CN108951856A - A kind of volume of concrete foundation cushion cap internal frame sky pedestal anchor bolt and its installation and locating method - Google Patents

A kind of volume of concrete foundation cushion cap internal frame sky pedestal anchor bolt and its installation and locating method Download PDF

Info

Publication number
CN108951856A
CN108951856A CN201810879124.XA CN201810879124A CN108951856A CN 108951856 A CN108951856 A CN 108951856A CN 201810879124 A CN201810879124 A CN 201810879124A CN 108951856 A CN108951856 A CN 108951856A
Authority
CN
China
Prior art keywords
anchor bolt
pedestal
locating support
plate
ring flat
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810879124.XA
Other languages
Chinese (zh)
Inventor
张大慰
傅新芝
杨国松
任鹏
薛超军
王强
张永菲
查宜鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Huning Steel Mechanism Co Ltd
Original Assignee
Jiangsu Huning Steel Mechanism Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Huning Steel Mechanism Co Ltd filed Critical Jiangsu Huning Steel Mechanism Co Ltd
Priority to CN201810879124.XA priority Critical patent/CN108951856A/en
Publication of CN108951856A publication Critical patent/CN108951856A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • E04B1/2403Connection details of the elongated load-supporting parts
    • E04B2001/2463Connections to foundations

Abstract

The invention discloses a kind of volume of concrete foundation cushion cap internal frame sky pedestal anchor bolts, it include: concrete bearing platform and one group of pedestal anchor bolt, the pedestal anchor bolt is fixedly connected pedestal anchor bolt by anchor bolt positioning ring flat-plate, the lower section of the pedestal anchor bolt is equipped with anchor bolt locating support, and the anchor bolt locating support is fixedly connected with anchor bolt positioning ring flat-plate, the pedestal anchor bolt, anchor bolt positioning ring flat-plate and anchor bolt locating support are welded into an entirety, the pedestal anchor bolt, anchor bolt positioning ring flat-plate and anchor bolt locating support weld the inside that the entirety to be formed is set to concrete bearing platform.By in pedestal anchor bolt in the present invention, it is fixed anchor bolt by being provided with anchor bolt positioning ring flat-plate on pedestal anchor bolt, greatly improve the stability of pedestal anchor bolt connection, simultaneously, the setting of anchor bolt locating support, the stability that entire pedestal anchor bolt is connect with concrete bearing platform can be effectively improved, to improve its whole stability.

Description

A kind of volume of concrete foundation cushion cap internal frame sky pedestal anchor bolt and its installation positioning Method
Technical field
The invention belongs to steel building technical field, in particular to a kind of volume of concrete foundation cushion cap internal frame void column Foot anchor bolt and its installation and locating method.
Background technique
With the rapid development of social economy, all trades and professions all realize quick development, and building trade is also in this way, passing The building trade of system is all to use concrete construction mostly, however since the construction of concrete usually will receive some extraneous factors Influence, such as winter, the requirement due to concrete to temperature will lead to its can not normal construction, so as to cause construction delay, It also will receive the influence of rainy weather simultaneously, will also result in its duration is extended, thus existing concrete construction needs It improves, this birth with regard to growth-promoting steel building.
In steel building, for the public buildings such as various large airports, it is related to steel knot in mass concrete more Bent anchor bolt installation question.Wherein most anchor bolts are positioned at cushion cap central location, deposit centainly with structure cushion cap bottom The drop of height not only needs foundation platform to divide and repeatedly pours section, but also each profession with traditional anchor bolt locating mounting method Between cross influence face it is larger, construction period extend.The construction quality and construction speed for seriously affecting engineering, constrain steel structure with Civil construction cooperative development.
Summary of the invention
Goal of the invention: in order to overcome the above deficiency, the object of the present invention is to provide a kind of volume of concrete foundation cushion caps Internal frame sky pedestal anchor bolt and its installation and locating method, strong operability, installation effectiveness is high, while it is fixed to improve pedestal anchor bolt installation Position precision, reduces pre-buried deviation, effectively avoids cross-operation duration between profession, provide the quality of construction steel structure.
Technical solution: to achieve the goals above, the present invention provides make somebody a mere figurehead in a kind of volume of concrete foundation cushion cap Pedestal anchor bolt, comprising: concrete bearing platform and one group of pedestal anchor bolt, the pedestal anchor bolt position ring flat-plate to suspension column anchor by anchor bolt Bolt is fixedly connected, and the lower section of the pedestal anchor bolt is equipped with anchor bolt locating support, and the anchor bolt locating support and anchor bolt are fixed Position ring flat-plate is fixedly connected, and the pedestal anchor bolt, anchor bolt positioning ring flat-plate and anchor bolt locating support are welded into an entirety, the column Foot anchor bolt, anchor bolt positioning ring flat-plate and anchor bolt locating support weld the inside that the entirety to be formed is set to concrete bearing platform.
Heretofore described a kind of volume of concrete foundation cushion cap internal frame sky pedestal anchor bolt, by pedestal anchor bolt , anchor bolt is fixed by being provided with anchor bolt positioning ring flat-plate on pedestal anchor bolt, greatly improves pedestal anchor bolt connection Stability, meanwhile, the setting of anchor bolt locating support can effectively improve what entire pedestal anchor bolt was connect with concrete bearing platform Stability, to improve its whole stability.
Column and one group of anchor bolt are equipped in heretofore described pedestal anchor bolt, the top and bottom of the column are equipped with anchor Bolt, the setting of the anchor bolt greatly improve the stability of total.
Heretofore described anchor bolt locating support is always equipped with locating support and pedestal, and the locating support is set to the bottom of pedestal Portion, and dowel is equipped between the locating support, the setting of the dowel can greatly improve locating support connection Stability, while also greatly improving its safety used.
Heretofore described locating support uses angle steel locating support.
Upper anchor bolt positioning ring flat-plate and the anchoring position ring flat-plate that casts anchor, the upper anchor are equipped in heretofore described anchor bolt positioning ring flat-plate Anchoring position ring flat-plate and the anchoring position ring flat-plate that casts anchor are fixedly connected with pedestal anchor bolt, and the upper anchor bolt positioning ring flat-plate is set to lower anchor bolt Position the top of ring flat-plate.
The installation and locating method of heretofore described volume of concrete foundation cushion cap internal frame sky pedestal anchor bolt, specifically Installation and locating method is as follows:
(1): the pedestal anchor bolt being located in volume of concrete foundation cushion cap is passed through by three-dimensional modeling mode 1:1 using BIM technology Realistic simulation goes out its relative position inside concrete bearing platform, i.e., the space orientation coordinate and reality of pedestal anchor bolt to be installed Installation site is identical, and according to its BIM model, finds out relative relief of the pedestal anchor bolt relative to foundation platform bottom absolute altitude.
(2): the relative relief according to pedestal anchor bolt structure type and pedestal anchor bolt relative to concrete bearing platform bottom absolute altitude, if Count out economic, stable anchor bolt locating support;Pedestal anchor bolt and anchor bolt locating support are set up according to installation position in BIM model Vertical threedimensional model, determines the shop detail drawing and field erected three-dimensional localization coordinate of anchor bolt locating support;
(3): according to the shop detail drawing of anchor bolt locating support, part being processed by processing factory and is delivered to scene, construction site Locating support is assembled into according to its number and pedestal anchor bolt welding is admittedly integral, according to the three-dimensional localization coordinate of suspension column, is carried out whole Body installation positioning.
The installation and locating method of heretofore described volume of concrete foundation cushion cap internal frame sky pedestal anchor bolt, the column Foot anchor bolt integral installation positioning method particularly includes:
1): according to BIM Deepen Design drawing, temporal material stacks processing district at the scene, and column and anchor bolt are positioned ring flat-plate, suspension column Anchor bolt group positioning welding is completed to foundation platform inner cushion layer, waterproof, the binding of bottom muscle at an entirety, is inserted into Construction of Steel Structure;
2): total station is utilized, locating support installation site is measured into setting-out, pile cap steel muscle absolute altitude is first carried out and measures, It is checked with pedestal anchor bolt installed height mark, it is determined whether need to adjust the height of locating support.
3): integral installation pedestal anchor bolt and anchor bolt locating support, according to the exact arrangement situation of reinforcing bar, locating support angle steel Flat billet is welded in lower part setting, and locating support and backing plate carry out fillet weld seam, and backing plate is shelved on cushion cap reinforcing bar;
4): three-dimensional localization finally being carried out to anchor pole using total station, fixes it with reinforcing bar spot welding after qualified, depending on locating support height Degree, can add oblique strut and be subject to lateral stability;
5): anchor bolt is installed, and after whole repetition measurement is errorless, management is submitted to carry out an acceptance inspection, and can submit subsequent carrying out the after qualified One-time-concreting concrete.
Above-mentioned technical proposal can be seen that the invention has the following beneficial effects:
1, heretofore described a kind of volume of concrete foundation cushion cap internal frame sky pedestal anchor bolt, by pedestal anchor bolt, It is fixed anchor bolt by being provided with anchor bolt positioning ring flat-plate on pedestal anchor bolt, greatly improves the steady of pedestal anchor bolt connection It is qualitative, meanwhile, the setting of anchor bolt locating support can effectively improve the stabilization that entire pedestal anchor bolt is connect with concrete bearing platform Property, to improve its whole stability.
2, heretofore described anchor bolt locating support is always equipped with locating support and pedestal, and the locating support is set to pedestal Bottom, and dowel is equipped between the locating support, the setting of the dowel can greatly improve locating support connection Stability, while also greatly improving its safety used.
3, the installation and locating method of heretofore described volume of concrete foundation cushion cap internal frame sky pedestal anchor bolt uses The method of " prefabrication, on-site consolidation, integral installation positioning " solves large-volume concrete bearing platform internal frame spare anchor bolt and accurately pacifies The problem of dress, the method for the invention strong operability, installation effectiveness is high, while improving pedestal anchor bolt installation positioning accuracy, Pre-buried deviation is reduced, cross-operation duration between profession is effectively avoided, provides the quality of construction steel structure, improves steel knot The construction efficiency of structure.
Detailed description of the invention
Fig. 1 is the structural diagram of the present invention;
Fig. 2 is the structural schematic diagram of pedestal anchor bolt of the present invention;
In figure: concrete bearing platform -1, pedestal anchor bolt -2, anchor bolt position ring flat-plate -3, anchor bolt locating support -4, column -21, one group of anchor Bolt -22, upper anchor bolt positioning ring flat-plate -31, the anchoring position ring flat-plate -32 that casts anchor, locating support -41, pedestal -42, dowel -43,.
Specific embodiment
In the following with reference to the drawings and specific embodiments, the present invention is furture elucidated.
Embodiment 1
A kind of volume of concrete foundation cushion cap internal frame sky pedestal anchor bolt as shown in the figure, comprising: concrete bearing platform 1 and one group of column Foot anchor bolt 2, the pedestal anchor bolt 2 are fixedly connected pedestal anchor bolt 2 by anchor bolt positioning ring flat-plate 3, the pedestal anchor bolt 2 Lower section be equipped with anchor bolt locating support 4, and the anchor bolt locating support 4 and anchor bolt position ring flat-plate 3 and are fixedly connected, the suspension column anchor Bolt 2, anchor bolt positioning ring flat-plate 3 and anchor bolt locating support 4 are welded into an entirety, and the pedestal anchor bolt 2, anchor bolt position ring flat-plate 3 And the entirety that the welding of anchor bolt locating support 4 is formed is set on the inside of concrete bearing platform 1.
Column 21 and one group of anchor bolt 22, the top and bottom of the column 21 are equipped in pedestal anchor bolt 2 described in the present embodiment Portion is equipped with anchor bolt 22.
Anchor bolt locating support described in the present embodiment 4 is always equipped with locating support 41 and pedestal 42, and the locating support 41 is set In the bottom of pedestal 42, and dowel 43 is equipped between the locating support 41.
Locating support 41 described in the present embodiment uses angle steel locating support.
It is equipped with upper anchor bolt positioning ring flat-plate 31 and the anchoring position ring flat-plate 32 that casts anchor in the positioning ring flat-plate 3 of anchor bolt described in the present embodiment, The upper anchor bolt positioning ring flat-plate 31 and the anchoring position ring flat-plate 32 that casts anchor are fixedly connected with pedestal anchor bolt 2, and the upper anchor bolt positioning Ring flat-plate 31 is set to the top for the anchoring position ring flat-plate 32 that casts anchor.
Embodiment 2
A kind of volume of concrete foundation cushion cap internal frame sky pedestal anchor bolt as shown in the figure, comprising: concrete bearing platform 1 and one group of column Foot anchor bolt 2, the pedestal anchor bolt 2 are fixedly connected pedestal anchor bolt 2 by anchor bolt positioning ring flat-plate 3, the pedestal anchor bolt 2 Lower section be equipped with anchor bolt locating support 4, and the anchor bolt locating support 4 and anchor bolt position ring flat-plate 3 and are fixedly connected, the suspension column anchor Bolt 2, anchor bolt positioning ring flat-plate 3 and anchor bolt locating support 4 are welded into an entirety, and the pedestal anchor bolt 2, anchor bolt position ring flat-plate 3 And the entirety that the welding of anchor bolt locating support 4 is formed is set on the inside of concrete bearing platform 1.
Column 21 and one group of anchor bolt 22, the top and bottom of the column 21 are equipped in pedestal anchor bolt 2 described in the present embodiment Portion is equipped with anchor bolt 22.
Anchor bolt locating support described in the present embodiment 4 is always equipped with locating support 41 and pedestal 42, and the locating support 41 is set In the bottom of pedestal 42, and dowel 43 is equipped between the locating support 41.
Locating support 41 described in the present embodiment uses angle steel locating support.
It is equipped with upper anchor bolt positioning ring flat-plate 31 and the anchoring position ring flat-plate 32 that casts anchor in the positioning ring flat-plate 3 of anchor bolt described in the present embodiment, The upper anchor bolt positioning ring flat-plate 31 and the anchoring position ring flat-plate 32 that casts anchor are fixedly connected with pedestal anchor bolt 2, and the upper anchor bolt positioning Ring flat-plate 31 is set to the top for the anchoring position ring flat-plate 32 that casts anchor.
The installation and locating method of the sky pedestal anchor bolt of volume of concrete foundation cushion cap internal frame described in the present embodiment, specifically Installation and locating method it is as follows:
1): the pedestal anchor bolt 2 being located in volume of concrete foundation cushion cap 1 is passed through by three-dimensional modeling mode 1:1 using BIM technology Realistic simulation goes out its relative position inside concrete bearing platform 1, i.e., the space orientation coordinate and reality of pedestal anchor bolt 2 to be installed Border installation site is identical, and according to its BIM model, finds out relative relief of the pedestal anchor bolt 2 relative to foundation platform bottom absolute altitude.
2): the relative relief according to 2 structure type of pedestal anchor bolt and pedestal anchor bolt relative to 1 bottom absolute altitude of concrete bearing platform, Design economic, stable anchor bolt locating support;By pedestal anchor bolt and anchor bolt locating support according to installation site in BIM model Threedimensional model is established, determines the shop detail drawing and field erected three-dimensional localization coordinate of anchor bolt locating support;
3): according to the shop detail drawing of anchor bolt locating support, part being processed by processing factory and is delivered to scene, construction site is pressed Locating support 41 is assembled into according to its number and the welding of pedestal anchor bolt 2 is admittedly integral, according to the three-dimensional localization coordinate of suspension column, is carried out whole Body installation positioning.
Embodiment 3
A kind of volume of concrete foundation cushion cap internal frame sky pedestal anchor bolt as shown in the figure, comprising: concrete bearing platform 1 and one group of column Foot anchor bolt 2, the pedestal anchor bolt 2 are fixedly connected pedestal anchor bolt 2 by anchor bolt positioning ring flat-plate 3, the pedestal anchor bolt 2 Lower section be equipped with anchor bolt locating support 4, and the anchor bolt locating support 4 and anchor bolt position ring flat-plate 3 and are fixedly connected, the suspension column anchor Bolt 2, anchor bolt positioning ring flat-plate 3 and anchor bolt locating support 4 are welded into an entirety, and the pedestal anchor bolt 2, anchor bolt position ring flat-plate 3 And the entirety that the welding of anchor bolt locating support 4 is formed is set on the inside of concrete bearing platform 1.
Column 21 and one group of anchor bolt 22, the top and bottom of the column 21 are equipped in pedestal anchor bolt 2 described in the present embodiment Portion is equipped with anchor bolt 22.
Anchor bolt locating support described in the present embodiment 4 is always equipped with locating support 41 and pedestal 42, and the locating support 41 is set In the bottom of pedestal 42, and dowel 43 is equipped between the locating support 41.
Locating support 41 described in the present embodiment uses angle steel locating support.
It is equipped with upper anchor bolt positioning ring flat-plate 31 and the anchoring position ring flat-plate 32 that casts anchor in the positioning ring flat-plate 3 of anchor bolt described in the present embodiment, The upper anchor bolt positioning ring flat-plate 31 and the anchoring position ring flat-plate 32 that casts anchor are fixedly connected with pedestal anchor bolt 2, and the upper anchor bolt positioning Ring flat-plate 31 is set to the top for the anchoring position ring flat-plate 32 that casts anchor.
The installation and locating method of the sky pedestal anchor bolt of volume of concrete foundation cushion cap internal frame described in the present embodiment, specifically Installation and locating method it is as follows:
1): the pedestal anchor bolt 2 being located in volume of concrete foundation cushion cap 1 is passed through by three-dimensional modeling mode 1:1 using BIM technology Realistic simulation goes out its relative position inside concrete bearing platform 1, i.e., the space orientation coordinate and reality of pedestal anchor bolt 2 to be installed Border installation site is identical, and according to its BIM model, finds out relative relief of the pedestal anchor bolt 2 relative to foundation platform bottom absolute altitude.
2): the relative relief according to 2 structure type of pedestal anchor bolt and pedestal anchor bolt relative to 1 bottom absolute altitude of concrete bearing platform, Design economic, stable anchor bolt locating support;By pedestal anchor bolt and anchor bolt locating support according to installation site in BIM model Threedimensional model is established, determines the shop detail drawing and field erected three-dimensional localization coordinate of anchor bolt locating support;
3): according to the shop detail drawing of anchor bolt locating support, part being processed by processing factory and is delivered to scene, construction site is pressed Locating support 41 is assembled into according to its number and the welding of pedestal anchor bolt 2 is admittedly integral, according to the three-dimensional localization coordinate of suspension column, is carried out whole Body installation positioning.
The installation and locating method of the sky pedestal anchor bolt of volume of concrete foundation cushion cap internal frame described in the present embodiment, it is described 2 integral installation of pedestal anchor bolt positioning method particularly includes:
1): according to BIM Deepen Design drawing, temporal material stacks processing district at the scene, by column 21 and anchor bolt positioning ring flat-plate 3, 2 groups of positioning weldings of pedestal anchor bolt are completed, insertion steel construction is applied at an entirety to foundation platform inner cushion layer, waterproof, the binding of bottom muscle Work;
2): utilizing total station, 41 installation site of locating support is measured into setting-out, first carry out pile cap steel muscle absolute altitude and surveyed Amount, is checked, it is determined whether need to adjust the height of locating support 41 with 2 installed height mark of pedestal anchor bolt.
3): integral installation pedestal anchor bolt 2 and anchor bolt locating support 41, according to the exact arrangement situation of reinforcing bar, locating support Flat billet is welded in the setting of angle steel lower part, and locating support and backing plate carry out fillet weld seam, and backing plate is shelved on cushion cap reinforcing bar;
4): three-dimensional localization finally being carried out to anchor pole using total station, fixes it with reinforcing bar spot welding after qualified, depending on locating support height Degree, can add oblique strut and be subject to lateral stability;
5): anchor bolt is installed, and after whole repetition measurement is errorless, management is submitted to carry out an acceptance inspection, and can submit subsequent carrying out the after qualified One-time-concreting concrete.
The above is only a preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art For member, without departing from the principle of the present invention, several improvement can also be made, these improvement also should be regarded as of the invention Protection scope.

Claims (7)

1. a kind of volume of concrete foundation cushion cap internal frame sky pedestal anchor bolt, it is characterised in that: include: concrete bearing platform (1) and One group of pedestal anchor bolt (2), the pedestal anchor bolt (2) position ring flat-plate (3) to pedestal anchor bolt (2) company of being fixed by anchor bolt It connects, the lower section of the pedestal anchor bolt (2) is equipped with anchor bolt locating support (4), and the anchor bolt locating support (4) and anchor bolt positioning ring Plate (3) is fixedly connected, the pedestal anchor bolt (2), anchor bolt positioning ring flat-plate (3) and anchor bolt locating support (4) be welded into one it is whole Body, the entirety that the pedestal anchor bolt (2), anchor bolt positioning ring flat-plate (3) and anchor bolt locating support (4) welding are formed are set to concrete The inside of cushion cap (1).
2. volume of concrete foundation cushion cap internal frame sky pedestal anchor bolt according to claim 1, it is characterised in that: the column Column (21) and one group of anchor bolt (22) are equipped in foot anchor bolt (2), the top and bottom of the column (21) are equipped with anchor bolt (22).
3. volume of concrete foundation cushion cap internal frame sky pedestal anchor bolt according to claim 1, it is characterised in that: the anchor Bolt locating support (4) is always equipped with locating support (41) and pedestal (42), and the locating support (41) is set to the bottom of pedestal (42), And dowel (43) are equipped between the locating support (41).
4. volume of concrete foundation cushion cap internal frame sky pedestal anchor bolt according to claim 3, it is characterised in that: described fixed Position bracket (41) uses angle steel locating support.
5. volume of concrete foundation cushion cap internal frame sky pedestal anchor bolt according to claim 1, it is characterised in that: the anchor Upper anchor bolt positioning ring flat-plate (31) and the anchoring position ring flat-plate (32) that casts anchor are equipped in anchoring position ring flat-plate (3), the upper anchor bolt positions ring flat-plate (31) it is fixedly connected with pedestal anchor bolt (2) with the anchoring position ring flat-plate (32) that casts anchor, and upper anchor bolt positioning ring flat-plate (31) is set to It casts anchor the top of anchoring position ring flat-plate (32).
6. the installation of volume of concrete foundation cushion cap internal frame sky pedestal anchor bolt according to any one of claims 1 to 5 is fixed Position method, it is characterised in that: specific installation and locating method is as follows:
(1) pedestal anchor bolt (2) in volume of concrete foundation cushion cap (1) will be located at using BIM technology and passes through three-dimensional modeling side Formula 1:1 realistic simulation goes out its relative position internal in concrete bearing platform (1), i.e., the space of pedestal anchor bolt to be installed (2) is fixed Position coordinate is identical as actual installation position, and according to its BIM model, finds out pedestal anchor bolt (2) relative to foundation platform bottom absolute altitude Relative relief;
(2) relative relief according to pedestal anchor bolt (2) structure type and pedestal anchor bolt relative to concrete bearing platform (1) bottom absolute altitude, Design economic, stable anchor bolt locating support;By pedestal anchor bolt and anchor bolt locating support according to installation site in BIM model Threedimensional model is established, determines the shop detail drawing and field erected three-dimensional localization coordinate of anchor bolt locating support;
(3) according to the shop detail drawing of anchor bolt locating support, part is processed by processing factory and is delivered to scene, construction site is pressed Be assembled into locating support (41) according to its number and pedestal anchor bolt (2) welding consolidate it is integral, according to the three-dimensional localization coordinate of suspension column, into Row integral installation positioning.
7. the installation and locating method of volume of concrete foundation cushion cap internal frame sky pedestal anchor bolt according to claim 6, It is characterized in that: pedestal anchor bolt (2) the integral installation positioning method particularly includes:
1): according to BIM Deepen Design drawing, temporal material stacks processing district at the scene, and column (21) and anchor bolt are positioned ring flat-plate (3), pedestal anchor bolt (2) group positioning welding is completed to foundation platform inner cushion layer, waterproof, the binding of bottom muscle at an entirety, is inserted into steel Structure construction;
2): utilizing total station, locating support (41) installation site is measured into setting-out, first carry out pile cap steel muscle absolute altitude and surveyed Amount, is checked, it is determined whether need to adjust the height of locating support (41) with pedestal anchor bolt (2) installed height mark;
3): integral installation pedestal anchor bolt (2) and anchor bolt locating support (41), according to the exact arrangement situation of reinforcing bar, locating support Flat billet is welded in the setting of angle steel lower part, and locating support and backing plate carry out fillet weld seam, and backing plate is shelved on cushion cap reinforcing bar;
4): three-dimensional localization finally being carried out to anchor pole using total station, fixes it with reinforcing bar spot welding after qualified, depending on locating support height Degree, can add oblique strut and be subject to lateral stability;
5): anchor bolt is installed, and after whole repetition measurement is errorless, management is submitted to carry out an acceptance inspection, and can submit subsequent carrying out the after qualified One-time-concreting concrete.
CN201810879124.XA 2018-08-03 2018-08-03 A kind of volume of concrete foundation cushion cap internal frame sky pedestal anchor bolt and its installation and locating method Pending CN108951856A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810879124.XA CN108951856A (en) 2018-08-03 2018-08-03 A kind of volume of concrete foundation cushion cap internal frame sky pedestal anchor bolt and its installation and locating method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810879124.XA CN108951856A (en) 2018-08-03 2018-08-03 A kind of volume of concrete foundation cushion cap internal frame sky pedestal anchor bolt and its installation and locating method

Publications (1)

Publication Number Publication Date
CN108951856A true CN108951856A (en) 2018-12-07

Family

ID=64467616

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810879124.XA Pending CN108951856A (en) 2018-08-03 2018-08-03 A kind of volume of concrete foundation cushion cap internal frame sky pedestal anchor bolt and its installation and locating method

Country Status (1)

Country Link
CN (1) CN108951856A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109469094A (en) * 2018-12-11 2019-03-15 中国建筑第八工程局有限公司 Super High bottom plate interpolation fashioned iron column construction method and fixed structure
CN110565675A (en) * 2019-07-31 2019-12-13 中建二局安装工程有限公司 Large anchor bolt group mounting bracket of high-strength anchor bolt and construction method thereof
CN115434513A (en) * 2022-09-29 2022-12-06 上海宝冶冶金工程有限公司 Construction method for embedding anchor bolt

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202265906U (en) * 2011-10-13 2012-06-06 武汉建工股份有限公司 Fixing device for anchor bolts of embedded type steel tube concrete column feet
CN104141318A (en) * 2014-08-12 2014-11-12 中冶建工集团有限公司 Installation and construction method of column base of large-diameter steel pipe column
CN204703182U (en) * 2015-05-07 2015-10-14 中建钢构有限公司 Crab-bolt stock
CN204876084U (en) * 2015-07-31 2015-12-16 中铁城市规划设计研究院有限公司 Steel column foot crab -bolt fixed bolster
CN105926958A (en) * 2016-07-01 2016-09-07 北京市机械施工有限公司 Mounting method for sill anchor combined support frame for steel structure shear wall and outer frame column base of super high-rise building

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202265906U (en) * 2011-10-13 2012-06-06 武汉建工股份有限公司 Fixing device for anchor bolts of embedded type steel tube concrete column feet
CN104141318A (en) * 2014-08-12 2014-11-12 中冶建工集团有限公司 Installation and construction method of column base of large-diameter steel pipe column
CN204703182U (en) * 2015-05-07 2015-10-14 中建钢构有限公司 Crab-bolt stock
CN204876084U (en) * 2015-07-31 2015-12-16 中铁城市规划设计研究院有限公司 Steel column foot crab -bolt fixed bolster
CN105926958A (en) * 2016-07-01 2016-09-07 北京市机械施工有限公司 Mounting method for sill anchor combined support frame for steel structure shear wall and outer frame column base of super high-rise building

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
李三军: "BIM技术在钢结构施工管理中的应用", 《江西建材》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109469094A (en) * 2018-12-11 2019-03-15 中国建筑第八工程局有限公司 Super High bottom plate interpolation fashioned iron column construction method and fixed structure
CN110565675A (en) * 2019-07-31 2019-12-13 中建二局安装工程有限公司 Large anchor bolt group mounting bracket of high-strength anchor bolt and construction method thereof
CN110565675B (en) * 2019-07-31 2024-01-23 中建二局安装工程有限公司 Large anchor bolt group mounting bracket of high-strength anchor bolts and construction method thereof
CN115434513A (en) * 2022-09-29 2022-12-06 上海宝冶冶金工程有限公司 Construction method for embedding anchor bolt
CN115434513B (en) * 2022-09-29 2023-11-21 上海宝冶冶金工程有限公司 Construction method for embedding anchor bolts

Similar Documents

Publication Publication Date Title
CN108951856A (en) A kind of volume of concrete foundation cushion cap internal frame sky pedestal anchor bolt and its installation and locating method
CN102561712B (en) Precise positioning frame for large steel columns and equipment foundation fixing bolts and construction method of precise positioning frame
CN108460189A (en) A kind of curtain wall mounting design method based on BIM technology
CN102828470B (en) Method for locating main girder cable sleeve of cable-stayed bridge
CN106638318B (en) The localization method and cable guide pipe installation method of cable-stayed bridge beam-ends anchor point
CN103084806A (en) Large curve steel box grider manufacture method
CN102828469B (en) Positioning mounting construction method for triangular steel constructed pillar of inclined-leg steel box
CN103114732A (en) Cast steel penetration pipe node space positioning method
CN103397780B (en) Air cooling tower X-type column construction method
CN104929295B (en) A kind of seamless steel pipe construction method for hyperbolicity arcuated roof
CN206562667U (en) A kind of quick pedestal anchor bolt structure in place
CN107165317A (en) It is a kind of to be used for the steel disc shape node component and application process of special-shaped Curtain wall frame
CN106759943A (en) A kind of pre-assembled Anchor Bolts in Steel Column Bases structure
CN103603503A (en) Anchor bolt installing method
CN104196165B (en) Huge post of a kind of ultra-large type Multi-cavity steel structure and preparation method thereof
CN107620270A (en) Portable positioning die carrier and its application method for guardrail reinforcing bar colligation
CN110241735B (en) Positioning and adjusting device and method for main tower cable guide pipe of cable-stayed bridge
CN112095485A (en) Bridge stay cable anchor cylinder pre-embedded positioning device and using method thereof
CN209584848U (en) Seam prototype template and casting system are reserved in a kind of assembled cushion cap pier stake
CN105113418B (en) A kind of bearing pad stone construction lofting method
CN201770940U (en) Mounting structure for lower load bearing plate of steel box tower with spatial variable cross section
CN109137963A (en) Fixing bracket body and its construction method for foundation bolt group positioning
CN205617664U (en) Prefabricated pier stud locating rack for steel reinforcement cage
CN102926532B (en) Mounting method for templates of box-type steel skeleton inclined column
CN211948529U (en) Positioning support of big post rag bolt crowd of multi-chamber

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181207