CN109469090A - A kind of foundation bolt fixed frame and its construction method of installation in groups - Google Patents

A kind of foundation bolt fixed frame and its construction method of installation in groups Download PDF

Info

Publication number
CN109469090A
CN109469090A CN201811602579.3A CN201811602579A CN109469090A CN 109469090 A CN109469090 A CN 109469090A CN 201811602579 A CN201811602579 A CN 201811602579A CN 109469090 A CN109469090 A CN 109469090A
Authority
CN
China
Prior art keywords
bolt
fixed frame
foundation bolt
groups
foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811602579.3A
Other languages
Chinese (zh)
Inventor
刘俊杰
胡艳
郑黄
田茂斌
宋恒宾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shougang Shuicheng Iron And Steel (group) Saide Construction Co Ltd
Original Assignee
Shougang Shuicheng Iron And Steel (group) Saide Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shougang Shuicheng Iron And Steel (group) Saide Construction Co Ltd filed Critical Shougang Shuicheng Iron And Steel (group) Saide Construction Co Ltd
Priority to CN201811602579.3A priority Critical patent/CN109469090A/en
Publication of CN109469090A publication Critical patent/CN109469090A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys

Abstract

The present invention provides a kind of foundation bolt fixed frame and its construction methods of installation in groups, belong to construction engineering technical field, fixed frame includes bearing support and several bolt fixed frames for being arranged on the bearing support to foundation bolt of the invention in groups, the bearing support includes two door shape frames being oppositely arranged, each door shape frame includes two columns (1) and the crossbeam (2) being connected between two columns (1), the crossbeam (2) of the bolt fixed frame and two door shape frames is connected and fixed, and foundation bolt (3) are provided on the bolt fixed frame;The construction method of installation speed of application of foundation bolt of the invention fixed rack structure advantages of simple in groups, foundation bolt of the invention fixed frame in groups is fast, and can ensure the installation quality of foundation bolt.

Description

A kind of foundation bolt fixed frame and its construction method of installation in groups
Technical field
The present invention relates to construction engineering technical field, in particular to a kind of foundation bolt fixed frame and its peace in groups Fill construction method.
Background technique
With the high speed development of modern industry workshop building, plant area requirement is increasing, and facade requires to get over Come higher, therefore, Steel Structural Design is widely used in large area plants construction field, so that diameter is big and more lower margin spiral shells The application of bolt is also more and more, and traditional pre-embedded anchoring bolts construction technology has been unable to meet that diameter is big and more foundation bolts at present Pinpoint requirement.
Summary of the invention
The present invention provides a kind of foundation bolt fixed frame and its construction methods of installation in groups, it is intended to improve existingly The problem of mounting process is complicated in foot bolt installation process and position inaccurate, using foundation bolt of the invention fixed frame in groups And its construction method of installation, foundation bolt accurate positioning, construction technology is simple, speed of application is fast, and the installation matter of foundation bolt Amount is protected.
The present invention is implemented as follows:
Foundation bolt of the invention fixed frame in groups, including bearing support and several bolts being arranged on the bearing support Fixed frame, the bearing support include two door shape frames being oppositely arranged, and each door shape frame includes two columns and is connected to The crossbeam of crossbeam between two columns, the bolt fixed frame and two door shape frames is connected and fixed, on the bolt fixed frame It is provided with foundation bolt.
Further, in preferred embodiments of the present invention, the bolt fixed frame includes two bolts being parallel to each other Two bolts of fixed frame and the first securing plate being connected between two bolt fixed frames, the bolt fixed frame are fixed Supporting plate is provided between frame, the foundation bolt is arranged on the supporting plate.
Further, also arranged in a crossed manner on the bolt fixed frame to have brace in preferred embodiments of the present invention.
Further, in preferred embodiments of the present invention, second is additionally provided between two columns of the door shape frame Securing plate.
Further, in preferred embodiments of the present invention, the bottom of each column is additionally provided with base plate.
Further, in preferred embodiments of the present invention, first securing plate, the second securing plate and base plate are Structural member made of cold-rolled steel sheet.
The present invention also provides the construction methods of installation of above-mentioned foundation bolt fixed frame in groups, the specific steps are as follows:
Step S1: requiring according to construction drawing, datum mark and carries out line setting on bed course, Bottom Board Steel to be tied up After muscle, column is installed and is fixed temporarily, the lower end of column is welded and fixed with baseplate reinforcing bar after correction;
Step S2: the absolute altitude for determining crossbeam is measured on column, crossbeam is welded and fixed by absolute altitude and column, then by spiral shell Bolt fixed frame is mounted on crossbeam, fixes bolt fixed frame with beam welding after adjustment correction;
Step S3: with theodolite and steel ruler on the upside of supporting plate supporting plate center, and with punching pin punctum;
Step S4: the center degree deviation a at the top of preliminary corrections foundation bolt, then preliminary corrections foundation bolt are vertical B is spent, then welds drawknot item in the bottom of foundation bolt, drawknot item is connect with bolt fixed frame for consolidating foundation bolt;
Step S5: the absolute altitude and verticality of correction foundation bolt are checked by hanging wire and the pendant that goes offline again, corrects foundation bolt Verticality should be carried out in horizontal orthogonal both direction;
Step S6: according to the datum mark measured, control central line and horizontal line is pulled out with steel wire, measures control centre The distance of line and foundation bolt central point determines the absolute altitude of foundation bolt with horizontal line, carries out check adjustment by level meter;
Step S7: when the error at center, verticality and absolute altitude at the top of foundation bolt is controlled in allowed limits, First securing plate is welded between two bolt fixed frames of bolt bolt fixed frame and is consolidated;
Step S8: after correction confirmation size is errorless on inspection, top nut is covered on foundation bolt, then on bolt fixed frame The brace intersected is welded, foundation bolt and brace are welded and fixed;
Step S9: after all foundation bolts are fixed, then primary inspection comprehensively is carried out, checks after-pouring coagulation Soil;
Step S10: i.e. available gas cutting cuts off exposed foundation bolt in groups when concreting reaches 50% design strength Fixed frame avoids beaing damage bolt screw thread when cutting off, the concrete residue on foundation bolt is removed after gas cutting, is derusted, surface Butter is smeared, outsourcing plastic cloth is protected.
Further, in preferred embodiments of the present invention, the bolt fixed frame of the bolt fixed frame is welded using angle steel It connects to be formed.
Further, in preferred embodiments of the present invention, the bolt fixed frame of the bolt fixed frame uses channel-section steel Welding is formed
Further, in preferred embodiments of the present invention, the steel wire in the step 6 is No. 24 steel wires.
Further, in preferred embodiments of the present invention, a≤3mm described in the step S4, the b be 1/100~ 1/50。
The beneficial effects of the present invention are: fixed frame is barricaded as two using column and crossbeam and is oppositely arranged foundation bolt in groups Door shape frame, setting bolt fixed frame includes that two bolts are solid for fixing foundation bolt, bolt fixed frame between two door shape frames Determining frame makes foundation bolt not only stable connection, also facilitates adjusting position and verticality, makes the foundation bolt precise positioning of installation;
The construction method of installation of foundation bolt of the invention fixed frame in groups positions the position that measuring point finds column accurately on bed course Simultaneously preburied column is set, then measures crossbeam absolute altitude on column, is welded and fixed crossbeam and column to form basic framework, then by spiral shell Bolt fixed frame is fixed with beam welding, and two bolt fixed frames form a bolt fixed frame, is calibrated the position of foundation bolt, is hung down Straight degree and absolute altitude ensure pouring when the position of foundation bolt is accurate by further reinforcing foundation bolt by brace again Foundation bolt will not shift during building concrete, and speed of application is fast and foundation bolt accurate positioning.
Detailed description of the invention
It, below will be to use required in embodiment in order to illustrate more clearly of the technical solution of embodiment of the present invention Attached drawing be briefly described, it should be understood that the following drawings illustrates only certain embodiments of the present invention, therefore is not to be seen as It is the restriction to range, it for those of ordinary skill in the art, without creative efforts, can be with root Other relevant attached drawings are obtained according to these attached drawings.
Fig. 1 is the main view of the foundation bolt fixed frame in groups of the embodiment of the present invention 1;
Fig. 2 is the top view of the foundation bolt fixed frame in groups of the embodiment of the present invention 1;
In figure:
1- column;2- crossbeam;3- foundation bolt;4- bolt fixed frame;The first securing plate of 5-;6- supporting plate;7- brace;8- Second securing plate;9- base plate.
Specific embodiment
To keep the purposes, technical schemes and advantages of embodiment of the present invention clearer, implement below in conjunction with the present invention The technical solution in embodiment of the present invention is clearly and completely described in attached drawing in mode, it is clear that described reality The mode of applying is some embodiments of the invention, rather than whole embodiments.Based on the embodiment in the present invention, ability Domain those of ordinary skill every other embodiment obtained without making creative work, belongs to the present invention The range of protection.Therefore, the detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit below and is wanted The scope of the present invention of protection is sought, but is merely representative of selected embodiment of the invention.Based on the embodiment in the present invention, Every other embodiment obtained by those of ordinary skill in the art without making creative efforts belongs to this Invent the range of protection.
In the description of the present invention, it is to be understood that, term " center ", " longitudinal direction ", " transverse direction ", " length ", " width ", " thickness ", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outside", " up time The orientation or positional relationship of the instructions such as needle ", " counterclockwise " is to be based on the orientation or positional relationship shown in the drawings, and is merely for convenience of The description present invention and simplified description, rather than the equipment of indication or suggestion meaning or element must have a particular orientation, with spy Fixed orientation construction and operation, therefore be not considered as limiting the invention.
In addition, term " first ", " second " are used for descriptive purposes only and cannot be understood as indicating or suggesting relative importance Or implicitly indicate the quantity of indicated technical characteristic.Define " first " as a result, the feature of " second " can be expressed or Implicitly include one or more of the features.In the description of the present invention, the meaning of " plurality " is two or more, Unless otherwise specifically defined.
In the present invention unless specifically defined or limited otherwise, term " installation ", " connected ", " connection ", " fixation " etc. Term shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or integral;It can be mechanical connect It connects, is also possible to be electrically connected;It can be directly connected, can also can be in two elements indirectly connected through an intermediary The interaction relationship of the connection in portion or two elements.It for the ordinary skill in the art, can be according to specific feelings Condition understands the concrete meaning of above-mentioned term in the present invention.
In the present invention unless specifically defined or limited otherwise, fisrt feature second feature "upper" or "lower" It may include that the first and second features directly contact, also may include that the first and second features are not direct contacts but pass through it Between other characterisation contact.Moreover, fisrt feature includes the first spy above the second feature " above ", " above " and " above " Sign is right above second feature and oblique upper, or is merely representative of first feature horizontal height higher than second feature.Fisrt feature exists Second feature " under ", " lower section " and " following " include that fisrt feature is directly below and diagonally below the second feature, or is merely representative of First feature horizontal height is less than second feature.
Embodiment 1
As shown in FIG. 1 to FIG. 2, a kind of foundation bolt fixed frame, including bearing support and setting in groups is present embodiments provided Several bolt fixed frames on the bearing support, the bearing support include two door shape frames being oppositely arranged, each described Door shape frame includes two columns 1 and the crossbeam 2 that is connected between two columns 1, the bolt fixed frame and two door shape frames Crossbeam 2 is connected and fixed, and is provided with foundation bolt 3 on the bolt fixed frame.
Specifically, the bolt fixed frame includes two bolt fixed frames 4 being parallel to each other and is connected to two spiral shells The first securing plate 5 between bolt fixed frame 4 is provided with supporting plate 6, institute between two bolt fixed frames 4 of the bolt fixed frame Foundation bolt 3 is stated to be arranged on the supporting plate 6.
In the present embodiment, the bolt fixed frame 4 should have enough strength and stiffness, and Ying Jinliang avoids transporting and pacifying It deforms in dress link, as preferably selecting, according to the specification and weight of foundation bolt 3, the bolt fixed frame 4 should be adopted It is welded to be formed with angle steel or channel-section steel.
It is also arranged in a crossed manner on the bolt fixed frame 4 to have brace 7 as further improvement of this embodiment, for adding Fixed.
As further improvement of this embodiment, the second securing plate is additionally provided between two columns 1 of the door shape frame 8。
As further improvement of this embodiment, the bottom of each column 1 is additionally provided with base plate 9.
As further improvement of this embodiment, first securing plate 5, the second securing plate 8 and base plate 9 are cold rolling Structural member made of steel plate.
Embodiment 2
The construction method of installation of the present embodiment 1 foundation bolt fixed frame in groups based on the above embodiment, specific as follows:
Step S1: requiring according to construction drawing, datum mark and carries out line setting on bed course, Bottom Board Steel to be tied up After muscle, column 1 is installed and is fixed temporarily, the lower end of column 1 is welded and fixed with baseplate reinforcing bar after correction;
Step S2: the absolute altitude for determining crossbeam 2 is measured on column 1, crossbeam 2 is welded and fixed by absolute altitude and column 1, then Bolt fixed frame is mounted on crossbeam 2, bolt fixed frame and crossbeam 2 are welded and fixed after adjustment correction;
Step S3: with theodolite and steel ruler on the upside of supporting plate 6 supporting plate 6 center, and with punching pin punctum;
Step S4: the center degree deviation a at 3 top of preliminary corrections foundation bolt, then preliminary corrections foundation bolt 3 are vertical Straight degree b, then welds drawknot item 10 in the bottom of foundation bolt 3, drawknot item 10 is connect with bolt fixed frame for consolidating lower margin Bolt 3;
Step S5: the absolute altitude and verticality of correction foundation bolt 3 are checked by hanging wire and the pendant that goes offline again, corrects foundation bolt 3 verticality should be carried out in horizontal orthogonal both direction;
Step S6: according to the datum mark measured, control central line and horizontal line is pulled out with steel wire, measures control centre The distance of 3 central point of line and foundation bolt, the absolute altitude of foundation bolt 3 is determined with horizontal line, carries out check adjustment by level meter;
In step S6, the foundation bolt application theodolite testing of significant points is corrected again.
Step S7: when the error of the center at 3 top of foundation bolt, verticality and absolute altitude controls in allowed limits When, the first securing plate 5 is welded between two bolt fixed frames 4 of bolt bolt fixed frame and is consolidated;
Step S8: after correction confirmation size is errorless on inspection, top nut is covered on foundation bolt 3, then in bolt fixed frame The brace 7 that upper welding intersects, foundation bolt 3 and brace 7 are welded and fixed;
Step S9: after all foundation bolts 3 are fixed, then primary inspection comprehensively is carried out, checks after-pouring coagulation Soil;
Step S10: i.e. available gas cutting cuts off exposed foundation bolt in groups when concreting reaches 50% design strength Fixed frame avoids beaing damage bolt screw thread when cutting off, the concrete residue on foundation bolt 3 is removed after gas cutting, is derusted, surface Butter is smeared, outsourcing plastic cloth is protected.
As further improvement of this embodiment, the bolt fixed frame 4 of the bolt fixed frame uses angle steel or channel-section steel Welding is formed.
As further improvement of this embodiment, the steel wire in the step 6 is No. 24 steel wires.
As further improvement of this embodiment, a≤3mm described in the step S4, the b are 1/100~1/50.
Using foundation bolt of the invention in groups fixed frame construction method of installation stay set anchor bolt box when, choosing With the undulating helical casing of the cold-rolled steel sheet of 0.4~1.0mm, covers secure up and down, two sides are welded with fixed plate band, and spot welding is fixed In on framework of steel reinforcement, in direct Transducers Embedded in Concrete, anchor bolt box is formed, is put into after foundation bolt and is directly in the milk i.e. It can.
The foregoing is merely the preferred embodiment of the present invention, are not intended to restrict the invention, for this field For technical staff, the invention may be variously modified and varied.All within the spirits and principles of the present invention, made any Modification, equivalent replacement, improvement etc., should all be included in the protection scope of the present invention.

Claims (10)

1. a kind of foundation bolt fixed frame in groups, it is characterised in that: including bearing support and be arranged in several on the bearing support A bolt fixed frame, the bearing support include two door shape frames being oppositely arranged, and each door shape frame includes two columns (1) And the crossbeam (2) being connected between two columns (1), the crossbeam (2) of the bolt fixed frame and two door shape frames are connected and fixed, Foundation bolt (3) are provided on the bolt fixed frame;
The bolt fixed frame includes two bolt fixed frames (4) being parallel to each other and is connected to two bolt fixed frames (4) the first securing plate (5) between is provided with supporting plate (6), institute between two bolt fixed frames (4) of the bolt fixed frame Foundation bolt (3) are stated to be arranged on the supporting plate (6).
2. foundation bolt according to claim 1 fixed frame in groups, it is characterised in that: on the bolt fixed frame (4) also It is arranged in a crossed manner to have brace (7).
3. foundation bolt according to claim 2 fixed frame in groups, it is characterised in that: two columns of the door shape frame (1) the second securing plate (8) are additionally provided between.
4. foundation bolt according to claim 3 fixed frame in groups, it is characterised in that: the bottom of each column (1) It is additionally provided with base plate (9).
5. the construction method of installation of foundation bolt according to claim 4 fixed frame in groups, it is characterised in that: described first Securing plate (5), the second securing plate (8) and base plate (9) are structural member made of cold-rolled steel sheet.
6. the construction method of installation of any foundation bolt of claim 3~5 fixed frame in groups, it is characterised in that: including Following steps:
Step S1: requiring according to construction drawing, datum mark and carries out line setting on bed course, baseplate reinforcing bar to be tied up Afterwards, column (1) is installed and is fixed temporarily, the lower end of column (1) is welded and fixed with baseplate reinforcing bar after correction;
Step S2: measuring the absolute altitude for determining crossbeam (2) on column (1), crossbeam (2) be welded and fixed by absolute altitude and column (1), Then bolt fixed frame is mounted on crossbeam (2), bolt fixed frame and crossbeam (2) is welded and fixed after adjustment correction;
Step S3: with theodolite and steel ruler on the upside of supporting plate (6) supporting plate (6) center, and with punching pin punctum;
Step S4: the center degree deviation a at the top of preliminary corrections foundation bolt (3), then preliminary corrections foundation bolt (3) hang down Straight degree b, then welds drawknot item (10) in the bottom of foundation bolt (3), drawknot item (10) is connect for steady with bolt fixed frame Gu foundation bolt (3);
Step S5: the absolute altitude and verticality of correction foundation bolt (3) are checked by hanging wire and the pendant that goes offline again, corrects foundation bolt (3) verticality should be carried out in horizontal orthogonal both direction;
Step S6: according to the datum mark measured, pulling out control central line and horizontal line with steel wire, measure control central line and The distance of foundation bolt (3) central point, the absolute altitude of foundation bolt (3) is determined with horizontal line, carries out check adjustment by level meter;
Step S7: when the error at center, verticality and absolute altitude at the top of foundation bolt (3) controls in allowed limits, First securing plate (5) is welded between two bolt fixed frames (4) of bolt bolt fixed frame and is consolidated;
Step S8: after correction confirmation size is errorless on inspection, top nut is covered on foundation bolt (3), then on bolt fixed frame The brace (7) intersected is welded, foundation bolt (3) and brace (7) are welded and fixed;
Step S9: after all foundation bolts (3) are fixed, then primary inspection comprehensively is carried out, checks after-pouring concrete;
Step S10: i.e. available gas cutting cuts off exposed foundation bolt and fixes in groups when concreting reaches 50% design strength Frame avoids beaing damage bolt screw thread when cutting off, the concrete residue on foundation bolt (3) is removed after gas cutting, is derusted, surface is smeared Butter, outsourcing plastic cloth are protected.
7. the construction method of installation of foundation bolt according to claim 6 fixed frame in groups, it is characterised in that: the bolt The bolt fixed frame (4) of fixed frame welds to be formed using angle steel.
8. the construction method of installation of foundation bolt according to claim 6 fixed frame in groups, it is characterised in that: the bolt The bolt fixed frame (4) of fixed frame welds to be formed using channel-section steel.
9. the construction method of installation of foundation bolt according to claim 6 fixed frame in groups, it is characterised in that: the step Steel wire in S6 is No. 24 steel wires.
10. the construction method of installation of foundation bolt according to claim 6 fixed frame in groups, it is characterised in that: the step A≤3mm described in rapid S4, the b are 1/100~1/50.
CN201811602579.3A 2018-12-26 2018-12-26 A kind of foundation bolt fixed frame and its construction method of installation in groups Pending CN109469090A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811602579.3A CN109469090A (en) 2018-12-26 2018-12-26 A kind of foundation bolt fixed frame and its construction method of installation in groups

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811602579.3A CN109469090A (en) 2018-12-26 2018-12-26 A kind of foundation bolt fixed frame and its construction method of installation in groups

Publications (1)

Publication Number Publication Date
CN109469090A true CN109469090A (en) 2019-03-15

Family

ID=65676891

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811602579.3A Pending CN109469090A (en) 2018-12-26 2018-12-26 A kind of foundation bolt fixed frame and its construction method of installation in groups

Country Status (1)

Country Link
CN (1) CN109469090A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110512945A (en) * 2019-09-05 2019-11-29 上海建工二建集团有限公司 A kind of vertical lever fixing apparatus and installation method of safe protective railing
CN111042207A (en) * 2019-12-12 2020-04-21 中国五冶集团有限公司 Concrete edge-protecting angle steel construction method

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101307603A (en) * 2008-06-06 2008-11-19 中冶天工上海十三冶建设有限公司 Column base anchor bolt moving-out type fixing rack construction method
KR20100077234A (en) * 2008-12-29 2010-07-08 재단법인 포항산업과학연구원 Modular device for foundation bolt anchorage

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101307603A (en) * 2008-06-06 2008-11-19 中冶天工上海十三冶建设有限公司 Column base anchor bolt moving-out type fixing rack construction method
KR20100077234A (en) * 2008-12-29 2010-07-08 재단법인 포항산업과학연구원 Modular device for foundation bolt anchorage

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
江正荣: "《大型设备基础施工技术》", 31 October 1997, 中国建筑工业出版社 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110512945A (en) * 2019-09-05 2019-11-29 上海建工二建集团有限公司 A kind of vertical lever fixing apparatus and installation method of safe protective railing
CN111042207A (en) * 2019-12-12 2020-04-21 中国五冶集团有限公司 Concrete edge-protecting angle steel construction method

Similar Documents

Publication Publication Date Title
CN102561712B (en) Precise positioning frame for large steel columns and equipment foundation fixing bolts and construction method of precise positioning frame
CN104833294B (en) Pile pile verticality measurement device and measuring method
CN105040717A (en) Foundation bolt fixing support and installation method
CN109469090A (en) A kind of foundation bolt fixed frame and its construction method of installation in groups
CN106368125B (en) Cross-saddle single-track traffic circuit LFM signal method and adjusting apparatus
CN103526954B (en) Support for overweight precision embedded part and construction method thereof
CN106012848B (en) A kind of pre-buried bracket construction method of cast-in-situ box girder and bridge
CN112127641A (en) Accurate fixing method for anchor plate foundation bolt
CN204849798U (en) Rag bolt fixed bolster
CN105317052B (en) Tower crane foundation bolt fixing method
CN101806069A (en) Integrated fixation and installation method for bolt
CN110670734A (en) Fixing device for pre-buried steel plate under shock insulation support and construction method thereof
CN110295620A (en) The fast accurate installation method of large-scale space division device overall skid-mounted formula ice chest
CN110067257A (en) A kind of pedestal anchor bolt device and its application method
CN111549815A (en) Steel structure foundation bolt pre-embedding construction method
CN105735228A (en) Construction method and installation accuracy control method of rack systems of high-lift rack climbing type ship lift
CN106869162B (en) Steam turbine built-in fitting fixes device and method
CN207419691U (en) For resisting the truss structure of load
CN105526920B (en) A kind of three-dimensional adjusting bracket
CN212001245U (en) Accurate installation adjusting device of pre-buried bolt
CN210621745U (en) Foundation bolt fixing frame assembly
CN113124769A (en) Method for measuring camber of large plate girder
CN209228069U (en) A kind of reinforcing bar correction inspection measuring device
CN109235483A (en) A kind of large equipment base foundation bolt positioning device and its application method
CN108411779B (en) A kind of construction method of Bridge guardrail reinforcing bar

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190315