CN105926958B - A kind of installation method for the sill anchor combined support frame for being used for high-rise building steel construction shear wall and outline border suspension column - Google Patents
A kind of installation method for the sill anchor combined support frame for being used for high-rise building steel construction shear wall and outline border suspension column Download PDFInfo
- Publication number
- CN105926958B CN105926958B CN201610515480.4A CN201610515480A CN105926958B CN 105926958 B CN105926958 B CN 105926958B CN 201610515480 A CN201610515480 A CN 201610515480A CN 105926958 B CN105926958 B CN 105926958B
- Authority
- CN
- China
- Prior art keywords
- crab
- bolt
- frame
- stock
- combined support
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000009434 installation Methods 0.000 title claims abstract description 55
- 238000010276 construction Methods 0.000 title claims abstract description 47
- 238000000034 method Methods 0.000 title claims abstract description 47
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 35
- 239000010959 steel Substances 0.000 title claims abstract description 35
- 239000000725 suspension Substances 0.000 title claims abstract description 20
- 230000007704 transition Effects 0.000 claims abstract description 38
- 238000012937 correction Methods 0.000 claims abstract description 18
- 238000005266 casting Methods 0.000 claims abstract description 8
- 238000010008 shearing Methods 0.000 claims abstract description 6
- 230000003014 reinforcing effect Effects 0.000 claims description 22
- 230000002787 reinforcement Effects 0.000 claims description 8
- 238000006073 displacement reaction Methods 0.000 claims description 4
- 238000012544 monitoring process Methods 0.000 claims description 3
- 238000010586 diagram Methods 0.000 description 8
- 238000005516 engineering process Methods 0.000 description 6
- 230000006872 improvement Effects 0.000 description 3
- 239000000463 material Substances 0.000 description 3
- 238000003032 molecular docking Methods 0.000 description 3
- 230000007547 defect Effects 0.000 description 2
- 230000008569 process Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000003912 environmental pollution Methods 0.000 description 1
- 238000009415 formwork Methods 0.000 description 1
- 238000002955 isolation Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 description 1
- 238000011084 recovery Methods 0.000 description 1
- 239000000126 substance Substances 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/16—Tools or apparatus
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The invention discloses a kind of installation method for the sill anchor combined support frame for being used for high-rise building steel construction shear wall and outline border suspension column, include the following steps:S1, carry out sill anchor combined support rack position unwrapping wire after the completion of foundation of civil work cushion construction;S2, transition frame installed it is in place;S3, by crab-bolt stock, crab-bolt and crab-bolt perforation frame be assembled into anchor component, be placed in transition frame;S4, installation steel plate wall or steel column lower margin shearing resistance component reserve slot template;S5, the first correction for integrally carrying out for anchor component verticality, plan-position, crab-bolt elevation of top;Secondary correction is carried out to the verticality and elevation of top of crab-bolt in anchor component before S6, concreting;S8, carry out building foundation concrete casting.The advantages that present invention is with that in assembled off-site sill anchor combined support frame and then can reduce live cross-operation, and crab-bolt combined support frame can be adjusted flexibly, can increase substantially construction efficiency according to on-site actual situations.
Description
Technical field
It is more particularly to a kind of to be used for high-rise building steel construction the present invention relates to high-rise building Construction Technology field
The installation method of the sill anchor combined support frame of shear wall and outline border suspension column.
Background technology
Steel construction is small from heavy and light, intensity height, environmental pollution with it, is assigned the good name of " green building ";Again because of its material
The rate of recovery is high, it is convenient to recycle, and is referred to as " sustainable ".Recently as design level and construction technology not
Disconnected to improve, super high steel structure has obtained development at full speed.The suspension column member section of such steel construction is very big, and each suspension column makes
Sill anchor also up to tens or up to a hundred, forms Bolt, and crab-bolt section and length are also very big, and substance is from tens
Kilogram to hundreds of kilograms, between each other without any connection.Traditional single installation and temporarily fixed crab-bolt construction technology is
Through that cannot meet the needs of this crab-bolt form, some crab-bolts are sequentially combined with crab-bolt supporting rack (template), integral built-in
It is a very effective method for solving crab-bolt group construction in place.But traditional crab-bolt supporting rack for using in the past and its pre-
Bury method there are it is many problem of:
1st, the defects of crab-bolt supporting rack is directly placed in scheme of the bar-mat reinforcement topmost on one layer of reinforcing bar, the program be,
1) when nearby thering are personnel to walk about, placing of material and moving position, particularly placing concrete construction when, some degree will occur for reinforcing bar
Deformation, supporting rack can arrive disturbance and produce straight line and angular displacement, and supporting rack is higher, and disturbance is bigger.2) concrete casting it
Before, supporting rack, which is interfered, produces offset deviation, it is necessary to when being adjusted, since reinforcing bar elasticity is larger, it is necessary to repeatedly be adjusted
It is whole, and Adjustment precision is also impacted;Even if slight run-off the straight, crab-bolt can also deform due to being unable to automatic deviation correction.
3) height and position cannot be arbitrarily adjusted during complicated shape foundation pit construction, is restricted by construction condition larger.
2nd, crab-bolt supporting rack is placed in the technical solution on blinding layer, and the program is disadvantageous in that supporting rack is existing
, it is necessary to separately set embedded part positioning on blinding layer, construction efficiency is relatively low and is asked in the presence of adjustment location difficulty etc. for field single-piece assembling
Topic.
3rd, supporting rack is placed in the improvement project of blinding layer, and the program is that some independences are first preset on blinding layer
Column, the method that then some columns of top precast support frame connect one to one therewith.This technical solution still suffer from positioning,
The problem of cumbersome for installation, such as:Detached column positioning accuracy request itself is high, also needs separately to set embedded part positioning.It is prefabricated with top
Docking operation is inconvenient one by one for supporting rack column, and welding capacity is big.
At the scene during practice of construction, sill anchor installation accuracy control above all control first adjacent crab-bolt it
Between spacing, it is ensured that crab-bolt has the function of automatic deviation correction in inclined scope of necessarily hanging down, it is ensured that can pass through pedestal anchor bolt
Hole;Second is control crab-bolt misalignment of axe, it is ensured that suspension column plan-position is accurate;3rd is to ensure that crab-bolt is highly consistent, ensures institute
There is crab-bolt uniform stressed.In addition also civil engineering other process such as reinforcing bar binding, concreting, accident can be overcome in construction
The influence to crab-bolt installation accuracy such as collision.
The content of the invention
The technical problem to be solved in the present invention is provide one kind the defects of improvement in the presence of existing construction method and be used for
The installation method of the sill anchor combined support frame of high-rise building steel construction shear wall and outline border suspension column;This method has can be with
In assembled off-site sill anchor combined support frame and then live cross-operation is reduced, and can be adjusted flexibly according to on-site actual situations
Crab-bolt combined support frame, the advantages that construction efficiency can be increased substantially;And the sill anchor combined support used in this method
Frame its underpart is the transition frame that height can arbitrarily be set, and top is used for the crab-bolt stock for fixing crab-bolt and crab-bolt perforation frame can be quick
Installation docking and adjustment, fixed crab-bolt, are very suitable for that deep foundation reinforcing bar is intensive, locally lie in catch pit and elevator etc. is complicated
Construction environment.
In order to solve the above technical problems, the present invention uses following technical proposals:
A kind of installation side for high-rise building steel construction shear wall and the sill anchor combined support frame of outline border suspension column
Method, the installation method include the following steps:
S1, carry out sill anchor combined support rack position unwrapping wire after the completion of foundation of civil work cushion construction;
S2, after basic infrastructure reinforcing bar has been bound, by the mistake with vertical supporting leg in sill anchor combined support frame
It is in place to cross frame installation;
S3, by the crab-bolt stock in sill anchor combined support frame, crab-bolt of the assembling on the crab-bolt stock and setting
Crab-bolt perforation frame on the crab-bolt top is assembled into anchor component, which is placed in transition frame;
S4, installation steel plate wall or steel column lower margin shearing resistance component reserve slot template, are worn after stencil plane location determination with crab-bolt
Aperture frame is welded and fixed;
S5, the first correction for integrally carrying out for anchor component verticality, plan-position, crab-bolt elevation of top;
Secondary correction is carried out to the verticality and elevation of top of crab-bolt in anchor component before S6, concreting;
S8, carry out building foundation concrete casting.
The installation method of sill anchor combined support frame provided by the present invention and conventional crab-bolt supporting rack and its pre-buried side
Difference lies in this method utilizes the transition frame in sill anchor combined support frame to method, after portion's reinforcing bar has been bound under the foundation, directly
Connect and the vertical supporting leg of transition frame is passed through into basic infrastructure reinforcing bar, be connected fixation after positioning with reinforcement foundation, anchor component is direct
It is placed in transition frame, and the height of transition frame arbitrarily can be adjusted or set according to actual conditions;
The technical solution and supporting rack that are placed in compared to crab-bolt supporting rack on blinding layer are placed in the improvement of blinding layer
Scheme, method provided by the present invention have:1) built-in fitting is not required;2) required precision of the transition frame installation to plan-position be not
Height, an elevation control precision;3) crab-bolt stock docks convenient with transition frame installation, is easily adjusted correction, is conveniently adjusted crab-bolt and wears
Aperture frame;4) there is crab-bolt adjust automatically verticality, adjustment is fixed conveniently;5) channel mould is reserved easy to the fixed shearing-resistant member of setting
The advantages that plate.
Further, which further includes:
S7, when with multigroup sill anchor combined support frame, every group of supporting rack is attached by angle steel or channel steel
It is fixed, the separately installed bearing diagonal when every group of supporting rack is in larger distance.
Further, the step S2 is specially:After basic infrastructure reinforcing bar has been bound, by the vertical supporting leg of transition frame
Through basic infrastructure reinforcing bar, fixation is connected after positioning with reinforcement foundation.
Further, the step S5 is specially:
S51, carry out axial line control mark according to drawing on the vertical two sides of crab-bolt stock;
S52, measure the verticality for adjusting crab-bolt stock from two mutually perpendicular directions;
Axial line control on S53, the method control crab-bolt stock monitored with total station instrument coordinate marks, adjustment crab-bolt stock
Plan-position is allowed to overlap with axis;
S54, the method monitored with total station instrument coordinate control crab-bolt elevation of top, by adjusting in the crab-bolt of perforation frame top
Second adjustment nut, it is ensured that crab-bolt elevation of top is consistent.
Further, the step S6 is specially:
S61, the method control crab-bolt perforation frame plane positioning monitored with total station instrument coordinate;
S62, crab-bolt perforation frame plane positioning after the completion of, with branch ejection device support top crab-bolt perforate frame, when crab-bolt bottom is left
The chassis of crab-bolt stock stops jacking, and crab-bolt is in overhang and adjust automatically verticality at this time;
S63, axial line control on vernier control crab-bolt stock marks the method monitored with total station instrument coordinate again, be allowed to
Axis overlaps, and is welded and fixed crab-bolt stock with transition frame after correction.
S64, monitoring crab-bolt elevation of top, the second adjustment nut that adjustment is perforated in the crab-bolt of frame top, it is ensured that at the top of crab-bolt
Absolute altitude is consistent, meets code requirement;
Crab-bolt, is connected fixation by S65 with crab-bolt stock, ensures that crab-bolt does not produce displacement in the horizontal direction, afterwards unloading branch
Ejection device.
Further, the sill anchor combined support frame, which includes bottom, has the transition frame of vertical supporting leg, is arranged on
Crab-bolt stock in the transition frame, the crab-bolt being assemblied on the crab-bolt stock and it is arranged on the crab-bolt on the crab-bolt top and wears
Aperture frame;
The crab-bolt stock include chassis, the vertical strut that is arranged on the chassis and in a lateral direction two be in
What is be oppositely arranged is used to connect the crossbeam of fixed adjacent vertical strut;
The bottom of the crab-bolt is fixed on the chassis, and the crab-bolt top passes through the crossbeam, positioned at described
Outside crossbeam, and crab-bolt perforation frame is located above the crossbeam.
Further, the crab-bolt stock includes being arranged on two in the middle part of the crab-bolt stock in the horizontal stroke being oppositely arranged
Beam, and two of the crab-bolt stock top are arranged in the crossbeam being oppositely arranged;
The crossbeam is double bar structures, the crab-bolt body be located at this in pair two cross bars of bar structure crossbeams it
Between.
Further, the crab-bolt stock further includes connecting rod, and the connecting rod is arranged in two horizontal strokes being oppositely arranged
Between beam;The both ends of the connecting rod are fixed with crossbeam respectively;
The connecting rod is double bar structures, and the crab-bolt body is located at two bodies of rod that this is in double bar structure connecting rods
Between.
Further, the crab-bolt perforation frame is equipped with the anchor hole passed through for crab-bolt corresponding with crab-bolt matching;Position
Crab-bolt installation adjusting device is equipped with the crab-bolt top outside the crossbeam, which includes setting successively from top to bottom
Put fixing nut, the first adjusting nut, cover board and second adjustment nut on the crab-bolt body;The crab-bolt perforation is set up
Put on the crab-bolt body between the cover board and second adjustment nut.
Further, the transition frame is the frame body structure being made of upright bar, cross bar, vertical pole and vertical supporting leg.
Compared with prior art, the present invention with following positive beneficial effect:
1st, built-in fitting, transition frame installation essence is not required in the installation method of sill anchor combined support frame provided by the present invention
Of less demanding, an elevation control precision is spent, it is convenient that crab-bolt stock is docked with transition frame installation, is easily adjusted correction, is conveniently adjusted
Crab-bolt perforation frame.
2nd, sill anchor combined support frame provided by the present invention, only need to carry out 2 adjustment after mounting can reach essence
Degree requires;Compared to the frequency that existing method largely reduces adjustment, construction efficiency is improved.Supporting rack is by first
After adjustment, precision disclosure satisfy that code requirement, can provide working face for subsequent handling.Can not in casting concrete front support frame
The meeting avoided is influenced be subject to other process, and positioning accuracy can change, and carries out secondary adjustment to supporting rack at this time, it is ensured that branch
The final precision of support disclosure satisfy that code requirement.
3rd, the sill anchor combined support frame provided in the present invention, its underpart are the transition frames that height can arbitrarily be set,
Top is the crab-bolt stock and crab-bolt perforation frame for fixing crab-bolt, and three being capable of Fast Installation docking, adjustment and fixed crab-bolt;
It is very suitable for that deep foundation reinforcing bar is intensive, locally lies in catch pit and construction environment that elevator etc. is complicated.
4th, the sill anchor combined support frame provided in the present invention, has at the assembled off-site scene of reducing to intersect and makees
Industry, and the advantages that can be adjusted flexibly according to on-site actual situations, and fundamentally solve in existing construction method, common crab-bolt
Stent be directly placed at it is basic topmost on one layer of reinforcing bar when, when this layer of reinforcing bar because material installation is stacked, personnel walk about, stent from
After various outside causes deform, misplace again etc., the problem of stent precision also changes therewith, and adjustment is very cumbersome.
5th, by construction method provided by the present invention, the absolute altitude of crab-bolt can be arbitrarily adjusted, arbitrarily can also adjust ground
The plan-position of foot crab-bolt combined support frame entirety and height, it is ensured that the locus of crab-bolt.
6th, the sill anchor combined support frame provided in the present invention, itself has certain rigidity, has resistance one
Determine the ability of external force influence, such as influence of assembling reinforcement, casting concrete, accident collision to precision.
7th, by construction method provided by the present invention, sill anchor can freely be determined according to live hoisting machinery performance
The size of combined support frame, from the limitation of crab-bolt group's size;Common installation method need to be only taken during installation, it is not necessary to special
Measure.The isolation of rear lower margin crab-bolt combined support frame reinforcing bar is installed, reinforcing bar deformation is fundamentally avoided, misplaces to crab-bolt precision
Influence, avoid repetition adjustment, greatly improve construction efficiency.
8th, by construction method provided by the present invention, it is possible to prevente effectively from common problem in crab-bolt installation, such as
Crab-bolt is not vertical, the inconsistent deviation of crab-bolt spacing is big, after absolute altitude and plan-position installation it is non-adjustable, external interference resistance is poor etc.
Problem.
Brief description of the drawings
Fig. 1 is the integral construction flow diagram of the present invention.
Fig. 2 is the flow diagram of step S5 in the present invention.
Fig. 3 is the flow diagram of step S6 in the present invention.
Fig. 4 is the structure diagram of crab-bolt perforation frame in the present invention.
Fig. 5 is the structure diagram of crab-bolt stock in the present invention.
Fig. 6 is the structure diagram of transition frame in the present invention.
Fig. 7 is crab-bolt stock and the cooperation scheme of installation of transition frame in the present invention.
Fig. 8 is the structure diagram of crab-bolt and the crab-bolt installation adjusting device being fixed on crab-bolt body in the present invention.
Fig. 9 is crab-bolt perforation frame and the cooperation scheme of installation of crab-bolt in the present invention.
Figure 10 is the integral installation distribution structure schematic diagram of sill anchor combined support frame in the present invention.
Embodiment
Illustrate the embodiment of the present invention below in conjunction with the accompanying drawings.
It is a kind of for the combination of the sill anchor of high-rise building steel construction shear wall and outline border suspension column as shown in Fig. 1 to 10
The installation method of supporting rack, the installation method include the following steps:
S1, carry out sill anchor combined support rack position unwrapping wire after the completion of foundation of civil work cushion construction;
S2, after basic infrastructure reinforcing bar has been bound, by the mistake with vertical supporting leg in sill anchor combined support frame
It is in place to cross frame installation, i.e., the vertical supporting leg of transition frame is passed through into basic infrastructure reinforcing bar, is connected fixation after positioning with reinforcement foundation;
S3, by the crab-bolt stock in sill anchor combined support frame, crab-bolt of the assembling on the crab-bolt stock and setting
Crab-bolt perforation frame on the crab-bolt top is assembled into anchor component, which is placed in transition frame;
S4, installation steel plate wall or steel column lower margin shearing resistance component reserve slot template, are worn after stencil plane location determination with crab-bolt
Aperture frame is welded and fixed;
S5, the first correction for integrally carrying out for anchor component verticality, plan-position, crab-bolt elevation of top, are specially:
S51, carry out axial line control mark according to drawing on the vertical two sides of crab-bolt stock;
S52, measure the verticality for adjusting crab-bolt stock from two mutually perpendicular directions;
Axial line control on S53, the method control crab-bolt stock monitored with total station instrument coordinate marks, adjustment crab-bolt stock
Plan-position is allowed to overlap with axis;
S54, the method monitored with total station instrument coordinate control crab-bolt elevation of top, by adjusting in the crab-bolt of perforation frame top
Second adjustment nut, it is ensured that crab-bolt elevation of top is consistent.
After the overall first correction of anchor component, basis middle part and upper reinforcement are bound.
Secondary correction is carried out to the verticality and elevation of top of crab-bolt in anchor component before S6, concreting, is specially:
S61, the method control crab-bolt perforation frame plane positioning monitored with total station instrument coordinate;
S62, crab-bolt perforation frame plane positioning after the completion of, with branch ejection device support top crab-bolt perforate frame, when crab-bolt bottom is left
The chassis of crab-bolt stock stops jacking, and crab-bolt is in overhang and adjust automatically verticality at this time;
S63, axial line control on vernier control crab-bolt stock marks the method monitored with total station instrument coordinate again, be allowed to
Axis overlaps, and is welded and fixed crab-bolt stock with transition frame after correction.
S64, monitoring crab-bolt elevation of top, the second adjustment nut that adjustment is perforated in the crab-bolt of frame top, it is ensured that at the top of crab-bolt
Absolute altitude is consistent, meets code requirement;
Crab-bolt, is connected fixation by S65 with crab-bolt stock, ensures that crab-bolt does not produce displacement in the horizontal direction, afterwards unloading branch
Ejection device.
S7, when with multigroup sill anchor combined support frame, every group of supporting rack is attached by angle steel or channel steel
It is fixed, the separately installed bearing diagonal when every group of supporting rack is in larger distance;
S8, carry out building foundation concrete casting.
It should also be noted that, when building foundation concrete casting is completed and reaches construction intensity requirement, lifting first
Save steel structure column and steel plate wall;Adjust positional precision, fastening foundation bolt and examine after, carry out grouting base treatment → formwork →
Grouting → maintenance → form removal.So complete corner, suspension column bottom grouting construction, filling corner, heel slab lower part and shearing-resistant member week
The gap on side.
In the installation method of sill anchor combined support frame of the present invention, support frame as described above, which includes bottom, has vertical supporting leg
11 transition frame 1, the crab-bolt stock 2 being fixed on 1 top surface of transition frame, the anchor being assemblied on the crab-bolt stock 2
Bolt 3 and the crab-bolt perforation frame 4 for being arranged on 3 top of crab-bolt;
The transition frame 1 is the frame body structure being made of upright bar 12, cross bar 13, vertical pole 14 and vertical supporting leg 11.
The crab-bolt perforation frame 4 is equipped with matches the corresponding anchor hole passed through for crab-bolt with crab-bolt 3;3 top of crab-bolt is equipped with
Crab-bolt installation adjusting device 5, the installation adjusting device 5 include the fixation being successively set on from top to bottom on 3 body of crab-bolt
Nut 51, the first adjusting nut 52, cover board 53 and second adjustment nut 54;The crab-bolt perforation frame 4 is arranged on the cover board 53
On 3 body of crab-bolt between second adjustment nut 54.
The crab-bolt stock 2 includes chassis 21, the vertical strut 22 that is arranged on the chassis 21 and in a lateral direction
Two in the crossbeam 23 for being used to connect fixed adjacent vertical strut being oppositely arranged;Crab-bolt stock described in the present embodiment 2 includes
Be arranged on the middle part of crab-bolt stock 2 two are in the crossbeam 23 being oppositely arranged, and are arranged on the two of 2 top of crab-bolt stock
It is a in the crossbeam 23 being oppositely arranged;Connecting rod 24 is being provided between be oppositely arranged two crossbeams 23, the connecting rod 24
Both ends are fixed with crossbeam respectively.
The bottom of the crab-bolt 3 is fixed on the chassis 21 by anchor head 31, and 3 top of crab-bolt is described in
Crossbeam 23, outside the crossbeam 23, and crab-bolt perforation frame 4 is positioned at the top of crossbeam 23.
Further, the crossbeam 23 is double bar structures, and 3 body of crab-bolt is in double bar structure crossbeams 23 positioned at being somebody's turn to do
Two cross bars 231 between;The connecting rod 24 is double bar structures, and 3 body of crab-bolt is in that double bar structures connect positioned at being somebody's turn to do
Adjustment gap is left between two bodies of rod 241 of extension bar 24, and between 3 body of crab-bolt and crossbeam 23 and connecting rod 24.
In the present embodiment, crab-bolt stock 2 passes through the crossbeam 23 in double bar structures and the connecting rod 24 in double bar structures
Between cooperation, formed " well " font fixed bit, by this be in " well " font fixed bit middle hole so that 3 bolt of crab-bolt
Body has all obtained Primary Location at the same time in a lateral direction and on longitudinal direction, and can also pass through the cross bar 231 of crossbeam 23
And the body of rod 241 of connecting rod 24 crosses the middle hole of " well " the font fixed bit to be formed, to crab-bolt 3 in the horizontal direction
Certain fine setting is done in position, after 3 position coordinates of crab-bolt meets the requirements, by itself and the cross bar 231 of crossbeam 23 and the bar of connecting rod 24
Body 241 is fixed.
In Specific construction, lower transition frame 1 is after installation is complete at the scene, after basic infrastructure reinforcing bar has been bound, will under
The vertical supporting leg 11 of portion's transition frame 1 passes through basic infrastructure reinforcing bar, is connected fixation after positioning with reinforcement foundation.The transition frame 1
After fixation by crab-bolt perforate frame 4, crab-bolt 3, crab-bolt installation adjusting device 5 and crab-bolt stock 2 be assembled into anchor component is put
Put in the transition frame 1, and verticality, plan-position, the first school of 3 elevation of top of crab-bolt progress are integrally carried out to anchor component
Just;The verticality before concreting to crab-bolt in anchor component 3 and elevation of top carry out secondary correction afterwards, and correction finishes
Afterwards by the cross bar 13 on the top surface of the chassis 21 of crab-bolt stock 2 and the transition frame 1 of lower part and or vertical pole 14 be welded to connect fixation,
Crab-bolt 3 is connected fixation with crab-bolt stock 2.
What the word " on ", " under " in description orientation, "left", "right" etc. were for explanation used by herein facilitates base
For orientation in attached drawing shown in drawing, in actual device these orientation may due to device disposing way and
It is different.
In conclusion embodiment of the present invention only provides a kind of optimal embodiment, in technology of the invention
Hold and technical characterstic has revealed that as above, but one skilled in the art scholar is still potentially based on disclosed content and makees
Various replacements and modification without departing substantially from creation spirit of the present invention;Therefore, protection scope of the present invention is not limited to disclosed in embodiment
Technology contents, therefore equivalence changes that all shape under this invention, construction and principle are done, are encompassed by the protection model of the present invention
In enclosing.
Claims (9)
1. a kind of installation method for the sill anchor combined support frame for being used for high-rise building steel construction shear wall and outline border suspension column,
It is characterized in that, the installation method includes the following steps:
S1, carry out sill anchor combined support rack position unwrapping wire after the completion of foundation of civil work cushion construction;
S2, after basic infrastructure reinforcing bar has been bound, by the transition frame with vertical supporting leg in sill anchor combined support frame
Installation is in place;Specially:After basic infrastructure reinforcing bar has been bound, the vertical supporting leg of transition frame is passed through into basic infrastructure reinforcing bar,
Fixation is connected after positioning with reinforcement foundation;
S3, by the crab-bolt stock in sill anchor combined support frame, crab-bolt of the assembling on the crab-bolt stock and be arranged on institute
The crab-bolt perforation frame for stating crab-bolt top is assembled into anchor component, which is placed in transition frame;
S4, installation steel plate wall or steel column lower margin shearing resistance component reserve slot template, frame of perforating after stencil plane location determination with crab-bolt
It is welded and fixed;
S5, the first correction for integrally carrying out for anchor component verticality, plan-position, crab-bolt elevation of top;
Secondary correction is carried out to the verticality and elevation of top of crab-bolt in anchor component before S6, concreting;
S8, carry out building foundation concrete casting.
A kind of 2. sill anchor group for high-rise building steel construction shear wall and outline border suspension column according to claim 1
Close the installation method of supporting rack, it is characterised in that the installation method further includes:
S7, when with multigroup sill anchor combined support frame, every group of supporting rack is attached fixation by angle steel or channel steel,
The separately installed bearing diagonal when every group of supporting rack is in larger distance.
A kind of 3. sill anchor group for high-rise building steel construction shear wall and outline border suspension column according to claim 1
Close the installation method of supporting rack, it is characterised in that the step S5 is specially:
S51, carry out axial line control mark according to drawing on the vertical two sides of crab-bolt stock;
S52, measure the verticality for adjusting crab-bolt stock from two mutually perpendicular directions;
Axial line control on S53, the method control crab-bolt stock monitored with total station instrument coordinate marks, and adjusts the plane of crab-bolt stock
Position is allowed to overlap with axis;
S54, the method monitored with total station instrument coordinate control crab-bolt elevation of top, by adjusting second in the crab-bolt of perforation frame top
Adjusting nut, it is ensured that crab-bolt elevation of top is consistent.
A kind of 4. sill anchor group for high-rise building steel construction shear wall and outline border suspension column according to claim 1
Close the installation method of supporting rack, it is characterised in that the step S6 is specially:
S61, the method control crab-bolt perforation frame plane positioning monitored with total station instrument coordinate;
S62, crab-bolt perforation frame plane positioning after the completion of, with branch ejection device support top crab-bolt perforate frame, when crab-bolt is left in crab-bolt bottom
The chassis of stock stops jacking, and crab-bolt is in overhang and adjust automatically verticality at this time;
S63, axial line control on vernier control crab-bolt stock marks the method monitored with total station instrument coordinate again, is allowed to and axis
Overlap, be welded and fixed crab-bolt stock with transition frame after correction;
S64, monitoring crab-bolt elevation of top, the second adjustment nut that adjustment is perforated in the crab-bolt of frame top, it is ensured that crab-bolt elevation of top
Unanimously, code requirement is met;
Crab-bolt, is connected fixation by S65 with crab-bolt stock, ensures that crab-bolt does not produce displacement in the horizontal direction, unloads support top dress afterwards
Put.
A kind of 5. sill anchor group for high-rise building steel construction shear wall and outline border suspension column according to claim 1
Close the installation method of supporting rack, it is characterised in that the sill anchor combined support frame, which includes bottom, has vertical supporting leg
Transition frame, the crab-bolt stock being arranged in the transition frame, the crab-bolt being assemblied on the crab-bolt stock and it is arranged on the anchor
The crab-bolt perforation frame on bolt top;
The crab-bolt stock include chassis, the vertical strut that is arranged on the chassis and in a lateral direction two in opposite
What is set is used to connect the crossbeam of fixed adjacent vertical strut;
The bottom of the crab-bolt is fixed on the chassis, and the crab-bolt top passes through the crossbeam, positioned at the crossbeam
Outside, and crab-bolt perforation frame is located above the crossbeam.
A kind of 6. sill anchor group for high-rise building steel construction shear wall and outline border suspension column according to claim 5
Close the installation method of supporting rack, it is characterised in that the crab-bolt stock include being arranged in the middle part of the crab-bolt stock two are in
The crossbeam being oppositely arranged, and two of the crab-bolt stock top are arranged in the crossbeam being oppositely arranged;
The crossbeam is double bar structures, and the crab-bolt body is located between two cross bars that this is in double bar structure crossbeams.
A kind of 7. sill anchor group for high-rise building steel construction shear wall and outline border suspension column according to claim 5
Close the installation method of supporting rack, it is characterised in that the crab-bolt stock further includes connecting rod, and the connecting rod is arranged in opposite
Between two crossbeams set;The both ends of the connecting rod are fixed with crossbeam respectively;
The connecting rod is double bar structures, the crab-bolt body be located at this in pair two bodies of rod of bar structure connecting rods it
Between.
A kind of 8. sill anchor group for high-rise building steel construction shear wall and outline border suspension column according to claim 5
Close the installation method of supporting rack, it is characterised in that the crab-bolt perforation frame is worn equipped with corresponding with crab-bolt matching for crab-bolt
The anchor hole crossed;Crab-bolt top outside the crossbeam is equipped with crab-bolt installation adjusting device, which includes
Fixing nut, the first adjusting nut, cover board and the second adjustment nut being successively set on from top to bottom on the crab-bolt body;Institute
Crab-bolt perforation frame is stated to be arranged on the crab-bolt body between the cover board and second adjustment nut.
A kind of 9. lower margin anchor for being used for high-rise building steel construction shear wall and outline border suspension column according to claim 1 or 5
The installation method of bolt combined support frame, it is characterised in that the transition frame is by upright bar, cross bar, vertical pole and vertical supporting leg group
Into frame body structure.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610515480.4A CN105926958B (en) | 2016-07-01 | 2016-07-01 | A kind of installation method for the sill anchor combined support frame for being used for high-rise building steel construction shear wall and outline border suspension column |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610515480.4A CN105926958B (en) | 2016-07-01 | 2016-07-01 | A kind of installation method for the sill anchor combined support frame for being used for high-rise building steel construction shear wall and outline border suspension column |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105926958A CN105926958A (en) | 2016-09-07 |
CN105926958B true CN105926958B (en) | 2018-04-20 |
Family
ID=56830295
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610515480.4A Active CN105926958B (en) | 2016-07-01 | 2016-07-01 | A kind of installation method for the sill anchor combined support frame for being used for high-rise building steel construction shear wall and outline border suspension column |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105926958B (en) |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108951856A (en) * | 2018-08-03 | 2018-12-07 | 江苏沪宁钢机股份有限公司 | A kind of volume of concrete foundation cushion cap internal frame sky pedestal anchor bolt and its installation and locating method |
CN109252674B (en) * | 2018-10-17 | 2020-12-04 | 北京市机械施工有限公司 | Giant pillar anchor bolt construction method |
CN111707430A (en) * | 2020-06-29 | 2020-09-25 | 中国建筑第八工程局有限公司 | Embedded part mounting structure and method for horizontal actuator of vibration table |
CN111751069B (en) * | 2020-06-29 | 2022-06-28 | 中国建筑第八工程局有限公司 | Mounting device and mounting method for embedded part panel of vertical actuator of vibrating table |
CN114108996B (en) * | 2021-11-26 | 2023-06-06 | 中煤西安设计工程有限责任公司 | Construction device and method for building filling wall without floor bricks |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0288818A (en) * | 1988-09-26 | 1990-03-29 | Hiromi Yamada | Method and apparatus for leveling surface of column for foundation |
JPH0742369A (en) * | 1993-07-29 | 1995-02-10 | Shimizu Corp | Steel column construction method |
CN201756803U (en) * | 2010-05-31 | 2011-03-09 | 中建钢构有限公司 | Sill anchor pre-embedded positioning cover die |
CN202830961U (en) * | 2012-08-30 | 2013-03-27 | 中国二十冶集团有限公司 | Support frame for installing and positioning anchor bolt |
CN203654313U (en) * | 2013-12-26 | 2014-06-18 | 河北建设集团有限公司 | Embedded anchor bolt positioning mold |
CN104141318A (en) * | 2014-08-12 | 2014-11-12 | 中冶建工集团有限公司 | Installation and construction method of column base of large-diameter steel pipe column |
CN204326093U (en) * | 2014-12-06 | 2015-05-13 | 内蒙古兴泰建设集团有限公司 | A kind of rigid steel pile locating support |
CN205100237U (en) * | 2015-10-20 | 2016-03-23 | 中铁城建集团第二工程有限公司 | Be used for pre -buried fixing device of steel column sill anchor |
-
2016
- 2016-07-01 CN CN201610515480.4A patent/CN105926958B/en active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0288818A (en) * | 1988-09-26 | 1990-03-29 | Hiromi Yamada | Method and apparatus for leveling surface of column for foundation |
JPH0742369A (en) * | 1993-07-29 | 1995-02-10 | Shimizu Corp | Steel column construction method |
CN201756803U (en) * | 2010-05-31 | 2011-03-09 | 中建钢构有限公司 | Sill anchor pre-embedded positioning cover die |
CN202830961U (en) * | 2012-08-30 | 2013-03-27 | 中国二十冶集团有限公司 | Support frame for installing and positioning anchor bolt |
CN203654313U (en) * | 2013-12-26 | 2014-06-18 | 河北建设集团有限公司 | Embedded anchor bolt positioning mold |
CN104141318A (en) * | 2014-08-12 | 2014-11-12 | 中冶建工集团有限公司 | Installation and construction method of column base of large-diameter steel pipe column |
CN204326093U (en) * | 2014-12-06 | 2015-05-13 | 内蒙古兴泰建设集团有限公司 | A kind of rigid steel pile locating support |
CN205100237U (en) * | 2015-10-20 | 2016-03-23 | 中铁城建集团第二工程有限公司 | Be used for pre -buried fixing device of steel column sill anchor |
Non-Patent Citations (2)
Title |
---|
天津高银117大厦超长超大直径锚栓群施工技术;陈志刚;《施工技术》;20150131;第44卷(第2期);全文 * |
超高层钢结构柱脚锚栓施工质量控制;杨秀举;《中国建筑金属结构》;20151231(第12期);全文 * |
Also Published As
Publication number | Publication date |
---|---|
CN105926958A (en) | 2016-09-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105926958B (en) | A kind of installation method for the sill anchor combined support frame for being used for high-rise building steel construction shear wall and outline border suspension column | |
CN204040056U (en) | A kind of location and installation support of pre-embedded anchoring bolts | |
CN107806019A (en) | Large-span suspension bridge gate Sarasota construction method | |
CN104674665A (en) | Installation method for corridor bridge of large space steel structure | |
CN205777593U (en) | A kind of adjustable combination type bracing frame for vertical supporting sill anchor | |
CN105569054A (en) | Device and method for controlling direction and elevation of lattice column below ground | |
CN103485574A (en) | Method for constructing reinforced concrete structure of tower top of prilling tower | |
CN110295620A (en) | The fast accurate installation method of large-scale space division device overall skid-mounted formula ice chest | |
CN112536911B (en) | Integral construction method for prefabricated stand column of bridge | |
CN104196165B (en) | Huge post of a kind of ultra-large type Multi-cavity steel structure and preparation method thereof | |
CN109812021A (en) | A kind of installation method of large span welding ball grid | |
CN110080271B (en) | Construction method for embedded quality control of foundation bolt embedded part | |
CN203213019U (en) | Long cantilever bent cap cast-in-place construction support system | |
CN111648611A (en) | Embedded part supporting device and embedded part installation method using embedded part supporting device | |
CN214883824U (en) | Pre-leveling tower foundation | |
CN113293790B (en) | Pre-leveling tower foundation and leveling construction method thereof | |
CN213086589U (en) | Double-width prefabricated stand column positioning and mounting device | |
CN212249280U (en) | Embedded part supporting device | |
CN210508326U (en) | Liftable well operation platform | |
CN111927111B (en) | Construction method of ultrahigh special-shaped outer frame steel structure | |
CN113802694A (en) | Construction method of large-span asymmetric U-shaped multi-layer truss | |
CN211340848U (en) | Underground structure falls board construction system among reverse construction method | |
CN210947710U (en) | Synchronous sliding mode system for multiple special-shaped cabin bodies of underground shaft | |
CN203383563U (en) | Fast assembled communication iron tower | |
CN205475256U (en) | Control is less than device of ground lattice column direction and elevation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |