CN205777593U - A kind of adjustable combination type bracing frame for vertical supporting sill anchor - Google Patents

A kind of adjustable combination type bracing frame for vertical supporting sill anchor Download PDF

Info

Publication number
CN205777593U
CN205777593U CN201620690837.8U CN201620690837U CN205777593U CN 205777593 U CN205777593 U CN 205777593U CN 201620690837 U CN201620690837 U CN 201620690837U CN 205777593 U CN205777593 U CN 205777593U
Authority
CN
China
Prior art keywords
crab
bolt
frame
crossbeam
vertical supporting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620690837.8U
Other languages
Chinese (zh)
Inventor
韩朋
王小瑞
赵东生
汪潇驹
许明泽
谢永伟
刘武华
王沁怡
谢静
庄会云
高永祥
李东
巴盼峰
常乃麟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Fourth Construction & Engineering Co Ltd
BEIJING MACHINERY CONSTRUCTION Co Ltd
Original Assignee
Beijing Fourth Construction & Engineering Co Ltd
BEIJING MACHINERY CONSTRUCTION Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Fourth Construction & Engineering Co Ltd, BEIJING MACHINERY CONSTRUCTION Co Ltd filed Critical Beijing Fourth Construction & Engineering Co Ltd
Priority to CN201620690837.8U priority Critical patent/CN205777593U/en
Application granted granted Critical
Publication of CN205777593U publication Critical patent/CN205777593U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model discloses a kind of adjustable combination type bracing frame for vertical supporting sill anchor, it includes transition frame, the crab-bolt stock being arranged in transition frame, the crab-bolt being assemblied on crab-bolt stock that bottom has vertical supporting lower limb and is arranged on the perforation frame on crab-bolt top;Crab-bolt stock includes underframe, be arranged on underframe vertical pole and in a lateral direction two in the crossbeam for connecting fixing adjacent vertical pole being oppositely arranged;The bottom of crab-bolt is fixedly installed on underframe, and crab-bolt top passes crossbeam, is positioned at outside crossbeam, and perforation frame is positioned at above described crossbeam.This utility model has and can reduce cross-operation at assembled off-site, and the advantage such as can be adjusted flexibly according to on-site actual situations.

Description

一种用于竖向支撑地脚锚栓的可调组合式支撑架An adjustable combined support frame for vertically supporting foundation anchor bolts

技术领域technical field

本实用新型涉及建筑施工领域,特别涉及一种用于竖向支撑地脚锚栓的可调组合式支撑架。The utility model relates to the field of building construction, in particular to an adjustable combined support frame for vertically supporting foundation anchor bolts.

背景技术Background technique

钢结构以其自重轻、强度高、环境污染小,被冠以“绿色建筑”的美名;又因其材料回收率高、循环使用便捷,被称为“可持续发展建筑”。近年来随着设计水平和施工技术的不断提高,超高层钢结构得到了飞速的发展。此类钢结构的柱脚构件截面非常大,每个柱脚使用的地脚锚栓也多达几十或上百条,形成锚栓群,而且锚栓截面及长度也很大,单重从几十公斤到几百公斤,相互之间没有任何连接。Steel structures are known as "green buildings" for their light weight, high strength, and low environmental pollution; they are also known as "sustainable buildings" because of their high material recovery rate and convenient recycling. In recent years, with the continuous improvement of design level and construction technology, super high-rise steel structure has been developed rapidly. The section of the column foot member of this kind of steel structure is very large, and there are dozens or hundreds of anchor bolts used for each column foot, forming an anchor bolt group. Tens of kilograms to hundreds of kilograms, without any connection between each other.

传统的单根安装并临时固定的锚栓施工工艺已经不能满足这种锚栓形式的需要,用锚栓支撑架(模板)把若干条锚栓按序组合、整体安装就位是解决锚栓群施工的一个非常有效的方法。然而以往采用的锚栓支撑架,存在下述问题:The traditional anchor bolt construction technology of single installation and temporary fixing can no longer meet the needs of this anchor bolt form. Using anchor bolt support frame (formwork) to combine several anchor bolts in sequence and install them in place as a whole is the solution to the problem of anchor bolt group. A very efficient method of construction. However, the anchor bolt support frame adopted in the past has the following problems:

1、锚栓支撑架直接安放于钢筋网最上面一层钢筋上的方案;当附近有人员走动、材料堆放及挪位,以及其它工序施工时,钢筋就会发生变形,造成支撑架发生倾斜等扰动,并且支撑架越高,扰动越大。当支撑架受到干扰产生偏差进行调整时,由于钢筋弹性较大,需要多次进行调整,而且调整精度也受影响。即使轻微的发生倾斜,锚栓由于不能自动纠偏,也会发生变形。复杂形状基坑施工时不能随意调整高度和位置,受现场施工条件制约较大。1. The anchor bolt support frame is placed directly on the steel bar on the top layer of the steel mesh; when there are people walking around, material stacking and displacement, and other construction processes, the steel bar will be deformed, causing the support frame to tilt, etc. disturbance, and the higher the support frame, the greater the disturbance. When the support frame is adjusted due to interference and deviation, due to the high elasticity of the steel bar, it needs to be adjusted many times, and the adjustment accuracy is also affected. Even if there is a slight inclination, the anchor bolt will be deformed because it cannot automatically correct the deviation. During the construction of complex-shaped foundation pits, the height and position cannot be adjusted arbitrarily, which is greatly restricted by the construction conditions on site.

2、锚栓支撑架安放在基础垫层的技术方案;其不足之处是支撑架现场单件组装,效率较低而且存在调整定位困难的问题。2. The technical scheme of placing the anchor bolt support frame on the foundation cushion; its disadvantage is that the support frame is assembled in one piece on site, which is inefficient and difficult to adjust and position.

3、支撑架安放在基础垫层的改进方案;是在基础垫层上先预设若干独立柱,然后将上部预制支撑架的若干立柱与之一一对应连接的方法。此技术方案仍存在定位、安装繁琐的问题,比如:独立柱本身定位精度要求高,与上部预制支撑架立柱一一对接操作不方便,焊接量较大;另外出现偏差进行调整时,由于受钢筋网变形的影响,调整后需要再次进行加固,因此非常繁琐。3. The improvement plan for the support frame to be placed on the foundation cushion; it is a method of presetting a number of independent columns on the foundation cushion, and then connecting several columns of the upper prefabricated support frame to one of them. This technical solution still has the problems of cumbersome positioning and installation. For example, the positioning accuracy of the independent column itself is high, and it is inconvenient to connect with the upper prefabricated support frame column one by one, and the welding volume is large; Due to the influence of net deformation, it needs to be reinforced again after adjustment, so it is very cumbersome.

地脚锚栓安装精度控制最重要的是首先控制相邻锚栓之间的间距,要保证锚栓在一定垂偏范围内有自动纠偏的功能,确保能够顺利通过柱脚底板或钢板墙底板锚栓孔;第二是控制锚栓轴线偏差,确保柱脚底板或钢板墙底板平面位置准确;第三是确保锚栓高度一致,保证所有锚栓均匀受力。另外在施工中还要能够克服土建其它工序如钢筋绑扎、混凝土浇筑、意外碰撞等对锚栓安装精度的影响。The most important thing to control the installation accuracy of anchor bolts is to firstly control the distance between adjacent anchor bolts. It is necessary to ensure that the anchor bolts have the function of automatic deviation correction within a certain vertical deviation range, so as to ensure that the anchor bolts can pass through the base plate of the column base or the base plate of the steel plate wall smoothly. Bolt holes; the second is to control the axis deviation of the anchor bolts to ensure that the plane position of the base plate of the column foot or the steel plate wall bottom plate is accurate; the third is to ensure that the height of the anchor bolts is consistent and that all anchor bolts are evenly stressed. In addition, in the construction, it is necessary to be able to overcome the influence of other civil engineering processes such as steel bar binding, concrete pouring, accidental collision, etc. on the installation accuracy of anchor bolts.

实用新型内容Utility model content

本实用新型要解决的技术问题是提供一种用于竖向支撑地脚锚栓的可调组合式支撑架。本实用新型所提供的支撑架,其下部是高度可任意设定的过渡架,上部是用于固定锚栓的锚栓套架和锚栓穿孔架,三者能够快速安装对接、调整和固定锚栓;非常适合深基础钢筋密集、局部存在集水坑和电梯井等复杂的施工环境;该可调组合式支撑架具有可以在场外组装减少交叉作业,并可根据现场实际情况,灵活调整等优点。The technical problem to be solved by the utility model is to provide an adjustable combined support frame for vertically supporting anchor bolts of foundations. The lower part of the support frame provided by the utility model is a transition frame whose height can be set arbitrarily, and the upper part is an anchor bolt sleeve frame and an anchor bolt perforation frame for fixing anchor bolts. Bolt; it is very suitable for complex construction environments such as deep foundation with dense steel bars, local sump pits and elevator shafts; the adjustable combined support frame has the advantages of being able to be assembled outside the site to reduce cross operations, and can be flexibly adjusted according to the actual situation on site. .

为解决上述技术问题,本实用新型采用下述技术方案:In order to solve the problems of the technologies described above, the utility model adopts the following technical solutions:

一种用于竖向支撑地脚锚栓的可调组合式支撑架,所述支撑架包括底部具有竖向支撑腿的过渡架、设置在所述过渡架上的锚栓套架、装配在所述锚栓套架上的锚栓和设置在所述锚栓上部的穿孔架;An adjustable combined support frame for vertically supporting foundation anchor bolts, the support frame includes a transition frame with vertical support legs at the bottom, an anchor bolt sleeve set on the transition frame, assembled on the The anchor bolt on the anchor bolt sleeve frame and the perforated frame arranged on the upper part of the anchor bolt;

所述锚栓套架包括底架、设置在所述底架上的竖向支杆、及在横向方向上两个呈相对设置的用于连接固定相邻竖向支杆的横梁;The anchor bolt sleeve includes a base frame, a vertical strut arranged on the base frame, and two cross beams arranged oppositely in the transverse direction for connecting and fixing adjacent vertical struts;

所述锚栓的底部固定设置在所述底架上,所述锚栓上部穿过所述横梁,位于所述横梁外,且所述穿孔架位于所述横梁上方。The bottom of the anchor bolt is fixedly arranged on the base frame, the upper part of the anchor bolt passes through the beam and is located outside the beam, and the perforated frame is located above the beam.

进一步的,所述横梁为双横杆结构,所述锚栓栓体位于该呈双横杆结构横梁的两个横杆之间。将锚栓栓体设置在横梁的两个横杆之间用于固定所述锚栓栓体在纵向方向上的位置。Further, the cross beam is a double cross bar structure, and the anchor bolt body is located between two cross bars of the double cross bar structure cross beam. The anchor bolt body is arranged between two cross bars of the cross beam for fixing the position of the anchor bolt body in the longitudinal direction.

进一步的,所述锚栓套架包括设置在所述锚栓套架中部的两个呈相对设置的横梁,及设置在所述锚栓套架上部的两个呈相对设置的横梁。Further, the anchor bolt sleeve includes two opposite cross beams arranged in the middle of the anchor bolt sleeve, and two opposite cross beams arranged on the upper part of the anchor bolt sleeve.

进一步的,所述锚栓套架还包括连接杆,所述连接杆设置在呈相对设置的两个横梁之间;该连接杆的两端分别与横梁固定。Further, the anchor bolt sleeve also includes a connecting rod, which is arranged between two opposite cross beams; both ends of the connecting rod are respectively fixed to the cross beams.

进一步的,所述连接杆为双杆体结构,所述锚栓栓体位于该呈双杆体结构连接杆的两个杆体之间。将锚栓栓体设置在连接杆的两个杆体之间用于固定所述锚栓栓体在横向方向上的位置。Further, the connecting rod has a double-rod structure, and the anchor bolt body is located between two rods of the connecting rod having a double-rod structure. The anchor bolt body is arranged between the two rod bodies of the connecting rod for fixing the position of the anchor bolt body in the transverse direction.

进一步的,所述穿孔架上设有与锚栓匹配对应的用于锚栓穿过的锚栓孔;位于所述横梁外的锚栓上部上设有锚栓安装调整装置,该安装调整装置包括从上至下依次设置在所述锚栓栓体上的固定螺母、第一调整螺母、盖板和第二调整螺母;所述穿孔架设置在所述盖板和第二调整螺母之间的锚栓栓体上。Further, the perforated frame is provided with an anchor bolt hole corresponding to the anchor bolt for the anchor bolt to pass through; an anchor bolt installation adjustment device is provided on the upper part of the anchor bolt outside the beam, and the installation adjustment device includes The fixing nut, the first adjusting nut, the cover plate and the second adjusting nut arranged on the anchor bolt body in turn from top to bottom; the perforated frame is arranged between the cover plate and the second adjusting nut On the plug body.

所述固定螺母用于固定安装后续施工中的上层立柱,所述第一调整螺母用于调整所需安装的上层立柱的标高,所述盖板用于与所述第二调整螺母配合固定所述穿孔架,所述第二调整螺母除了用于与所述盖板固定穿孔架之外,还用于调整所述穿孔架在锚栓栓体上的上下位置。The fixing nut is used to fix and install the upper column in the subsequent construction, the first adjusting nut is used to adjust the elevation of the upper column to be installed, and the cover plate is used to cooperate with the second adjusting nut to fix the As for the perforated frame, the second adjusting nut is not only used for fixing the perforated frame with the cover plate, but also used for adjusting the upper and lower positions of the perforated frame on the anchor bolt body.

进一步的,所述锚栓套架固定设置在所述过渡架的顶面上。Further, the anchor bolt sleeve is fixedly arranged on the top surface of the transition frame.

进一步的,所述过渡架为由立杆、横杆、纵杆和竖向支撑腿组成的框架体结构。Further, the transition frame is a frame structure composed of vertical bars, horizontal bars, longitudinal bars and vertical support legs.

本实用新型与现有技术相比,具有如下有益效果:Compared with the prior art, the utility model has the following beneficial effects:

1、本实用新型所提供的支撑架,其下部是高度可任意设定的过渡架,上部是用于固定锚栓的锚栓套架和锚栓穿孔架,三者能够快速安装对接、调整和固定锚栓;非常适合深基础钢筋密集、局部存在集水坑和电梯井等复杂的施工环境。1. The lower part of the support frame provided by the utility model is a transition frame whose height can be set arbitrarily, and the upper part is an anchor bolt sleeve frame and an anchor bolt perforation frame for fixing anchor bolts. The three can be quickly installed, docked, adjusted and Fixed anchor bolts; very suitable for complex construction environments such as deep foundations with dense reinforcement, local sump pits and elevator shafts.

2、本实用新型所提供的支撑架,具有可以在场外组装减少现场交叉作业,并可根据现场实际情况灵活调整等优点,且从根本上解决了普通锚栓支架直接放置在基础最上面一层钢筋上时,当该层钢筋因材料设备堆放、人员走动、支架自重等各种外界原因发生变形、错位后,支架精度也随之变化,调整非常繁琐的问题。2. The support frame provided by the utility model has the advantages of being able to assemble outside the site to reduce on-site cross operations, and can be flexibly adjusted according to the actual situation on site, and it fundamentally solves the problem of placing ordinary anchor bolt brackets directly on the top layer of the foundation. When the steel bars are put on, when the steel bars of this layer are deformed and dislocated due to various external reasons such as material equipment stacking, personnel walking, and the self-weight of the brackets, the accuracy of the brackets will also change accordingly, and the adjustment is very cumbersome.

3、本实用新型所提供的支撑架,在一定垂偏范围内能够实现自动纠偏的功能。该功能的实现是利用锚栓自重自动保持竖直。3. The support frame provided by the utility model can realize the function of automatic deviation correction within a certain vertical deviation range. The realization of this function is to use the self-weight of the anchor bolt to keep vertical automatically.

4、本实用新型所提供的支撑架,可以随意调整锚栓的标高,可以随意调整支撑架整体的平面位置和高度,确保锚栓的空间位置。4. The support frame provided by the utility model can adjust the elevation of the anchor bolt at will, and can adjust the overall plane position and height of the support frame at will, so as to ensure the spatial position of the anchor bolt.

5、本实用新型所提供的支撑架本身具有一定的刚度,具有抵抗一定外力影响的能力,如绑扎钢筋、浇筑混凝土、意外碰撞等对精度的影响。5. The support frame provided by the utility model itself has a certain rigidity, and has the ability to resist the influence of a certain external force, such as the influence of binding steel bars, pouring concrete, accidental collision, etc. on the accuracy.

6、本实用新型所提供的支撑架可以根据现场起重机械性能自由确定支撑架的大小,不受锚栓群大小的限制;安装时只需采取普通的安装方法,不需要特殊的措施。安装后支撑架和钢筋隔绝,从根本上避免了钢筋变形、错位对锚栓精度的影响,避免了重复调整,极大提高了施工效率。6. The support frame provided by the utility model can freely determine the size of the support frame according to the performance of the on-site hoisting machinery, and is not limited by the size of the anchor bolt group; it only needs to adopt ordinary installation methods during installation, and no special measures are required. After installation, the support frame is isolated from the steel bar, which fundamentally avoids the influence of steel bar deformation and misalignment on the accuracy of anchor bolts, avoids repeated adjustments, and greatly improves construction efficiency.

7、本实用新型所提供的支撑架可以有效避免锚栓安装中普遍存在的问题,如锚栓不竖直、锚栓间距不一致偏差大、标高和平面位置安装后不可调、抗外界干扰能力差等问题。7. The support frame provided by the utility model can effectively avoid the common problems in the installation of anchor bolts, such as the anchor bolts are not vertical, the distance between the anchor bolts is inconsistent and the deviation is large, the elevation and plane position cannot be adjusted after installation, and the ability to resist external interference is poor And other issues.

8、采用本实用新型所提供的支撑架时,只有过渡架和基础垫层、钢筋网接触。当过渡架固定后,锚栓套架、锚栓穿孔架安放于过渡架上,调整时不受其它工序如钢筋绑扎、人员走动、材料堆放和移位的影响,极大的提高了施工效率。8. When the support frame provided by the utility model is adopted, only the transition frame is in contact with the foundation cushion and the steel mesh. After the transition frame is fixed, the anchor bolt sleeve frame and anchor bolt perforation frame are placed on the transition frame, and the adjustment will not be affected by other processes such as steel bar binding, personnel walking, material stacking and displacement, which greatly improves the construction efficiency.

9、本实用新型中的锚栓具有在一定范围内自动纠偏的功能,因此即使锚栓套架等存在偏差,锚栓仍然能够自动恢复,也很大程度上提供了施工效率。9. The anchor bolts in this utility model have the function of automatic deviation correction within a certain range, so even if there is deviation in the anchor bolt sleeves, the anchor bolts can still be automatically restored, and the construction efficiency is greatly improved.

10、本实用新型中的过渡架可以根据基坑深度和平面外形任意加长放置,特别适合深基础钢筋密集、局部存在集水坑和电梯井等复杂的施工环境。10. The transition frame in the utility model can be arbitrarily lengthened and placed according to the depth of the foundation pit and the plane shape, and is especially suitable for complex construction environments such as deep foundations with dense steel bars, local sump pits and elevator shafts.

附图说明Description of drawings

图1为本实用新型中穿孔架的结构示意图。Fig. 1 is the structural schematic diagram of perforated frame in the utility model.

图2为本实用新型中锚栓套架的结构示意图。Fig. 2 is a schematic structural view of the anchor bolt sleeve in the present invention.

图3为本实用新型中过渡架的结构示意图。Fig. 3 is a structural schematic diagram of the transition frame in the utility model.

图4为本实用新型中锚栓套架与过渡架的配合安装示意图。Fig. 4 is a schematic diagram of the cooperative installation of the anchor bolt sleeve frame and the transition frame in the present invention.

图5为本实用新型中锚栓及固定在锚栓栓体上的锚栓安装调整装置的结构示意图。Fig. 5 is a structural schematic diagram of the anchor bolt and the anchor bolt installation and adjustment device fixed on the anchor bolt body in the present invention.

图6为本实用新型中穿孔架与锚栓的配合安装示意图。Fig. 6 is a schematic diagram of the cooperative installation of the perforated frame and the anchor bolt in the present invention.

图7为本实用新型的整体装配结构示意图。Fig. 7 is a schematic diagram of the overall assembly structure of the utility model.

具体实施方式detailed description

下面结合附图说明本实用新型的具体实施方式。The specific embodiment of the utility model is described below in conjunction with accompanying drawing.

如图1至7所示,一种用于竖向支撑地脚锚栓的可调组合式支撑架,所述支撑架包括底部具有竖向支撑腿11的过渡架1、固定设置在所述过渡架1顶面上的锚栓套架2、装配在所述锚栓套架2上的锚栓3和设置在所述锚栓3上部的穿孔架4;As shown in Figures 1 to 7, an adjustable combined support frame for vertically supporting anchor bolts, the support frame includes a transition frame 1 with vertical support legs 11 at the bottom, fixedly arranged on the transition The anchor bolt sleeve frame 2 on the top surface of the frame 1, the anchor bolt 3 assembled on the anchor bolt sleeve frame 2, and the perforated frame 4 arranged on the upper part of the anchor bolt 3;

所述过渡架1为由立杆12、横杆13、纵杆14和竖向支撑腿11组成的框架体结构。在所述穿孔架4上设有与锚栓3匹配对应的用于锚栓穿过的锚栓孔;所述锚栓3上部设有锚栓安装调整装置5,该安装调整装置5包括从上至下依次设置在所述锚栓3栓体上的固定螺母51、第一调整螺母52、盖板53和第二调整螺母54;所述穿孔架4设置在所述盖板53和第二调整螺母54之间的锚栓3栓体上。The transition frame 1 is a frame body structure composed of vertical bars 12 , cross bars 13 , longitudinal bars 14 and vertical support legs 11 . The perforated frame 4 is provided with an anchor bolt hole corresponding to the anchor bolt 3 for the anchor bolt to pass through; the upper part of the anchor bolt 3 is provided with an anchor bolt installation adjustment device 5, which includes an installation adjustment device 5 from above. Down to the fixing nut 51, the first adjusting nut 52, the cover plate 53 and the second adjusting nut 54 arranged on the bolt body of the anchor bolt 3 in sequence; the perforated frame 4 is arranged on the cover plate 53 and the second adjusting nut On the bolt body of the anchor bolt 3 between the nuts 54.

所述锚栓套架2包括底架21、设置在所述底架21上的竖向支杆22、及在横向方向上两个呈相对设置的用于连接固定相邻竖向支杆的横梁23;本实施例中所述锚栓套架2包括设置在所述锚栓套架2中部的两个呈相对设置的横梁23,及设置在所述锚栓套架2上部的两个呈相对设置的横梁23;在呈相对设置的两个横梁23之间设置有连接杆24,该连接杆24的两端分别与横梁23固定。The anchor bolt sleeve frame 2 includes a base frame 21, a vertical strut 22 arranged on the base frame 21, and two cross beams arranged oppositely in the transverse direction for connecting and fixing adjacent vertical struts 23. In this embodiment, the anchor bolt frame 2 includes two opposite beams 23 arranged in the middle of the anchor bolt frame 2, and two opposite beams 23 arranged on the upper part of the anchor bolt frame 2. The set cross beams 23 ; a connecting rod 24 is arranged between the two opposite cross beams 23 , and the two ends of the connecting rod 24 are respectively fixed with the cross beams 23 .

所述锚栓3的底部通过锚头31固定设置在所述底架21上,所述锚栓3上部穿过所述横梁23,位于所述横梁23外,且所述穿孔架4位于所述横梁23上方。The bottom of the anchor bolt 3 is fixedly arranged on the underframe 21 through the anchor head 31, the upper part of the anchor bolt 3 passes through the cross beam 23 and is located outside the cross beam 23, and the perforated frame 4 is located on the bottom of the cross beam 23. Above the beam 23.

进一步的,所述横梁23为双横杆结构,所述锚栓3栓体位于该呈双横杆结构横梁23的两个横杆231之间;所述连接杆24为双杆体结构,所述锚栓3栓体位于该呈双杆体结构连接杆24的两个杆体241之间。Further, the cross beam 23 is a double cross bar structure, and the bolt body of the anchor bolt 3 is located between the two cross bars 231 of the double cross bar structure cross beam 23; the connecting rod 24 is a double bar structure, and the The bolt body of the anchor bolt 3 is located between the two rod bodies 241 of the connecting rod 24 in a double-rod structure.

本实用新型所提供的锚栓套架2通过呈双横杆结构的横梁23及呈双杆体结构的连接杆24之间的配合,形成一“井”字形固定位,通过该呈“井”字形固定位的中间孔洞,使得锚栓3栓体在横向方向上及纵向方向上都同时得到了准确定位,并且还可以通过横梁23的横杆231及连接杆24的杆体241所交汇形成的“井”字形固定位的中间孔洞,对锚栓3在水平方向上的位置做一定的微调,锚栓3位置坐标符合要求后,将其与横梁23的横杆231及连接杆24的杆体241固定。The anchor bolt sleeve frame 2 provided by the utility model forms a "well"-shaped fixed position through the cooperation between the crossbeam 23 in the double-bar structure and the connecting rod 24 in the double-bar structure. The hole in the middle of the fixed position makes the bolt body of the anchor bolt 3 accurately positioned in the lateral direction and the longitudinal direction at the same time, and can also pass through the "well" formed by the intersection of the cross bar 231 of the cross beam 23 and the rod body 241 of the connecting rod 24. "The middle hole of the glyph fixed position is fine-tuned to the position of the anchor bolt 3 in the horizontal direction. After the position coordinates of the anchor bolt 3 meet the requirements, it is fixed with the crossbar 231 of the crossbeam 23 and the rod body 241 of the connecting rod 24.

在具体施工中,下部过渡架1在现场安装完成后,待基础下部钢筋绑扎完后,将下部过渡架1的竖向支撑腿11穿过基础下部钢筋,定位后与基础钢筋连接固定。所述过渡架1固定之后将锚栓穿孔架4、锚栓3、锚栓安装调整装置5和锚栓套架2所组装成得锚栓组件放置在所述过渡架1上,并对锚栓组件整体进行垂直度、平面位置、锚栓3顶部标高进行初次校正;之后在混凝土浇筑前对锚栓组件中锚栓3的垂直度及顶部标高进行二次校正,校正完毕后将锚栓套架2的底架21与下部的过渡架1的顶面上的横杆13和\或纵杆14焊接连接固定,将锚栓3与锚栓套架2连接固定。In the specific construction, after the lower transition frame 1 is installed on site, after the lower steel bars of the foundation are tied, the vertical support legs 11 of the lower transition frame 1 pass through the lower steel bars of the foundation, and are connected and fixed with the foundation steel bars after positioning. After the transition frame 1 is fixed, the anchor bolt assembly assembled by the anchor bolt perforated frame 4, the anchor bolt 3, the anchor bolt installation adjustment device 5 and the anchor bolt sleeve frame 2 is placed on the transition frame 1, and the anchor bolt is adjusted. The verticality, plane position, and top elevation of the anchor bolt 3 are corrected for the first time on the whole component; after that, the verticality and top elevation of the anchor bolt 3 in the anchor bolt assembly are corrected twice before the concrete pouring, and the anchor bolt is set up after the correction is completed. The underframe 21 of 2 is welded and fixed to the cross bar 13 and/or longitudinal bar 14 on the top surface of the transition frame 1 of the lower part, and the anchor bolt 3 is connected and fixed with the anchor bolt sleeve frame 2.

本文中所采用的描述方位的词语“上”、“下”、“左”、“右”等均是为了说明的方便基于附图中图面所示的方位而言的,在实际装置中这些方位可能由于装置的摆放方式而有所不同。The words "upper", "lower", "left", "right" etc. used in this article to describe the orientation are based on the orientation shown in the drawings for the convenience of explanation. In the actual device, these Orientation may vary due to how the unit is positioned.

综上所述,本实用新型所述的实施方式仅提供一种最佳的实施方式,本实用新型的技术内容及技术特点已揭示如上,然而熟悉本项技术的人士仍可能基于本实用新型所揭示的内容而作各种不背离本发明创作精神的替换及修饰;因此,本实用新型的保护范围不限于实施例所揭示的技术内容,故凡依本实用新型的形状、构造及原理所做的等效变化,均涵盖在本实用新型的保护范围内。To sum up, the embodiment described in this utility model only provides a kind of optimal implementation mode, and the technical content and technical characteristics of this utility model have been disclosed as above, but those who are familiar with this technology may still be based on this utility model. According to the disclosed content, various replacements and modifications are made without departing from the creative spirit of the present invention; The equivalent changes are all covered within the protection scope of the present utility model.

Claims (8)

1. the adjustable combination type bracing frame for vertical supporting sill anchor, it is characterised in that: support frame as described above includes the end Transition frame, the crab-bolt stock being arranged in described transition frame that portion has vertical supporting lower limb, it is assemblied on described crab-bolt stock Crab-bolt and the perforation frame being arranged on described crab-bolt top;
Described crab-bolt stock include underframe, the vertical pole being arranged on described underframe and in a lateral direction two in relatively The crossbeam for connecting fixing adjacent vertical pole arranged;
The bottom of described crab-bolt is fixedly installed on described underframe, and described crab-bolt top passes described crossbeam, is positioned at described crossbeam Outward, and described perforation frame is positioned at above described crossbeam.
A kind of adjustable combination type bracing frame for vertical supporting sill anchor the most according to claim 1, its feature exists In: described crossbeam is double bar structures, and described crab-bolt key is between two cross bars that this is double bar structure crossbeam.
A kind of adjustable combination type bracing frame for vertical supporting sill anchor the most according to claim 1, its feature exists Include being arranged on two in the middle part of described crab-bolt stock in the crossbeam being oppositely arranged in: described crab-bolt stock, and be arranged on described Two of crab-bolt stock top in the crossbeam being oppositely arranged.
A kind of adjustable combination type bracing frame for vertical supporting sill anchor the most according to claim 1, its feature exists In: between described crab-bolt stock also includes that connecting rod, described connecting rod are arranged in two crossbeams being oppositely arranged;This connecting rod Two ends fix with crossbeam respectively.
A kind of adjustable combination type bracing frame for vertical supporting sill anchor the most according to claim 4, its feature exists In: described connecting rod is double bar structures, and described crab-bolt key is between two bodies of rod that this is double bar structure connecting rod.
A kind of adjustable combination type bracing frame for vertical supporting sill anchor the most according to claim 1, its feature exists In: described perforation frame is provided with the anchor hole that for crab-bolt pass corresponding with crab-bolt coupling;It is positioned at the crab-bolt outside described crossbeam Top is provided with crab-bolt installation adjusting device, and this installation adjusting device includes being successively set on from top to bottom on described crab-bolt key Fixing nut, the first adjusting nut, cover plate and the second adjusting nut;Described perforation frame is arranged on described cover plate and second and adjusts On crab-bolt key between nut.
A kind of adjustable combination type bracing frame for vertical supporting sill anchor the most according to claim 1, its feature exists In: described crab-bolt stock is fixedly installed on the end face of described transition frame.
A kind of adjustable combination type bracing frame for vertical supporting sill anchor the most according to claim 1, its feature exists In: described transition frame is the frame body structure being made up of vertical rod, cross bar, vertical pole and vertical supporting lower limb.
CN201620690837.8U 2016-07-01 2016-07-01 A kind of adjustable combination type bracing frame for vertical supporting sill anchor Expired - Fee Related CN205777593U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620690837.8U CN205777593U (en) 2016-07-01 2016-07-01 A kind of adjustable combination type bracing frame for vertical supporting sill anchor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620690837.8U CN205777593U (en) 2016-07-01 2016-07-01 A kind of adjustable combination type bracing frame for vertical supporting sill anchor

Publications (1)

Publication Number Publication Date
CN205777593U true CN205777593U (en) 2016-12-07

Family

ID=58127070

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620690837.8U Expired - Fee Related CN205777593U (en) 2016-07-01 2016-07-01 A kind of adjustable combination type bracing frame for vertical supporting sill anchor

Country Status (1)

Country Link
CN (1) CN205777593U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109252674A (en) * 2018-10-17 2019-01-22 北京市机械施工有限公司 Huge column anchor bolt construction method
CN110219399A (en) * 2019-04-12 2019-09-10 深圳全景空间工业有限公司 A kind of wall and lower margin module
CN113007495A (en) * 2021-03-29 2021-06-22 华能国际电力股份有限公司上海石洞口第一电厂 Adjustable supporting frame for foundation bolts of boiler and mounting method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109252674A (en) * 2018-10-17 2019-01-22 北京市机械施工有限公司 Huge column anchor bolt construction method
CN110219399A (en) * 2019-04-12 2019-09-10 深圳全景空间工业有限公司 A kind of wall and lower margin module
CN110219399B (en) * 2019-04-12 2024-06-04 深圳全景空间工业有限公司 Wall and lower margin module
CN113007495A (en) * 2021-03-29 2021-06-22 华能国际电力股份有限公司上海石洞口第一电厂 Adjustable supporting frame for foundation bolts of boiler and mounting method

Similar Documents

Publication Publication Date Title
CN113401815B (en) High-altitude conversion system of core tube tower crane of super high-rise building and construction method thereof
CN103243654A (en) Mounting method for steel anchor beam of cable-stayed bridge and assembly jig and cable bent tower mounting platform used in method
CN105926958B (en) A kind of installation method for the sill anchor combined support frame for being used for high-rise building steel construction shear wall and outline border suspension column
CN105970811A (en) Construction technology for elevated bridge with large-span spatial 3D-surface fish-bellied box steel structure
CN103469735B (en) The installation method of the formwork of the solid section of the pier top of the hollow column and slab pier with curved superelevation
CN104895082B (en) Precise large-diameter steel casing deviation rectifying device and method
CN103266778A (en) Detachable triangular scaffold and steel truss assembly construction method
CN203223003U (en) Detachable triangular jig frame for steel truss assembling
CN100365237C (en) A self-elevating deformable and detachable overall lifting steel platform system and construction method
CN113137046A (en) Anchored I-steel cantilever frame member and construction method
CN218893398U (en) Tower crane foundation structure for high-altitude tower column construction
CN206360399U (en) The existing reinforced concrete coupling beam bracing means of one species " doubly-linked beam "
CN207277363U (en) Assembling type base for construction elevator
CN207582806U (en) A kind of fire-proof shock-proof cylinder system constructing structure
CN109972847A (en) A positioning and vertical adjustment device for a structural column
CN203474309U (en) Supporting seat of tower crane supporting beam
CN103397638A (en) Tie bar for supporting system in high-rigidity integral prestressed fabricated foundation pit support
CN202831628U (en) Combined type bailey frame load-bearing shelving for pouring large span concrete beam
CN207526141U (en) Small-section tower-shaped steel structure assembled operating platform
CN105625732A (en) Supporting-free construction method of ultrahigh overhung steel-structure truss
CN204754150U (en) Disc type node scaffolding
CN204982905U (en) Positioner is used in lattice column construction
CN212336300U (en) A prefabricated reinforced concrete bearing body for prefabricated buildings
CN212670601U (en) A flat tube formwork system
CN203383563U (en) Fast assembled communication iron tower

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161207

CF01 Termination of patent right due to non-payment of annual fee