CN104234716B CN201410346959.0A CN201410346959A CN104234716B CN 104234716 B CN104234716 B CN 104234716B CN 201410346959 A CN201410346959 A CN 201410346959A CN 104234716 B CN104234716 B CN 104234716B
Authority
CN
China
Prior art keywords
filling
cofferdam
obturator
back production
fixed frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410346959.0A
Other languages
Chinese (zh)
Other versions
CN104234716A (en
Inventor
宋嘉栋
周爱民
甯瑜琳
詹进
王长军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangxi Xiushuixianglushan Tungsten Industry Co ltd
Original Assignee
Changsha Institute of Mining Research Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changsha Institute of Mining Research Co Ltd filed Critical Changsha Institute of Mining Research Co Ltd
Priority to CN201410346959.0A priority Critical patent/CN104234716B/en
Publication of CN104234716A publication Critical patent/CN104234716A/en
Application granted granted Critical
Publication of CN104234716B publication Critical patent/CN104234716B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

The present invention relates to a kind of packed cofferdam filling mining method, for back production subregion, construct the packed obturator cofferdam being connected with post to be dug up mine, the then dead zone in stoping-and-filling subregion cofferdam, including: (1), in back production partition boundaries, sets up three-dimensional netted obturator fixed frame;(2) the filling bag being provided with charging aperture is placed in obturator fixed frame, filling bag is fixed in fixed frame;(3) in filling bag, it is filled with slurry placement material, forms packed obturator cofferdam.The present invention is that stable operating conditions is created in the recovery of ore pillar, it is achieved some post, the safe and efficient back production of bar post under the conditions of through goaf, is effectively improved the rate of extraction and the production efficiency of ore pillar.

Description

The packed cofferdam method of mining by the way of filling
Technical field
The invention belongs to Cut-and-fill Mining Technology field, be specifically related to a kind of packed cofferdam filling mining method.
Background technology
In China's underground metal mine, the ore deposit amount of possessing of ore pillar or remnant ore is the most considerable, and a lot of ore pillar grade of ores are high, compose Depositing complicated condition, form and situation unclear, face sky more, conventional mining method exploitation generally also exists the problem that exploitation difficulty is big. Used open-stope method and these high-grade ore pillars of Caving Method with Large Space back production can only be recovered to 10%~20% in the past.And when using filling method back production, Under conditions of and goaf tall and big in goaf is mutually communicated, existing filling process technology is difficult to the subregion isolation in goaf Filling, thus the recovery of ore pillar need to be high to the prescription of obturator in obturator or obturator periphery construction work, and Being difficult to ensure the ore removal of stope, ventilation etc. everything goes well with your work and carry out, ultimately resulting in major part ore pillar cannot reclaim.Therefore, for this Process for stoping complexity, the poor stability of class ore body, back production efficiency is low, loss and dilution is big, stoping cost is high, lacks safety at present Efficient and reliable Cut-and-fill Mining Technology.
Summary of the invention
It is an object of the invention to provide a kind of packed cofferdam filling mining method, realize goaf subregion isolation and ore deposit safely and efficiently Post partition recovery.
The technical scheme is that for back production subregion, construct the packed obturator cofferdam being connected with post to be dug up mine, then Dead zone in stoping-and-filling subregion cofferdam, comprises the following steps:
(1) in back production partition boundaries, three-dimensional netted obturator fixed frame is set up;
(2) the filling bag being provided with charging aperture is placed in obturator fixed frame, filling bag is fixed in fixed frame;
(3) in filling bag, it is filled with slurry placement material, forms packed obturator cofferdam.
Dead zone can be run through and multiple ore pillar is combined and is divided into a back production subregion by a range of.When constructing cofferdam, Post to be dug up mine an at least face is made to be positioned at outside obturator cofferdam.
Steel tube member bar or wooden rod member is used to set up three-dimensional netted obturator fixed frame.
Described filling bag is provided with charging aperture and air vent;Filling bag is provided with strap, with strap, filling bag is bundled in fixing structure It is fixed on frame.
Bamboo board or plank is placed as baffle plate between filling bag and fixed frame.
Dead zone in employing tailing cemented filling mode stoping-and-filling subregion cofferdam, repeating said steps, until Tight filling. Process for stoping includes:
(1) the ore pillar face outside obturator cofferdam is dug stoping operation passage, is entered ore pillar;
(2) carry out undercuting or digging drilling chamber in ore pillar bottom;
(3) use Upward slicing back production mode stooping pillaring or use upper centripetal deep hole elementary errors once to fall ore deposit stooping pillaring.
For the goaf formed after stooping pillaring, tailing cemented filling mode is used to carry out filling or with adjacent back production subregion together Filling.
The present invention uses packed filling method to form obturator cofferdam as the block body hindering filling slurry flowing, it is achieved goaf Subregion isolation filling, simultaneously by the consolidated fill in goaf in subregion, stable operating conditions is created in the recovery for ore pillar, it is achieved Point post, the safe and efficient back production of bar post under the conditions of through goaf, is effectively improved the rate of extraction and the production efficiency of ore pillar.
Accompanying drawing explanation
Fig. 1 is the mining methods schematic diagram that the present invention uses Upward slicing back production mode stooping pillaring.
Fig. 2 is that the present invention uses medium-length hole elementary errors once to fall the mining methods schematic diagram of ore deposit stooping pillaring.
In figure: 1-stope pillar;2-packed obturator cofferdam;3-cemented fill;4-rock drilling lane;5-shallow bore hole big gun hole;6-adopts Ore pillar;7-medium-length hole big gun hole;Ore pillar is numbered: 1 ', 2 ', 3 ', 4 ', 5 ', 6 ', 7 ', 8 ', 9 ', 10 ', 11 ', 12 ', 13 ', 14’、15’、16’。
Detailed description of the invention
In being embodied as, the packed cofferdam filling mining method of the present invention comprises the following steps:
1, stope divides and arranges
The safe span of maximum according to ore deposit rock mass and maximum exposure area condition, run through dead zone and multiple ore pillar by a range of Combine and be divided into a back production subregion.
2, packed filling process
Use packed tailings cofferdam placement method for the back production subregion divided, form the packed obturator being connected with post to be dug up mine Cofferdam, and make post to be dug up mine an at least face be positioned at outside obturator cofferdam so that back production, specifically include:
(1) set back production partition boundaries, set up three-dimensional netted obturator fixed frame, can use steel tube member bar or Wooden rod member sets up;
(2) being placed in obturator fixed frame by filling bag, wherein filling bag has two openings, respectively as charging aperture and row QI KOU.Strap can be set on filling bag to be easy to fix.Filling bag is preferably flexible knitting bag, has certain tensile strength and secretes Aqueous energy.As one preferred embodiment, the horizontal length 5m-20m of filling bag, horizontal width are 1.8m-2.2m, hang down Straight height is 1m-1.5m;
(3) with the strap on filling bag filling bag is bundled in fixed frame and is fixed, and in filling bag and fixed frame Between place baffle plate, such as bamboo board or plank;
(4) filling pipe is accessed filling bag charging aperture, be filled with slurry placement material, during discharge hole for discharge, stop filling;
(5), when the slip bleeding in filling bag, solidification, after forming packed obturator cofferdam, tailing cemented filling mode is used Dead zone in stoping-and-filling subregion cofferdam;
(6) repetition step (1) is to step (5), until Tight filling.
3, process for stoping
(1) the ore pillar face digging stoping operation passage outside obturator cofferdam enters ore pillar;
(2) carry out undercuting or digging drilling chamber in ore pillar bottom;
(3) use Upward slicing back production mode stooping pillaring or use upper centripetal deep hole elementary errors once to fall ore deposit stooping pillaring;
(4) use scraper that broken ore is transported to drop shaft or direct entrucking transports;
(5) for after stooping pillaring formed goaf, use tailing cemented filling mode carry out filling or with adjacent back production subregion Together filling.
Below by way of specific embodiments and the drawings 1,2, the present invention will be described in detail.
Embodiment one
It will be seen from figure 1 that the present invention use packed cofferdam filling mining method, it is adaptable to goaf subregion isolation filling and Ore pillar partition recovery.
As it is shown in figure 1, when ore deposit rock is firm, by 1 ', 2 ', 3 ', 4 ' numbers four ore pillars and between through dead zone be divided into one Individual back production subregion.
Use packed tailing-filled method to form the packed obturator cofferdam being connected with post to be dug up mine, construct packed obturator and enclose Post to be dug up mine an at least face must be made during weir to be positioned at outside obturator cofferdam, and with People's Bank of China, transport, the channel connection such as ventilation. Concretely comprising the following steps of packed filling: 1. use steel tube member bar to set up three-dimensional netted filling between adjacent 1 ', 2 ', 3 ', 4 ' ore pillars Body fixed frame, the horizontal interval of fixed frame steel tube member bar is 2m, is vertically spaced apart 1m, uses casting between steel pipe and steel pipe Hasp part connects;2. by a length of 10m, a width of 2m, a height of 1m, it is provided with charging aperture and the flexible knitting of two openings of air vent Filling bag, fixes architecturally, and places bamboo board between filling bag and fixed frame, and bamboo board iron wire is fixed on framework On;3. filling pipe is accessed filling bag charging aperture, is filled with cement last mortar cemented filling material, stop filling when discharge hole for discharge; 4. when after the slip bleeding in filling bag, solidification, the dead zone in this layer of obturator cofferdam of back production subregion is carried out tailing cemented filling; 5. step is repeated 1. to step 4., until back production subregion Tight filling.
To be filled recuperating is protected to desired strength, uses Upward slicing back production mode stooping pillaring.First draw bottom ore pillar during back production The end, forms the layer that undercuts, the horizontal big gun hole using shallow bore hole rock drilling equipment Drilling hole depth to be 2~3m afterwards, is layered the ore deposit that falls.Broken ore Major part first stay in stope, as the job platform adopted on continuing, until after the whole avalanche of this ore pillar, using scraper to enter The a large amount of ore removals of row.
The goaf formed after stooping pillaring, will together carry out filling with adjacent back production subregion.
Embodiment two
Figure it is seen that for ore deposit rock the firmest time, by 9 ', 10 ', 11 ', 12 ' numbers four ore pillars and fill with exploiting field Fill out the through dead zone between body and be divided into a back production subregion.
Use packed tailing-filled method to form the packed obturator cofferdam being connected with post to be dug up mine and adjacent obturator, construct Post to be dug up mine an at least face must be made during packed obturator cofferdam to be positioned at outside obturator cofferdam, and with People's Bank of China, transport, logical The channel connections such as wind.Concretely comprising the following steps of packed filling: 1. between 9 ', 10 ', 11 ', 12 ' numbers ore pillars and adjacent obturator Using steel tube member bar to set up three-dimensional netted obturator fixed frame, the horizontal interval of fixed frame steel tube member bar is 2m, is vertically spaced For 1m, cast iron fastener between steel pipe with steel pipe, is used to be connected;2. by a length of 10m, a width of 2m, a height of 1m, it is provided with charging aperture With the flexible knitting filling bag of two openings of air vent, fix architecturally, and between filling bag and fixed frame, place bamboo weaving Plate, bamboo board is fixing architecturally with iron wire;3. filling pipe is accessed filling bag charging aperture, is filled with cement last mortar consolidated fill Material, stops filling when discharge hole for discharge;4. when after the slip bleeding in filling bag, solidification, to this layer of obturator of back production subregion Dead zone in cofferdam carries out tailing cemented filling;5. step is repeated 1. to step 4., until back production subregion Tight filling.
To be filled recuperating is protected to desired strength, uses upper centripetal deep hole elementary errors once to fall miner's skill stooping pillaring.During back production, first Construction rock drilling lane bottom ore pillar, uses medium-length hole rig Drilling upper centripetal deep hole afterwards in rock drilling lane, and both sides, rock drilling lane use Shallow bore hole rock drilling equipment Drilling horizontal shallow hole, elementary errors once falls ore deposit.Broken ore uses scraper to carry out ore removal.
The goaf formed after stooping pillaring, will together carry out filling with adjacent back production subregion.

Claims (4)

1. a filling mining method, it is characterised in that run through dead zone and multiple ore pillar is combined and is divided into by a range of Individual back production subregion;For back production subregion, construct the packed obturator cofferdam being connected with post to be dug up mine, make post to be dug up mine at least One face is positioned at outside obturator cofferdam, then the dead zone in stoping-and-filling subregion cofferdam, comprises the following steps:
(1) in back production partition boundaries, three-dimensional netted obturator fixed frame is set up;
(2) the filling bag being provided with charging aperture is placed in obturator fixed frame, filling bag is fixed in fixed frame;
(3) in filling bag, it is filled with slurry placement material, forms packed obturator cofferdam;
Dead zone in employing tailing cemented filling mode stoping-and-filling subregion cofferdam, repeat the above steps, until Tight filling;
Process for stoping includes: the ore pillar face digging stoping operation passage outside obturator cofferdam, entrance ore pillar;Carry out in ore pillar bottom Undercut or dig drilling chamber;Use Upward slicing back production mode stooping pillaring or use upper centripetal deep hole elementary errors once to fall ore deposit back production Ore pillar;
For after stooping pillaring formed goaf, use tailing cemented filling mode carry out filling or with adjacent back production subregion together filling.
Filling mining method the most according to claim 1, it is characterised in that use steel tube member bar or wooden rod member to set up three-dimensional netted Obturator fixed frame.
Filling mining method the most according to claim 1, it is characterised in that described filling bag is provided with charging aperture and air vent;Fill Fill out bag and be provided with strap, with strap filling bag is bundled in fixed frame and is fixed.
Filling mining method the most according to claim 1, it is characterised in that between filling bag and fixed frame place bamboo board or Plank is as baffle plate.
CN201410346959.0A 2014-07-22 2014-07-22 The packed cofferdam method of mining by the way of filling Active CN104234716B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410346959.0A CN104234716B (en) 2014-07-22 2014-07-22 The packed cofferdam method of mining by the way of filling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410346959.0A CN104234716B (en) 2014-07-22 2014-07-22 The packed cofferdam method of mining by the way of filling

Publications (2)

Publication Number Publication Date
CN104234716A CN104234716A (en) 2014-12-24
CN104234716B true CN104234716B (en) 2016-08-24

Family

ID=52223522

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410346959.0A Active CN104234716B (en) 2014-07-22 2014-07-22 The packed cofferdam method of mining by the way of filling

Country Status (1)

Country Link
CN (1) CN104234716B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104695958B (en) * 2015-03-02 2017-03-15 深圳市中金岭南有色金属股份有限公司凡口铅锌矿 A kind of erection method of ore removal stope first floor earth mat
CN106968676B (en) * 2017-03-27 2019-12-17 山西潞安环保能源开发股份有限公司 Method for tunneling through cavity
CN109098715A (en) * 2018-08-14 2018-12-28 云南木利锑业有限公司 Packed filling mining method
CN112081624B (en) * 2020-09-15 2021-09-21 中南大学 Mining environment reconstruction method based on waste tire recycling
CN117514329B (en) * 2024-01-05 2024-03-19 中煤科工能源科技发展有限公司 Mining cave filling method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1162058A (en) * 1996-04-05 1997-10-15 李良健 Residue-less pillar recovering method
CN1373286A (en) * 2002-03-05 2002-10-09 殷惠钧 Mining method by cutting ore breakdown and dry filling artificial ore pillars
CN101749019A (en) * 2009-10-30 2010-06-23 韦立坚 Method for forming artificial ore pillar and mining method
CN102434162A (en) * 2011-12-27 2012-05-02 中矿金业股份有限公司 Panel tailing filling mining method
CN103233739A (en) * 2013-04-16 2013-08-07 北京矿冶研究总院 Mining method for thick and large ore pillar under filling body package

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1162058A (en) * 1996-04-05 1997-10-15 李良健 Residue-less pillar recovering method
CN1373286A (en) * 2002-03-05 2002-10-09 殷惠钧 Mining method by cutting ore breakdown and dry filling artificial ore pillars
CN101749019A (en) * 2009-10-30 2010-06-23 韦立坚 Method for forming artificial ore pillar and mining method
CN102434162A (en) * 2011-12-27 2012-05-02 中矿金业股份有限公司 Panel tailing filling mining method
CN103233739A (en) * 2013-04-16 2013-08-07 北京矿冶研究总院 Mining method for thick and large ore pillar under filling body package

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
金属矿山的矿柱回采;杨源伦;《工程设计与研究》;19951215;第2页第2栏 *

Also Published As

Publication number Publication date
CN104234716A (en) 2014-12-24

Similar Documents

Publication Publication Date Title
CN105587318B (en) A kind of method of mining by the way of filling of the parallel middle thickness orebody group continuous stoping of low-angle dip
CN104234716B (en) The packed cofferdam method of mining by the way of filling
CN105041314B (en) A kind of combined mining method of deep afterwards rooming-slicing ore pillar
CN101328809B (en) Non-bottom pillar deep hole falling-back type mining method
CN103437769B (en) Combination is reproduced structure medium-length hole ore blast and is worked in coordination with cable bolting afterwards filling mining method
WO2016112771A1 (en) Complete non-coal-pillar continuous depressurized mining method for short-distance coal seam group
RU2581587C1 (en) Method of filling hole under anchor, drilled in roof of mine working cartridges with resin
CN107178366B (en) A kind of stoping method of column ore body
CN111828007B (en) Stoping method for residual studs in underground mine goaf
CN109209391A (en) Tiny step excavation method suitable for IV-V grade of country rock of large cross-section tunnel
CN105545353B (en) A kind of Man-made False construction method based on paste body filling
CN108661646A (en) A kind of false top house column type shrink afterwards filling mining method
CN102168579A (en) Rib-pillar-free continuous sublevel filling method for mining preparation in medium-thickness slope crushed ore body vein
CN105804748B (en) A kind of method of block mining Wall ore under open air transport system
CN102748029A (en) Sectional mining method
CN105422102B (en) A kind of vertical medium-length hole ore blast subsection access back-filling method
CN105649635B (en) A kind of disaster type tunnelling method in goaf
CN109209392A (en) Loopful excavation method suitable for IV-V grade of country rock of large cross-section tunnel
CN108798672B (en) A kind of mining methods for the area's ore high-efficiency mining that collapses greatly
CN106089252B (en) Grouting reinforcement method for inhomogeneous loose bodies
CN104005415A (en) Efficient grooving construction method for underground diaphragm wall in micro-weathered granite
CN108533265B (en) Utilize the filling mining method of concrete component assembling foundation
CN103982186B (en) The vertical Inclined strips sublevel caving of oper cylinler retrusive
CN104453900A (en) Filling mining method of near-horizontal ore body
CN210948688U (en) Artificial false lane

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20190521

Address after: 332499 Wudu Industrial Park, Xiushui County, Jiujiang City, Jiangxi Province

Patentee after: Jiangxi Xiushuixianglushan Tungsten Industry Co.,Ltd.

Address before: 410012 No. 343 Lushan South Road, Changsha City, Hunan Province

Patentee before: Changsha Institute of Mining Research Co.,Ltd.

TR01 Transfer of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Bagged cofferdam filling mining method

Effective date of registration: 20220819

Granted publication date: 20160824

Pledgee: China Construction Bank Co.,Ltd. Xiushui sub branch

Pledgor: Jiangxi Xiushuixianglushan Tungsten Industry Co.,Ltd.

Registration number: Y2022980013064

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20230905

Granted publication date: 20160824

Pledgee: China Construction Bank Co.,Ltd. Xiushui sub branch

Pledgor: Jiangxi Xiushuixianglushan Tungsten Industry Co.,Ltd.

Registration number: Y2022980013064

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Bagged cofferdam filling mining method

Effective date of registration: 20230925

Granted publication date: 20160824

Pledgee: China Construction Bank Co.,Ltd. Xiushui sub branch

Pledgor: Jiangxi Xiushuixianglushan Tungsten Industry Co.,Ltd.

Registration number: Y2023980058963