CN112320580B CN202011178651.1A CN202011178651A CN112320580B CN 112320580 B CN112320580 B CN 112320580B CN 202011178651 A CN202011178651 A CN 202011178651A CN 112320580 B CN112320580 B CN 112320580B
Authority
CN
China
Prior art keywords
bolts
steel beam
leveling
workshop
adjusting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202011178651.1A
Other languages
Chinese (zh)
Other versions
CN112320580A (en
Inventor
任文海
尚波
毕雯帅
高产
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Xinghua Intelligent Equipment Co ltd
Original Assignee
Qingdao Xinghua Intelligent Equipment Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Xinghua Intelligent Equipment Co ltd filed Critical Qingdao Xinghua Intelligent Equipment Co ltd
Priority to CN202011178651.1A priority Critical patent/CN112320580B/en
Publication of CN112320580A publication Critical patent/CN112320580A/en
Application granted granted Critical
Publication of CN112320580B publication Critical patent/CN112320580B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C6/00Girders, or track-supporting structures, specially adapted for cranes

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention relates to a method for mounting a crane beam, in particular to a method for mounting a workshop crane beam. The method comprises the following steps: 1) Welding the bracket on one side of a workshop upright post according to the required flatness and straightness to ensure the welding strength; 2) Fixing the middle connecting plate on the upper surface of the bracket, adjusting the positions of the left and right adjusting bolts and the upper and lower leveling bolts to enable the middle connecting plate to be level up and down and the left and right spacing to meet the design requirements, and fixing firmly; 3) Lifting the steel beam to the installation height of the workshop upright post; 4) Mounting the steel beam on the intermediate connecting plate by using a fixing bolt and a check washer; 5) Leveling the steel beam by using the front and rear leveling bolts of the steel beam; 6) And locking the front and rear leveling bolts of the steel beam. The crane beam fixing device can realize accurate and stable installation of the crane beam on the basis of the stand column of the workshop, can realize stable adjustment in 6 directions, is convenient to install, has high efficiency and strong stability, and is suitable for popularization and application.

Description

Method for mounting workshop crane beam
Technical Field
The invention relates to a method for mounting a crane beam, in particular to a method for mounting a workshop crane beam.
Background
Most of the existing truss manipulators are provided with stand columns, and during installation, the stand columns are positioned and leveled through line drawing, so that the implementation operation is convenient and controllable. However, in the actual installation process, due to the reasons of limited space of a client site, scheme layout, cost control and the like, the truss manipulator cannot install the upright post and can only install the upright post by virtue of the workshop. In the process of mounting by using the workshop stand column, the mounting precision of the workshop stand column is low, and the mounting and size adjustment in 6 directions in the beam space are difficult to realize. Therefore, a method for realizing accurate installation of the crane beam by using the workshop stand column is urgently needed.
Disclosure of Invention
In order to overcome the defects in the prior art, the invention provides the installation method for realizing accurate fixed installation of the crane beam and 6-direction adjustable workshop crane beams on the premise of borrowing the workshop stand column.
The technical scheme of the invention is as follows:
a method for installing a workshop crane beam comprises the following steps:
1) The bracket is welded on one side of the column of the workshop according to the required flatness and straightness, and the welding strength is ensured.
2) The middle connecting plate is fixed on the upper surface of the bracket, and the upper and lower leveling bolts and the left and right adjusting bolts are adjusted to enable the middle connecting plate to be level up and down and the left and right spacing to meet the design requirements and be firmly fixed.
3) And lifting the steel beam to the installation height of the column in the workshop.
4) And mounting the steel beam on the intermediate connecting plate by using a fixing bolt and a check washer.
5) And leveling the steel beam by using the front and rear leveling bolts of the steel beam.
6) And locking the front and rear leveling bolts of the steel beam, and finishing the mounting and leveling operation of the steel beam.
Furthermore, the intermediate junction board includes the diaphragm, the riser of vertical fixation on the diaphragm and be fixed in the deep floor of diaphragm and riser triangle-shaped structure between, deep floor parallel arrangement has a plurality of.
Furthermore, diaphragm and bracket upper surface connection, the riser is connected with the girder steel.
Furthermore, the transverse plate is provided with adjusting holes, the adjusting holes comprise left and right adjusting holes and upper and lower adjusting holes, the left and right adjusting holes are connected with left and right adjusting bolts, and the upper and lower adjusting holes are connected with upper and lower leveling bolts.
Furthermore, the left and right adjusting holes are long strips with two semicircular ends, and the upper and lower adjusting holes are circular.
Furthermore, fixing bolt passes the riser and is connected with the girder steel, the leveling bolt cover is established in fixing bolt's the outside and is fixed through lock nut around.
Furthermore, the left and right adjusting bolts, the upper and lower leveling bolts, the fixing bolts and the front and rear leveling bolts are respectively provided with a plurality of bolts.
The invention has the following beneficial effects:
according to the method for installing the crane beam in the workshop, the bracket (beam support), the middle connecting plate, the left adjusting bolt, the right adjusting bolt, the upper leveling bolt, the lower leveling bolt, the fixing bolt and the front leveling bolt are arranged, and the crane beam can be accurately and stably installed on the basis of the workshop stand column.
According to the installation method of the workshop crane beam, stable adjustment in 6 directions can be achieved, the installation is convenient, the efficiency is high, the stability is strong, and the technical problems of low precision and poor stability in the existing installation method of the workshop column are solved.
Drawings
Fig. 1 is a schematic view of an installation structure of a method for installing a crane beam for a workshop according to the present invention.
FIG. 2 is a schematic connection diagram of a steel beam, a vertical plate, front and rear leveling bolts, a fixing bolt and a locking nut in the installation method of the crane beam in the workshop.
Wherein, 1, bracket; 2. a workshop upright post; 3. a steel beam; 4. an intermediate connection plate; 5. front and rear leveling bolts; 6. fixing the bolt; 7. an upper leveling bolt and a lower leveling bolt; 8. a left and right adjusting bolt; 9. and locking the nut.
Detailed Description
To facilitate an understanding of the present invention by those skilled in the art, specific embodiments thereof are described below with reference to the accompanying drawings.
As shown in fig. 1-2, a method for installing a workshop crane beam includes the following steps:
1) The bracket 1 is welded on one side of the workshop stand column 2 according to the required flatness and straightness, and the welding strength is guaranteed.
2) The middle connecting plate 4 is fixed on the upper surface of the bracket 1, and the upper and lower leveling bolts 7 and the position of the left and right adjusting bolts 8 are adjusted to enable the middle connecting plate 4 to be level up and down and the left and right spacing to meet the design requirements and be firmly fixed.
3) And lifting the steel beam 3 to the installation height of the workshop upright post 2.
4) The steel beam 3 is mounted on the intermediate connection plate 4 by means of fixing bolts 6 and lock washers.
5) And leveling the steel beam 3 by using front and rear leveling bolts 5 of the steel beam 3.
6) And locking the front and rear leveling bolts 5 of the steel beam 3, and finishing the installation and leveling operation of the steel beam 3.
Specifically, the intermediate connecting plate 4 comprises a transverse plate, a vertical plate vertically fixed on the transverse plate and a reinforcing rib plate fixed on a triangular structure between the transverse plate and the vertical plate. A plurality of reinforcing rib plates are arranged in parallel, and 3 reinforcing rib plates are arranged in the embodiment. The diaphragm is connected with 1 upper surface of bracket, the riser is connected with girder steel 3. Specifically, be provided with the regulation hole on the diaphragm, the regulation hole is including controlling the regulation hole and adjusting the hole from top to bottom, control the regulation hole and set up to both ends semicircular rectangular form, adjust the hole from top to bottom and set up to circular. The left and right adjusting holes are connected with left and right adjusting bolts 8, and the up and down adjusting holes are connected with up and down leveling bolts 7. Fixing bolt 6 passes the riser and is connected with girder steel 3, around 5 covers of leveling bolt establish in fixing bolt 6 the outside and fixed through lock nut 9.
By arranging the bracket 1 (beam support), the middle connecting plate 4, the left and right adjusting bolts 8, the upper and lower leveling bolts 7, the fixing bolts 6 and the front and rear leveling bolts 5, the crane beam can be accurately and stably installed on the basis of the workshop upright post 2, and can be stably adjusted in 6 directions,
the above-described embodiments of the present invention do not limit the scope of the present invention. Any modification, equivalent replacement, and improvement made within the spirit and principle of the present invention should be included in the scope of the claims of the present invention.

Claims (3)

1. The method for installing the workshop crane beam is characterized by comprising the following steps of:
1) Welding the bracket on one side of the upright post of the workshop according to the required flatness and straightness so as to ensure the welding strength;
2) Fixing the middle connecting plate on the upper surface of the bracket, adjusting the positions of the left and right adjusting bolts and the upper and lower leveling bolts to enable the middle connecting plate to be level up and down and the left and right spacing to meet the design requirements, and fixing firmly;
3) Lifting the steel beam to the installation height of the workshop upright post;
4) Mounting the steel beam on the intermediate connecting plate by using a fixing bolt and a check washer;
5) Leveling the steel beam by using the front and rear leveling bolts of the steel beam;
6) Locking front and rear leveling bolts of the steel beam, and finishing the mounting and leveling operation of the steel beam;
the middle connecting plate comprises a transverse plate, a vertical plate and a reinforcing rib plate, wherein the vertical plate is vertically fixed on the transverse plate;
the transverse plate is connected with the upper surface of the bracket, and the vertical plate is connected with the steel beam;
the transverse plate is provided with adjusting holes, the adjusting holes comprise a left adjusting hole, a right adjusting hole and an upper adjusting hole and a lower adjusting hole, the left adjusting hole and the right adjusting hole are connected with a left adjusting bolt and a right adjusting bolt, and the upper adjusting hole and the lower adjusting hole are connected with an upper leveling bolt and a lower leveling bolt;
the fixing bolt penetrates through the vertical plate to be connected with the steel beam, and the front leveling bolt and the rear leveling bolt are sleeved on the outer side of the fixing bolt and fixed through the locking nut.
2. The method for mounting the workshop crane beam as claimed in claim 1, wherein: the left and right adjusting holes are long strips with semicircular ends, and the upper and lower adjusting holes are circular.
3. The method for mounting the workshop crane beam as claimed in claim 1, wherein: the left and right adjusting bolts, the upper and lower leveling bolts, the fixing bolt and the front and rear leveling bolts are respectively provided with a plurality of bolts.
CN202011178651.1A 2020-10-29 2020-10-29 Method for mounting workshop crane beam Active CN112320580B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011178651.1A CN112320580B (en) 2020-10-29 2020-10-29 Method for mounting workshop crane beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011178651.1A CN112320580B (en) 2020-10-29 2020-10-29 Method for mounting workshop crane beam

Publications (2)

Publication Number Publication Date
CN112320580A CN112320580A (en) 2021-02-05
CN112320580B true CN112320580B (en) 2023-01-20

Family

ID=74297859

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011178651.1A Active CN112320580B (en) 2020-10-29 2020-10-29 Method for mounting workshop crane beam

Country Status (1)

Country Link
CN (1) CN112320580B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114803334B (en) * 2022-03-25 2024-05-14 宁波海天精工股份有限公司 Heavy-load transportation line track structure

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0667695U (en) * 1993-03-04 1994-09-22 戸田建設株式会社 Jig for setting PC beam
CN109914616A (en) * 2019-04-18 2019-06-21 中民筑友房屋科技集团有限公司 A kind of dry construction connection structure of assembling frame structural construction corner post and beam
CN110721653A (en) * 2019-11-11 2020-01-24 北洋国家精馏技术工程发展有限公司 Multifunctional adjustable supporting beam
CN210369420U (en) * 2019-06-05 2020-04-21 浙江绿筑集成科技有限公司 Connecting node structure of externally-hung wallboard
CN211162644U (en) * 2019-12-16 2020-08-04 宜昌江峡船用机械有限责任公司 Large-scale I-beam welding platform
CN111591882A (en) * 2020-04-08 2020-08-28 中船第九设计研究院工程有限公司 Installation method of large crane beam

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0667695U (en) * 1993-03-04 1994-09-22 戸田建設株式会社 Jig for setting PC beam
CN109914616A (en) * 2019-04-18 2019-06-21 中民筑友房屋科技集团有限公司 A kind of dry construction connection structure of assembling frame structural construction corner post and beam
CN210369420U (en) * 2019-06-05 2020-04-21 浙江绿筑集成科技有限公司 Connecting node structure of externally-hung wallboard
CN110721653A (en) * 2019-11-11 2020-01-24 北洋国家精馏技术工程发展有限公司 Multifunctional adjustable supporting beam
CN211162644U (en) * 2019-12-16 2020-08-04 宜昌江峡船用机械有限责任公司 Large-scale I-beam welding platform
CN111591882A (en) * 2020-04-08 2020-08-28 中船第九设计研究院工程有限公司 Installation method of large crane beam

Also Published As

Publication number Publication date
CN112320580A (en) 2021-02-05

Similar Documents

Publication Publication Date Title
CN110900082A (en) Large I-beam welding platform and welding method
CN112320580B (en) Method for mounting workshop crane beam
CN111254968A (en) Installation device and installation method for large-diameter embedded bolt of large-scale equipment foundation
CN110295761B (en) Steel upright post sagging adjustment monitoring device and sagging adjustment monitoring method
CN202627494U (en) Device for locating and supporting prefabricated concrete structure laminated slab
CN211114901U (en) Bracket device convenient to precast beam is under construction fast
CN216339647U (en) Novel pre-buried bolt structure of tower crane foundation location
CN213086589U (en) Double-width prefabricated stand column positioning and mounting device
CN215053064U (en) Lattice column verticality correction device
CN215178641U (en) Special-shaped cabin assembling test platform
CN216341060U (en) Bracket structure for quickly and accurately positioning, installing and leveling suspended heavy embedded part
CN211341825U (en) Quick positioning tool for prefabricated superposed beam
CN112282074A (en) Adjusting device for embedded part and construction method thereof
CN212477442U (en) Steel box girder mounting bracket
CN211338427U (en) Integrated rack guide rail system for beamless fixation of machine room-less tractor
CN213271635U (en) Corner supporting bottom plate
CN219692646U (en) Hydraulic leveling mechanism with tilting function
CN215211159U (en) Coincide piping lane installation accuracy control device
CN217266949U (en) Positioning support for mounting anchor rod of head section of steel tower
CN210529932U (en) Steel construction erection column convenient to installation
CN219326471U (en) Adjustable machine room bearing heightening platform
CN218931504U (en) Steel tower column segment adjusting and positioning tool
CN210032630U (en) Interim fixing device of adjustable horizontal component
CN210914932U (en) Lifting frame unit for construction site
CN217053371U (en) Steel-pipe column installation transfers platform of hanging down

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant