CN106930406A CN201710168234.0A CN201710168234A CN106930406A CN 106930406 A CN106930406 A CN 106930406A CN 201710168234 A CN201710168234 A CN 201710168234A CN 106930406 A CN106930406 A CN 106930406A
Authority
CN
China
Prior art keywords
crab
locating
bolt
pieces
locating template
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710168234.0A
Other languages
Chinese (zh)
Other versions
CN106930406B (en
Inventor
杨士长
黄闯
袁代鹏
余勇江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC5 Group Corp Ltd
Original Assignee
China MCC5 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC5 Group Corp Ltd filed Critical China MCC5 Group Corp Ltd
Priority to CN201710168234.0A priority Critical patent/CN106930406B/en
Publication of CN106930406A publication Critical patent/CN106930406A/en
Application granted granted Critical
Publication of CN106930406B publication Critical patent/CN106930406B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/41Connecting devices specially adapted for embedding in concrete or masonry
    • E04B1/4157Longitudinally-externally threaded elements extending from the concrete or masonry, e.g. anchoring bolt with embedded head
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • E04B1/2403Connection details of the elongated load-supporting parts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/18Adjusting tools; Templates
    • E04G21/1841Means for positioning building parts or elements
    • E04G21/185Means for positioning building parts or elements for anchoring elements or elements to be incorporated in the structure

Abstract

The invention discloses a kind of preparation method of Anchor Bolts in Steel Column Bases positioning structure:A () opens up identical anchor hole on two pieces of locating templates, two pieces of locating templates are distributed and just right up and down, each self-retaining;B () penetrates crab-bolt in two pieces of anchor holes of locating template one by one, and by the bottom surface pad level of all crab-bolts;C () adjusts two pieces of locating templates to level respectively;Each crab-bolt is adjusted again, each crab-bolt is each perpendicular to locating template;D () connects support steel bar between adjacent two crab-bolts;E () is installing leveling nut from two pieces of locating templates of crab-bolt top dismounting, reinstall one piece of locating template;F () adjusts the locating template reinstalled to level by leveling nut, fixing nut is installed again in the top of the locating template.Speed is slow, efficiency is low when the present invention is used to solve the problems, such as steel kind design positioning construction in the prior art, realizes simplifying on-site construction processes when steel kind design is positioned, and improves the purpose of efficiency of construction.

Description

A kind of preparation method of Anchor Bolts in Steel Column Bases positioning structure
Technical field
The present invention relates to steel building construction field, and in particular to a kind of preparation side of Anchor Bolts in Steel Column Bases positioning structure Method.
Background technology
With the continuous popularization of steel building, all kinds of structural steelwork construction project scales expand day by day, steel construction work The projects such as industry factory building, steel house, high-rise steel structure, steel construction venue are increasing.In steel building, steel kind design one As using anchor bolts flat board suspension column.Crab-bolt is the key position on connection basis and superstructure, for ensureing that steel column is accurate Positioning, therefore the quality of pedestal anchor bolt construction quality directly affects total quality and the safe handling of building structure.Conventional , it is necessary to set the external control stake point of each axis in basal perimeter in work progress, set up during so as to pre-buried pedestal anchor bolt theodolite from Both direction is thrown and is surveyed in length and breadth, then positions relative distance per post sill anchor with steel tape and to each group between pin crab-bolt Location dimension.The method has the following disadvantages:Positioning survey station is more, and measuring process is cumbersome, and the error that artificial operation is produced is big, fixed Bit manipulation difficulty is higher, and accuracy is difficult to control.Regarding to the issue above, some Anchor Bolts in Steel Column Bases positioning is proposed in the prior art Device, can to a certain extent improve precision during installation.But existing positioner is to use two-layer location structure, i.e., The combining structure of two-layer locating template, is fixed between two-layer locating template by support member.Use at the scene after crab-bolt is positioned, Need to dismantle two-layer locating template and support member therebetween one by one, speed relatively slow, inefficiency.
The content of the invention
It is an object of the invention to provide a kind of preparation method of Anchor Bolts in Steel Column Bases positioning structure, to solve in the prior art The problem that speed is slow, efficiency is low during steel kind design positioning construction, is realized simplifying on-site construction processes when steel kind design is positioned, and raising is applied The purpose of work efficiency rate.
The present invention is achieved through the following technical solutions:
A kind of preparation method of Anchor Bolts in Steel Column Bases positioning structure, comprises the following steps:
A () opens up arrangement and the identical anchor hole of size on two pieces of locating templates, two pieces of locating templates are adjusted It is whole to be distributed up and down and just right, then each self-retaining;
B () penetrates crab-bolt in two pieces of anchor holes of locating template one by one, and by the bottom surface pad level of all crab-bolts;
C () adjusts two pieces of locating templates to level respectively;Each crab-bolt is adjusted again, each crab-bolt is each perpendicular to locating template;
D () connects support steel bar between adjacent two crab-bolts, support steel bar is connected with crab-bolt spot welding;All support steel bars It is respectively positioned under locating template;
E () installs leveling nut from two pieces of locating templates of crab-bolt top dismounting on each bolt, reinstall one again afterwards Block locating template is on each leveling nut;
F () adjusts the locating template reinstalled to level by leveling nut, installed again in the top of the locating template Fixing nut.
The problem that speed is slow, efficiency is low when constructing is positioned for steel kind design in the prior art, the present invention proposes a kind of steel column The preparation method of pin crab-bolt positioning structure, this method is used to prepare a kind of Anchor Bolts in Steel Column Bases positioning apparatus, made by this method The device created, simple structure, easy to use, speed is fast during steel kind design positioning construction, efficiency high, while precision is also very high. This method uses two pieces of complete corresponding locating templates first, will treat in crab-bolt two anchor holes of insertion in place, and two pieces position Template is parallel and just right up and down, therefore crab-bolt can run through bilevel anchor hole.Using 2 principles of boning out, it is ensured that Crab-bolt axis is in stabilization.Two pieces of location-plates are each fixed, and prevent it from rocking and are subjected to displacement.By all crab-bolt bottom surface pad water It is flat so that all crab-bolt bottoms are respectively positioned in same horizontal plane, so that structure when simulating actual in place in plane foundation ditch. Afterwards, two pieces of locating templates to level are adjusted respectively;Each crab-bolt is adjusted again, each crab-bolt is each perpendicular to locating template, that is, cause Each crab-bolt is in vertical state, is now supported the welding of steel bar.All support steel bars are respectively positioned under locating template, are branch Support steel bar is located at the lower section of the locating template of downside, it is to avoid support steel bar stops the dismounting of locating template.Support steel bar is connected to Between adjacent two crab-bolts, relative position is maintained static between ensuring crab-bolt by supporting steel bar, and each anchor bolts turn into one Overall structure.Afterwards from two pieces of locating templates of crab-bolt top dismounting, leveling nut is installed on each bolt, in each crab-bolt again One piece of locating template is installed to be allowed to be placed on each leveling nut, the residing height of each leveling nut is adjusted, so as to reinstall Locating template to level, fixing nut is finally installed again in the top of the locating template, by leveling nut and fixing nut The fastening of upper and lower both sides is realized, one piece of fixation of locating template to reinstalling is realized.By manufactured by this method out Anchor Bolts in Steel Column Bases positioning structure, can be prefabricated outside the venue according to construction drawing, only needs at the scene to prefabricated sill anchor, whole Body copies survey to axis and absolute altitude, then be able to ensure that crab-bolt is in vertical state.Support steel bar is stayed in crab-bolt together to be carried out Pour, single crab-bolt in casting process in the prior art can not only be avoided to be independently arranged easily causes displacement by cement mortar agitation Situation, additionally it is possible to by supporting steel bar to replace part basis reinforcing bar, reducing the colligation consumption of follow-up reinforcement foundation.Compared to biography If the positioning that cannot be stablized to crab-bolt using only one piece of locating template in system technology, while needing in the prior art at the scene Crab-bolt is installed one by one, and perpendicularity correction is carried out to each crab-bolt, afterwards dismounting two-layer locating template and therebetween one by one again Support member, even needs to carry out cutting operation during dismounting, while also needing to set total powerstation etc. in addition when correction is spent vertically The complicated procedures of forming that row judges, the structure prepared by this method can in advance carry out prefabricated outside the venue, only need at the scene to prefabricated Sill anchor, it is overall that survey is copied to axis and absolute altitude, also only need to dismantle one piece of locating template when dismantling afterwards, and without one by one Dismounting two-layer locating template and support member therebetween, less with cutting action is carried out, largely simplify steel kind design just On-site construction processes, raising efficiency of construction during position, reduction engineering cost, therefore the present invention has protrusion compared to prior art Substantive distinguishing features and marked improvement.
Preferably, the support steel bar quantity for being connected between adjacent two crab-bolts in step (d) is N roots, N roots support steel bar It is distributed up and down, while welding longitudinal rib between two neighbouring support steel bars.By many support steel bars, crab-bolt is improved Between connective stability, it is ensured that crab-bolt constitute overall structure, will not be damaged by external force easily.It is fixed on by longitudinal rib Between two support steel bars of lower distribution so that support steel bar collectively forms frame structure with longitudinal rib, can not only be more true The Stability Analysis of Structures reliability protected between crab-bolt, additionally it is possible to after joints cement, reinforcing bar is collectively formed by supporting steel bar and longitudinal rib Concrete structure so that more stronger than the mode more firm, structure that traditional binding reinforcement foundation is poured after the completion of pouring, So as to significantly improve construction quality when Anchor Bolts in Steel Column Bases is constructed.
Preferably, when welding longitudinal rib, longitudinal rib is made perpendicular to support steel bar, and using full weld welding.Longitudinal rib and branch Support steel bar is intersected vertically, and same effect is realized with minimum longitudinal rib consumption, realizes the effect of optimization cost.In traditional approach Support member and crab-bolt between connected using spot welding, but because support steel bar, longitudinal rib are as fastener in this method Together poured with crab-bolt, therefore welded from full weld mode, it is to avoid traditional spot welding there may be Joint Strength it is weak, The problem of easy fracture, more ensures the resistance to overturning of structure.
Preferably, two pieces of locating templates in step (a) are respectively adopted fixture and fix.Two pieces of uses of locating template independence Fixture is fixed, and is easy to two pieces of adjustment own level degree of locating template independence, it is to avoid cannot individually be adjusted after being linked to be entirety Levelness.
Preferably, the locating template surface reinstalled in step (e), marks the cross searching point of the locating template. It is easy to during follow-up use, is fast and accurately positioned by finding the position of cross searching point accurately, in preparation process In use just to the later stage work ready in place so that efficiency when improving site operation.
Preferably, the locating template surface middle part reinstalled in step (e) opens up through hole, fixed laser hair in through hole Injection device, beam direction that laser beam emitting device is launched downwards and with crab-bolt diameter parallel.Using laser direction is good, brightness High the characteristics of, it is ensured that can have notable visible hot spot during centering, prepared by the efficiency during raising later stage use during centering During use just to the later stage work ready in place so that efficiency when improving site operation.
Preferably, the extended line of the laser beam that laser beam emitting device sent is made to cross the center of the locating template reinstalled Point.Because center position is difficult to find, it is easy to be marked on ground to be onstructed at the scene, therefore be also advantageous for by laser The centering that emitter carries out locating template is in place.
Preferably, in two pieces of locating templates in step (a) the upper fixed level meter of any one piece, to secure level meter That block locating template as the locating module reinstalled in step (e).So as to whole preparation process only needs two pieces of positioning Template can be completed, and reduce material and cost.Simultaneously by level meter can quickly judge the block locating template whether water It is flat, the service efficiency of this structure is further improved with this.
The present invention compared with prior art, has the following advantages and advantages:
1st, the preparation method of a kind of Anchor Bolts in Steel Column Bases positioning structure of the invention, by the steel kind design manufactured by this method out Crab-bolt positioning structure, can be prefabricated outside the venue according to construction drawing, only needs at the scene to prefabricated sill anchor, overall to axle Line and absolute altitude copy survey, then be able to ensure that crab-bolt is in vertical state.Support steel bar is stayed in crab-bolt and is together poured, no Can only avoid single crab-bolt in casting process in the prior art from being independently arranged easily causes the situation of displacement by cement mortar agitation, Can also be by supporting steel bar to replace part basis reinforcing bar, reducing the colligation consumption of follow-up reinforcement foundation.Compared to conventional art If in the positioning that crab-bolt cannot be stablized using only one piece of locating template, while needing to pacify one by one at the scene in the prior art Dress crab-bolt, and perpendicularity correction is carried out to each crab-bolt, dismantle two-layer locating template and support therebetween one by one again afterwards Part, even needs to carry out cutting operation during dismounting, while also need to set total powerstation etc. in addition when correction is spent vertically being sentenced Disconnected complicated procedures of forming, the structure prepared by this method can in advance carry out prefabricated outside the venue, only need to carry out looking for a centering at the scene , also only need to dismantle one piece of locating template without again one by one carrying out crab-bolt degree correction vertically, when dismantling afterwards, and without Two-layer locating template and support member therebetween are dismantled one by one, less with cutting action is carried out, largely simplify steel column On-site construction processes, raising efficiency of construction when pin is in place, reduction engineering cost.
2nd, the preparation method of a kind of Anchor Bolts in Steel Column Bases positioning structure of the invention, by setting many support steel bars, improves anchor Connective stability between bolt, it is ensured that crab-bolt constitutes overall structure, will not be damaged by external force easily.It is fixed on by longitudinal rib Between two support steel bars being distributed up and down so that support steel bar collectively forms frame structure with longitudinal rib, can not only be more Ensure the Stability Analysis of Structures reliability between crab-bolt, additionally it is possible to after joints cement, steel is collectively formed by supporting steel bar and longitudinal rib Tendon concrete structure so that the mode poured than traditional binding reinforcement foundation after the completion of pouring more firmly, structure more By force, so as to significantly improve construction quality when Anchor Bolts in Steel Column Bases is constructed.
Brief description of the drawings
Accompanying drawing described herein is used for providing further understanding the embodiment of the present invention, constitutes of the application Point, do not constitute the restriction to the embodiment of the present invention.In the accompanying drawings:
Fig. 1 is the schematic flow sheet of the specific embodiment of the invention 1;
Fig. 2 is the schematic diagram of the prepared positioning structure out of the specific embodiment of the invention 1.
Mark and corresponding parts title in accompanying drawing:
The locating template that 1- is reinstalled, 2- crab-bolts, 3- leveling nuts, 4- support steel bars, 5- level meters, 6- longitudinal ribs, 7- fixing nuts, 8- through holes, 9- laser beam emitting devices.
Specific embodiment
To make the object, technical solutions and advantages of the present invention become more apparent, with reference to embodiment and accompanying drawing, to this Invention is described in further detail, and exemplary embodiment of the invention and its explanation are only used for explaining the present invention, do not make It is limitation of the invention.
Embodiment 1:
A kind of preparation method of Anchor Bolts in Steel Column Bases positioning structure as shown in Figures 1 and 2, comprises the following steps:A () is two Arrangement and the identical anchor hole of size are opened up on block locating template, two pieces of locating templates are adjusted to be distributed up and down and just It is right, then each self-retaining;B () penetrates crab-bolt in two pieces of anchor holes of locating template one by one, and by the bottom surface pad water of all crab-bolts It is flat;C () adjusts two pieces of locating templates to level respectively;Each crab-bolt is adjusted again, each crab-bolt is each perpendicular to locating template;D () exists Support steel bar is connected between adjacent two crab-bolts, support steel bar is connected with crab-bolt spot welding;All support steel bars are respectively positioned on positioning mould Under plate;E () installs leveling nut from two pieces of locating templates of crab-bolt top dismounting on each bolt, reinstall one again afterwards Block locating template is on each leveling nut;Fixing nut is installed again in the top of the locating template.Adjacent two in step (d) The support steel bar quantity connected between root crab-bolt is two, and two support steel bars are distributed up and down, while at neighbouring two Longitudinal rib is welded between support steel bar.During welding longitudinal rib, make longitudinal rib perpendicular to support steel bar, and using full weld welding.Step Suddenly two pieces of locating templates in (a) are respectively adopted fixture and fix.The locating template surface middle part reinstalled in step (e) is opened If through hole, fixed laser emitter in through hole, the beam direction that laser beam emitting device is launched is downwards and flat with crab-bolt axis OK.The extended line of the laser beam that laser beam emitting device sent is set to cross the central point of the locating template reinstalled.In step (a) In any one piece of upper fixed level meter in two pieces of locating templates, to secure that block locating template of level meter as step The locating module reinstalled in (e).Fig. 2 is shown using the prepared positioning structure schematic diagram out of this method.By this The manufactured Anchor Bolts in Steel Column Bases positioning structure out of method, can be prefabricated outside the venue according to construction drawing, and it is right to only need at the scene Prefabricated sill anchor, it is overall that survey is copied to axis and absolute altitude, then it is able to ensure that crab-bolt is in vertical state.Support steel bar is stayed Together poured in crab-bolt, single crab-bolt is independently arranged easily by water in can not only avoiding casting process in the prior art Mud agitation causes the situation of displacement, additionally it is possible to by supporting steel bar to replace part basis reinforcing bar, reducing follow-up reinforcement foundation Colligation consumption.If compared to the positioning that cannot be stablized to crab-bolt using only one piece of locating template in conventional art, while existing Having in technology needs to install crab-bolt one by one at the scene, and carries out perpendicularity correction to each crab-bolt, dismantles two-layer one by one again afterwards Locating template and support member therebetween, even need to carry out cutting operation during dismounting, while being also needed to when correction is spent vertically The complicated procedures of forming that total powerstation etc. is judged is set in addition, the structure prepared by this method can in advance be carried out outside the venue it is prefabricated, Scene only needs to carry out looking for a centering, without carrying out degree correction vertically to crab-bolt one by one again, is also only needed when dismantling afterwards One piece of locating template of dismounting, and without dismantling two-layer locating template and support member therebetween one by one, less with carrying out cutting work Sequence, largely simplify steel kind design it is in place when on-site construction processes, improve efficiency of construction, reduce engineering cost, therefore The present invention has prominent substantive distinguishing features and marked improvement compared to prior art.
Above-described specific embodiment, has been carried out further to the purpose of the present invention, technical scheme and beneficial effect Describe in detail, should be understood that and the foregoing is only specific embodiment of the invention, be not intended to limit the present invention Protection domain, all any modification, equivalent substitution and improvements within the spirit and principles in the present invention, done etc. all should include Within protection scope of the present invention.

Claims (8)

1. a kind of preparation method of Anchor Bolts in Steel Column Bases positioning structure, it is characterised in that comprise the following steps:
A () opens up arrangement and the identical anchor hole of size on two pieces of locating templates, two pieces of locating templates are adjusted to It is distributed up and down and just right, then each self-retaining;
B () penetrates crab-bolt in two pieces of anchor holes of locating template one by one, and by the bottom surface pad level of all crab-bolts;
C () adjusts two pieces of locating templates to level respectively;Each crab-bolt is adjusted again, each crab-bolt is each perpendicular to locating template;
D () connects support steel bar between adjacent two crab-bolts, support steel bar is connected with crab-bolt spot welding;The equal position of all support steel bars Under locating template;
E () installs leveling nut from two pieces of locating templates of crab-bolt top dismounting on each bolt, reinstall one piece again afterwards and determine Position template is on each leveling nut;
F () adjusts the locating template reinstalled to level by leveling nut, fixation is installed again in the top of the locating template Nut.
2. a kind of preparation method of Anchor Bolts in Steel Column Bases positioning structure according to claim 1, it is characterised in that step (d) In between adjacent two crab-bolts connect support steel bar quantity be N roots, N roots support steel bar be distributed up and down, while in phase up and down Longitudinal rib is welded between two adjacent support steel bars.
3. a kind of preparation method of Anchor Bolts in Steel Column Bases positioning structure according to claim 2, it is characterised in that welding longitudinal direction During muscle, make longitudinal rib perpendicular to support steel bar, and using full weld welding.
4. a kind of preparation method of Anchor Bolts in Steel Column Bases positioning structure according to claim 1, it is characterised in that step (a) In two pieces of locating templates fixture be respectively adopted fix.
5. the preparation method of a kind of Anchor Bolts in Steel Column Bases positioning structure according to claim 1, it is characterised in that in step E the locating template surface reinstalled in (), marks the cross searching point of the locating template.
6. the preparation method of a kind of Anchor Bolts in Steel Column Bases positioning structure according to claim 1, it is characterised in that in step E the locating template surface middle part reinstalled in () opens up through hole, fixed laser emitter in through hole, laser beam emitting device institute The beam direction of transmitting downwards and with crab-bolt diameter parallel.
7. the preparation method of a kind of Anchor Bolts in Steel Column Bases positioning structure according to claim 6, it is characterised in that send out laser The extended line of the laser beam that injection device is sent crosses the central point of the locating template reinstalled.
8. the preparation method of a kind of Anchor Bolts in Steel Column Bases positioning structure according to claim 1, it is characterised in that in step Any one piece in (a) in two pieces of locating templates upper fixed level meter, to secure that block locating template of level meter as step Suddenly the locating module reinstalled in (e).
CN201710168234.0A 2017-03-21 2017-03-21 A kind of preparation method of Anchor Bolts in Steel Column Bases positioning structure Active CN106930406B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710168234.0A CN106930406B (en) 2017-03-21 2017-03-21 A kind of preparation method of Anchor Bolts in Steel Column Bases positioning structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710168234.0A CN106930406B (en) 2017-03-21 2017-03-21 A kind of preparation method of Anchor Bolts in Steel Column Bases positioning structure

Publications (2)

Publication Number Publication Date
CN106930406A true CN106930406A (en) 2017-07-07
CN106930406B CN106930406B (en) 2019-03-01

Family

ID=59433427

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710168234.0A Active CN106930406B (en) 2017-03-21 2017-03-21 A kind of preparation method of Anchor Bolts in Steel Column Bases positioning structure

Country Status (1)

Country Link
CN (1) CN106930406B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109252674A (en) * 2018-10-17 2019-01-22 北京市机械施工有限公司 Huge column anchor bolt construction method
CN111395783A (en) * 2020-04-25 2020-07-10 五冶集团上海有限公司 Construction method for carrying out in-place fine correction and adjustment on bolt

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201433400Y (en) * 2009-06-26 2010-03-31 北京国电华北电力工程有限公司 Anchor rod foundation
CN204080852U (en) * 2014-07-19 2015-01-07 山西建筑工程(集团)总公司 A kind of stone bolt jig
CN104314101A (en) * 2014-09-15 2015-01-28 中国十七冶集团有限公司 Mounting method for foundation anchor bolt assembly of wind-driven generator
CN204435409U (en) * 2015-01-31 2015-07-01 陕西建工安装集团有限公司 A kind of embedding anchor bolts construction jig

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201433400Y (en) * 2009-06-26 2010-03-31 北京国电华北电力工程有限公司 Anchor rod foundation
CN204080852U (en) * 2014-07-19 2015-01-07 山西建筑工程(集团)总公司 A kind of stone bolt jig
CN104314101A (en) * 2014-09-15 2015-01-28 中国十七冶集团有限公司 Mounting method for foundation anchor bolt assembly of wind-driven generator
CN204435409U (en) * 2015-01-31 2015-07-01 陕西建工安装集团有限公司 A kind of embedding anchor bolts construction jig

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109252674A (en) * 2018-10-17 2019-01-22 北京市机械施工有限公司 Huge column anchor bolt construction method
CN111395783A (en) * 2020-04-25 2020-07-10 五冶集团上海有限公司 Construction method for carrying out in-place fine correction and adjustment on bolt
CN111395783B (en) * 2020-04-25 2024-01-30 五冶集团上海有限公司 Construction method for carrying out positioning fine adjustment on bolts

Also Published As

Publication number Publication date
CN106930406B (en) 2019-03-01

Similar Documents

Publication Publication Date Title
CN104695557B (en) Steel structure building construction method for one-step pre-burying of foundation bolts
CN103590510B (en) The fixed connection method of embedded bar in fabricated construction and cast-in-place structural
CN204703182U (en) Crab-bolt stock
CN107268424A (en) Can fast leveling precast assembly bridge pier structure and its construction method
CN103526954B (en) Support for overweight precision embedded part and construction method thereof
CN105887811A (en) Ultra-deep soft soil pile integral construction method based on high-precision information monitoring
CN106759943A (en) A kind of pre-assembled Anchor Bolts in Steel Column Bases structure
CN106930406A (en) A kind of preparation method of Anchor Bolts in Steel Column Bases positioning structure
CN105804110A (en) Construction method of foundation bolts of railway contact net and mounting bracket
CN103174155B (en) Reverse construction method of erecting steel column and pouring concrete foundation in sequential mode
CN203383332U (en) Adjustable positioning structure with two positioning plates for embedded bolts
CN107587770A (en) Disjunctor storehouse synchronization slding form operation method
CN110424455A (en) The underground confined space is without fertile slot structure side wall big steel form plate system and construction method
KR101621944B1 (en) setting device based towers enclosing
JPH09291545A (en) Joining method of column and pile
JP2006322154A (en) Foundation construction method of building
CN206554273U (en) A kind of pre-assembled Anchor Bolts in Steel Column Bases structure
CN108661301A (en) Derrick stand modularization assembling platform and application method
CN106320186B (en) A kind of skewback embedded anchor bar positioning system and construction method
CN107059913A (en) A kind of reactor built-in fitting supporting construction and method for embedding
CN203174618U (en) Steel support for reverse construction of firstly erecting steel column and secondly pouring concrete foundation
CN208618771U (en) A kind of derrick stand modularization assembling platform
CN210529741U (en) Independent foundation embedded bolt mounting structure
CN110080271B (en) Construction method for embedded quality control of foundation bolt embedded part
JP2630623B2 (en) Anchor bolt installation method and anchor bolt support device used for it

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant