage area, ice chest Lifting equipment erect-position and travel region carry out consolidation process, and carry out foundation bearing force inspecting as requested;Ice chest scene storage On dedicated buttress, ice chest buttress position ground carries out precompressed using crane counterweight, and carries out sedimentation detection, it is desirable that ice chest is deposited It puts each surface level difference of temporary rest pier and is no more than 5mm, sedimentation is not more than 2mm.
3. the integrated installation method of overall skid-mounted formula ice chest according to claim 1, it is characterised in that: in the step (2), Lifting equipment enters specified lifting region, after ice chest is transported to scene, is placed on ice chest buttress using hydraulic lifting self-unloading technology, It is leveled between buttress and transport beam using parallels, observation buttress sedimentation, synchronous to start pump box interior conduit prefabricated.
4. the integrated installation method of overall skid-mounted formula ice chest according to claim 1, it is characterised in that: in the step (3), After ice chest storage is stablized, ice chest structure platform railing, instrument gantry, bracket are turned round into leg, breathing sleeve successively carries out ground and integrates Assembling, while by ice chest column root-plate shear key grout sealing, ice chest structure finishing coat anti-corrosion is completed;It is synchronous to carry out pump box half module Change assembling, after the completion of pump box pipe prefabrication, the residual liquid discharge pipeline around pump box is completed into assembling in prefabricated workshop.
5. the integrated installation method of overall skid-mounted formula ice chest according to claim 1, it is characterised in that: in the step (4), After ice chest completes ground handling, ice chest is lifted to cold box foundation using double-machine lifting crane, ice chest verticality is adjusted using parallels, After verticality acceptance(check), lifting equipment tears hook open completely and withdraws from the arena, then fastening bolt, the grouting of suspension column shearing resistance slot.
6. the integrated installation method of overall skid-mounted formula ice chest according to claim 1, it is characterised in that: in the step (5), Wherein top ice chest gap bridge connecting box is hung in using crane from top;Bottom ice chest gap bridge connecting box slides into installation site with rolling bar It is installed afterwards using jack promotion to designated position;Connecting box is lifted into same layer bottom using crane by middle part ice chest gap bridge connecting box On platform, lifted using jack in place;Synchronous pump box, expansion cabinet are directly lifted in place using crane.
7. the integrated installation method of overall skid-mounted formula ice chest according to claim 1, it is characterised in that: in the step (6), The dismounting of ice chest transport support is fixed temporarily tower in 3, bracket and main ice chest including tower in argon ice chest and is fixed temporarily 4, bracket, Tower falsework is fixed using bolt fastening, partially needs manual cutting to transport because space problem influence bracket transports ice chest;It is cold The installation of case attachment includes manually-operated gate on ice chest, analysis evaporator, breather valve, top safety valve, angle valve control film head installation;Pump In case, expansion computer room equipment and pipe fitting synchronize be in full swing.
8. the integrated installation method of overall skid-mounted formula ice chest according to claim 1, it is characterised in that: in the step (7), Distributor adjustment refers to cutting distributor head, carries out distributor adjustment using laser level measuring instrument and checks and accepts, qualified laggard pedestrian Hole blocks welding, flaw detection;It synchronizes and pours ice chest bottom expanded-sand concrete.
9. the integrated installation method of overall skid-mounted formula ice chest according to claim 1, it is characterised in that: the step (10) In, after the naked cold passed examination of ice chest, cold box interior scaffold is removed, scaffold clears up sundries in ice chest after removing, installs bottom Every cold plate.
10. the integrated installation method of overall skid-mounted formula ice chest according to claim 1, it is characterised in that: the step (11) In, cold box interior is checked, manhole door is closed, fills filling pearlife thermal insulation material in mouthful case ice chest from ice chest top.
CN201910574793.0A 2019-06-28 2019-06-28 The integrated installation method of overall skid-mounted formula ice chest Pending CN110360811A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910574793.0A CN110360811A (en) 2019-06-28 2019-06-28 The integrated installation method of overall skid-mounted formula ice chest

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910574793.0A CN110360811A (en) 2019-06-28 2019-06-28 The integrated installation method of overall skid-mounted formula ice chest

Publications (1)

Publication Number Publication Date
CN110360811A true CN110360811A (en) 2019-10-22

Family

ID=68216599

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910574793.0A Pending CN110360811A (en) 2019-06-28 2019-06-28 The integrated installation method of overall skid-mounted formula ice chest

Country Status (1)

Country Link
CN (1) CN110360811A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113959180A (en) * 2021-10-28 2022-01-21 上海二十冶建设有限公司 Rapid joint debugging method for oxygen production process of air separation plant
CN113958801A (en) * 2021-10-09 2022-01-21 中国化学工程第六建设有限公司 Column base bottom plate separated large-scale integral cold box and installation method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2917490A1 (en) * 2007-06-12 2008-12-19 Air Liquide Cold box for air separation apparatus, has air cleaning unit, separated fluid processing element or air compression unit separated in distillation column, where elements are mounted on external wall of enclosure
CN106223669A (en) * 2016-08-19 2016-12-14 浙江智海化工设备工程有限公司 A kind of space division packaging type ice chest
CN109340510A (en) * 2018-10-18 2019-02-15 杭州杭氧化医工程有限公司 Air separation cooling box basis foot anchor mounting structure and its installation method
CN109720976A (en) * 2018-12-28 2019-05-07 上海二十冶建设有限公司 The installation method of overall skid-mounted formula ice chest in Large Air Separation Devices engineering

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2917490A1 (en) * 2007-06-12 2008-12-19 Air Liquide Cold box for air separation apparatus, has air cleaning unit, separated fluid processing element or air compression unit separated in distillation column, where elements are mounted on external wall of enclosure
CN106223669A (en) * 2016-08-19 2016-12-14 浙江智海化工设备工程有限公司 A kind of space division packaging type ice chest
CN109340510A (en) * 2018-10-18 2019-02-15 杭州杭氧化医工程有限公司 Air separation cooling box basis foot anchor mounting structure and its installation method
CN109720976A (en) * 2018-12-28 2019-05-07 上海二十冶建设有限公司 The installation method of overall skid-mounted formula ice chest in Large Air Separation Devices engineering

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
中国冶金建设协会: "《空分制氧设备安装工程施工与质量验收规范》", 18 February 2011 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113958801A (en) * 2021-10-09 2022-01-21 中国化学工程第六建设有限公司 Column base bottom plate separated large-scale integral cold box and installation method thereof
CN113958801B (en) * 2021-10-09 2023-02-17 中国化学工程第六建设有限公司 Column base bottom plate separated large-scale integral cold box and installation method thereof
CN113959180A (en) * 2021-10-28 2022-01-21 上海二十冶建设有限公司 Rapid joint debugging method for oxygen production process of air separation plant

Similar Documents

Publication Publication Date Title
CN108468430B (en) Hoisting and sliding construction method for large-span unequal-height support steel truss structure
CN104895318B (en) Aluminum alloy template system and construction method of same
CN107542268A (en) The reverse construction method of installation of stage steel construction in a kind of grand theater room
CN106894639B (en) The hanging reverse construction method of installation of steel construction under a kind of
CN104141383B (en) A kind of Bailey beam pendent form support system and construction thereof
CN112854745A (en) Construction process of assembled building aluminum alloy template
CN108019076A (en) Large-size rebar concrete silo construction method and the device for conical shell construction
CN103075025B (en) Wholly lifting construction method for asymmetric structure of huge overhang steel of high-rise building
CN109611102B (en) Construction method for cold excavation underpass overpass
CN107905522A (en) A kind of exterior wall assembly plank sheathing monolithic construction method
CN103510702A (en) Concrete-filled steel tube column needle type concrete pouring construction method
CN111828013B (en) Ground shield tunnel experiment entity model and construction method thereof
CN106437178A (en) Integral lifting construction method and integral lifting construction device of veranda of multi-layer steel structure
CN101818645A (en) Construction method for newly increasing arched open cut tunnel at railway operating line tunnel portal
CN110360811A (en) The integrated installation method of overall skid-mounted formula ice chest
CN108222066A (en) A kind of combined steel formwork support system and its construction method
CN113047447B (en) Split-level steel structure building semi-reverse construction method
CN107060070A (en) Load transfer device and the construction method that steel vestibule is lifted with the device
CN105350581A (en) Advanced sealing structure for basement top slab settlement post-cast strips
CN107143076A (en) A kind of Prefabricated stacking floor with side flanging and its construction method for being used to drop plate region
CN110184948A (en) A kind of Bridge beam construction method
CN110284702A (en) A kind of constructing device and construction method of hyperboloid arc mixed mud wall
CN115369778A (en) Construction method of steel cross beam rotating body structure
CN114059782A (en) Construction method of prefabricated slab
CN103061508A (en) Triangular slip form device and construction method for the same triangular slip form

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination