CN102748071A - Underground backfilling and transporting method for ground gangue of coal mine - Google Patents

Underground backfilling and transporting method for ground gangue of coal mine Download PDF

Info

Publication number
CN102748071A
CN102748071A CN2012102039295A CN201210203929A CN102748071A CN 102748071 A CN102748071 A CN 102748071A CN 2012102039295 A CN2012102039295 A CN 2012102039295A CN 201210203929 A CN201210203929 A CN 201210203929A CN 102748071 A CN102748071 A CN 102748071A
Authority
CN
China
Prior art keywords
gangue
ground
spoil
cash
bin
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012102039295A
Other languages
Chinese (zh)
Other versions
CN102748071B (en
Inventor
刘笃鸿
陈东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
OTOG FRONT BANNER CHANGCHENG MINE CO Ltd
Original Assignee
OTOG FRONT BANNER CHANGCHENG MINE CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by OTOG FRONT BANNER CHANGCHENG MINE CO Ltd filed Critical OTOG FRONT BANNER CHANGCHENG MINE CO Ltd
Priority to CN201210203929.5A priority Critical patent/CN102748071B/en
Publication of CN102748071A publication Critical patent/CN102748071A/en
Application granted granted Critical
Publication of CN102748071B publication Critical patent/CN102748071B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention discloses an underground backfilling and transporting method for ground gangue of a coal mine. The method comprises the following steps of: arranging a gangue crusher and a belt conveyer on the ground, constructing a vertical gangue conveying hole of which the diameter is more than 0.5 meter from the ground to an underground constructed overhauling roadway, establishing a surge bin on one side of the overhauling roadway, drilling a gangue slipway with the diameter of 1 meter between the surge bin and the conventional gangue storage bin which is a gangue bin or a coal bin, and arranging an upper pipeline in the gangue slipway; and crushing the gangue on the ground, then loading the gangue into the vertical gangue conveying hole by using the belt conveyer, allowing the gangue to fall to the surge bin due to self weight and automatically fall to the gangue bin for storage through the gangue slipway, and transporting and backfilling a certain quantity of gangue to a goaf. The method is not affected by interactive interference of main shaft and secondary shaft hoisting systems, facilitates transportation by using self weight of the gangue, and is low in treatment cost.

Description

Backfill transportation resources under the coal mine ground waste shaft
Technical field
The present invention relates to the coal mine waste rock backfill technology.The cash backfill of washing that is specially adapted to the coal separation plant, colliery is handled.
Background technology
In the exploitation in colliery; The inevitable a large amount of spoil of association, along with the raising year by year of pit mining intensity, the output of spoil is increasing; The spoil of opening up stone head except that operating mine can directly directly be backfilling into the goaf in the down-hole; Spoil between mine construction stage, the spoil of operating mine coal separation plant all is put in ground, and pile up like a mountain.Existing mine spoil is handled has following several kinds of processing modes:
1. filling subsidence area: the surface subsidence district after mine is a kind of important mode of reclaiming with waste filling.Utilize the colliery cash as the subsidence area filler, can consume spoil in large quantities, solve the problem of reclaiming on the ground that subsides.But, containing a large amount of S, Mg, Na, K, Ca, Si, Fe, Al plasma panel in the coal mine waste rock, thereby there are serious pollution in environment and underground water and atmosphere, this kind method has greater environmental impacts.
2. generating: the discarded spoil of discharging in the coal mining process contains a certain amount of organic matter mostly, can utilize gangue in fluidized bed furnace, to burn and heat or generating, and the lime-ash after the burning can be used to produce constructional materialss such as cement.This kind method is had relatively high expectations to the calorific value of gangue, under the particular case, also must join colm and cooperate burning, and after the gangue burning, and emission gases processing cost up to standard is higher, and economic worth is not high, the applicable elements restriction.
3. brickmaking: the primary spoil of mine can and can utilize wherein contained organic spontaneous combustion, thereby economize in raw materials coal in order to batching brickmaking, and this method investment is little, and method is simple, and is widely-used.But in the brickmaking process, the part hazardous substances in the gangue is still residual, and the mankind are had potential health threat.And the spoil amount of brickmaking digestion is limited, does not possess the condition of extensive processing.
4. without any processing, directly be deposited in ground: this processing method land occupation, atmosphere pollution and water body, and destroy surface vegetation and view, have endless trouble.
5. waste filling: gangue is transported to the down-hole through mine car and belt, carries out the stope filling.This method meets the green exploitation policy of country, but the link of spoil transportation is many, and the equipment of input is many, can not realize continuous processing, and the cost that spoil is handled is higher.
Therefore, existing spoil treatment technology can not satisfy the raising of pit mining intensity far away, how to realize high strength, low cost, large-scale spoil processing, is the another new problem of current coal mining technical development.
Summary of the invention
The objective of the invention is to propose the backfill transportation resources of a kind of down-hole for solving the handling problem of spoil.
Technical scheme of the present invention is: spoil crushing engine and belt conveyer are set on ground; From ground to the maintenance tunnel of having constructed in the down-hole construction diameter greater than 0.5 meter vertical spoil material transport hole; One side is set up a surge bunker in the maintenance tunnel, utilizes existing waste bin or coal bunker as storage cash storehouse, between surge bunker and storage cash storehouse, gets through the slide cash road of 1 meter of a diameter; The slide cash is installed pipeline in the road, and slide angle of inclination, cash road is not less than 60 °; Spoil after pulverize on ground, is discharged in the vertical spoil material transport hole with belt conveyer, and the spoil deadweight falls to surge bunker, falls in the waste bin voluntarily through slide cash road to store again, and utilizes existing means of transportation to be backfilling into the goaf to a certain amount of back.
Be provided with wear-resistant sleeve in the above-mentioned spoil material transport hole;
The effective buffering of above-mentioned surge bunker highly is not less than 3 meters; Cut off with the brick wall of access path with thickness 50cm.
The present invention has the following advantages with present similar compared with techniques:
1. transportation system is independent, and the interactive interference that does not receive main shaft and auxiliary shaft to put forward system influences.
2. cost of transportation is low, utilizes spoil deadweight transportation, practices thrift processing cost.
3. system is simple, and corollary equipment is few, and early investment is few.
4. it is few to take personnel, and link is simple.
5. closed transportation, safe and reliable.
Description of drawings
Fig. 1 is the sketch map of the embodiment of the invention.
Among the figure: 1-crushing engine, 2-belt conveyer, 3-spoil material transport hole, 4-surge bunker, 5-access path, 6-slide cash road, 7-storage cash storehouse.
The specific embodiment
As shown in Figure 1, construction sequence of the present invention is following:
1. transportation system at first designes and constructes
Confirm the position in storage cash storehouse; Can utilize existing waste bin of mine or no coal bunker as storage cash storehouse 7; Access path 5 one sides of storage 7 tops, cash storehouse are widened, be divided into surge bunker 4, be not more than 60 degree inclination angles on the vertical direction of requirement storage cash storehouse 7 and surge bunker 4 with brick wall; Construct greater than the boring of 0.5 rice diameter at the vertical ground of surge bunker 4 simultaneously; Establish sleeve pipe in the boring as spoil material transport hole 3, to of the boring of storage cash storehouse 7 construction diameter, install pipeline in the boring as slipping cash road 6 greater than 1.0 meters at surge bunker 4; At ground configuration crushing engine 1 and belt conveyer 2 to spoil material transport hole.
2. the broken transportation of spoil
Wash cash and the digging gangue of coal separation plant, ground are discharged to spoil material transport hole 3 through belt conveyer 2 after crushing engine 1 is broken; The spoil freely falling body is transported to surge bunker 4; Utilize and pile up buffering, prevent to destroy bulkhead, piling height is not less than 3 meters; The spoil of piling up is passed to the waste filling work plane through transportation system's air transport then and carries out goaf filling through slipping cash road 6 from slipping in the storage cash storehouse 7.

Claims (1)

1. backfill transportation resources under the coal mine ground waste shaft is characterized in that, spoil crushing engine and belt conveyer are set on ground; From ground to the maintenance tunnel of having constructed in the down-hole construction diameter greater than 0.5 meter vertical spoil material transport hole; One side is set up a surge bunker in the maintenance tunnel, utilizes existing waste bin or coal bunker as storage cash storehouse, between surge bunker and storage cash storehouse, gets through the slide cash road of 1 meter of a diameter; The slide cash is installed pipeline in the road, and slide angle of inclination, cash road is not less than 60 °; Spoil after pulverize on ground, is discharged in the vertical spoil material transport hole with belt conveyer, and the spoil deadweight falls to surge bunker, falls in the waste bin voluntarily through slide cash road to store again, and is backfilling into the goaf to the transportation of a certain amount of back; Wherein:
Be provided with wear-resistant sleeve in the above-mentioned spoil material transport hole;
The effective buffering of above-mentioned surge bunker highly is not less than 3 meters; Cut off with the brick wall of access path with thickness 50cm.
CN201210203929.5A 2012-06-20 2012-06-20 Underground backfilling and transporting method for ground gangue of coal mine Expired - Fee Related CN102748071B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210203929.5A CN102748071B (en) 2012-06-20 2012-06-20 Underground backfilling and transporting method for ground gangue of coal mine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210203929.5A CN102748071B (en) 2012-06-20 2012-06-20 Underground backfilling and transporting method for ground gangue of coal mine

Publications (2)

Publication Number Publication Date
CN102748071A true CN102748071A (en) 2012-10-24
CN102748071B CN102748071B (en) 2014-08-06

Family

ID=47028525

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210203929.5A Expired - Fee Related CN102748071B (en) 2012-06-20 2012-06-20 Underground backfilling and transporting method for ground gangue of coal mine

Country Status (1)

Country Link
CN (1) CN102748071B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103603680A (en) * 2013-11-14 2014-02-26 山西潞安环保能源开发股份有限公司 One-well two-bin type quick conveying method for deep tunnel guniting and concreting materials
WO2014131323A1 (en) * 2013-02-28 2014-09-04 中国矿业大学 Method and device for using gangue aboveground to backfill mine goaf
CN107120139A (en) * 2017-06-06 2017-09-01 中煤第五建设有限公司第工程处 A kind of shaft coal pocket construction fast and safely goes out cash system and goes out cash method
CN108005715A (en) * 2017-11-28 2018-05-08 中国矿业大学 A kind of mine multipurpose vertical well conduit formula material-transporting system
CN108005717A (en) * 2017-11-28 2018-05-08 中国矿业大学 A kind of mine multipurpose vertical spiral material transport system
CN108331581A (en) * 2018-03-27 2018-07-27 新汶矿业集团有限责任公司翟镇煤矿 A kind of system that single block filling mining can be achieved
CN110284883A (en) * 2019-07-08 2019-09-27 中国矿业大学 Recovery method is filled by a kind of row of adopting, open coal mine end side
CN114033480A (en) * 2021-11-09 2022-02-11 晋能控股装备制造集团金鼎山西煤机有限责任公司 Modular angle-variable waste rock square bin

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU688646A1 (en) * 1977-08-18 1979-09-30 Среднеазиатское Отделение Всесоюзного Ордена Ленина Проектно-Изыскательского И Научно-Исследовательского Института "Гидропроект" Им. С.Я.Жука Inclined rock delivery shaft
SU1416715A1 (en) * 1986-06-30 1988-08-15 Московский Горный Институт Arrangement for delivering sticking ore
RU1810589C (en) * 1990-04-16 1993-04-23 Всесоюзный научно-исследовательский горно-металлургический институт цветных металлов Ore chute
CN101566072A (en) * 2009-05-22 2009-10-28 中国矿业大学 Large vertical depth solid feeding system and large vertical depth solid feeding process for filling extracted coal
CN201554495U (en) * 2009-12-04 2010-08-18 中国矿业大学 Tray type vertical continuous solid material feeding system
CN101915100A (en) * 2010-08-24 2010-12-15 霍州煤电集团有限责任公司 Loess-filling coal-mining method in a coal mine
CN101845965B (en) * 2010-05-11 2012-05-23 中国矿业大学 Pressure discharge method for anti-blocking chamber of feeding well

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU688646A1 (en) * 1977-08-18 1979-09-30 Среднеазиатское Отделение Всесоюзного Ордена Ленина Проектно-Изыскательского И Научно-Исследовательского Института "Гидропроект" Им. С.Я.Жука Inclined rock delivery shaft
SU1416715A1 (en) * 1986-06-30 1988-08-15 Московский Горный Институт Arrangement for delivering sticking ore
RU1810589C (en) * 1990-04-16 1993-04-23 Всесоюзный научно-исследовательский горно-металлургический институт цветных металлов Ore chute
CN101566072A (en) * 2009-05-22 2009-10-28 中国矿业大学 Large vertical depth solid feeding system and large vertical depth solid feeding process for filling extracted coal
CN201554495U (en) * 2009-12-04 2010-08-18 中国矿业大学 Tray type vertical continuous solid material feeding system
CN101845965B (en) * 2010-05-11 2012-05-23 中国矿业大学 Pressure discharge method for anti-blocking chamber of feeding well
CN101915100A (en) * 2010-08-24 2010-12-15 霍州煤电集团有限责任公司 Loess-filling coal-mining method in a coal mine

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2014131323A1 (en) * 2013-02-28 2014-09-04 中国矿业大学 Method and device for using gangue aboveground to backfill mine goaf
CN103603680A (en) * 2013-11-14 2014-02-26 山西潞安环保能源开发股份有限公司 One-well two-bin type quick conveying method for deep tunnel guniting and concreting materials
CN103603680B (en) * 2013-11-14 2015-09-02 山西潞安环保能源开发股份有限公司 Deep tunnel whitewashing and the quick Transfer method of concreting material one well two storehouse formula
CN107120139A (en) * 2017-06-06 2017-09-01 中煤第五建设有限公司第工程处 A kind of shaft coal pocket construction fast and safely goes out cash system and goes out cash method
CN108005715A (en) * 2017-11-28 2018-05-08 中国矿业大学 A kind of mine multipurpose vertical well conduit formula material-transporting system
CN108005717A (en) * 2017-11-28 2018-05-08 中国矿业大学 A kind of mine multipurpose vertical spiral material transport system
CN108331581A (en) * 2018-03-27 2018-07-27 新汶矿业集团有限责任公司翟镇煤矿 A kind of system that single block filling mining can be achieved
CN110284883A (en) * 2019-07-08 2019-09-27 中国矿业大学 Recovery method is filled by a kind of row of adopting, open coal mine end side
CN114033480A (en) * 2021-11-09 2022-02-11 晋能控股装备制造集团金鼎山西煤机有限责任公司 Modular angle-variable waste rock square bin
CN114033480B (en) * 2021-11-09 2024-03-12 晋能控股装备制造集团金鼎山西煤机有限责任公司 Modular angle-variable gangue square bin

Also Published As

Publication number Publication date
CN102748071B (en) 2014-08-06

Similar Documents

Publication Publication Date Title
CN102748071B (en) Underground backfilling and transporting method for ground gangue of coal mine
Zheng et al. Challenges and opportunities of using tunnel boring machines in mining
AU2014223132B2 (en) Method and device for using gangue aboveground to backfill mine goaf
CN102889084B (en) Continuous mining technique for thin coal layer of opencast coal mine
Ju et al. Vertical transportation system of solid material for backfilling coal mining technology
CN105736045A (en) Bag type filling system and filling method for controlling water inrush from gob floor
CN109736808B (en) Underground mine mining process without tailing pond building
CN202745931U (en) Underground backfilling and conveying system for ground gangue of coal mine
CN105971605A (en) A non-waste mining method for underground mines
CN102704996B (en) A kind of side dump stowage conveyer
CN210152649U (en) Coal mine mining, selecting, filling and reserving integrated mining system
CN107676096A (en) A kind of continuous mining system of iron and steel industry surface mine and production practice
SS et al. Outlook on the implementation of steep inclined conveyors in deep open pits
Brannon et al. Development of and production update for the Grasberg Block Cave mine–PT Freeport Indonesia
CN205714207U (en) The rock slag of a kind of mining TBM discharges system
CN205503143U (en) Primary waste rock is broken system in pit
CN102716901A (en) Method for disposing and reusing building waste nearby coal mine
Yanli et al. Underground backfilling technology for waste dump disposal in coal mining district
Wei et al. A novel clean mining technology involving the underground disposal of waste rock in coal mines
CN102720532A (en) Method for transporting grouting material vertical delivery pipe used for mine
RU2196895C2 (en) Method of kimberlite pipe mining
Medvedev et al. Cleaner production in mining industry: a flowsheet for underground mining of iron ore deposit
CN202745925U (en) Conveying system of mining spouting material vertical feed delivery pipe
CN107218077B (en) Rock gangway multimode combines cash technique out
CN206174998U (en) Material conveying system is thrown to fly ash and waste rock

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140806

Termination date: 20150620

EXPY Termination of patent right or utility model