CN102155262B - Method for filling gas near roadway of coal mine gob-side entry retaining - Google Patents

Method for filling gas near roadway of coal mine gob-side entry retaining Download PDF

Info

Publication number
CN102155262B
CN102155262B CN2011100579523A CN201110057952A CN102155262B CN 102155262 B CN102155262 B CN 102155262B CN 2011100579523 A CN2011100579523 A CN 2011100579523A CN 201110057952 A CN201110057952 A CN 201110057952A CN 102155262 B CN102155262 B CN 102155262B
Authority
CN
China
Prior art keywords
cylinder rubber
pneumatic bag
rubber pneumatic
gas
goaf
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011100579523A
Other languages
Chinese (zh)
Other versions
CN102155262A (en
Inventor
彭小亚
许家林
张超
路军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology CUMT
Original Assignee
China University of Mining and Technology CUMT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology CUMT filed Critical China University of Mining and Technology CUMT
Priority to CN2011100579523A priority Critical patent/CN102155262B/en
Publication of CN102155262A publication Critical patent/CN102155262A/en
Application granted granted Critical
Publication of CN102155262B publication Critical patent/CN102155262B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

The invention discloses a method for filling a gas near a roadway of coal mine gob-side entry retaining, comprising the following steps: firstly, arranging a gas pressurization room on the ground; then, arranging a gas booster pump in an underground mining area haulage roadway 3; arranging a cylinder rubber air sac as high as the mining height on one side close to a goaf along the gob-side entry retaining behind a coal face; aerating the cylinder rubber air sac arranged on one side close to a goaf by the gas booster pump until roof contacting; when the pressure gage of the gas booster pump displays that the pressure reaches the stress of a primary rock, stopping aerating, sealing the cylinder rubber air sac to finish the aeration operation of one cylinder rubber air sac; and when the coal face is continuously advanced, continuously arranging one cylinder rubber air sac behind one aerated cylinder rubber air sac every time the coal face is advanced by one step, and aerating one by one until one exhausting body on one side of the goaf 5 along the gob-side entry retaining 6 is filled and supported. The method is simple, is convenient to operate and has the advantages of small labor intensity of workers and good supporting effect.

Description

The other gas filling method in coal mine gob-side entry retaining lane
Technical field
The present invention relates to the other gas filling method in a kind of coal mine gob-side entry retaining lane, be particularly useful for the other filling in coal mining work plane gob side entry retaining lane.
Background technology
Gob side entry retaining is after the upper curtate work plane is adopted, and through adding strong supporting or adopt other effective ways, a crossheading of upper curtate work plane is remained, and uses as a crossheading when supplying the lower curtate working face extraction.As the major reform of production practice, gob side entry retaining utilization rate abroad is higher, but technology popularization speed just at the early-stage at home is not high.Gob side entry retaining have improve the coal resources rate of extraction, reduce drivage ratio, alleviate alternately nervous between the digging back production, reduce the work plane removal charge, improve remarkable advantage such as safety production condition, be to fail to find suitable gob-side entry retaining support material but restrict the main cause that this technology promotes the use of in China.The roadside packing material of domestic main use at present has spoil, concrete lotion, high percentage of water rapid solidifying material etc.But these materials also come with some shortcomings in stowing operation, and, obturation not enough like obturation early anti pressured intension time of setting, oversize, filler difficulty of transportation, filling cost were high excessively.
Summary of the invention
The objective of the invention is to overcome the problem that exists in the prior art, provide that a kind of method is simple, the obturation early strength high, save support material, reduce the other gas filling method in coal mine gob-side entry retaining lane of labour intensity.
The other gas filling method in coal mine gob-side entry retaining of the present invention lane comprises the steps:
A., the gas boosting room is set near the auxiliary shaft of ground, in the gas boosting room, settles ground gas boosting pump and the high pressure tank that 0.8~1Mpa gases at high pressure are housed;
B. in the exploiting field haulage way of down-hole coal excavation work plane the place ahead 5~20m, arrange the mine gas booster pump that links to each other with ground high pressure tank pipeline;
C. when coal-face advance distance open-off cut 5~8m; A height and the highly identical cylinder rubber pneumatic bag of mining are laid near goaf one side in the empty tunnel that keeps on the edge at coal-face rear, and the diameter of cylinder rubber pneumatic bag and its ratio highly are 0.4~0.6;
D. by the road the empty tunnel that keeps, the edge that is laid in the coal-face rear is inflated near the cylinder rubber pneumatic bag of goaf one side through the mine gas booster pump, until connecing the top;
E. when the pressure meter of mine gas booster pump shows that pressure reaches the stress of primary rock, stop inflation, the cylinder rubber pneumatic bag is sealed;
F. along with coal-face is pushed ahead a step pitch, continue to lay a cylinder rubber pneumatic bag along the empty tunnel that keeps near goaf one side at the coal-face rear;
G. repeating step d, e, f constantly carry out the inflation of next row's cylinder rubber pneumatic bag, until accomplishing the gas filling supporting that keeps the tunnel near goaf one side along empty.
The described stress of primary rock=adopt deeply * the overlying rock body force; It is said that inflation is air or nitrogen to the cylinder rubber pneumatic bag.
Beneficial effect:
1) the present invention utilizes gases at high pressure to charge into rubber pneumatic bag to form obturation and carry out the supporting of gob side entry retaining roadside packing, and process links is few, and filling procedure is few, and labor strength is little, and produce influence to mining few.
2) obturation that forms has the early strength height, initiatively connects the advantage of top supporting roof, and the obturation internal pressure can increase and the characteristics of increase along with roof pressure, has better supporting effect.
3) only need in the main tunnel of mine, to lay gas pipeline, filling gas can be carried in the pipeline high speed, and cost of transportation is low, has reduced worker's labour intensity.
4) through gas filling, improve coal recovery rate, reduced the tunnelling rate, increased economic benefit.
Description of drawings
Fig. 1 is the floor map of the other gas filling method in gob side entry retaining lane, coal seam of the present invention.
Among the figure: 1-coal-face, 2-cylinder rubber pneumatic bag, 3-exploiting field haulage way, 4-gas boosting pump, 5-goaf.
The specific embodiment
Below in conjunction with accompanying drawing one embodiment of the present of invention are done further to describe:
The other gas filling method in coal mine gob-side entry retaining of the present invention lane at first is provided with the gas boosting room near the auxiliary shaft of ground, in the gas boosting room, settle ground gas boosting pump and the high pressure tank that 0.8~1Mpa gases at high pressure are housed; In the exploiting field haulage way 3 of down-hole coal excavation work plane 1 the place ahead 5~20m, arrange the mine gas booster pump 4 that links to each other with ground high pressure tank pipeline then; When coal-face 1 advance distance open-off cut 5~8m; A height and the highly identical cylinder rubber pneumatic bag 2 of mining are laid near goaf 5 one sides in the empty tunnel 6 that keeps on the edge at coal-face 1 rear, and the diameter of cylinder rubber pneumatic bag 2 and its ratio highly are 0.4~0.6; By the road to being laid in inflating near the cylinder rubber pneumatic bag 2 of goaf 5 one sides along the empty tunnel 6 that keeps of coal-face 1 rear, until connecing the top, 2 inflations are air or nitrogen to the cylinder rubber pneumatic bag through mine gas booster pump 4; When the pressure meter of mine gas booster pump 4 shows that pressure reaches the stress of primary rock, stop inflation, cylinder rubber pneumatic bag 2 is sealed, accomplish the inflation of a cylinder rubber pneumatic bag 2; The stress of primary rock=adopt deeply * the overlying rock body force.Along with constantly pushing ahead of coal-face 1; Whenever push ahead a step pitch; After the cylinder rubber pneumatic bag 2 that inflation is before accomplished, continue to lay a cylinder rubber pneumatic bag 2; And inflation one by one, until accomplishing an exhaust body filling and support that keeps tunnel 6 near goaf 5 one sides along empty.

Claims (1)

1. the other gas filling method in coal mine gob-side entry retaining lane is characterized in that: comprise the steps:
A., the gas boosting room is set near the auxiliary shaft of ground, in the gas boosting room, settles ground gas boosting pump and the high pressure tank that 0.8~1Mpa gases at high pressure are housed;
B. in the exploiting field haulage way (3) of down-hole coal excavation work plane (1) the place ahead 5~20m, arrange the mine gas booster pump (4) that links to each other with ground high pressure tank pipeline;
C. when down-hole coal excavation work plane (1) advance distance open-off cut 5~8m; A height and the highly identical cylinder rubber pneumatic bag (2) of mining are laid near goaf (5) one sides in the empty tunnel (6) that keeps on the edge at down-hole coal excavation work plane (1) rear, and the diameter of cylinder rubber pneumatic bag (2) and its ratio highly are 0.4~0.6;
D. by the road the cylinder rubber pneumatic bag (2) near goaf (5) one sides along empty reservation tunnel (6) that is laid in down-hole coal excavation work plane (1) rear is inflated through mine gas booster pump (4), until connecing the top;
E. when the pressure meter of mine gas booster pump (4) shows that pressure reaches the stress of primary rock, stop inflation, cylinder rubber pneumatic bag (2) is sealed, the described stress of primary rock=adopt deeply * the overlying rock body force;
F. along with down-hole coal excavation work plane (1) is pushed ahead a step pitch; Down-hole coal excavation work plane (1) rear continue to lay a cylinder rubber pneumatic bag (2) along the empty tunnel (6) that keeps near goaf (5) one sides, inflation is air or nitrogen to said cylinder rubber pneumatic bag (2);
G. repeating step d, e, f constantly carry out the inflation of next row's cylinder rubber pneumatic bag (2), until accomplishing an exhaust body filling and support that keeps tunnel (6) near goaf (5) one sides along empty.
CN2011100579523A 2011-03-11 2011-03-11 Method for filling gas near roadway of coal mine gob-side entry retaining Expired - Fee Related CN102155262B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011100579523A CN102155262B (en) 2011-03-11 2011-03-11 Method for filling gas near roadway of coal mine gob-side entry retaining

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011100579523A CN102155262B (en) 2011-03-11 2011-03-11 Method for filling gas near roadway of coal mine gob-side entry retaining

Publications (2)

Publication Number Publication Date
CN102155262A CN102155262A (en) 2011-08-17
CN102155262B true CN102155262B (en) 2012-11-14

Family

ID=44436906

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011100579523A Expired - Fee Related CN102155262B (en) 2011-03-11 2011-03-11 Method for filling gas near roadway of coal mine gob-side entry retaining

Country Status (1)

Country Link
CN (1) CN102155262B (en)

Families Citing this family (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103953390B (en) * 2014-05-08 2016-02-10 中国矿业大学 The water-retaining production Tight filling method of control overlying mining rock crack and subsidence
CN104074542B (en) * 2014-05-10 2016-02-03 河北充填采矿技术有限公司 A kind of colliery C0 2concrete formula placement method
CN104405440B (en) * 2014-10-21 2016-04-06 河南理工大学 A kind of coal mine gob filling system and placement method
CN104453997B (en) * 2014-10-21 2016-04-06 河南理工大学 A kind of filling bladder spacer device of coal mine gob-side entry retaining
CN104806289B (en) * 2015-04-08 2017-10-10 兖州煤业股份有限公司 A kind of coal-face tip-segment band device for filling and method
CN105240048B (en) * 2015-10-26 2019-07-23 山东科技大学 A kind of gas filling method based on paste body filling
CN105673039B (en) * 2016-02-02 2017-11-14 安徽理工大学 Soft strong carrying constructing structure and its construction method by a kind of gob side entry retaining lane
CN106382118B (en) * 2016-11-30 2018-04-17 长沙矿山研究院有限责任公司 No divider wall actively connects the roof formula method of mining by the way of filling
CN106988780B (en) * 2017-05-09 2018-12-14 山东科技大学 A kind of girdle goaf paste body filling construction method
CN110566269A (en) * 2019-08-19 2019-12-13 西北矿冶研究院 Truss type filling method for underground goaf
CN112459781B (en) * 2020-10-29 2021-11-05 煤炭科学研究总院 Full-automatic pillar filling mining control method and control device
CN112664269B (en) * 2020-12-17 2024-01-30 华能煤炭技术研究有限公司 Gob-side entry retaining goaf side sealing structure and side air leakage preventing method
CN112746863B (en) * 2021-02-04 2023-02-21 太原理工大学 Rapid closing device and method for mine roof cutting gob-side entry retaining goaf
CN114033449B (en) * 2021-10-11 2024-02-27 中煤科工集团沈阳设计研究院有限公司 End slope coal mining roadway air bag supporting device and method
CN114562329B (en) * 2022-04-02 2023-03-24 中国矿业大学 Non-closed overlying strata grouting, filling and isolating method
CN115013049B (en) * 2022-06-24 2023-12-15 福州大学 Goaf filling reserved roadway device and construction process thereof

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1260461C (en) * 2003-08-08 2006-06-21 中南大学 Continuous mining method of stepped sectional extruding and ore caving followed by filling
RU2277170C1 (en) * 2005-04-20 2006-05-27 Государственное образовательное учреждение высшего профессионального образования "Санкт-Петербургский государственный горный институт им. Г.В. Плеханова (технический университет)" Development method for composite formations having gob interlayers
DE202005015134U1 (en) * 2005-09-24 2005-12-01 GFR Gesellschaft für die Aufbereitung und Verwertung von Reststoffen mbH Hydraulically-transportable, self-leveling mine backfilling material, used for filling underground rock salt caverns, contains residue from (quasi)dry flue gas desulfurization of coal-fired power station plus binder, salt and mixing water
CN101701526B (en) * 2009-11-05 2011-07-06 冀中能源邯郸矿业集团有限公司 Goaf bag-type packing method
CN101749020A (en) * 2010-01-26 2010-06-23 淄博市王庄煤矿 Forward coal mining by filling method

Also Published As

Publication number Publication date
CN102155262A (en) 2011-08-17

Similar Documents

Publication Publication Date Title
CN102155262B (en) Method for filling gas near roadway of coal mine gob-side entry retaining
CN102155225B (en) Filling and mining method of coal gases
CN103742148B (en) The soft coal-mining method covering the descending waste filling of supporting of a kind of half-edge coal seam
CN102493838B (en) Method for fully mechanized continuously-filling coal mining of steeply pitching coal seam
CN101725368B (en) Thick seam large mining height working face gob-side entry retaining method
CN102155260B (en) Method for filling heavy-pitch coal bed goaf
CN103758567B (en) A kind of breaking roof Collapsed zone grouting filling method
CN101858215B (en) Road retained method for extrusion molding of waste rock
CN104564137B (en) Handling method and device for double-medium stacked supporting and hard top plate type mined-out area
CN102996131A (en) Solid-filling coal mining method with two pre-excavating tunnels for advancing
CN102146794B (en) Grouting, consolidating and gob-side tunneling process method
CN103195390A (en) Mining-coal bed nearly horizontal gas extraction borehole sealing method
CN101749020A (en) Forward coal mining by filling method
CN102337925B (en) Method for enlarging, filling and supporting coal-pillar-free mining roadway for fully-mechanized top coal caving
CN102877848B (en) Method for performing coal mining and gangue cementation stripe filling simultaneously
CN106968676A (en) The method that cavity is passed through in tunnelling
CN110259449A (en) A kind of super high seam strip-type filling mining method for relying on telescoping steel form
CN109630112A (en) A kind of N00 mining codes for cutting top filling
CN103161498B (en) Method for filling coal pillar beside roadway in steep coal seam section
CN102287211A (en) Gob roadway end part hydraulic support frame and gob roadway coal mining method thereof
CN105649673A (en) Roadside gangue mixture filling and gob-side entry retaining method for large-dip angle coal seams
CN113236254B (en) Filling mining method for end slope thick coal seam with large inclination angle of strip mine
CN105240012A (en) F-type section coal-mining method allowing commingled mining of coal pillars
CN113756868A (en) Geotechnical engineering underground side wall construction method
CN204283488U (en) A kind of constant-resistance allows presses gob side entry retaining filling air bag

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121114

Termination date: 20140311