CN1131368C - Mining method by cutting ore breakdown and dry filling artificial ore pillars - Google Patents
Mining method by cutting ore breakdown and dry filling artificial ore pillars Download PDFInfo
- Publication number
- CN1131368C CN1131368C CN 02109245 CN02109245A CN1131368C CN 1131368 C CN1131368 C CN 1131368C CN 02109245 CN02109245 CN 02109245 CN 02109245 A CN02109245 A CN 02109245A CN 1131368 C CN1131368 C CN 1131368C
- Authority
- CN
- China
- Prior art keywords
- ore
- cutting
- falls
- artificial
- ore deposit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Aiming, Guidance, Guns With A Light Source, Armor, Camouflage, And Targets (AREA)
- Manufacture And Refinement Of Metals (AREA)
Abstract
The present invention relates to a mining method by cutting ore breakdown and dry filling artificial ore pillars, which belongs to the field of mining. The present invention is suitable for jade ore deposits of any inclination angle and any thickness. The present invention is characterized in that artificial ore pillars adopt cutting ore breakdown; a bumper pad is arranged on the lower side of ore breakdown; a special ore support sledge can be used for transport. The present invention has the advantages that the ore recovery ratio can be enhanced from 80% to 95%; the finished product ore yield rate can be enhanced from 20% to 85%; the finished product ore can be enhanced to 1 to 2 grades; the economic value of the mining quantity can be enhanced to more than ten times.
Description
Technical field
The invention belongs to field of mining, particularly a kind of underground mining method.
Background technology
Jade is the important source material material of high-grade handicraft, the underground mining of present jade deposits, generally adopt shallow-hole shrinkage stoping method, miner's skill because the technology arrangement of this mining methods and explosion fall, the jade ore deposit rate of recovery is hanged down reach because of producing many secondary interstices in the jade material material piece of extraction, again through felling and transporting collision mutually between the ore in the process, make the further subject to severe risks of damage of globality of the jade material material piece of extraction, cause the output capacity in jade finished product ore deposit low, the grade in finished product ore deposit is low, has a strong impact on the economic benefit of jade ore deposit exploitation.
Summary of the invention
Purpose design of the present invention is a kind of to improve ore recovery ratio and the secondary interstice of extracted ore is reduced as far as possible, in the process of felling and transporting, do not destroy extracted ore piece globality as far as possible, thereby make finished product ore deposit output capacity, all high mining methods of finished product ore deposit grade.
The present invention realizes like this, be divided into several nuggets along orebody trend, in the ore body lower wall country rock of each nugget, drive ore drawing courtyard 1 and pedestrian's vent (-escape) raise 2, and the upper end of two courtyards is linked to each other with return aircourse 3, the lower end links to each other with haulage drift 10, rim orebody trend and under ore body near the cutting gallery 9 of prospect outside arteries and veins of ore body pick a cutting gallery 8 and a vertical orebody trend, drive a stope connection roadway 4 every 5 meters to ore body 13 at pedestrian's vent (-escape) raise 6, contact ore body end at the stope connection roadway, drive an arteries and veins near the ore body lower wall and cut courtyard 5 outward, stopping sequence routinely, in vertical direction back production successively from lower to upper, begin to the 1 direction back production of ore drawing courtyard by pedestrian's vent (-escape) raise 2 in the horizontal direction, be that the secondary interstice that makes the lump under adopting reduces as far as possible, adopt and cut the ore deposit, be exactly to adopt intensive parallel hole and coupling charging not at place, the non-scope of freedom,, adopt not powder charge emptying aperture to carry out the Cutting Control explosion ore deposit that falls in junction, two cross sections; Damaged when ore falls when falling the ore deposit for reducing is provided with cushion pad below the ore deposit that falls; The lump that cutting falls, the special year ore deposit vehicle of packing into is transported to haulage level through ore drawing courtyard 1 usefulness winch 12; The goaf is with adopting with filling, and casting resin 14 is a waste wool stone, as the horsestone in the mineral ore, non-ore rock, cut the rock of group's wall; For improving ore recovery ratio, do artificial foundation 2 and artificial wall 11.
The present invention can make ore recovery ratio bring up to 95% by 80%, and finished product ore deposit output capacity brings up to 85% by 20%, and 1~2 grade can be improved in the finished product ore deposit.
Description of drawings
Fig. 1 is the stope generalized section of mining method by cutting ore breakdown and dry filling artificial ore pillars along orebody trend.
Fig. 2 is a mining method by cutting ore breakdown and dry filling artificial ore pillars stope horizontal profile schematic diagram.
Fig. 3 is the stope floor map of mining method by cutting ore breakdown and dry filling artificial ore pillars haulage level.
Fig. 4 is the stope generalized section of the vertical orebody trend of mining method by cutting ore breakdown and dry filling artificial ore pillars.
Fig. 5 is a mining method by cutting ore breakdown and dry filling artificial ore pillars ore drawing courtyard ore drawing view.
The specific embodiment
Mining method by cutting ore breakdown and dry filling artificial ore pillars, be divided into several nuggets for 30~50 meters along orebody trend, 20~60 meters of Duan Gaowei, in the ore body lower wall country rock of each nugget, drive ore drawing courtyard 1 and pedestrian's vent (-escape) raise 2, and the upper end of two courtyards is linked to each other with return aircourse 3, the lower end links to each other with haulage drift 10, rim orebody trend and drive the cutting gallery 9 of cutting gallery 8 and the vertical orebody trend of prospecting outside the arteries and veins near ore body under ore body, drive a stope connection roadway 4 every 5 meters to ore body 13 at pedestrian's vent (-escape) raise 6, at the contact ore body end of stope connection roadway 4, drive an arteries and veins near the ore body lower wall and cut courtyard 5 outward.Stopping sequence in vertical direction back production successively from lower to upper, is begun by pedestrian's vent (-escape) raise 2 in the horizontal direction routinely, and to ore drawing sky and 1 direction back production, the face height is 2~2.5 meters.The secondary interstice of the lump under adopting being reduced as far as possible, adopt the cutting ore deposit that falls, is exactly to adopt intensive parallel hole and coupling charging not at place, the non-scope of freedom, in junction, two cross sections, adopts not powder charge emptying aperture to carry out the Cutting Control explosion ore deposit that falls; Damaged when ore falls when falling the ore deposit for reducing, placing old tire below the ore deposit that falls is cushion pad; The lump that cutting falls, the holder ore deposit sledge of packing into special, the winch 12 in ore drawing courtyard 1 is transferred to haulage level; The goaf is with adopting with filling, and casting resin 14 can cut the rock of group's wall for horsestone, non-ore rock, insufficient section in the mineral ore; Be to improve ore recovery ratio, artificial sill pillar 2 can be made steel concrete, and artificial wall 11 can make concrete.
Claims (6)
1, a kind of mining method by cutting ore breakdown and dry filling artificial ore pillars, its production process is, be divided into several nuggets for 30~50 meters along orebody trend, 20~60 meters of Duan Gaowei, in the ore body lower wall country rock of each nugget, drive ore drawing courtyard (1) and pedestrian's vent (-escape) raise (2), and the upper end of two courtyards (1) (2) is linked to each other with return aircourse (3), the lower end links to each other with haulage drift (10), prospect at the following rim orebody trend of ore body (13) and outside the cutting gallery (9) of a cutting gallery (8) and a vertical orebody trend near arteries and veins of ore body pick, the pedestrian ventilate the sky also (6) drive a stope connection roadway (4) every 5 meters to ore body, contact ore body (13) end at the stope connection roadway, drive an arteries and veins near ore body (13) lower wall and cut courtyard (5) outward, in vertical direction back production successively from lower to upper, by pedestrian's vent (-escape) raise (2) beginning,, it is characterized in that in the horizontal direction to ore drawing courtyard (1) direction back production:
A, adopt the cutting ore deposit that falls;
B, below the ore deposit that falls, cushion pad is set;
The lump that c, cutting fall, the special ore deposit vehicle that carries of packing into is carried;
D, goaf dry stowing are with adopting with filling;
E, do artificial foundation (2) and artificial wall (11).
2, mining methods according to claim 1 is characterized in that cutting that its adopts ore deposit that falls, and are to adopt intensive parallel hole and coupling charging not at place, the non-scope of freedom, in junction, two cross sections, adopt not powder charge emptying aperture to cut the controlled blasting ore deposit that falls.
3, mining methods according to claim 1 is characterized in that being provided with the tyre buffering pad below the ore deposit that falls.
4, mining methods according to claim 1 is characterized in that the lump that the falls holder ore deposit sledge carrying of packing into.
5, mining methods according to claim 1 is characterized in that the goaf with adopting with filling, and casting resin (14) is horsestone or non-ore rock in the mineral ore or the rock of cutting group's wall.
6, mining methods according to claim 1 is characterized in that making artificial sill pillar (2) with steel concrete, make artificial wall (11) with rubble concrete.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 02109245 CN1131368C (en) | 2002-03-05 | 2002-03-05 | Mining method by cutting ore breakdown and dry filling artificial ore pillars |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 02109245 CN1131368C (en) | 2002-03-05 | 2002-03-05 | Mining method by cutting ore breakdown and dry filling artificial ore pillars |
Publications (2)
Publication Number | Publication Date |
---|---|
CN1373286A CN1373286A (en) | 2002-10-09 |
CN1131368C true CN1131368C (en) | 2003-12-17 |
Family
ID=4740575
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 02109245 Expired - Fee Related CN1131368C (en) | 2002-03-05 | 2002-03-05 | Mining method by cutting ore breakdown and dry filling artificial ore pillars |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN1131368C (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101368482B (en) * | 2008-10-16 | 2010-06-02 | 灵宝市金源矿业有限责任公司 | Novel technique of slight-pitch ore body overall mining method |
Families Citing this family (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101871347B (en) * | 2010-07-08 | 2011-12-14 | 中南大学 | Mining environment reconstruction layering and striping medium-length hole ore removal mining method |
CN104234716B (en) * | 2014-07-22 | 2016-08-24 | 长沙矿山研究院有限责任公司 | The packed cofferdam method of mining by the way of filling |
CN105298493B (en) * | 2015-11-23 | 2018-05-01 | 武汉理工大学 | Underground low-angle dip lamelliform jade ore deposit nondestructive blasting mining methods |
CN105240016B (en) * | 2015-11-23 | 2019-03-08 | 武汉理工大学 | Low-angle dip lamelliform jade mine nugget cutting rod band pulls filling mining method |
CN105370283B (en) * | 2015-11-23 | 2018-03-20 | 武汉理工大学 | A kind of pre- joint-cutting blasting mining method of low-angle dip lamelliform jade ore deposit machinery |
CN108005657B (en) * | 2017-11-27 | 2019-09-20 | 西北矿冶研究院 | Mining method for group/group of included stone-included steeply-inclined thin veins |
CN114000877B (en) * | 2021-10-29 | 2022-07-01 | 中南大学 | Quasi-shallow hole shrinkage subsequent filling mining method and structure for intra-vein and intra-vein raise combined mining |
-
2002
- 2002-03-05 CN CN 02109245 patent/CN1131368C/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101368482B (en) * | 2008-10-16 | 2010-06-02 | 灵宝市金源矿业有限责任公司 | Novel technique of slight-pitch ore body overall mining method |
Also Published As
Publication number | Publication date |
---|---|
CN1373286A (en) | 2002-10-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101967973B (en) | Open stope-caving combined mining method | |
CN101737052B (en) | Sublevel fill-mining method | |
CN102155262B (en) | Method for filling gas near roadway of coal mine gob-side entry retaining | |
CN102086765B (en) | High-sublevel multi-layer mining method of ultrathin copper ore body | |
CN106761912B (en) | It is a kind of be suitable for unstable formation efficiently on to route slicing and filling mining methods | |
CN109488301A (en) | A kind of mine, which picks up, fills place's recovery method | |
CN103437769B (en) | Combination is reproduced structure medium-length hole ore blast and is worked in coordination with cable bolting afterwards filling mining method | |
CN102493838A (en) | Method for fully mechanized continuously-filling coal mining of steeply pitching coal seam | |
CN101403304A (en) | Large dead zone residual ore recovery method | |
CN102704934A (en) | High-yield and low-cost subsequent filling mining method for underground mine | |
CN101598031B (en) | Mining method featuring backfilling waste rocks in situ and increasing ore recovery ratio | |
CN104533416A (en) | Large-scale mechanized non-sill-pillar sub-level caving mining method for extremely thick ore body | |
CN110424966B (en) | Ultrahigh water material filling working face gangue pumping entry retaining non-coal pillar mining method | |
CN101899976A (en) | Continuous coal mining process method of open-pit coal mine | |
CN104358574B (en) | The horizontal room-and-pillar stoping of gently inclined orebody | |
CN101737053A (en) | Natural caving method suitable for slowly-inclined thick and large ore bodies | |
CN102418527B (en) | Method for mining flat dipping ultrathin sedimentary type subterranean iron ore deposit | |
CN105019904A (en) | Mining- machine-based slowly inclined thin ore vein mechanized continuous mining method | |
CN102261249B (en) | Creasing-type sill-pillar-free stage caving stopping method based on steel structured artificial top | |
CN109403974A (en) | A kind of mine, which picks up, unloads pumping and fills lasting exploit design method | |
CN1131368C (en) | Mining method by cutting ore breakdown and dry filling artificial ore pillars | |
CN109899070B (en) | Slow-inclination medium-thickness ore body solid-waste-free filling mining method based on ellipsoid ore drawing structure | |
CN110284883A (en) | Recovery method is filled by a kind of row of adopting, open coal mine end side | |
CN106223955B (en) | Rhombic bench cemented filling mining method | |
CN101302932A (en) | Method for underground chamber digging and laneway opening digging |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C19 | Lapse of patent right due to non-payment of the annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |