CN110273359A - A kind of prefabricated bent cap and construction method of packaged type bridges - Google Patents

A kind of prefabricated bent cap and construction method of packaged type bridges Download PDF

Info

Publication number
CN110273359A
CN110273359A CN201910488278.0A CN201910488278A CN110273359A CN 110273359 A CN110273359 A CN 110273359A CN 201910488278 A CN201910488278 A CN 201910488278A CN 110273359 A CN110273359 A CN 110273359A
Authority
CN
China
Prior art keywords
column
bent cap
embedded
template
embedded groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910488278.0A
Other languages
Chinese (zh)
Inventor
韩兵
李冻青
佘金波
冯身强
魏英杰
安偲玮
王虎
陈朝晖
闫洪坤
左佩文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Jiangong Industrialization Building Co Ltd
Original Assignee
Chengdu Jiangong Industrialization Building Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Jiangong Industrialization Building Co Ltd filed Critical Chengdu Jiangong Industrialization Building Co Ltd
Priority to CN201910488278.0A priority Critical patent/CN110273359A/en
Publication of CN110273359A publication Critical patent/CN110273359A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/20Concrete, stone or stone-like material
    • E01D2101/24Concrete

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses the prefabricated bent caps and construction method of a kind of packaged type bridges, main body is that steel reinforcement cage casting concrete forms, for being arranged in bridge column, column embedded groove is offered on the interface of the prefabricated bent cap and bridge column, convex shaped block is provided in the column embedded groove, perforation is provided on the cell wall of the column embedded groove to perforation extraneous and for slurry stream, the upper end of the bridge column is provided with the embedded division mutually chimeric with column embedded groove, reinforcing bar is embedded on the embedded division, grout sleeve corresponding with reinforcing bar is embedded in the column embedded groove, the present invention uses the form of construction work of grout sleeve and steel reinforcement abutting joints, embedded groove and lug boss in hoisting process to limiting, reduce original difficulty of construction, improve the precision of lifting splicing.

Description

A kind of prefabricated bent cap and construction method of packaged type bridges
Technical field
The present invention relates to bridge construction field, the prefabricated bent cap and construction method of especially a kind of packaged type bridges.
Background technique
The load that bent cap refers to as bearing, distribution and transmitting superstructure, Coping Construction belongs to high altitude operation, cast-in-place big Concrete is measured, construction risk is big.It can accelerate speed of application by the way of precast assembly bent cap, guarantee quality, consider simultaneously There is good economy to scale effect.
In the work progress of prefabricated bent cap at this stage, grout sleeve is embedded in prefabricated bent cap, after connecting column reinforcing bar Grouting joint close is carried out, connection type is solid and reliable, and stability is strong, and the later period safeguards bent cap less.But this connection type needs Multiple grout sleeves and Duo Gen reinforcing bar are set, when construction, builder must accurate control, could will be so reinforcing bar insertion corresponds to Grout sleeve in, then hole-specifically encapsulating again, difficulty of construction is larger, influences project progress.
Summary of the invention
To solve problems of the prior art, the present invention provides a kind of prefabricated bent cap of packaged type bridges and constructions Method.
The technical solution adopted by the present invention is that:
A kind of prefabricated bent cap of packaged type bridges, main body is that steel reinforcement cage casting concrete forms, vertical in bridge for being arranged On column, column embedded groove is offered on the interface of the prefabricated bent cap and bridge column, is provided in the column embedded groove Convex shaped block is provided with perforation on the cell wall of the column embedded groove to perforation extraneous and for slurry stream, the bridge The upper end of column has the embedded division mutually chimeric with column embedded groove, and reinforcing bar, the column insertion are embedded on the embedded division Grout sleeve corresponding with reinforcing bar is embedded in slot.
Preferably, there are the spaces for slurry stream at the chimeric surface of the embedded division and column embedded groove.
Preferably, the cross section of the convex shaped block is inverted trapezoidal.
The construction method of the prefabricated bent cap of packaged type bridges, comprising the following steps:
S1, fabrication of reinforcing cage, will be processed after reinforcing bar bind into steel reinforcement cage, and covered in the pre-buried grouting in steel reinforcement cage bottom Cylinder;
S2, the template assemblies of prefabricated bent cap, using the mould of the assembled prefabricated bent cap of end template, side template, Side Template and bracket Plate, being made on end template has structure corresponding with the embedded division, and answers masterpiece finite element analysis computation to template;
S3, casting concrete and maintenance in template, will the qualified concrete of proportion using it is vertical pour smash by the way of pour It builds, and carries out auxiliary using vibrating spear and vibrate, after the completion of pouring, plastic film health-preserving method is taken to be conserved, bent cap Internal-external temperature difference is controlled at 15 DEG C, and template is dismantled after the completion of maintenance;
The interface of bent cap and bridge, the embedded division of column embedded groove and column are cleared up and moistened to S4, hoisting prefabricated bent cap Alignment, grout sleeve are directed at the reinforcing bar on embedded division, by slip casting of perforating, complete lifting.
Preferably, the template profile is Q235, protects weldering welding using dioxo gas, is connected between template by flange It connects.
Preferably, the grade of the proportion concrete is C50.
The beneficial effects of the present invention are: retaining the form of construction work of part original grout sleeve and steel reinforcement abutting joints, increase embedding Enter slot and lug boss to limiting in hoisting process, reduce original difficulty of construction, improves the precision of lifting splicing, There are the spaces for slurry stream after the completion of lifting, between prefabricated bent cap and bridge column, the plumpness after ensure that grouting.
Detailed description of the invention
Fig. 1 is the structural diagram of the present invention;
Fig. 2 is construction schematic diagram of the invention;
Appended drawing reference:
1, prefabricated bent cap;10, column embedded groove;11, convex shaped block;12, perforation;13, grout sleeve 2, bridge column; 20, embedded division;21, reinforcing bar.
Specific embodiment
The embodiment of the present invention is described in detail with reference to the accompanying drawing.
As shown in Figure 1, a kind of prefabricated bent cap 1 of packaged type bridges of the invention, main body be steel reinforcement cage casting concrete and At setting offers column embedded groove 10, institute on the prefabricated bent cap 1 and the interface of bridge column 2 on bridge column 2 It states and is provided with convex shaped block 11 in column embedded groove 10, the cross section of the convex shaped block 11 is inverted trapezoidal, the column insertion Perforation is provided on the cell wall of slot 10 to perforation 12 extraneous and for slurry stream, the upper end of the bridge column 2 is provided with There are for slurry at the chimeric surface of the embedded division 20 mutually chimeric with column embedded groove 10, the embedded division 20 and column embedded groove 10 The space of circulation is embedded with reinforcing bar 21 on the embedded division 20, is embedded in the column embedded groove 10 corresponding with reinforcing bar 21 Grout sleeve 13.During lifting splicing, convex shaped block 11 is first docked with bridge column 2, and 11 face domain of convex shaped block is big, convenient Positioning, can reduce docking difficulty.13 ability of post-grouting sleeve is successfully docked to the two to dock with reinforcing bar 21, guarantees the accurate of its docking Degree.
As shown in Fig. 2, the construction method of the prefabricated bent cap of packaged type bridges of the invention, comprising the following steps:
I, screwing steel bars 21 in reinforcement shed, including top main reinforcement, bottom main reinforcement and side stirrup, will be processed after reinforcing bar 21 are placed on dedicated moulding bed and carry out binding molding, and in the pre-buried grout sleeve 13 in 21 cage bottom portion of reinforcing bar, grout sleeve 13 is adopted With full grout sleeve, material is high-strength spheroidal graphite cast-iron;
II, template is assembled by end template, side template, Side Template and bracket, is provided on end template and the insertion The corresponding structure in portion 20, template profile are Q235, protect weldering welding using dioxo gas, pass through flanged joint, mould between template Plate piece height difference, width are less than 2mm, make release agent using refined oil, answer masterpiece to have template after the completion of template assembly, before pouring Finite element analysis calculates, and can pour after analysis acquired results are qualified;
III, selection intensity is not less than the material mixture ratios such as 42.5 portland cements and flyash, ground slag into its grade and is The high performance concrete of C50, will the qualified concrete of proportion using it is vertical pour smash by the way of pour, and use vibrating spear into Row auxiliary is vibrated, and during pouring, the moment checks form stable situation, and timely processing of finding the problem avoids the occurrence of safety and quality The problem of;After the completion of pouring, plastic film health-preserving method is taken to be conserved, the internal-external temperature difference of bent cap is controlled at 15 DEG C, when When temperature is lower than 5 DEG C, reinforce covering and heat insulating, no longer watering health dismantles template after the completion of maintenance;
IV, it clears up and the interface of wet bent cap and bridge, the embedded division 20 of 10 alignment post of column embedded groove, grouting covers Cylinder 13 is directed at the reinforcing bar 21 on embedded division 20, by 12 slip castings of perforating, completes lifting.
A specific embodiment of the invention above described embodiment only expresses, the description thereof is more specific and detailed, but simultaneously Limitations on the scope of the patent of the present invention therefore cannot be interpreted as.It should be pointed out that for those of ordinary skill in the art For, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to guarantor of the invention Protect range.

Claims (6)

1. a kind of prefabricated bent cap of packaged type bridges, main body is that steel reinforcement cage casting concrete forms, for being arranged in bridge column On, it is characterised in that: column embedded groove, the column embedded groove are offered on the interface of the prefabricated bent cap and bridge column It is inside provided with convex shaped block, perforation of the perforation to the external world and for slurry stream is provided on the cell wall of the column embedded groove, The upper end of the bridge column has the embedded division mutually chimeric with column embedded groove, is embedded with reinforcing bar on the embedded division, described Grout sleeve corresponding with reinforcing bar is embedded in column embedded groove.
2. the prefabricated bent cap of packaged type bridges according to claim 1, it is characterised in that: the embedded division of the bridge column With there are the spaces for slurry stream at the chimeric surface of the column embedded groove.
3. the prefabricated bent cap of packaged type bridges according to claim 1, it is characterised in that: the cross section of the convex shaped block For inverted trapezoidal.
4. a kind of prefabricated construction method of bent cap using the packaged type bridges as described in claim 1-3 is any, comprising the following steps:
S1, fabrication of reinforcing cage: the reinforcing bar after will be processed is bound into steel reinforcement cage, and in the pre-buried grout sleeve in steel reinforcement cage bottom;
The template assemblies of S2, prefabricated bent cap: using the template of the assembled prefabricated bent cap of end template, side template, Side Template and bracket, bottom Being made in template has structure corresponding with the embedded division, and answers masterpiece finite element analysis computation to template;
Casting concrete and maintenance in S3, template: will the qualified concrete of proportion using it is vertical pour smash by the way of pour, and Auxiliary is carried out using vibrating spear to vibrate, and after the completion of pouring, plastic film health-preserving method is taken to be conserved, the inside and outside temperature of bent cap Difference control dismantles template at 15 DEG C after the completion of maintenance;
S4, hoisting prefabricated bent cap: clearing up and the interface of wet bent cap and bridge, the embedded division pair of column embedded groove and column Standard, grout sleeve are directed at the reinforcing bar on embedded division, by slip casting of perforating, complete lifting.
5. a kind of construction method of the prefabricated bent cap of packaged type bridges according to claim 4, it is characterised in that: the mould Profile material is Q235, protects weldering welding using dioxo gas, passes through flanged joint between template.
6. a kind of construction method of the prefabricated bent cap of packaged type bridges according to claim 4, it is characterised in that: described to match Grade than concrete is C50.
CN201910488278.0A 2019-06-05 2019-06-05 A kind of prefabricated bent cap and construction method of packaged type bridges Pending CN110273359A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910488278.0A CN110273359A (en) 2019-06-05 2019-06-05 A kind of prefabricated bent cap and construction method of packaged type bridges

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910488278.0A CN110273359A (en) 2019-06-05 2019-06-05 A kind of prefabricated bent cap and construction method of packaged type bridges

Publications (1)

Publication Number Publication Date
CN110273359A true CN110273359A (en) 2019-09-24

Family

ID=67962008

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910488278.0A Pending CN110273359A (en) 2019-06-05 2019-06-05 A kind of prefabricated bent cap and construction method of packaged type bridges

Country Status (1)

Country Link
CN (1) CN110273359A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110593119A (en) * 2019-09-29 2019-12-20 同济大学 Device and method for assembling and positioning upper and lower components of prefabricated bridge
CN113062224A (en) * 2021-03-26 2021-07-02 襄阳路桥建设集团有限公司 Prefabricated bridge bent cap positioning device and using method thereof
CN113235447A (en) * 2021-05-31 2021-08-10 湖南对外建设集团有限公司 Prefabricated bent cap installation equipment and construction method thereof
CN113373815A (en) * 2021-06-22 2021-09-10 中铁十九局集团第一工程有限公司 Construction method for on-site wet joint of prefabricated bent cap
CN113771186A (en) * 2021-09-03 2021-12-10 北京好运达智创科技有限公司 Capping beam and manufacturing method thereof
CN114808654A (en) * 2022-05-18 2022-07-29 中交一公局集团有限公司 Fully-prefabricated assembled bridge and construction method thereof
CN114808662A (en) * 2022-03-21 2022-07-29 上海市城市建设设计研究总院(集团)有限公司 Nested standardized prefabricated assembled bent cap and construction method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20110225746A1 (en) * 2010-03-19 2011-09-22 Gilles Desrochers Prefabricated steel bridge or viaduct structure
CN104018422A (en) * 2014-06-18 2014-09-03 上海市城市建设设计研究总院 Wet joint structure for prefabrication and splicing of joint part between bridge pier column and cover beam
CN107859248A (en) * 2017-11-02 2018-03-30 湖南大学 A kind of prefabricated concrete structure jointing and connection method
CN207608807U (en) * 2017-11-29 2018-07-13 深圳市交运工程集团有限公司 Packaged type bridges
CN108547217A (en) * 2018-06-12 2018-09-18 北京市市政工程设计研究总院有限公司 Unit construction bridge formed precast concrete pier stud and bent cap bell and spigot frame and construction method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20110225746A1 (en) * 2010-03-19 2011-09-22 Gilles Desrochers Prefabricated steel bridge or viaduct structure
CN104018422A (en) * 2014-06-18 2014-09-03 上海市城市建设设计研究总院 Wet joint structure for prefabrication and splicing of joint part between bridge pier column and cover beam
CN107859248A (en) * 2017-11-02 2018-03-30 湖南大学 A kind of prefabricated concrete structure jointing and connection method
CN207608807U (en) * 2017-11-29 2018-07-13 深圳市交运工程集团有限公司 Packaged type bridges
CN108547217A (en) * 2018-06-12 2018-09-18 北京市市政工程设计研究总院有限公司 Unit construction bridge formed precast concrete pier stud and bent cap bell and spigot frame and construction method

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110593119A (en) * 2019-09-29 2019-12-20 同济大学 Device and method for assembling and positioning upper and lower components of prefabricated bridge
CN113062224A (en) * 2021-03-26 2021-07-02 襄阳路桥建设集团有限公司 Prefabricated bridge bent cap positioning device and using method thereof
CN113235447A (en) * 2021-05-31 2021-08-10 湖南对外建设集团有限公司 Prefabricated bent cap installation equipment and construction method thereof
CN113235447B (en) * 2021-05-31 2023-08-18 湖南对外建设集团有限公司 Prefabricated bent cap mounting equipment and construction method thereof
CN113373815A (en) * 2021-06-22 2021-09-10 中铁十九局集团第一工程有限公司 Construction method for on-site wet joint of prefabricated bent cap
CN113771186A (en) * 2021-09-03 2021-12-10 北京好运达智创科技有限公司 Capping beam and manufacturing method thereof
CN114808662A (en) * 2022-03-21 2022-07-29 上海市城市建设设计研究总院(集团)有限公司 Nested standardized prefabricated assembled bent cap and construction method thereof
CN114808662B (en) * 2022-03-21 2023-10-03 上海市城市建设设计研究总院(集团)有限公司 Nested standardized prefabricated assembled bent cap and construction method thereof
CN114808654A (en) * 2022-05-18 2022-07-29 中交一公局集团有限公司 Fully-prefabricated assembled bridge and construction method thereof

Similar Documents

Publication Publication Date Title
CN110273359A (en) A kind of prefabricated bent cap and construction method of packaged type bridges
CN104746422B (en) A kind of hollow pier stud delay-pour joint structure of bridge prefabrication and construction method
CN103938864B (en) Infilled wall Constructional Col-umn Construction engineering method
CN108360712A (en) A kind of assembled steel reinforced concrete shear force wall and its construction method
CN107119574A (en) A kind of Cantilever Construction Method of arch rib bridge girder
CN101768916A (en) Lower flange improved corrugated steel web plate composite box girder and construction method thereof
CN106930194B (en) Inter-tie and pier stud global formation construction method and template used holder
CN109837831A (en) A kind of centrifugation prefabricated assembled concrete bridge pier and construction method
CN105804395B (en) Stair continuously poured in one molding construction method based on monoblock type typified form
CN207919746U (en) A kind of prefabricated node of high-strength high concrete assembled frame of ductility
CN109537895A (en) Method for mounting beam-slab column of cast-in-place core tube structure of assembled integral frame
CN209162667U (en) All-hydraulic automatically walk culvert abutment body trolley
CN106193588A (en) A kind of method pouring building post-cast strip and pour mould
CN106113230B (en) The non-type prefabricated for bench, template system and its construction method can be had enough to meet the need
CN109267585A (en) Assembled prismoid shaped basis and rod structure and assembly method
CN109853365A (en) A kind of high pier construction of modularization prefabrication and assembly construction based on high-strength bolt connection and production method
CN204097864U (en) A kind of bridge prefabrication hollow pier stud delay-pour joint structure
CN210713517U (en) Assembled superposed beam structure
CN108582465A (en) After pour canopy, precast reinforced concrete frame beam and after pour canopy manufacturing method
CN208473072U (en) A kind of damping assembly concrete building cover structure
CN109750832A (en) A kind of construction method of constructional column concrete self-compaction
CN208072390U (en) A kind of connection structure of the stake of bridge support and underwater binder
CN106906747A (en) A kind of column and bent cap splicing structure
CN110409283A (en) It is a kind of based on retarded adhesive prestressed UHPC permanent template without the rib prestressed Self-curing combination beam of abdomen and construction method
CN206844444U (en) A kind of steel bar girder concrete hollow building roof based on non-dismantling formwork

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190924

RJ01 Rejection of invention patent application after publication