CN102716901A - Method for disposing and reusing building waste nearby coal mine - Google Patents

Method for disposing and reusing building waste nearby coal mine Download PDF

Info

Publication number
CN102716901A
CN102716901A CN2012102049032A CN201210204903A CN102716901A CN 102716901 A CN102716901 A CN 102716901A CN 2012102049032 A CN2012102049032 A CN 2012102049032A CN 201210204903 A CN201210204903 A CN 201210204903A CN 102716901 A CN102716901 A CN 102716901A
Authority
CN
China
Prior art keywords
building waste
waste
coal mine
building
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012102049032A
Other languages
Chinese (zh)
Inventor
刘笃鸿
陈东
崔西玉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
OTOG FRONT BANNER CHANGCHENG MINE CO Ltd
Original Assignee
OTOG FRONT BANNER CHANGCHENG MINE CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by OTOG FRONT BANNER CHANGCHENG MINE CO Ltd filed Critical OTOG FRONT BANNER CHANGCHENG MINE CO Ltd
Priority to CN2012102049032A priority Critical patent/CN102716901A/en
Publication of CN102716901A publication Critical patent/CN102716901A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Processing Of Solid Wastes (AREA)

Abstract

The invention discloses a method for disposing and reusing building waste nearby a coal mine. Firstly, a building waste crushing plant is arranged on the ground, the building waste is primarily crushed by a crusher, and the diameter of the crushed building waste is not larger than 5 centimeters. Secondly, waste rock conveying holes are constructed undergrounds on the coal mine, and a waste rock transfer bin is arranged in the underground of the coal mine. Thirdly, the crushed building waste is conveyed into the underground transfer bin through the waste rock conveying holes. Fourthly, an underground waste rock filling and conveying system is used for backfilling the building waste to a coal face gob, so that the building waste is harmlessly disposed. By the aid of a coal mine waste rock backfilling and filling system, the building waste is crushed, conveyed and then filled in the gob of the coal mine, efficient environment-friendly mining of the coal mine can be realized, the problem of difficulty in disposing the building waste is solved, and the method has the advantages of zero pollution, high efficiency, low cost and easiness in operation.

Description

Building waste is handled reuse method near the coal field
Technical field
The present invention relates near the processing of the building waste of coal field.
Background technology
According to measuring and calculating; Per 10,000 square metres of brick mix structures, frame structure building will produce 500-600 ton building waste; 10,000 square metres of brick mix structures of every dismounting, the old building of frame structure will produce 10000 tons of building wastes; Quantity mega structure rubbish like this has not only taken a large amount of soils, also environment has been caused pollution.
Existing processing method is through vehicles transportation, and building waste is carried out landfill or air storage processing, has not only taken a large amount of soils; Also influenced regional environment looks, caused the dust pollution of air, along with the construction of more buildings; The harmless treatment of building waste will more and more become a serious environmental problem, and after the coal mining; To produce the goaf, and cause surface collapse, the soil loses the farming effect.
Summary of the invention
The present invention is the handling problem that solves near the building waste of coal field, and a kind of reuse method that building waste is backfilling into the goaf is provided.
Reuse method is:
The first step: the break process factory of a building waste is set on ground, utilizes disintegrating machine that building waste is carried out preliminary break process, broken back diameter must not be greater than 5 centimeters.
Second step: to down-hole construction cash factory material transport hole, open up a gangue reprint storehouse in the down-hole at coal mine ground;
The 3rd step: the building waste particle after the fragmentation is slipped in the transfer bin of down-hole through the spoil material transport hole certainly;
The 4th step: utilize that waste filling transportation system is backfilling into the coal work face goaf with building waste under the existing mine, thereby realize the harmless treatment of building waste.
The present invention is by coal mine waste rock backfill, filling system; Through broken, transit link is transported to mine goaf and carries out filling with building waste; Can either realize the high-efficiency environment friendly exploitation of mine; Having solved the processing difficult problem of building waste, had zero pollution, high efficiency, low cost, advantage such as easy to operate, is the twin technology of mine waste filling of mutual reciprocity and mutual benefit.
Description of drawings
Fig. 1 is that building waste is handled the reuse method sketch map near the coal field of the present invention.
Among the figure: 1-disintegrating machine, 2-travelling belt, 3-spoil material transport hole, 4-transfer bin, 5-filling belt, 6-working face.
The specific embodiment
Further specify near the coal field of the present invention building waste below in conjunction with accompanying drawing and handle reuse method.
As shown in Figure 1:
The first step: the break process factory of a building waste at first is set on ground, utilizes disintegrating machine 1 that building waste is carried out preliminary break process, broken back diameter must not be greater than 5 centimeters.
Second step: to down-hole construction cash factory material transport hole 3, open up a gangue reprint storehouse 4 in the down-hole at coal mine ground;
The 3rd step: the building waste particle after the fragmentation is transported to spoil material transport hole 3 with travelling belt 2, and particle slips in the down-hole transfer bin 4 through spoil material transport hole 3 certainly;
The 4th step: utilize that waste filling belt 5 is filled to working face 6 with the building waste particle after the fragmentation under the existing mine.

Claims (1)

1. near the building waste of coal field is handled reuse method, it is characterized in that:
The first step: the break process factory of a building waste is set on ground, utilizes disintegrating machine that building waste is carried out preliminary break process, broken back diameter must not be greater than 5 centimeters;
Second step: to down-hole construction cash factory material transport hole, open up a gangue reprint storehouse in the down-hole at coal mine ground;
The 3rd step: the building waste particle after the fragmentation is slipped in the transfer bin of down-hole through the spoil material transport hole certainly;
The 4th step: utilize that waste filling transportation system is backfilling into the coal work face goaf with building waste under the mine, thereby realize the harmless treatment of building waste.
CN2012102049032A 2012-06-20 2012-06-20 Method for disposing and reusing building waste nearby coal mine Pending CN102716901A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012102049032A CN102716901A (en) 2012-06-20 2012-06-20 Method for disposing and reusing building waste nearby coal mine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012102049032A CN102716901A (en) 2012-06-20 2012-06-20 Method for disposing and reusing building waste nearby coal mine

Publications (1)

Publication Number Publication Date
CN102716901A true CN102716901A (en) 2012-10-10

Family

ID=46942846

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012102049032A Pending CN102716901A (en) 2012-06-20 2012-06-20 Method for disposing and reusing building waste nearby coal mine

Country Status (1)

Country Link
CN (1) CN102716901A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105370279A (en) * 2015-11-16 2016-03-02 姜福兴 High initial strength filling mining method
CN106837412A (en) * 2017-02-28 2017-06-13 山东科技大学 It is a kind of to build the method that bashing is spaced with house refuse clamp dog
CN110777819A (en) * 2019-11-07 2020-02-11 山西大地民基生态环境股份有限公司 High and steep mine mountain reconstruction ecological restoration method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0548491A1 (en) * 1991-12-25 1993-06-30 Kyoei Bussan Kabushiki Kaishi Method of regenerating aggregate from construction waste
CN1298772A (en) * 1999-12-06 2001-06-13 王健 Process for treating and reclaiming construction garbage
JP3790806B2 (en) * 1996-07-04 2006-06-28 ヤンマー建機株式会社 Crushing vehicle
CN101463732A (en) * 2009-01-05 2009-06-24 杨洪涛 Continuous waste rock back-filling system for coal mine down-hole goaf
CN101586460A (en) * 2009-06-02 2009-11-25 中国矿业大学 Coal mining solid filling method
CN102444418A (en) * 2011-12-12 2012-05-09 山东明兴矿业集团有限公司 Device for filling roadway
CN202741419U (en) * 2012-06-20 2013-02-20 鄂托克前旗长城煤矿有限责任公司 Treatment and reuse system of construction waste near coal district

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0548491A1 (en) * 1991-12-25 1993-06-30 Kyoei Bussan Kabushiki Kaishi Method of regenerating aggregate from construction waste
JP3790806B2 (en) * 1996-07-04 2006-06-28 ヤンマー建機株式会社 Crushing vehicle
CN1298772A (en) * 1999-12-06 2001-06-13 王健 Process for treating and reclaiming construction garbage
CN101463732A (en) * 2009-01-05 2009-06-24 杨洪涛 Continuous waste rock back-filling system for coal mine down-hole goaf
CN101586460A (en) * 2009-06-02 2009-11-25 中国矿业大学 Coal mining solid filling method
CN102444418A (en) * 2011-12-12 2012-05-09 山东明兴矿业集团有限公司 Device for filling roadway
CN202741419U (en) * 2012-06-20 2013-02-20 鄂托克前旗长城煤矿有限责任公司 Treatment and reuse system of construction waste near coal district

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105370279A (en) * 2015-11-16 2016-03-02 姜福兴 High initial strength filling mining method
CN105370279B (en) * 2015-11-16 2017-12-26 北京科技大学 A kind of high initial strength filling coal mining method
CN106837412A (en) * 2017-02-28 2017-06-13 山东科技大学 It is a kind of to build the method that bashing is spaced with house refuse clamp dog
CN106837412B (en) * 2017-02-28 2019-01-11 山东科技大学 A method of building and house refuse clamp dog interval bashing
CN110777819A (en) * 2019-11-07 2020-02-11 山西大地民基生态环境股份有限公司 High and steep mine mountain reconstruction ecological restoration method

Similar Documents

Publication Publication Date Title
AU2014223132B2 (en) Method and device for using gangue aboveground to backfill mine goaf
CN112377247B (en) In-situ grouting filling method for in-situ separation of coal mine underground gangue
CN104033153A (en) Coal mine underground mining, dress and filling integral method
CN102748071B (en) Underground backfilling and transporting method for ground gangue of coal mine
AU2018376026B2 (en) Microbial modification filling-based coal mining method
CN101215976B (en) Down-hole gangue pump packing system and method
CN109882239B (en) Open-pit end slope coal-pressing radial filling mining method
CN103590851A (en) Underground waste-rock concrete preparation, pumping and filling system and method
CN105370279A (en) High initial strength filling mining method
CN104453994A (en) Gob-side entry retaining method for putting top waste rock down to achieve roadway side packing
CN201982137U (en) Underground preparation device taking waste rock as aggregate concrete filling material
CN102716901A (en) Method for disposing and reusing building waste nearby coal mine
CN113460562B (en) Method for sealing and storing coal-electricity fly ash in abandoned coal mining space
CN108331580B (en) Clean and efficient coal mining method
CN112610271B (en) Drilling tank slurry backfilling device and method for coal mining subsidence area treatment
CN110284883A (en) Recovery method is filled by a kind of row of adopting, open coal mine end side
CN1952349A (en) Mining method for replacement of pressed coal under village by waste rock
CN105971605A (en) A non-waste mining method for underground mines
CN202741419U (en) Treatment and reuse system of construction waste near coal district
WO2020243919A1 (en) Mining machine and mining method applicable to fluidized minging of ore bodies
Yanli et al. Underground backfilling technology for waste dump disposal in coal mining district
CN104453998A (en) Coal mine solid filling coal mining ground material throwing system and technology
CN104481533A (en) Underground mine and ore lifting method
CN201165881Y (en) Downhole gangue pump filling system
CN202745931U (en) Underground backfilling and conveying system for ground gangue of coal mine

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20121010