CN109137963A - Fixing bracket body and its construction method for foundation bolt group positioning - Google Patents

Fixing bracket body and its construction method for foundation bolt group positioning Download PDF

Info

Publication number
CN109137963A
CN109137963A CN201811222984.2A CN201811222984A CN109137963A CN 109137963 A CN109137963 A CN 109137963A CN 201811222984 A CN201811222984 A CN 201811222984A CN 109137963 A CN109137963 A CN 109137963A
Authority
CN
China
Prior art keywords
foundation bolt
fixing bracket
bracket body
annular panel
positioning plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811222984.2A
Other languages
Chinese (zh)
Inventor
邢继斌
张宝燕
肖能文
李晓飞
丁超
姚澄
孙亮
陈和
肖俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Construction Co Ltd of China Construction Third Engineering Division
Original Assignee
First Construction Co Ltd of China Construction Third Engineering Division
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Construction Co Ltd of China Construction Third Engineering Division filed Critical First Construction Co Ltd of China Construction Third Engineering Division
Priority to CN201811222984.2A priority Critical patent/CN109137963A/en
Publication of CN109137963A publication Critical patent/CN109137963A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys

Abstract

The invention discloses the fixing bracket bodies positioned for foundation bolt group, including as made of more root posts and cross bar enclosing, frame up and down, the top of frame is equipped with annular panel, and the middle part interval of frame is installed on the first positioning plate and the second positioning plate with annular panel parallel;It is spaced apart on the annular panel and is equipped with multiple bolt mounting holes, foundation bolt sequentially passes through the bolt positioning hole on the second positioning plate, the first positioning plate, and annular panel, cooperates with nut;The lower end of the column is connected with the embedded part plate in the blinding layer for being embedded in the huge column of steel construction in advance.The invention also discloses a kind of foundation bolt group pre-embedded construction methods.The invention has the benefit that design fixing bracket body, foundation bolt is precisely mounted on fixing bracket body, the two is formed with entirety, Integral correction is carried out eventually by the position of adjustment fixing bracket body and the huge column of steel construction, the positional accuracy of the pre-buried precision of realization foundation bolt, construction is simple and foundation bolt is higher.

Description

Fixing bracket body and its construction method for foundation bolt group positioning
Technical field
The present invention relates to super high-rise building fields, and in particular to it is a kind of for foundation bolt group positioning fixing bracket body and its Construction method.
Background technique
Currently, domestic super high-rise building has entered development peak period, structure type is essentially frame Core Walls Structure, and outline border Column is intended to the concrete filled steel tube using big section form.The huge column foot joint of super high-rise building i.e. big section node shape thus Formula has section big, and the anchor bolt quantity of foundation bolt is more, installation difficulty is big, installation accuracy is low.Therefore, it is necessary to existing skill Art improves.
Summary of the invention
Present invention aims in view of the deficiencies of the prior art, provide a kind of fixed frame for foundation bolt group positioning Body and foundation bolt group's pre-embedded construction method, solve the problems, such as the prior art it is pure installation difficulty is big, installation accuracy is low.
The technical solution adopted by the present invention are as follows: a kind of fixing bracket body for foundation bolt group positioning, mainly includes by more Root post and cross bar enclose made of, frame up and down, the top of frame is equipped with annular panel, the middle part interval peace of frame Equipped with the first positioning plate and the second positioning plate with annular panel parallel;It is spaced apart on the annular panel and is equipped with multiple bolts peace Hole is filled, foundation bolt sequentially passes through the bolt positioning hole on the second positioning plate, the first positioning plate, and annular panel, with nut Cooperation;The lower end of the column is connected with the embedded part plate in the blinding layer for being embedded in the huge column of steel construction in advance.
According to the above scheme, brace is equipped between the column in the frame same side.
According to the above scheme, horizontal and vertical reinforcing rod is had additional on the annular panel.
According to the above scheme, it is spaced apart on the annular panel and emits stomata equipped with multiple.
The present invention also provides a kind of foundation bolt group pre-embedded construction methods, comprising the following steps:
Step 1: being familiar with drawing and design construction standard, and foundation bolt is determined according to the design drawing of the huge column of steel construction Quantity and position;
Step 2: designing and making the fixing bracket body for positioning stone bolt:
Step 3: foundation bolt is installed on fixing bracket body according to design;
Step 4: surveying setting-out: determining the coordinate of foundation bolt and fixing bracket body according to designing institute's blueprint, use level SURVEYING CONTROL NETWORK is established with total station, chooses control point of the midpoint on four sides of fixing bracket body as measurement;
Step 5: integral installation foundation bolt and fixing bracket body, according to unwrapping wire position by 1 lower end of column of fixing bracket body with The concrete foundation of the huge column of steel construction is connected by embedded part plate;
Step 6: the position of measurement correction foundation bolt and fixing bracket body:
Step 7: inspection of quality.
According to the above scheme, in step 2, fixing bracket body model and the system of processing are established using Tekla structure software Make.
According to the above scheme, in step 2, the fixing bracket body mainly includes made of being enclosed as more root posts and cross bar, Frame up and down, the top of frame are equipped with annular panel, and the middle part interval of frame is installed on the with annular panel parallel One positioning plate and the second positioning plate;It is spaced apart on the annular panel and is equipped with multiple bolt mounting holes, foundation bolt sequentially passes through Bolt positioning hole on second positioning plate, the first positioning plate, and annular panel, cooperates with nut;The lower end of the column with The embedded part plate being embedded in the blinding layer of the huge column of steel construction in advance is connected.
According to the above scheme, in step 3, foundation bolt sequentially passes through the second positioning plate, the first positioning plate and annular panel Afterwards, it is tightened with nut cooperation, foundation bolt and fixing bracket body form an overall structure
According to the above scheme, in step 6, to the foundation bolt and fixing bracket body of integral installation, level and whole station are used Instrument etc. measures the coordinate at control point, is accurately corrected;The column lower end of fixing bracket body and embedded part plate are welded after the completion of correction Securely.
The invention has the benefit that
1, present invention design fixing bracket body, foundation bolt are precisely mounted on fixing bracket body, and the two is formed with entirety, most Integral correction is carried out by adjusting the position of fixing bracket body and the huge column of steel construction eventually, realizes the pre-buried precision of foundation bolt, and it is existing There is technology to compare, the present invention utilizes fixing bracket body, and the positional accuracy of construction is simple and foundation bolt is higher;
2, the present invention establishes model using Tekla structure software, designs fixing bracket body, may be implemented in large quantity The integral installation of foot bolt avoids the complicated process that foot bolt in large quantity is installed in situ, easy for construction, the peace of foundation bolt It is high to fill positioning accuracy, construction quality is high;
3, the present invention has rational design, easy for construction, and the construction period is short, saves manpower and material resources, reduces construction cost, mentions High engineering efficiency.
Detailed description of the invention
Fig. 1 is the flow chart of construction method of the present invention.
Fig. 2 is the front sectional view of fixing bracket body of the present invention.
Fig. 3 is the top view of fixing bracket body.
Wherein: 1, column;2, cross bar;3, annular panel;4, the first positioning plate;5, the second positioning plate;6, foundation bolt;7, Blinding layer;8, embedded part plate;9, brace;10, reinforcing rod;11, stomata is emitted.
Specific embodiment
For a better understanding of the present invention, the present invention is further described in the following with reference to the drawings and specific embodiments.
A kind of fixing bracket body for foundation bolt group positioning as depicted in figs. 1 and 2, mainly includes by more root posts 1 Made of being enclosed with cross bar 2, frame up and down, the top of frame is equipped with annular panel 3, and the middle part interval of frame is installed on First positioning plate 4 and second positioning plate 5 parallel with annular panel 3;It is spaced apart on the annular panel 3 and is equipped with multiple bolts peace Hole is filled, foundation bolt 6 sequentially passes through the bolt positioning hole on the second positioning plate 5, the first positioning plate 4, and annular panel 3, with Nut cooperation;The lower end of the column 1 is connected with the embedded part plate 8 being embedded in the blinding layer 7 of the huge column of steel construction in advance.Preferably, Brace 9 is equipped between column 1 in the frame same side;Horizontal and vertical add is had additional on the annular panel 3 Strong bar 10.Preferably, it is spaced apart on the annular panel and emits stomata 11 equipped with multiple;The column 1, cross bar 2,9 and of brace Reinforcing rod 10 is angle steel.
A kind of foundation bolt group integral built-in construction method, specifically includes following steps (as shown in Figure 3):
Step 1: being familiar with drawing and design construction standard, and foundation bolt is determined according to the design drawing of the huge column of steel construction Quantity and position: be familiar with " Code for design of steel structures " (GB50017-2003), " code for acceptance of construction quality of steel structures " (GB50205-2001) to the construction requirement of foundation bolt 6;In the present embodiment, 60 are neededFoundation bolt 6;
Step 2: being designed for the fixing bracket body of positioning stone bolt 6: being established using Tekla structure software solid Determine frame body model and processing and fabricating;In the present embodiment, the specific structure of the fixing bracket body is as described above, its overall dimensions is 4080mm × 5780mm × 6000mm (length × width × height), the bolt mounting holes on its annular panel 3 of fixing bracket body are according to lower margin The quantity of bolt 6 and position are opened up;
Step 3: foundation bolt 6 is installed on fixing bracket body according to design: foundation bolt 6 sequentially passes through the second positioning It after plate 5, the first positioning plate 4 and annular panel 3, is tightened with nut cooperation, foundation bolt 6 and fixing bracket body form an entirety knot Structure;
Step 4: surveying setting-out: determining the coordinate of foundation bolt and fixing bracket body according to designing institute's blueprint, use level SURVEYING CONTROL NETWORK is established with total station etc., chooses the midpoint on four sides in fixing bracket body top surface as the control point measured;
Step 5: integral installation foundation bolt 6 and fixing bracket body: pre-buried when the blinding layer 7 of the huge column of steel construction is constructed 200 × 200 embedded part plate 8 leads to the concrete foundation of 1 lower end of column of fixing bracket body and the huge column of steel construction according to unwrapping wire position The connection of embedded part plate 8 is crossed, integral installation is completed;In this step, 1 lower end of column of retaining clip is temporarily connect with embedded part plate 8;
Step 6: the position of measurement correction foundation bolt 6 and fixing bracket body: foundation bolt 6 and fixation to integral installation Frame body is accurately corrected using the coordinate at the measurement such as level and total station control point;By fixing bracket body after the completion of correction 1 lower end of column and 6 firm welding of embedded part plate;
Step 7: inspection of quality: in the huge column foundation bolt group's inspection of quality of progress steel construction, construction quality needs to meet The relevant regulations of " code for acceptance of construction quality of steel structures " (GB50205-2001).Product acceptance data in the present embodiment is seen below Table 1.
1 inspection of quality situation table of table
Serial number Inspection item Bolt number Acceptance number Qualification rate
1 Axis 480 480 100%
2 Absolute altitude 480 480 100%
3 Verticality 480 480 100%
More than, it is merely preferred embodiments of the present invention, but scope of protection of the present invention is not limited thereto, it is any Those familiar with the art in the technical scope disclosed by the present invention, according to the technique and scheme of the present invention and its invents Design is subject to equivalent substitution or change, should be covered by the protection scope of the present invention.

Claims (9)

1. a kind of fixing bracket body for foundation bolt group positioning, which is characterized in that including being enclosed by more root posts and cross bar At, frame up and down, the top of frame is equipped with annular panel, and the middle part interval of frame is installed on and annular panel parallel The first positioning plate and the second positioning plate;It is spaced apart on the annular panel and is equipped with multiple bolt mounting holes, foundation bolt is successively Bolt positioning hole on the second positioning plate, the first positioning plate, and annular panel, cooperates with nut;Under the column End is connected with the embedded part plate in the blinding layer for being embedded in the huge column of steel construction in advance.
2. the fixing bracket body for foundation bolt group positioning as described in claim 1, which is characterized in that described frame the same side Brace is equipped between column in face.
3. the fixing bracket body for foundation bolt group positioning as described in claim 1, which is characterized in that on the annular panel Have additional horizontal and vertical reinforcing rod.
4. the fixing bracket body for foundation bolt group positioning as described in claim 1, which is characterized in that on the annular panel It is spaced apart and emits stomata equipped with multiple.
5. a kind of foundation bolt group pre-embedded construction method, which comprises the following steps:
Step 1: being familiar with drawing and design construction standard, and the number of foundation bolt is determined according to the design drawing of the huge column of steel construction Amount and position;
Step 2: designing and making the fixing bracket body for positioning stone bolt:
Step 3: foundation bolt is installed on fixing bracket body according to design;
Step 4: surveying setting-out: the coordinate of foundation bolt and fixing bracket body is determined according to designing institute's blueprint, using level and entirely Instrument of standing establishes SURVEYING CONTROL NETWORK, chooses control point of the midpoint on four sides of fixing bracket body as measurement;
Step 5: integral installation foundation bolt and fixing bracket body, according to unwrapping wire position by 1 lower end of column of fixing bracket body and steel knot The concrete foundation of the huge column of structure is connected by embedded part plate;
Step 6: the position of measurement correction foundation bolt and fixing bracket body:
Step 7: inspection of quality.
6. foundation bolt group pre-embedded construction method as claimed in claim 4, which is characterized in that in step 2, utilize Tekla Structure software establishes fixing bracket body model and processing and fabricating.
7. foundation bolt group integral built-in construction method as claimed in claim 4, which is characterized in that described in step 2 Fixing bracket body mainly includes as made of more root posts and cross bar enclosing, frame up and down, and the top of frame is equipped with annular Panel, the middle part interval of frame are installed on the first positioning plate and the second positioning plate with annular panel parallel;The annular panel Upper be spaced apart is equipped with multiple bolt mounting holes, and foundation bolt sequentially passes through the second positioning plate, the first positioning plate, and annular panel On bolt positioning hole, with nut cooperate;The lower end of the column and the embedded part being embedded in the blinding layer of the huge column of steel construction in advance Plate is connected.
8. foundation bolt group integral built-in construction method as claimed in claim 7, which is characterized in that in step 3, lower margin After the second positioning plate of screw bolt passes, the first positioning plate and annular panel, tightened with nut cooperation, foundation bolt and fixed frame Body forms an overall structure.
9. foundation bolt group integral built-in construction method as claimed in claim 7, which is characterized in that in step 6, to whole The foundation bolt and fixing bracket body of body installation are accurately corrected using the coordinate at the measurement such as level and total station control point; By the column lower end of fixing bracket body and embedded part plate firm welding after the completion of correction.
CN201811222984.2A 2018-10-19 2018-10-19 Fixing bracket body and its construction method for foundation bolt group positioning Pending CN109137963A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811222984.2A CN109137963A (en) 2018-10-19 2018-10-19 Fixing bracket body and its construction method for foundation bolt group positioning

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811222984.2A CN109137963A (en) 2018-10-19 2018-10-19 Fixing bracket body and its construction method for foundation bolt group positioning

Publications (1)

Publication Number Publication Date
CN109137963A true CN109137963A (en) 2019-01-04

Family

ID=64809039

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811222984.2A Pending CN109137963A (en) 2018-10-19 2018-10-19 Fixing bracket body and its construction method for foundation bolt group positioning

Country Status (1)

Country Link
CN (1) CN109137963A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109898547A (en) * 2019-03-31 2019-06-18 上海二十冶建设有限公司 The precise positioning method of pre-embedded bolt
CN112901914A (en) * 2021-01-26 2021-06-04 中国化学工程第三建设有限公司 Foundation bolt group positioning and fixing device and method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS59150830A (en) * 1983-02-14 1984-08-29 Nippon Steel Corp Construction of exposed fixing type steel pillar leg
CN101266011A (en) * 2008-04-22 2008-09-17 中冶天工建设有限公司 Mounting device for preburying high precision major diameter anchor bolt and mounting method therefor
CN207063551U (en) * 2017-04-05 2018-03-02 通州建总集团有限公司 A kind of foundation bolt assembles fixing device

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS59150830A (en) * 1983-02-14 1984-08-29 Nippon Steel Corp Construction of exposed fixing type steel pillar leg
CN101266011A (en) * 2008-04-22 2008-09-17 中冶天工建设有限公司 Mounting device for preburying high precision major diameter anchor bolt and mounting method therefor
CN207063551U (en) * 2017-04-05 2018-03-02 通州建总集团有限公司 A kind of foundation bolt assembles fixing device

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
许航等: "巨型地脚螺栓组的安装定位技术", 《钢结构》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109898547A (en) * 2019-03-31 2019-06-18 上海二十冶建设有限公司 The precise positioning method of pre-embedded bolt
CN109898547B (en) * 2019-03-31 2021-01-15 上海二十冶建设有限公司 Accurate positioning method for embedded bolt
CN112901914A (en) * 2021-01-26 2021-06-04 中国化学工程第三建设有限公司 Foundation bolt group positioning and fixing device and method

Similar Documents

Publication Publication Date Title
CN209636847U (en) A kind of adjustable tower crane built-in fitting accurate positioning tool
CN206306252U (en) A kind of prefabricated small box girder reinforcing bar colligation moulding bed
CN105113671A (en) Construction method of large conchoidal hyperbolic curtain wall
CN105951579B (en) A kind of preparation method of preform lid beam steel moulding bed and prefabricated bent cap reinforcement cage
CN106284399B (en) Build the pre-buried locating template of pedestal anchor bolt and construction method
CN203247603U (en) High-position foundation bolt positioning device
CN205688332U (en) A kind of preform lid beam steel moulding bed
CN109137963A (en) Fixing bracket body and its construction method for foundation bolt group positioning
CN209585094U (en) A kind of bracket basis installation of embedded parts auxiliary mould
CN205852606U (en) Three dimensions tubular truss assembly moulding bed
CN108951856A (en) A kind of volume of concrete foundation cushion cap internal frame sky pedestal anchor bolt and its installation and locating method
CN205421321U (en) Precast reinforced concrete base
CN102817482A (en) Steel column correcting device and correcting construction method thereof
CN110241735B (en) Positioning and adjusting device and method for main tower cable guide pipe of cable-stayed bridge
CN105735228B (en) High-lift tooth climbs formula ship lift rack system construction method and installation accuracy control method
CN111549815A (en) Steel structure foundation bolt pre-embedding construction method
CN208472565U (en) It is a kind of for accurately installing the device of Collison fence for bridge built-in fitting
CN113653199B (en) Construction method for embedding stiffening anchor plate foundation bolt
CN211948529U (en) Positioning support of big post rag bolt crowd of multi-chamber
CN109469090A (en) A kind of foundation bolt fixed frame and its construction method of installation in groups
CN212477455U (en) Pre-buried positioner of bridge suspension cable anchor cylinder
CN114737756A (en) Construction method of disc buckle early-dismantling support real-time monitoring system
CN106930406A (en) A kind of preparation method of Anchor Bolts in Steel Column Bases positioning structure
CN210713801U (en) Pre-buried device of climbing awl embedding piece in special-shaped climbing frame system
CN203174618U (en) Steel support for reverse construction of firstly erecting steel column and secondly pouring concrete foundation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190104