CN213086589U - Double-width prefabricated stand column positioning and mounting device - Google Patents

Double-width prefabricated stand column positioning and mounting device Download PDF

Info

Publication number
CN213086589U
CN213086589U CN202021729328.4U CN202021729328U CN213086589U CN 213086589 U CN213086589 U CN 213086589U CN 202021729328 U CN202021729328 U CN 202021729328U CN 213086589 U CN213086589 U CN 213086589U
Authority
CN
China
Prior art keywords
positioning
prefabricated
mounting
mounting base
column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202021729328.4U
Other languages
Chinese (zh)
Inventor
梁辉
吴伟斌
李江
蔡学峰
李德昆
王彦强
郑学锦
陈明喜
宋文明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Major Bridge Engineering Group Co Ltd MBEC
China Railway Major Bridge Bureau Shanghai Engineering Co Ltd
Original Assignee
China Railway Major Bridge Engineering Group Co Ltd MBEC
China Railway Major Bridge Bureau Shanghai Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Major Bridge Engineering Group Co Ltd MBEC, China Railway Major Bridge Bureau Shanghai Engineering Co Ltd filed Critical China Railway Major Bridge Engineering Group Co Ltd MBEC
Priority to CN202021729328.4U priority Critical patent/CN213086589U/en
Application granted granted Critical
Publication of CN213086589U publication Critical patent/CN213086589U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The embodiment of the utility model discloses two prefabricated stand location installation devices of width of cloth. Double width prefabricated stand location installation device includes: the mounting base is connected with the plurality of positioning assemblies respectively, and a prefabricated upright column mounting space is formed among the plurality of positioning assemblies; each positioning component comprises: the positioning rod is vertically connected with the mounting base, and the opposite other end of the positioning rod is provided with a first positioning adjusting piece; the second positioning adjusting piece is arranged on the mounting base and is positioned on one side of the positioning rod; wherein each of the positioning adjusting pieces is located in the prefabricated pillar installation space. The installation error of the prefabricated upright post can reach millimeter level.

Description

Double-width prefabricated stand column positioning and mounting device
Technical Field
The utility model relates to a prefabricated technical field of bridge especially relates to a two width of cloth prefabricated stand location installation device and a two width of cloth prefabricated stand location installation's construction method.
Background
At present, in the positioning process of mounting a prefabricated upright post, a construction method for positioning and mounting the prefabricated upright post is involved. In the construction process, the prefabricated stand columns need to be installed and placed at preset installation positions, and construction in the next step is facilitated.
Because the quality and the volume of prefabricated stand are great, generally descend by the prefabricated stand of loop wheel machine control in the installation of location, nevertheless, the rocking of dress in-process prefabricated stand can cause certain degree of difficulty to the location of prefabricated stand. In order to accurately mount the prefabricated column to a predicted mounting position, the current construction method is to match a plurality of position-limiting members at the bottom, so that the prefabricated column is mounted to a prefabricated column mounting position. Specifically, set up four "L" type stopper in the bottom, be provided with two adjusting screw on every "L" type stopper, 8 adjusting screw through 4 "L" type stoppers carry out the adjustment of position to the all directions of prefabricated stand. But the installation accuracy that this kind of adjustment mode can only guarantee prefabricated stand end opening satisfies the requirement, can't guarantee prefabricated stand's straightness that hangs down, and the installation accuracy at prefabricated stand top is difficult to satisfy.
In the installation process of the double-width upright column, due to the fact that errors of installation of the single upright column are accumulated, deviation overrun can be caused, great difficulty is caused to installation of the prefabricated cover beam in the next procedure, and measures must be taken to improve installation accuracy of the single upright column.
SUMMERY OF THE UTILITY MODEL
Therefore, the embodiment of the utility model provides a two width of cloth prefabricated stand location installation device and a two width of cloth prefabricated stand location installation construction method effectively improve the precision of prefabricated stand location installation.
On the one hand, the embodiment of the utility model provides a pair of prefabricated stand location installation device of two width of cloth, include: the mounting base is connected with the plurality of positioning assemblies respectively, and a prefabricated upright column mounting space is formed among the plurality of positioning assemblies; each positioning component comprises: the positioning rod is vertically connected with the mounting base, and the opposite other end of the positioning rod is provided with a first positioning adjusting piece; the second positioning adjusting piece is arranged on the mounting base and is positioned on one side of the positioning rod; wherein each of the positioning adjusting pieces is located in the prefabricated pillar installation space.
In an embodiment of the present invention, each of the positioning adjustment members respectively includes: a guide wheel; and the telescopic piece is connected between the guide wheel and the positioning rod.
In an embodiment of the present invention, each of the second adjusting positioning members respectively includes: the adjusting screw rod is in threaded connection with the mounting base, one end of the adjusting screw rod extends into the mounting space of the prefabricated stand column, and the other end of the adjusting screw rod is positioned on one side of the mounting base, which is far away from the mounting space of the prefabricated stand column; and the protective cushion layer is arranged at one end of the adjusting screw rod, which extends into the mounting space of the prefabricated stand column.
In an embodiment of the present invention, the double-width prefabricated column positioning and mounting device further comprises: and the reinforcing assembly is connected with the positioning rods and the mounting base.
In an embodiment of the present invention, the reinforcement assembly includes: the hoop is connected with the positioning rods; the first reinforcing pieces are circumferentially distributed between the hoop and the mounting base and are respectively connected with the hoop and the mounting base; and the second reinforcing pieces are respectively connected with the positioning rods and the mounting base.
In an embodiment of the present invention, the double-width prefabricated column positioning and mounting device further comprises: and the bearing platform is arranged on one side, far away from the positioning assembly, in the prefabricated upright post mounting space and connected with the mounting base.
In another aspect, an embodiment of the present invention provides a construction method for positioning and installing a double-width prefabricated column, in which the double-width prefabricated column positioning and installing apparatus described in any one of the above embodiments is used to install a prefabricated column at a target installation location, and specifically includes: fixedly mounting the mounting base around the target mounting position; at least one positioning rod is respectively connected to four surfaces of the mounting base, which respectively correspond to the target mounting position; at least two second positioning adjusting pieces are respectively arranged on the four surfaces of the mounting base, which respectively correspond to the target mounting positions; hoisting the prefabricated stand column to be installed and inserting the prefabricated stand column into the prefabricated stand column installation space, and meanwhile, enabling the prefabricated stand column to be installed to be located at the target installation position; and adjusting the prefabricated stand columns to be installed through the plurality of first positioning adjusting pieces and the plurality of second positioning adjusting pieces to meet the target requirements.
In an embodiment of the present invention, each of the positioning rods has a height not less than 2 meters.
In an embodiment of the present invention, the mounting base is fixedly mounted around the target mounting location; further comprising: arranging a protective cushion layer along the periphery of the target installation position, wherein the protective cushion layer is positioned between the target installation position and the installation base; and when the prefabricated stand column to be installed is hoisted and inserted into the prefabricated stand column installation space and is positioned at the target installation position, the prefabricated stand column to be installed is ensured to be positioned in the area limited by the protective cushion layer.
The utility model discloses an embodiment, will wait to install prefabricated stand and hang and insert during prefabricated stand installation space, the leading wheel of first positioning adjustment spare is in wait to install the surface roll of prefabricated stand for the prefabricated stand can normally transfer, after the prefabricated stand transfers to the bottom, uses hydraulic ram adjustment extensible member, reaches the purpose of adjusting the stand straightness that hangs down, makes prefabricated stand top deviation satisfy the designing requirement.
In summary, the above embodiments of the present application may have one or more of the following advantages or benefits: i) the shaking generated when the prefabricated stand column to be installed is driven by the crane to descend is reduced; ii) the precision of the installation and positioning of the prefabricated stand column is effectively improved, and the installation precision of the prefabricated stand column to be installed can reach millimeters; and iii) enabling the space between the double prefabricated stand columns to meet the design requirement, and providing guarantee for the installation of the cover beam in the next procedure.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings used in the description of the embodiments will be briefly introduced below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and it is obvious for those skilled in the art that other drawings can be obtained according to these drawings without creative efforts.
Fig. 1 is a schematic structural diagram of a double-width prefabricated column positioning and mounting device 100 according to a first embodiment of the present invention.
Fig. 2 is a coupling structure diagram of the first positioning adjustment member 21 and the positioning rod 22 in fig. 1.
Fig. 3 is a partially enlarged schematic view of a portion a in fig. 2.
Fig. 4 is a schematic structural view of the second positioning adjustment member 25 in fig. 1.
Fig. 5 is a schematic diagram of the double-width use of the prefabricated upright post positioning and mounting device.
Fig. 6 is a schematic flow chart of a positioning, installing and constructing method for a double prefabricated upright column according to a second embodiment of the present invention.
Fig. 7 is a schematic diagram of the position relationship of the prefabricated upright column 110 to be installed just entering the double-width prefabricated upright column positioning and installing device 100.
Fig. 8 is a schematic diagram of the position relationship when the prefabricated vertical column 110 to be installed completely enters the double-width prefabricated vertical column positioning and installing device 100 and is adjusted.
Description of the main element symbols:
100 is a double-width prefabricated upright positioning and mounting device; 10 is a mounting base; 20 is a positioning component; 21 is a first positioning adjustment member; 22 is a positioning rod; 23 is a guide wheel; 24 is a telescopic piece (hydraulic oil top); 25 is a second regulating member; 26 is an adjusting screw rod; 27 is a protective cushion layer; 30 is a prefabricated upright column installation space; 40 is a reinforcing component; 41 is a hoop; 42 is a first stiffener; 43 is a second stiffener; 50 is a bearing platform; 60 is a connecting piece; 110 are prefabricated columns to be installed.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts belong to the protection scope of the present invention.
[ first embodiment ] A method for manufacturing a semiconductor device
Referring to fig. 1, it is a schematic structural diagram of a double prefabricated upright positioning and mounting device 100 provided by a first embodiment of the present invention, where the double prefabricated upright positioning and mounting device 100 includes: a mounting base 10 and a plurality of positioning assemblies 20. Wherein each positioning component 20 is connected to the mounting base 10, and a prefabricated column mounting space 30 is formed between the plurality of positioning components.
Preferably, the double-width prefabricated column positioning and mounting device 100 further comprises a reinforcing component 40, for example. Specifically, the reinforcement assembly 40 includes, for example, a hoop 41, a plurality of first reinforcements 42, and a plurality of second reinforcements 43. Wherein, the hoop 41 is connected with a plurality of positioning rods 22; the first reinforcements 42 are circumferentially distributed between the hoop 42 and the mounting base 10 and are respectively connected with the hoop 41 and the mounting base 10; the second reinforcing members 42 are connected between the securing bars 22 and the mounting base 10 or between the securing bars 22 and the anchor ear 41, respectively.
Further, at least one second reinforcing member 43 may be connected between any adjacent mounting base 10 and positioning rod 22; at least one second reinforcement 43 may be connected between any adjacent hoop 41 and spacer 22. The two second reinforcing members 43 may be disposed in parallel or in a crossed manner, and will not be described in detail herein.
Furthermore, a plurality of connection positions, such as threaded holes, may be pre-formed on the reinforcing member 40, and the reinforcing member 40 may be fixed to the positioning rods 22 and the mounting base 10 by means of bolts; the anchor ear 41 and the first reinforcement 42 may be fixed by a bolt structure, but may also be fixed by welding or the like, and the fixing is not limited herein. However, in order to make the positioning element 20 and the reinforcing element 40 reusable, i.e., reusable, the positioning element 20 and the reinforcing element 40 are preferably connected by means of a detachable connection, such as a bolt.
Preferably, a bearing platform 50 may be further provided at the bottom of the installation base 10, and when the prefabricated vertical column to be installed is placed in the prefabricated vertical column installation space 30, because the prefabricated vertical column to be installed has a heavy weight, the bearing platform 50 may bear the load transferred by the prefabricated vertical column to be installed and distribute the load to each pile body in the bearing platform 50. The bearing platform 50 may be a reinforced concrete platform or other types capable of bearing loads, and is not limited herein.
Specifically, referring to fig. 1 and 2, the positioning assembly 20 includes, for example, a plurality of positioning rods 22, a plurality of first positioning adjusters 21, and at least one second positioning adjuster 25. Wherein, the positioning rod 22 is vertically connected with the mounting base 10, and a first positioning adjusting piece 21 is arranged at the opposite end; the second positioning adjusting members are disposed at four corners of the mounting base 10 and located at one side of the positioning rod 21.
Specifically, referring to fig. 3, the first positioning adjustment member 21 includes, for example, a guide wheel 23 and a telescopic member 24, and the telescopic member 24 is connected between the guide wheel 23 and the positioning rod 22. For example, when the bottom end of the prefabricated upright to be installed just enters the double-width prefabricated upright positioning and installing device 100, the side wall of the prefabricated upright to be installed goes down along the guide wheel 23. Furthermore, first positioning adjusting parts 21 can be arranged on the periphery of the double-width prefabricated stand column positioning and mounting device 100, the peripheral side walls of the prefabricated stand columns are downward along the guide wheels 23, so that the shaking generated in the descending process of the prefabricated stand columns to be mounted can be reduced, and the prefabricated stand columns to be mounted can stably enter the prefabricated stand column mounting space 30.
Specifically, referring to fig. 4, the second positioning adjuster 25 includes, for example, an adjusting screw 26 and a protective pad 27. The adjusting screw 26 is in threaded connection with the mounting base 10, one end of the adjusting screw extends into the prefabricated column mounting space 30, and the other end of the adjusting screw is positioned on one side of the mounting base 10 far away from the prefabricated column mounting space 30; and the protective cushion layer 27 is arranged at one end, extending into the prefabricated upright post mounting space 30, of the adjusting screw rod 26, and the protective cushion layer 27 can be fixed on the adjusting screw rod 26 and is close to one end of the prefabricated upright post mounting space 30. The protective pad 27 may be a rubber pad, but may be made of other materials.
Preferably, the protective cushion 27 can also be a separate component from the adjusting screw 26. When the prefabricated upright column to be installed is positioned and installed, a protective cushion layer 27 is arranged on the prefabricated upright column to be installed in advance, and then an adjusting screw rod 26 is arranged on the protective cushion layer 27. The protective cushion layer 27 is used for protecting the prefabricated stand column to be installed and preventing the adjusting screw 26 from damaging the surface of the prefabricated stand column to be installed during adjustment.
Preferably, referring to fig. 5, the two-width prefabricated column positioning and mounting device 100 can also be used in combination of two. Specifically, a plurality of connecting pieces 60 are added between two double-width prefabricated upright post positioning and mounting devices 100, and the distance between two prefabricated upright posts 110 to be mounted is determined through the fixed connecting pieces 60, so that errors caused by mounting between the two prefabricated upright posts 110 to be mounted are reduced. The two connecting members 60 may be disposed in parallel or in a crossed manner, and will not be described in detail herein.
Preferably, more than two prefabricated upright post positioning and mounting devices 100 can be combined together, and in the combined use process, the two adjacent prefabricated upright post positioning and mounting devices 100 are positioned through the connecting piece 60.
[ second embodiment ]
Referring to fig. 6, it is the second embodiment of the present invention provides a positioning, installing and constructing method for a double prefabricated vertical column, which is used to set the positioning and installing device for a double prefabricated vertical column according to the first embodiment on the installation position of the prefabricated vertical column. The construction method for positioning and installing the double-width prefabricated stand column comprises the following steps of:
step S10, fixedly mounting the mounting base around the target mounting position;
step S20, connecting at least one positioning rod to each of four surfaces of the mounting base corresponding to the target mounting position;
step S30, respectively arranging at least two second positioning adjusting pieces on the four surfaces of the mounting base, which respectively correspond to the target mounting position;
step S40, hoisting the prefabricated upright post to be installed and inserting the prefabricated upright post into the prefabricated upright post installation space, and simultaneously enabling the prefabricated upright post to be installed to be located at the target installation position;
and step S50, adjusting the prefabricated upright post to be installed through the plurality of first positioning adjusting pieces and the plurality of second positioning adjusting pieces to enable the prefabricated upright post to reach the target requirement.
The process of the construction method for positioning and installing the double prefabricated columns will be described in detail with reference to fig. 6 to 8, specifically, the process is described in detail
First, a mount 50 is provided on the target mounting site, and the mount base 10 is provided on the mount 50. Preferably, the mounting base 10 and the bearing platform can be fixed by expansion screws, and can be fixed by other fixing methods, which are not limited herein.
Then, the plurality of second positioning adjustment members 25 are respectively mounted to the four corners of the mounting base 10 and connected using the connection members and the cap 50. Each side of each second positioning and adjusting member 25 is provided with a hole for installing an adjusting screw 26, and after installing a protective cushion 27 at one end of each adjusting screw 26 extending into the prefabricated column installation space 30, the adjusting screw 26 is adjusted to be outside the prefabricated column installation space 30.
Next, a plurality of positioning rods 22 are disposed at the center line position around the mounting base 10, and a first positioning adjuster 21 is installed at one end of each positioning rod 22 away from the mounting base 10. Specifically, first positioning adjustment piece 21 sets up in the position that locating lever 22 is high apart from ground at least 2 meters, and specific height can set up according to the whole height of waiting to install prefabricated stand 110.
Next, the plurality of positioning rods 22 are connected by the anchor 41. Specifically, set up a set of staple bolt 41 at least and couple together a plurality of locating levers 22, also can set up multiunit staple bolt 41 and be used for strengthening the stability of two width of prefabricated stand location installation device, the height that specific staple bolt 41 set up can be according to locating lever 22's whole height and adjust.
After the anchor ear 41 is provided, the first reinforcement 42 and the second reinforcement 43 are respectively installed between the adjacent anchor ear 41, the securing rod 22, and the installation base 10. Specifically, each corner of the hoop 41 is provided with a first reinforcement 42 corresponding to the corner, and the first reinforcement 42 is connected to the mounting base 10, at least one second reinforcement 43 is provided between each adjacent hoop 41, the positioning rod 22 and the mounting base 10, and the two second reinforcements 43 may be arranged in parallel or in a cross manner, which is not described herein again.
Finally, the prefabricated vertical column 110 to be installed is slowly placed to the prefabricated vertical column installation space 30 by a crane. Specifically, firstly, the telescopic part 24 is contracted to be limited, when the bottom end of the prefabricated upright column 110 to be installed enters the prefabricated upright column installation space 30, the telescopic parts 24 around are simultaneously controlled to be extended, the guide wheels 23 around are enabled to be close to the side walls around the prefabricated upright column 110 to be installed, the prefabricated upright column 110 to be installed can descend along the guide wheels 23 to reduce and delay the swinging generated in the descending process of the prefabricated upright column 110 to be installed, and the prefabricated upright column 110 to be installed can stably enter the prefabricated upright column installation space 30. Specifically, to wait to install prefabricated stand 110 and slowly transfer along leading wheel 23, after 20t of hoist surplus lifting force (this surplus lifting force does not do the restriction, and specific surplus lifting force can be according to waiting to install the whole weight of prefabricated stand 110 and set up), begin to carry out preliminary adjustment, adjust the position of waiting to install prefabricated stand 110 through 8 adjusting screw 26 of four second location regulating parts 25 earlier, the position of waiting to install prefabricated stand 110 is adjusted to the extensible member 24 of rethread four first location regulating parts 25, adjust and finish and make and wait to install prefabricated stand 110 and lay and loosen the hoist after the predetermined place.
Preferably, the order of adjustment of the first positioning adjustment member 21 and the second positioning adjustment member 25 can be interchanged. For example, after the prefabricated upright column 110 to be installed enters the prefabricated upright column installation space 30, the adjustment can be performed through the first positioning adjusting piece 21 and then the adjustment can be performed through the second positioning adjusting piece 25; the adjustment may be performed by the second positioning adjustment member 25, and then the adjustment may be performed by the first positioning adjustment member 21, which is not limited herein.
Finally, it should be noted that: the above embodiments are only used to illustrate the technical solution of the present invention, and not to limit it; although the present invention has been described in detail with reference to the foregoing embodiments, it should be understood by those skilled in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some technical features may be equivalently replaced; such modifications and substitutions do not depart from the spirit and scope of the present invention in its corresponding aspects.

Claims (6)

1. The utility model provides a prefabricated stand location installation device of double width, its characterized in that includes:
a base is arranged on the base, and the base is arranged on the base,
the positioning assemblies are respectively connected with the mounting base, and a prefabricated upright column mounting space is formed among the positioning assemblies; each positioning component comprises:
the positioning rod is vertically connected with the mounting base, and the opposite other end of the positioning rod is provided with a first positioning adjusting piece;
the second positioning adjusting piece is arranged on the mounting base and is positioned on one side of the positioning rod;
wherein each of the positioning adjusting pieces is located in the prefabricated pillar installation space.
2. The apparatus according to claim 1, wherein each of the positioning adjustment members comprises:
a guide wheel;
and the telescopic piece is connected between the guide wheel and the positioning rod.
3. The prefabricated double-width upright post positioning and mounting device of claim 1, wherein each second positioning adjusting piece comprises:
the adjusting screw rod is in threaded connection with the mounting base, one end of the adjusting screw rod extends into the mounting space of the prefabricated stand column, and the other end of the adjusting screw rod is positioned on one side of the mounting base, which is far away from the mounting space of the prefabricated stand column;
and the protective cushion layer is arranged at one end of the adjusting screw rod, which extends into the mounting space of the prefabricated stand column.
4. The double-width prefabricated column positioning and mounting device of claim 1, further comprising:
and the reinforcing assembly is connected with the positioning rods and the mounting base.
5. The prefabricated double-width upright post positioning and mounting device of claim 4, wherein the reinforcing component comprises:
the hoop is connected with the positioning rods;
the first reinforcing pieces are circumferentially distributed between the hoop and the mounting base and are respectively connected with the hoop and the mounting base;
and the second reinforcing pieces are respectively connected with the positioning rods and the mounting base.
6. The double-width prefabricated column positioning and mounting device of claim 1, further comprising:
and the bearing platform is arranged on one side, far away from the positioning assembly, in the prefabricated upright post mounting space and connected with the mounting base.
CN202021729328.4U 2020-08-18 2020-08-18 Double-width prefabricated stand column positioning and mounting device Expired - Fee Related CN213086589U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021729328.4U CN213086589U (en) 2020-08-18 2020-08-18 Double-width prefabricated stand column positioning and mounting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021729328.4U CN213086589U (en) 2020-08-18 2020-08-18 Double-width prefabricated stand column positioning and mounting device

Publications (1)

Publication Number Publication Date
CN213086589U true CN213086589U (en) 2021-04-30

Family

ID=75630964

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021729328.4U Expired - Fee Related CN213086589U (en) 2020-08-18 2020-08-18 Double-width prefabricated stand column positioning and mounting device

Country Status (1)

Country Link
CN (1) CN213086589U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111962397A (en) * 2020-08-18 2020-11-20 中铁大桥局上海工程有限公司 Double-width prefabricated stand column positioning and mounting device and construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111962397A (en) * 2020-08-18 2020-11-20 中铁大桥局上海工程有限公司 Double-width prefabricated stand column positioning and mounting device and construction method

Similar Documents

Publication Publication Date Title
CN103243654B (en) Mounting method for steel anchor beam of cable-stayed bridge and assembly jig and cable bent tower mounting platform used in method
CN105586833B (en) Stiff skeleton steel reinforcement cage global formation large-scale cast-in-place tall pier and thin wall construction method
CN213086589U (en) Double-width prefabricated stand column positioning and mounting device
CN111645825B (en) Method for normally assembling torsion boxes at gangway ladder position of ultra-large container ship
CN114541652A (en) V-shaped steel column and construction method thereof
CN105926958A (en) Mounting method for sill anchor combined support frame for steel structure shear wall and outer frame column base of super high-rise building
CN105569054A (en) Device and method for controlling direction and elevation of lattice column below ground
CN109629449A (en) A kind of steel case arch bridge arch springing toughened internal stress installation locating support and alignment method
CN111962397A (en) Double-width prefabricated stand column positioning and mounting device and construction method
CN114382170B (en) Construction method of upper prefabricated vertical component
CN217205466U (en) Inclined supporting device for stably supporting upper-layer vertical member
CN208379444U (en) A kind of adjustable installing bracket of prefabricated assembled segmentation bent cap
CN115341475A (en) Steel anchor box positioning and mounting method
CN215055273U (en) A assembled template for installing support bracket embedded box
CN214883824U (en) Pre-leveling tower foundation
CN113293790B (en) Pre-leveling tower foundation and leveling construction method thereof
CN112320580B (en) Method for mounting workshop crane beam
CN111005324B (en) Support-free suspension and locking construction method for assembled type segmental box girder
CN212612045U (en) Cushion cap reserved rib positioning frame
KR20050091252A (en) Construction method for bridge using a jig apparatus
CN206667213U (en) A kind of embedded parts structure of ship lift main equipment room steel lattice column
CN111021394A (en) Construction elevator high-position conversion foundation and construction method thereof
CN218147837U (en) Steel buttress of steel anchor box
CN206128611U (en) A positioning and clamping device for surmounting integrated construction platform in layer or die carrier
KR102420436B1 (en) Modular chair-rebar structure and its installation method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210430