CN110284883A - Recovery method is filled by a kind of row of adopting, open coal mine end side - Google Patents

Recovery method is filled by a kind of row of adopting, open coal mine end side Download PDF

Info

Publication number
CN110284883A
CN110284883A CN201910608448.4A CN201910608448A CN110284883A CN 110284883 A CN110284883 A CN 110284883A CN 201910608448 A CN201910608448 A CN 201910608448A CN 110284883 A CN110284883 A CN 110284883A
Authority
CN
China
Prior art keywords
filling
open
coal
filled
end side
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910608448.4A
Other languages
Chinese (zh)
Inventor
张吉雄
李猛
夏康祺
周楠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology CUMT
Original Assignee
China University of Mining and Technology CUMT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology CUMT filed Critical China University of Mining and Technology CUMT
Priority to CN201910608448.4A priority Critical patent/CN110284883A/en
Publication of CN110284883A publication Critical patent/CN110284883A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • E21C41/18Methods of underground mining; Layouts therefor for brown or hard coal
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F15/00Methods or devices for placing filling-up materials in underground workings
    • E21F15/005Methods or devices for placing filling-up materials in underground workings characterised by the kind or composition of the backfilling material

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Remote Sensing (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The invention discloses a kind of open coal mine end, recovery method is filled by the row of adopting, side, first hole bottom is helped at opencut end, trunk roadway and back heading are tunneled in parallel along seam inclination direction, transportation roadway and track lane are tunneled in parallel along bearing direction, transportation roadway and track lane are penetrated through, open-off cut and complete ventilating system are formed;Stoping-and-filling working face is arranged in open-off cut, is disposed about Crushing Station in mineral rights circle, while Crushing Station is disposed about vertical transport system;While coalcutter coal cutting, outdoor slag is delivered to goaf, carries out packing job, repetitive cycling, until completing the coal mining and filling of entire end side stoping-and-filling working face.This method can solve end side pressure coal problem, improve the recoverable reserves of open coal mine, while can reduce opencast discharging earth field slag and pollute to environment bring, is a kind of safe and efficient, adaptable Green Mining Technology, has broad application prospects.

Description

Recovery method is filled by a kind of row of adopting, open coal mine end side
Technical field
The present invention relates to a kind of open coal mine end, recovery method is filled by the row of adopting, side, belongs to Green Technique in Coal Mining field.
Background technique
The annual coal resources total output 20% or so in China is strip mining transformation, and the large scale mining of opencut is to ecology of mining areas Environment causes tremendous influence, mainly includes that open-pit mine blast occupies and destroy a large amount of soils, refuse dump slag leaching water is dirty Dye surface water and soil, slag are not effectively used as cheap waste fill material;Simultaneously because open-pit slope The presence at angle, side pressure coal amount in end is huge, therefore the safe and efficient recycling of side pressure coal is held to become open coal mine a great problem, existing High wall mining technique has been achieved for some progress and practical application, but still there is ends to help resource recovery rate low, influences side The problem of slope stability, needs further to solve.
Summary of the invention
Goal of the invention: in order to solve the problems, such as the pressure coal back production of open coal mine end side, the purpose of the present invention is to provide one kind Recovery method is filled by the open coal mine end row of adopting, side, and safe and efficient recovery end helps coal resources, while reducing the discharge of open coal mine slag.
In order to achieve the above objectives, the present invention adopts the following technical scheme:
Recovery method is filled by a kind of row of adopting, open coal mine end side, characterized in that helps arrangement stoping-and-filling work at opencut end Face, and vertical transport system is established in open coal mine mineral rights circle, side stoping-and-filling work in end is delivered to after outdoor slag is crushed Face, bashing while back production achieve the purpose that control open slope, comprising the following steps:
A. hole bottom is helped at opencut end, tunnels trunk roadway and back heading in parallel along seam inclination direction;
B. transportation roadway and track lane, perforation fortune are tunneled along bearing direction is parallel respectively in trunk roadway and the back heading end of a lane Defeated lane and track lane form open-off cut and complete ventilating system;
C. stoping-and-filling working face, including coalcutter, drag conveyor and filling coal mining hydraulic support are arranged in open-off cut Deng;
D. it is disposed about Crushing Station in mineral rights circle, break process is carried out to outdoor slag, makes its partial size < 30mm;
E. Crushing Station is disposed about vertical transport system simultaneously, passes through vertically disposed batching hole and fortune from opencut top Broken outdoor slag is delivered to stoping-and-filling working face by defeated lane connection;
F. it mines and is carried out simultaneously with packing job, while coalcutter coal cutting, the filled hydraulic branch of mining of outdoor slag Frame is delivered to goaf, and the packing job of the drilling depth is completed in filled coal mining hydraulic support reinforcement mechanism compacting;
G. step f is repeated, coal mining, the packing job of next drilling depth are continued, until completing entire end side stoping-and-filling work Make the coal mining and filling in face.
Recovery method, trunk roadway and back heading fill at a distance of 20m, trunk roadway driving in a kind of open coal mine end row of adopting, side To at away from mineral rights circle 20m, the long 30m of back heading, transportation roadway and track lane are tunneled at away from mineral rights circle 20m.
Recovery method is filled by a kind of open coal mine end row of adopting, side, and the vertical transport system of foundation includes storing on well Stand, batching hole, downhole gangue storehouse, stocker is located at the top of opencut on well, batching hole extend vertically through up and down opencut to fortune Defeated lane connection, outdoor slag are fallen by stocker on well through batching hole, drop down onto transportation roadway by the drain hole in downhole gangue storehouse Haul rubber conveyer is transported to working face through elevating conveyor, forms underground filling material transport system.
The vertical transport system, downhole gangue storehouse include buffer, storage bin and drain hole, and buffer is used to reduce Filler throws into the impact force in storage bin, the radius R=2.5m of storage bin, total height 20m.
The vertical transport system, the bore dia that feeds intake are 40cm.
The outdoor slag is mainly ground mixture, through open-pit mine blast by Leather Belt Conveyance to Crushing Station.
Recovery method is filled by a kind of open coal mine end row of adopting, side, and the end side stoping-and-filling working face is adopted using filling Coal hydraulic bracket, filling process are as follows: while coalcutter coal cutting, outdoor slag is transported through underground filling material transport system It to coal working face, is unloaded by the dumping pit of the porous bottom-dump conveyer in bracket rear and drops down onto goaf, and is hydraulic by filling coal mining Reinforcement mechanism on bracket base carries out pushing compacting to attal, forms the closely knit obturation for connecing top.
Advantageous effects of the invention: by helping arrangement stoping-and-filling working face and vertical transport system at opencut end System is filled into end side stoping-and-filling working face using outdoor slag as filler, on the one hand can solve end side pressure coal and asks Topic, reduces stripping-to-ore ratio, expands the limit of mining of open coal mine, improve the recoverable reserves of open coal mine, having recycled can not Regenerated coal resources;Opencast discharging earth field slag can be reduced simultaneously to pollute environment bring, be a kind of safe and efficient, adaptation The strong Green Mining Technology of property, has broad application prospects.
Detailed description of the invention
Fig. 1 is outdoor slag transportation system figure of the invention;
Fig. 2 is stoping-and-filling working face floor plan of the invention;
Fig. 3 is stoping-and-filling working face sectional view of the invention;
In figure: 1- trunk roadway;2- back heading;3- mineral rights circle;4- transportation roadway;5- track lane;6- coalcutter;The conveying of 7- scraper plate Machine;8- filling coal mining hydraulic support;9- Crushing Station;10- stocker;11- batching hole;12- downhole gangue storehouse;13- haul adhesive tape Conveyer;14- elevating conveyor;The porous bottom-dump conveyer of 15-;16- dumping pit.
Specific embodiment:
The invention will be further described below in conjunction with the accompanying drawings.Following case study on implementation is only used for clearly illustrating this hair Bright technical solution, and not intended to limit the protection scope of the present invention.
As shown in Figure 1, this method fills transportation system in the outdoor slag for forming complete set, open-pit mine blast is stacked Slag as attal, be filled into end side filling coal mining work face goaf 2, safety coal extraction end while controlling side slope Side pressure coal.The specific steps are that:
A. hole bottom is helped at opencut end, tunnels trunk roadway 1 and back heading 2 in parallel along seam inclination direction;Trunk roadway with Back heading 2 is at a distance of 20m, and for the driving of trunk roadway 1 at away from mineral rights circle 20m, back heading 2 is 30m long;
B. transportation roadway 4 and track lane 5, transport are tunneled along bearing direction is parallel respectively in trunk roadway and the back heading end of a lane Lane 4 and the driving of track lane 5 penetrate through transportation roadway 4 and track lane 5, form open-off cut and complete ventage at away from mineral rights circle 20m System;
C. stoping-and-filling working face, including coalcutter 6, drag conveyor 7 and the hydraulic branch of filling coal mining are arranged in open-off cut Frame 8 etc.;
D. it is disposed about Crushing Station 9 in mineral rights circle 3, break process is carried out to outdoor slag, makes its partial size < 30mm;
E. Crushing Station 9 is disposed about vertical transport system simultaneously, and broken outdoor slag is delivered to stoping-and-filling work Make face;
F. it mines and is carried out simultaneously with packing job, while 6 coal cutting of coalcutter, the filled hydraulic branch of mining of outdoor slag Frame 8 is delivered to goaf, and the packing job of the drilling depth is completed in filled coal mining hydraulic support reinforcement mechanism compacting;
G. step f is repeated, coal mining, the packing job of next drilling depth are continued, until completing entire end side stoping-and-filling work Make the coal mining and filling in face.
Vertical transport system includes that waste bin 12 is put in stocker 10 on well, batching hole 11, underground, and stocker 10 is located on well At the top of opencut, about 11 batching hole extends vertically through opencut extremely with 4 connection of transportation roadway, and outdoor slag passes through by stocker 10 on well Batching hole 11 falls, and the haul rubber conveyer 13 of transportation roadway is dropped down by the drain hole in downhole gangue storehouse 12, through elevating conveyor 14 It is transported to working face, forms underground filling material transport system;11 diameter of batching hole of vertical transport system is 40cm.
Downhole gangue storehouse 12 from top to bottom successively includes buffer, storage bin and drain hole, the upper plan radius of buffer It is identical as batching hole 11, become larger it is identical as columnar storage bin radius to lower plane, buffer be used to reduce filling material Material throws into the impact force in storage bin, the radius R=2.5m of storage bin, total height 20m.The drain hole of storage bin lower part is presented The small cone bucket shape in the big lower part in portion, filler are conveyed from storage bin by the haul adhesive tape that drain hole buffering falls to transportation roadway Machine 13.
Outdoor slag is mainly ground mixture, through open-pit mine blast by Leather Belt Conveyance to Crushing Station.
Side stoping-and-filling working face in end uses filling coal mining hydraulic support 8, and filling process is as follows: in 6 coal cutting of coalcutter Meanwhile outdoor slag is transported through underground filling material transport system to coal working face, is conveyed by the porous bottom-dump in bracket rear The dumping pit 16 of machine 15, which unloads, drops down onto goaf, and by the reinforcement mechanism on 8 pedestal of filling coal mining hydraulic support to attal into Row pushes compacting, forms the closely knit obturation for connecing top.
The new slag generated after working face mining is transported to Crushing Station after sorting on well, refills after broken into underground.
The above is only a preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art For member, without departing from the technical principles of the invention, several improvement and deformations can also be made, these improvement and deformations Also it should be regarded as protection scope of the present invention.

Claims (8)

1. recovery method is filled by a kind of row of adopting, open coal mine end side, characterized in that arrangement stoping-and-filling working face is helped at opencut end, And vertical transport system is established in open coal mine mineral rights circle, side stoping-and-filling working face in end is delivered to after outdoor slag is crushed, Bashing while back production, side pressure coal in safety coal extraction end while controlling side slope, comprising the following steps:
A. hole bottom is helped at opencut end, tunnels trunk roadway and back heading in parallel along seam inclination direction, the length of trunk roadway is big In back heading;
B. transportation roadway and track lane are tunneled along bearing direction is parallel respectively in trunk roadway and the back heading end of a lane, penetrates through transportation roadway With track lane, open-off cut and complete ventilating system are formed;
C. stoping-and-filling working face, including coalcutter, drag conveyor and filling coal mining hydraulic support are arranged in open-off cut;
D. it is disposed about Crushing Station in mineral rights circle, break process is carried out to outdoor slag;
E. Crushing Station is disposed about vertical transport system simultaneously, passes through vertically disposed batching hole and transportation roadway from opencut top Broken outdoor slag is delivered to stoping-and-filling working face by connection;
F. it mines and is carried out simultaneously with packing job, while coalcutter coal cutting, the outdoor filled coal mining hydraulic support of slag is defeated It send to goaf, the packing job of the drilling depth is completed in filled coal mining hydraulic support reinforcement mechanism compacting;
G. step f is repeated, coal mining, the packing job of next drilling depth are continued, until completing entire end side stoping-and-filling working face Coal mining and filling.
2. recovery method is filled by a kind of row of adopting, open coal mine end side according to claim 1, characterized in that trunk roadway and pair are flat At a distance of 20m, trunk roadway is tunneled at away from mineral rights circle 20m in lane, and the long 30m of back heading, transportation roadway and track lane are tunneled to away from mineral rights circle At 20m.
3. recovery method is filled by a kind of row of adopting, open coal mine end side according to claim 1, it is characterized in that establishes is vertical defeated Sending system includes stocker on well, batching hole, downhole gangue storehouse, and stocker is located at the top of opencut on well, sagging on batching hole Directly through opencut to transportation roadway connection, outdoor slag falls by stocker on well through batching hole, passes through downhole gangue storehouse Drain hole drops down onto the haul rubber conveyer of transportation roadway, is transported to working face through elevating conveyor, forms underground filling material transportation system System.
4. recovery method is filled by a kind of row of adopting, open coal mine end side according to claim 1, it is characterized in that the underground cash established Stone storehouse from top to bottom successively includes buffer, storage bin and drain hole, the radius R=2.5m of storage bin, total height 20m.
5. recovery method is filled by a kind of row of adopting, open coal mine end side according to claim 3, characterized in that the batching hole is straight Diameter is 40cm.
6. recovery method is filled by a kind of row of adopting, open coal mine end side according to claim 1, characterized in that the outdoor slag Predominantly ground mixture, through open-pit mine blast by Leather Belt Conveyance to Crushing Station.
7. recovery method is filled by a kind of row of adopting, open coal mine end side according to claim 1, characterized in that the outdoor slag Partial size < 30mm after Crushing Station break process.
8. recovery method is filled by a kind of row of adopting, open coal mine end side according to claim 1, characterized in that end side filling Stope uses filling coal mining hydraulic support, and filling process is as follows: while coalcutter coal cutting, outdoor slag is through underground Attal transportation system transports to coal working face, unloaded by the dumping pit of the porous bottom-dump conveyer in bracket rear drop down onto it is mined out Area, and carry out pushing compacting to attal by the reinforcement mechanism on filling coal mining hydraulic support foundation forms the closely knit top that connects Obturation.
CN201910608448.4A 2019-07-08 2019-07-08 Recovery method is filled by a kind of row of adopting, open coal mine end side Pending CN110284883A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910608448.4A CN110284883A (en) 2019-07-08 2019-07-08 Recovery method is filled by a kind of row of adopting, open coal mine end side

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910608448.4A CN110284883A (en) 2019-07-08 2019-07-08 Recovery method is filled by a kind of row of adopting, open coal mine end side

Publications (1)

Publication Number Publication Date
CN110284883A true CN110284883A (en) 2019-09-27

Family

ID=68020986

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910608448.4A Pending CN110284883A (en) 2019-07-08 2019-07-08 Recovery method is filled by a kind of row of adopting, open coal mine end side

Country Status (1)

Country Link
CN (1) CN110284883A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112983525A (en) * 2021-03-12 2021-06-18 中国矿业大学 Inner soil discharge yard ditch remaining discharge method beneficial to ventilation of near-horizontal opencast coal mine stope
CN114320298A (en) * 2022-01-05 2022-04-12 国家能源集团国源电力有限公司 Coal mining method
CN116498326A (en) * 2023-05-10 2023-07-28 中国矿业大学 Collaborative mining method for end slope compression of open pit coal mine in cold region

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102748071A (en) * 2012-06-20 2012-10-24 鄂托克前旗长城煤矿有限责任公司 Underground backfilling and transporting method for ground gangue of coal mine
CN102996131A (en) * 2012-12-10 2013-03-27 中国矿业大学 Solid-filling coal mining method with two pre-excavating tunnels for advancing
CN103939102A (en) * 2014-04-14 2014-07-23 中国矿业大学 Coal mining method for recovering coal briquettes under open-pit mine final coal through solid filling
CN206174998U (en) * 2016-10-26 2017-05-17 淮北工业建筑设计院有限责任公司 Material conveying system is thrown to fly ash and waste rock
CN107313804A (en) * 2017-06-29 2017-11-03 中国矿业大学 A kind of open coal mine end side pressure coal filling fully mechanized mining recovery method
CN109882240A (en) * 2019-03-29 2019-06-14 中国矿业大学 A kind of outdoor end side pressure coal filling mining system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102748071A (en) * 2012-06-20 2012-10-24 鄂托克前旗长城煤矿有限责任公司 Underground backfilling and transporting method for ground gangue of coal mine
CN102996131A (en) * 2012-12-10 2013-03-27 中国矿业大学 Solid-filling coal mining method with two pre-excavating tunnels for advancing
CN103939102A (en) * 2014-04-14 2014-07-23 中国矿业大学 Coal mining method for recovering coal briquettes under open-pit mine final coal through solid filling
CN206174998U (en) * 2016-10-26 2017-05-17 淮北工业建筑设计院有限责任公司 Material conveying system is thrown to fly ash and waste rock
CN107313804A (en) * 2017-06-29 2017-11-03 中国矿业大学 A kind of open coal mine end side pressure coal filling fully mechanized mining recovery method
CN109882240A (en) * 2019-03-29 2019-06-14 中国矿业大学 A kind of outdoor end side pressure coal filling mining system

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112983525A (en) * 2021-03-12 2021-06-18 中国矿业大学 Inner soil discharge yard ditch remaining discharge method beneficial to ventilation of near-horizontal opencast coal mine stope
CN112983525B (en) * 2021-03-12 2022-04-05 中国矿业大学 Inner soil discharge yard ditch remaining discharge method beneficial to ventilation of near-horizontal opencast coal mine stope
CN114320298A (en) * 2022-01-05 2022-04-12 国家能源集团国源电力有限公司 Coal mining method
CN114320298B (en) * 2022-01-05 2024-03-01 国家能源集团国源电力有限公司 Coal mining method
CN116498326A (en) * 2023-05-10 2023-07-28 中国矿业大学 Collaborative mining method for end slope compression of open pit coal mine in cold region
CN116498326B (en) * 2023-05-10 2023-10-31 中国矿业大学 Collaborative mining method for end slope compression of open pit coal mine in cold region

Similar Documents

Publication Publication Date Title
CN1963149B (en) Mining method for replacement of banded coal under building by waste rock
CN206571487U (en) A kind of barren rock and cementing layering wedging mining with stowing structure
CN109488301A (en) A kind of mine, which picks up, fills place&#39;s recovery method
CN112377247B (en) In-situ grouting filling method for in-situ separation of coal mine underground gangue
CN110424966B (en) Ultrahigh water material filling working face gangue pumping entry retaining non-coal pillar mining method
CN106869931A (en) A kind of barren rock and cementing layering wedging mining with stowing technique and its structure
CN103590831A (en) Novel mining method of gently-inclined thin and medium thickness ore bodies
CN110284883A (en) Recovery method is filled by a kind of row of adopting, open coal mine end side
CN109630112B (en) N00 mining method of cut top filling
CN109869150B (en) Mine resource subsection full-mining local-charging mining method
CN109403974A (en) A kind of mine, which picks up, unloads pumping and fills lasting exploit design method
CN104453994A (en) Gob-side entry retaining method for putting top waste rock down to achieve roadway side packing
CN113565510B (en) Ultra-thick coal seam fully mechanized filling mining method based on underground gangue pile
CN1782326B (en) Method for treating waste rock in coal mine
CN102808624A (en) System and method for simultaneous mining of coal gangue
CN116378661A (en) Mine production method for fully extracting coal seam
CN1131368C (en) Mining method by cutting ore breakdown and dry filling artificial ore pillars
CN113931630B (en) Mechanized non-waste mining method for deep metal deposit
CN113565509B (en) Fully-mechanized caving filling mining method for extra-thick coal seam based on underground gangue strips
CN102444418B (en) Device for filling roadway
CN111852473B (en) Mining method of thin vein
CN111173560A (en) Filling replacement mining method for &#39;three lower&#39; coal pressing area
CN212272289U (en) Filling replacement mining equipment for &#39;three lower&#39; coal pressing area
CN111456742B (en) High-grade common mining opposite-drawing working face roadway of thin coal seam and forming method thereof
CN114215592B (en) Green mining method for filling long-wall working face gangue and ultra-high water material

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190927