CN209584848U - Prefabricated bearing platform pier pile reserved joint full-scale model template and pouring system - Google Patents

Prefabricated bearing platform pier pile reserved joint full-scale model template and pouring system Download PDF

Info

Publication number
CN209584848U
CN209584848U CN201822070226.5U CN201822070226U CN209584848U CN 209584848 U CN209584848 U CN 209584848U CN 201822070226 U CN201822070226 U CN 201822070226U CN 209584848 U CN209584848 U CN 209584848U
Authority
CN
China
Prior art keywords
reserved
model
cushion cap
seam
utility
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201822070226.5U
Other languages
Chinese (zh)
Inventor
李伟
李永胜
迟广智
周莎莉
孙鹏云
张蕊
王凯椿
王玉果
李献民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Civil And Agchitecural Engineering Institute Of Cccc-Fheb Ltd
CCCC First Highway Engineering Co Ltd
Original Assignee
Civil And Agchitecural Engineering Institute Of Cccc-Fheb Ltd
CCCC First Highway Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Civil And Agchitecural Engineering Institute Of Cccc-Fheb Ltd, CCCC First Highway Engineering Co Ltd filed Critical Civil And Agchitecural Engineering Institute Of Cccc-Fheb Ltd
Priority to CN201822070226.5U priority Critical patent/CN209584848U/en
Application granted granted Critical
Publication of CN209584848U publication Critical patent/CN209584848U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

本实用新型公开了一种装配式承台墩桩预留接缝足尺模型模板及浇筑系统,涉及预制装配施工桥梁连接接缝灌注施工的客观需求,本实用新型可模拟现场浇筑时灌缝材料的边界条件,属于建筑应用技术领域,本实用新型制作方便,细部构造对灌缝材料的边界条件进行模拟,模板缝宽调整范围满足设计图纸要求,灌缝材料使用量较少,既满足对搅拌设备参数的确定,又能对灌缝材料的施工工艺性进行检验,通过拆模后对试样外观的观察和材料切割后强度检测,对灌缝材料的性能可直观准确的判读,本实用新型中外模四面焊接钢条模仿界面波纹面;内模一面焊接钢条其余三面为光面模仿界面波纹面,在进行承台墩桩接缝灌注时能够有效地提高密实性,具有广阔的应用前景。

The utility model discloses a full-scale model formwork and pouring system for the reserved joints of the prefabricated abutment pier piles, and relates to the objective requirements of prefabricated assembly construction bridge connection joint joint pouring construction. The utility model can simulate the joint filling material during on-site pouring boundary conditions, belonging to the field of construction application technology, the utility model is easy to manufacture, the detailed structure simulates the boundary conditions of the filling materials, the adjustment range of the template seam width meets the requirements of the design drawings, and the usage of the filling materials is small, which not only satisfies the requirement for mixing The determination of the equipment parameters can also test the construction process of the joint filling material. Through the observation of the appearance of the sample after the removal of the formwork and the strength detection of the material after cutting, the performance of the joint filling material can be intuitively and accurately interpreted. The utility model Steel bars are welded on four sides of the middle and outer mold to imitate the corrugated surface of the interface; steel bars are welded on one side of the inner mold and the remaining three sides are smooth to imitate the corrugated interface, which can effectively improve the compactness when pouring the joints of cap pier piles, and has broad application prospects.

Description

一种装配式承台墩桩预留接缝足尺模型模板及浇筑系统A full-scale model template and pouring system for prefabricated cap pier piles with reserved joints

技术领域technical field

本实用新型涉及预制装配施工桥梁连接接缝灌注施工的客观需求,本实用新型可模拟现场浇筑时灌缝材料的边界条件,属于建筑应用技术领域,具体是一种装配式承台墩桩预留接缝足尺模型模板及浇筑系统。The utility model relates to the objective requirements of prefabricated assembly construction bridge connection joint pouring construction. The utility model can simulate the boundary conditions of filling joint materials during on-site pouring. Joint full-scale model formwork and pouring system.

背景技术Background technique

在我国,桥梁上部结构的预制建造技术已经比较成熟,并且已经在大量的桥梁建设中采用,而下部结构是目前预制装配式桥梁的关键,尤其对于北京高振区,下部结构的连接形式、力学性能和抗振性能是最为关键的环节,开展预制装配式连接缝超高性能混凝土灌缝施工工艺等关键技术试验研究,为桥梁施工项目设计和现场施工工艺提供基础和依据。In my country, the prefabricated construction technology of the bridge superstructure is relatively mature and has been adopted in a large number of bridge constructions, while the substructure is the key to the current prefabricated bridge, especially for the high-vibration area of Beijing, the connection form, mechanics of the substructure Performance and anti-vibration performance are the most critical links. Carry out experimental research on key technologies such as prefabricated joint joint ultra-high performance concrete filling construction technology to provide a basis and basis for bridge construction project design and on-site construction technology.

自密实混凝土是否能在仅依靠自身重力的条件下达到密实填充模板的要求,它的工作度起着至关重要的作用,而优良的工作度是其与普通混凝土最根本的不同。目前自密实混凝土自身特性以及预制装配施工桥梁连接接缝特殊结构形式仍有如下技术难点:①连接接缝宽度有限,灌注施工工艺需研究;②接缝灌浆可能存在而又不可检测的灌注不密实难题,避免质量隐患。Whether self-compacting concrete can meet the requirements of densely filling formwork under the condition of only relying on its own gravity, its workability plays a crucial role, and its excellent workability is the most fundamental difference from ordinary concrete. At present, the characteristics of self-compacting concrete and the special structural form of bridge connection joints in prefabricated assembly construction still have the following technical difficulties: ①The width of connection joints is limited, and the pouring construction technology needs to be studied; ②The joint grouting may exist but cannot be detected. difficult problems and avoid quality hazards.

为此,我们提出一种装配式承台墩桩预留接缝足尺模型模板及浇筑系统,所述模板外模四面焊接钢条模仿界面波纹面;内模一面焊接钢条其余三面为光面模仿界面波纹面,来解决界面波纹面制作难度高的技术难题。For this reason, we propose a full-scale model formwork and pouring system with joints reserved for prefabricated cap pier piles. The four sides of the outer formwork of the formwork are welded with steel bars to imitate the corrugated surface of the interface; one side of the inner form is welded with steel bars, and the other three sides are smooth. Imitate the corrugated surface of the interface to solve the difficult technical problem of making the corrugated surface of the interface.

实用新型内容Utility model content

本实用新型的目的在于提供一种装配式承台墩桩预留接缝足尺模型模板及浇筑系统,以解决上述背景技术中提出的问题。The purpose of this utility model is to provide a full-scale model formwork and pouring system for the reserved joints of assembled pier piles, so as to solve the problems raised in the above-mentioned background technology.

为实现上述目的,本实用新型提供如下技术方案:In order to achieve the above object, the utility model provides the following technical solutions:

一种装配式承台墩桩预留接缝足尺模型模板,包括预制墩桩和承台,所述预制墩桩安装在承台上,所述承台为预制墩桩的支撑台或扩大基础;还包括预留插槽、灌注混凝土、齿键和模板,所述预留插槽设置在承台上,所述预制墩桩通过灌注混凝土灌注连接在预留插槽中,所述模板包括外模和内模,内模设置在外模内部,所述齿键设置在外模和内模之间,所述外模外侧四面模仿界面波纹面,所述界面波纹面为装配式建筑中接缝浇筑时承台与预制墩桩的接触面,采用波纹面的好处是:提高浇筑的密实性。A full-scale model template for prefabricated pier piles with reserved seams, including prefabricated pier piles and caps, the prefabricated pier piles are installed on the caps, and the caps are the supporting platforms or enlarged foundations of prefabricated pier piles ; It also includes reserved slots, pouring concrete, tooth keys and templates, the reserved slots are set on the cap, the prefabricated pier piles are connected in the reserved slots by pouring concrete, and the templates include outer mold and inner mold, the inner mold is arranged inside the outer mold, the tooth key is arranged between the outer mold and the inner mold, and the outer four sides of the outer mold imitate the corrugated surface of the interface, and the corrugated surface of the interface is used when pouring joints in prefabricated buildings The advantage of using the corrugated surface on the contact surface between the cap and the prefabricated pier is to improve the compactness of the pouring.

作为本实用新型进一步的方案:所述,外模和内模均为方形,外模和内模的材质均为钢制材质。As a further solution of the utility model: as mentioned above, both the outer mold and the inner mold are square, and the materials of the outer mold and the inner mold are all steel materials.

作为本实用新型进一步的方案:所述外模的外侧四面和内模的内侧一面均设置有钢条,内模的内侧其它三面为光面,所述钢条焊接在外模和内模上;钢条的作用是:模拟界面波纹面细部构造。As a further solution of the present utility model: the outer four sides of the outer mold and the inner side of the inner mold are all provided with steel bars, and the other three inner sides of the inner mold are smooth surfaces, and the steel bars are welded on the outer mold and the inner mold; The function of the bar is to simulate the detailed structure of the corrugated surface of the interface.

作为本实用新型进一步的方案:所述外模的参数为:边长2150mm,高2400mm;所述内模的参数为:边长2000mm,高2400mm;所述钢条的参数为:宽50mm,厚7mm。As a further solution of the utility model: the parameters of the outer mold are: side length 2150mm, height 2400mm; the parameters of the inner mold are: side length 2000mm, height 2400mm; the parameters of the steel bar are: width 50mm, thickness 7mm.

作为本实用新型进一步的方案:所述钢条在外模和内模上中心间距为100m,钢条上设置有倒角。As a further solution of the utility model: the distance between the centers of the steel bars on the outer mold and the inner mold is 100m, and the steel bars are provided with chamfers.

作为本实用新型进一步的方案:所述外模上焊接钢条的四面和内模上焊接钢条的一面做齿键。As a further solution of the utility model: four sides of the welded steel bars on the outer mold and one side of the welded steel bars on the inner mold are used as tooth keys.

一种包括上述所述的装配式承台墩桩预留接缝足尺模型模板的装配式预留接缝浇筑系统。A prefabricated reserved joint pouring system comprising the above-mentioned prefabricated cap pier pile reserved joint full-scale model formwork.

与现有技术相比,本实用新型的有益效果是:Compared with the prior art, the beneficial effects of the utility model are:

本实用新型制作方便,细部构造对灌缝材料的边界条件进行模拟,模板缝宽调整范围满足设计图纸要求,灌缝材料使用量较少,既满足对搅拌设备参数的确定,又能对灌缝材料的施工工艺性进行检验,通过拆模后对试样外观的观察和材料切割后强度检测,对灌缝材料的性能可直观准确的判读。The utility model is easy to manufacture, and the detailed structure simulates the boundary conditions of the joint filling material. The adjustment range of the template joint width meets the requirements of the design drawings, and the usage of the joint filling material is small, which not only meets the determination of the parameters of the mixing equipment, but also can effectively control the joint filling. The construction process of the material is inspected. Through the observation of the appearance of the sample after the formwork is removed and the strength test of the material after cutting, the performance of the joint filling material can be intuitively and accurately interpreted.

本实用新型中外模四面焊接钢条模仿界面波纹面;内模一面焊接钢条其余三面为光面模仿界面波纹面,在进行承台墩桩接缝灌注时能够有效地提高密实性;本实用新型可方便、快捷调整缝宽,确定灌浆材料可灌性缝宽,确定可灌性缝宽参数,对模型进行外观和室内试验验证材料密实程度;本实用新型可减小施工难度,加快装配式桥梁施工进度;克服了套筒钢筋连接、灌浆波纹管连接有待验证的局限,减少现浇工作量,提高装配率,加快施工进度;减小施工过程中定位的难度;本实用新型可改善预制墩柱与基础连接处的受力性能,加强连接;减小承台的厚度,具有广阔的应用前景。In the utility model, four sides of the outer mold are welded with steel bars to imitate the corrugated surface of the interface; one side of the inner mold is welded with steel bars, and the remaining three sides are smooth surfaces to imitate the corrugated interface of the interface, which can effectively improve the compactness when pouring into the joints of pile caps; the utility model It is convenient and quick to adjust the gap width, determine the groutable gap width of the grouting material, determine the groutable gap width parameters, and conduct appearance and indoor tests on the model to verify the compactness of the material; the utility model can reduce the construction difficulty and speed up the assembled bridge. Construction progress; it overcomes the limitations of sleeve reinforcement connection and grouting bellows connection to be verified, reduces the workload of cast-in-place, improves the assembly rate, and speeds up the construction progress; reduces the difficulty of positioning in the construction process; the utility model can improve the prefabricated pier column The mechanical performance of the joint with the foundation can be strengthened; the thickness of the platform can be reduced, which has broad application prospects.

附图说明Description of drawings

图1为本实用新型中装配式承台墩桩足尺模型的结构示意图。Fig. 1 is a structural schematic diagram of a full-scale model of an assembled cap pier pile in the utility model.

图2为本实用新型中装配式承台墩桩足尺模型的界面波纹面的结构示意图。Fig. 2 is a structural schematic diagram of the interface corrugated surface of the full-scale model of the assembled pier pile in the utility model.

图3为本实用新型中装配式承台墩桩足尺模型的外模的俯视结构示意图。Fig. 3 is a top view structural schematic diagram of the outer mold of the full-scale model of the assembled cap pier pile in the utility model.

图4为本实用新型中装配式承台墩桩足尺模型的外模的正视结构示意图。Fig. 4 is a schematic diagram of the front view of the outer mold of the full-scale model of the assembled pier pile pile in the utility model.

图5为本实用新型中装配式承台墩桩足尺模型的外模的左视结构示意图。Fig. 5 is a left view structure schematic diagram of the outer mold of the full-scale model of the assembled cap pier pile in the utility model.

图6为本实用新型中装配式承台墩桩足尺模型的内模的俯视结构示意图。Fig. 6 is a top view structural diagram of the inner mold of the full-scale model of the assembled pier pile pile in the utility model.

图7为本实用新型中装配式承台墩桩足尺模型的内模的正视结构示意图。Fig. 7 is a schematic diagram of the front view of the inner mold of the full-scale model of the assembled pier pile pile in the utility model.

图8为本实用新型中装配式承台墩桩足尺模型的内模的左视结构示意图。Fig. 8 is a left view structural diagram of the inner mold of the full-scale model of the assembled cap pier pile in the utility model.

图中:1-预制墩桩、2-预留插槽、3-齿键、4-灌注混凝土、5-承台、6-界面波纹面、7-外模、8-钢条、9-内模。In the figure: 1-prefabricated pier pile, 2-reserved slot, 3-tooth key, 4-poured concrete, 5-cap, 6-interface corrugated surface, 7-outer mold, 8-steel bar, 9-inner mold.

具体实施方式Detailed ways

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. example. Based on the embodiments of the present utility model, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the scope of protection of the present utility model.

实施例一Embodiment one

请参阅图1~8,本实用新型实施例中,一种装配式承台墩桩预留接缝足尺模型模板,包括预制墩桩1和承台5,所述预制墩桩1安装在承台5上,所述承台5为预制墩桩1的支撑台或扩大基础;还包括预留插槽2、灌注混凝土4、齿键3和模板,所述预留插槽2 设置在承台5上,所述预制墩桩1通过灌注混凝土4灌注连接在预留插槽2中,所述模板包括外模7和内模9,内模9设置在外模7内部,所述齿键3设置在外模7和内模9之间,所述外模7外侧四面模仿界面波纹面6,所述界面波纹面6为装配式建筑中接缝浇筑时承台5与预制墩桩1的接触面,采用波纹面的好处是:提高浇筑的密实性。Please refer to Figures 1 to 8. In an embodiment of the present utility model, a full-scale model template for the reserved seam of an assembled cap pier pile includes a prefabricated pier pile 1 and a cap 5, and the prefabricated pier pile 1 is installed on the pier pile. On the platform 5, the cap 5 is the support platform or the enlarged foundation of the prefabricated pier pile 1; it also includes reserved slots 2, poured concrete 4, tooth keys 3 and formwork, and the reserved slots 2 are arranged on the caps 5, the prefabricated pier pile 1 is poured and connected in the reserved slot 2 by pouring concrete 4, the formwork includes an outer mold 7 and an inner mold 9, the inner mold 9 is set inside the outer mold 7, and the tooth key 3 is set Between the outer mold 7 and the inner mold 9, the outer four sides of the outer mold 7 imitate the interface corrugated surface 6, and the interface corrugated surface 6 is the contact surface between the cap 5 and the prefabricated pier pile 1 during joint pouring in the prefabricated building, The advantage of using corrugated surface is to improve the compactness of pouring.

本实用新型实施例中,所述外模7和内模9均为方形,外模7和内模9的材质均为钢制材质,外模7的外侧四面和内模9的内侧一面均设置有钢条8,内模9的内侧其它三面为光面,所述钢条8焊接在外模7和内模9上;钢条8的作用是:模拟界面波纹面6细部构造。In the embodiment of the utility model, the outer mold 7 and the inner mold 9 are square, and the materials of the outer mold 7 and the inner mold 9 are all steel materials, and the four sides of the outer mold 7 and the inner side of the inner mold 9 are all arranged There are steel bars 8, and the other three sides inside the inner mold 9 are smooth surfaces, and the steel bars 8 are welded on the outer mold 7 and the inner mold 9; the effect of the steel bars 8 is to simulate the detailed structure of the interface corrugated surface 6.

本实用新型实施例中,所述外模7的参数为:边长2150mm,高2400mm;所述内模9 的参数为:边长2000mm,高2400mm;所述钢条8的参数为:宽50mm,厚7mm。In the embodiment of the utility model, the parameters of the outer mold 7 are: side length 2150mm, height 2400mm; the parameters of the inner mold 9 are: side length 2000mm, height 2400mm; the parameters of the steel bar 8 are: width 50mm , thick 7mm.

本实用新型实施例中,所述钢条8在外模7和内模9上中心间距为100m,钢条8上设置有倒角;所述外模7上焊接钢条8的四面和内模9上焊接钢条8的一面做齿键3。In the embodiment of the utility model, the distance between the centers of the steel bars 8 on the outer mold 7 and the inner mold 9 is 100 m, and the steel bars 8 are provided with chamfers; the four sides of the steel bars 8 and the inner mold 9 are welded on the outer mold 7 One side of upper welding steel bar 8 is made tooth key 3.

实施例二Embodiment two

本实用新型实施例中,提供一种包括装配式承台墩桩预留接缝足尺模型模板的装配式预留接缝浇筑系统,所述的装配式承台墩桩预留接缝足尺模型模板的结构与实施例一所述的相同。In the embodiment of the present utility model, a prefabricated reserved seam pouring system including a full-scale model template for the reserved seam of the assembled cap pier pile is provided, and the prefabricated cap pier pile reserved seam full scale The structure of the model template is the same as that described in Embodiment 1.

本实用新型中外模四面焊接钢条模仿界面波纹面;内模一面焊接钢条其余三面为光面模仿界面波纹面,在进行承台墩桩接缝灌注时能够有效地提高密实性;本实用新型可方便、快捷调整缝宽,确定灌浆材料可灌性缝宽,确定可灌性缝宽参数,对模型进行外观和室内试验验证材料密实程度;本实用新型可减小施工难度,加快装配式桥梁施工进度;克服了套筒钢筋连接、灌浆波纹管连接有待验证的局限,减少现浇工作量,提高装配率,加快施工进度;减小施工过程中定位的难度;本实用新型可改善预制墩柱与基础连接处的受力性能,加强连接;减小承台的厚度,具有广阔的应用前景。In the utility model, four sides of the outer mold are welded with steel bars to imitate the corrugated surface of the interface; one side of the inner mold is welded with steel bars, and the remaining three sides are smooth surfaces to imitate the corrugated interface of the interface, which can effectively improve the compactness when pouring into the joints of pile caps; the utility model It is convenient and quick to adjust the gap width, determine the groutable gap width of the grouting material, determine the groutable gap width parameters, and conduct appearance and indoor tests on the model to verify the compactness of the material; the utility model can reduce the construction difficulty and speed up the assembled bridge. Construction progress; it overcomes the limitations of sleeve reinforcement connection and grouting bellows connection to be verified, reduces the workload of cast-in-place, improves the assembly rate, and speeds up the construction progress; reduces the difficulty of positioning in the construction process; the utility model can improve the prefabricated pier column The mechanical performance of the joint with the foundation can be strengthened; the thickness of the platform can be reduced, which has broad application prospects.

对于本领域技术人员而言,显然本实用新型不限于上述示范性实施例的细节,而且在不背离本实用新型的精神或基本特征的情况下,能够以其他的具体形式实现本实用新型。因此,无论从哪一点来看,均应将实施例看作是示范性的,而且是非限制性的,本实用新型的范围由所附权利要求而不是上述说明限定,因此旨在将落在权利要求的等同要件的含义和范围内的所有变化囊括在本实用新型内。不应将权利要求中的任何附图标记视为限制所涉及的权利要求。It is obvious to those skilled in the art that the present invention is not limited to the details of the above-mentioned exemplary embodiments, and that the present invention can be implemented in other specific forms without departing from the spirit or essential features of the present invention. Therefore, no matter from all points of view, the embodiments should be regarded as exemplary and non-restrictive, and the scope of the present invention is defined by the appended claims rather than the above description, so it is intended to fall within the scope of the claims All changes within the meaning and range of equivalents of the required elements are included in the present invention. Any reference sign in a claim should not be construed as limiting the claim concerned.

此外,应当理解,虽然本说明书按照实施方式加以描述,但并非每个实施方式仅包含一个独立的技术方案,说明书的这种叙述方式仅仅是为清楚起见,本领域技术人员应当将说明书作为一个整体,各实施例中的技术方案也可以经适当组合,形成本领域技术人员可以理解的其他实施方式。In addition, it should be understood that although this specification is described according to implementation modes, not each implementation mode only includes an independent technical solution, and this description in the specification is only for clarity, and those skilled in the art should take the specification as a whole , the technical solutions in the various embodiments can also be properly combined to form other implementations that can be understood by those skilled in the art.

Claims (8)

1. seam prototype template, including prefabricated pier stake (1) and cushion cap (5) are reserved in a kind of assembled cushion cap pier stake, described pre- Pier stake (1) processed is mounted on cushion cap (5), and the cushion cap (5) is the supporting table or Extended chemotherapy of prefabricated pier stake (1);Its feature exists In further including reserved slot (2), concrete perfusion (4), alligator (3) and template, the reserved slot (2) is arranged in cushion cap (5) On, the prefabricated pier stake (1) is connected in reserved slot (2) by concrete perfusion (4) perfusion, and the template includes external mold (7) it is arranged between external mold (7) and internal model (9) with internal model (9), internal model (9) setting in external mold (7) inside, the alligator (3), Interface corrugated surface (6) are imitated at four sides on the outside of the external mold (7), and the interface corrugated surface (6) is that seam pours in assembled architecture The contact surface of Shi Chengtai (5) and prefabricated pier stake (1).
2. seam prototype template is reserved in assembled cushion cap pier stake according to claim 1, which is characterized in that described outer Mould (7) and internal model (9) be it is rectangular, the material of external mold (7) and internal model (9) is steel material.
3. seam prototype template is reserved in assembled cushion cap pier stake according to claim 2, which is characterized in that described outer The outside four sides of mould (7) and the inside of internal model (9) are provided with steel bar (8) on one side, and other three faces in the inside of internal model (9) are light Face, the steel bar (8) are welded on external mold (7) and internal model (9).
4. seam prototype template is reserved in assembled cushion cap pier stake according to claim 3, which is characterized in that described outer The parameter of mould (7) are as follows: side length 2150mm, high 2400mm.
5. seam prototype template is reserved in assembled cushion cap pier stake according to claim 3, which is characterized in that in described The parameter of mould (9) are as follows: side length 2000mm, high 2400mm.
6. seam prototype template is reserved in assembled cushion cap pier stake according to claim 3, which is characterized in that the steel The parameter of item (8) are as follows: wide 50mm, thick 7mm, steel bar (8) center spacing on external mold (7) and internal model (9) is 100m, steel bar (8) On be provided with chamfering.
7. seam prototype template is reserved in assembled cushion cap pier stake according to claim 1, which is characterized in that described outer It is welded on mould (7) and welds steel bar (8) on the four sides and internal model (9) of steel bar (8) and do alligator (3) on one side.
8. a kind of assembled for reserving seam prototype template including assembled cushion cap pier stake as claimed in claim 1 to 7 Reserved seam casting system.
CN201822070226.5U 2018-12-11 2018-12-11 Prefabricated bearing platform pier pile reserved joint full-scale model template and pouring system Active CN209584848U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822070226.5U CN209584848U (en) 2018-12-11 2018-12-11 Prefabricated bearing platform pier pile reserved joint full-scale model template and pouring system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822070226.5U CN209584848U (en) 2018-12-11 2018-12-11 Prefabricated bearing platform pier pile reserved joint full-scale model template and pouring system

Publications (1)

Publication Number Publication Date
CN209584848U true CN209584848U (en) 2019-11-05

Family

ID=68348753

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822070226.5U Active CN209584848U (en) 2018-12-11 2018-12-11 Prefabricated bearing platform pier pile reserved joint full-scale model template and pouring system

Country Status (1)

Country Link
CN (1) CN209584848U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109680706A (en) * 2018-12-11 2019-04-26 中交一公局土木工程建筑研究院有限公司 Assembled bearing platform pier pile full scale model and crack pouring construction process using same
CN112147228A (en) * 2020-09-28 2020-12-29 廊坊市阳光建设工程质量检测有限公司 Method for establishing strength measurement curve for detecting concrete strength by using rebound ultrasonic angle measurement comprehensive method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109680706A (en) * 2018-12-11 2019-04-26 中交一公局土木工程建筑研究院有限公司 Assembled bearing platform pier pile full scale model and crack pouring construction process using same
CN112147228A (en) * 2020-09-28 2020-12-29 廊坊市阳光建设工程质量检测有限公司 Method for establishing strength measurement curve for detecting concrete strength by using rebound ultrasonic angle measurement comprehensive method
CN112147228B (en) * 2020-09-28 2023-03-10 廊坊市阳光建设工程质量检测有限公司 Method for establishing strength measurement curve for detecting concrete strength by using rebound ultrasonic angle measurement comprehensive method

Similar Documents

Publication Publication Date Title
CN105951856B (en) A kind of underwater non-bottom concrete steel reinforced concrete combines suspension box-cofferdam construction method
CN101280547A (en) Corrugated steel web box girder with steel-concrete composite slab lower flange
CN102839601A (en) Consolidated structure of steel piers and caps of portal-type rigid frame overpass and its construction method
CN109457599A (en) Hollow pier and cushion cap splicing construction and construction method
CN205778910U (en) A kind of outer mould trolley of cut-and-cover tunnel lining cutting
CN204919302U (en) Few main girder structure of wave form steel web
CN209584848U (en) Prefabricated bearing platform pier pile reserved joint full-scale model template and pouring system
CN207419229U (en) A kind of Concrete-Filled Square Steel Tube combination pier of double wave folding steel webplate shear wall
CN105002819A (en) Gradient-structure composite bridge pier
CN102535353A (en) Construction method for box beam swinging body striding on expressways and railways in rail transit
CN103243638B (en) Bridge space radioactive concrete-filled steel tube bridge pier and construction method thereof
CN108316164B (en) Structure for reinforcing old assembled hollow slab girder bridge by using new girder and construction method
CN206368306U (en) A kind of dismountable composite structure layer
CN209538012U (en) Assembled bent cap mound stake reservation seam full scale model template and pouring system
CN101906757A (en) Assembly method for replacing plate type rubber support on abutment of highway bridge
CN204139054U (en) Pin-connected panel regeneration concrete filled steel tube Y type bridge pier
CN106480827A (en) A kind of construction technology of segmented casting concrete box beam
CN203393635U (en) Main tower cable-stayed bridge splicing formwork adopting straight-line mode substituting for arc-line mode
CN206521768U (en) A kind of shear connector in the double-deck box hat concrete combined structure of immersed tube tunnel
CN108978432A (en) A medium-span assembled steel hollow sandwich slab bridge and its manufacturing method
CN105239675B (en) A kind of concrete filled steel tube switching node structure and its construction method
CN107059574A (en) A kind of method of concrete structure and its prefabricated assembled cement concrete pavement of leveling
CN209584847U (en) Prefabricated cushion cap pier stud reserved joint straight seam model template and pouring system
CN216766233U (en) Node suitable for regional concrete placement is watered after assembled PEC post
CN113293941A (en) Prefabricated staircase in steel structure building and construction method thereof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant