CN208072390U CN201820391378.2U CN201820391378U CN208072390U CN 208072390 U CN208072390 U CN 208072390U CN 201820391378 U CN201820391378 U CN 201820391378U CN 208072390 U CN208072390 U CN 208072390U
Authority
CN
China
Prior art keywords
binder
underwater
bridge
embedded bar
pile foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820391378.2U
Other languages
Chinese (zh)
Inventor
杨加文
李刚
何莹
花姣姣
胡朝慧
冯娇
陈云
耿辉
李豹
刘成明
李绍青
聂赛
任威
顾东东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Pizhou Yuantong Highway Engineering Co Ltd
Original Assignee
Pizhou Yuantong Highway Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Pizhou Yuantong Highway Engineering Co Ltd filed Critical Pizhou Yuantong Highway Engineering Co Ltd
Priority to CN201820391378.2U priority Critical patent/CN208072390U/en
Application granted granted Critical
Publication of CN208072390U publication Critical patent/CN208072390U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Foundations (AREA)

Abstract

There are one circular outer casings for the connection structure of a kind of bridge support stake and underwater binder;The arranged on left and right sides of outer casing, which is connected separately with, controls the box that blocks water;Configured with casing in a circle inside outer casing;Interior casing bottom is configured with bridge pile foundation embedded bar upwards;Bridge pile foundation embedded bar is higher by pile foundation face;The interior casing and left and right left and right underwater binder of the lifting configured with advance coagulation forming of outer casing;The left and right underwater mutual corresponding endface of binder is exposed respectively binder embedded bar;Binder embedded bar on the left and right underwater binder is interconnected and fixed with bridge pile foundation embedded bar.A kind of connection structure of the stake of bridge support and underwater binder, pouring for bridge variable cross-section is carried out more than the water surface, overcome and is easy to be corroded by river water in casting process of the existing technology, the problem of pouring quality of concrete is not easy to ensure, its construction method is simple, the duration can be saved, better economy.

Description

A kind of connection structure of the stake of bridge support and underwater binder
Technical field
The utility model is related to bridge construction field more particularly to a kind of connection structures of the stake of bridge support and underwater binder
Technical background
Currently, in bridge construction and maintenance project work progress, the construction operation for bridge formation of paddling can be usually encountered, at this moment In order to ensure the stability of bridge pier column, generally requires between two pier studs setting together or multiple tracks binder increases pier stud Lateral stiffness, improve pier stud overall stability, binder section is mostly rectangular or rectangle.Traditional construction technique has installation underwater The construction methods such as steel jacket box, steel cofferdam.Underwater steel jacket box is installed, steel cofferdam method is to install the good casing of pre-production, cofferdam In place, draw water back cover, in the case assembling reinforcement, casting concrete, then removes steel jacket box, cofferdam.The method is in casting process In, it is easy to be corroded by river water, the pouring quality of concrete is not easy to ensure;Working procedure is more, cumbersome;Casing, cofferdam week Turn often, the duration of occupancy is long;The steel form and other equipment of input are more, and economy is relatively poor.
Invention content
In order to solve a series of problems caused by underwater steel jacket box, steel cofferdam method, the utility model provides a kind of bridge The connection structure of corbel stake and underwater binder carries out pouring for bridge binder more than the water surface, overcomes of the existing technology It is easy to be corroded by river water in casting process, the problem of pouring quality of concrete is not easy to ensure, construction method is simple, energy The duration is saved, better economy.
The utility model solves technical solution used by its technical problem:A kind of company of the stake of bridge support and underwater binder Binding structure includes:Left underwater binder, a left side block water box, outer casing, interior casing, pile foundation face, binder embedded bar, and the right side blocks water box, right Underwater binder;There are one circular outer casings for the connection structure of a kind of bridge support stake and underwater binder;A left side for the outer casing, Right both sides are connected separately with the left and right box that blocks water;Configured with casing in a circle inside the outer casing;The interior casing bottom to It is upper to be configured with the bridge pile foundation embedded bar bound in advance;The bridge pile foundation embedded bar is higher by pile foundation face;Described Interior casing and the left and right lifting of outer the casing underwater binder in a left side, right underwater binder configured with advance coagulation forming;The left underwater system Beam, right underwater the mutual corresponding endface of binder is exposed respectively binder embedded bar;The underwater binder in the left side, right underwater system Binder embedded bar on beam is interconnected and fixed with bridge pile foundation embedded bar.
The outer casing and the left box that blocks water, the right box that blocks water play the role of water proof, block water.
In use, the underwater binder in a left side of advance coagulation forming, right underwater binder are lifted into interior casing, outer casing respectively Open-ended place keeps left underwater binder, the binder embedded bar on the right underwater mutual corresponding end face of binder and bridge pile foundation pre- It buries reinforcing bar to intersect connection, be fixed;Then the formwork erection in interior casing pours left underwater binder, right underwater binder and bridge The junction (variable cross-section) of beam pile foundation, then proceedes to the construction of top bridge.
The utility model has the beneficial effects that the connection structure of a kind of bridge support stake and underwater binder in the water surface with enterprising Row bridge binder pours, and overcomes and is easy to be corroded by river water in casting process of the existing technology, concrete pours Quality is not easy the problem of ensureing, construction method is simple, can save the duration, better economy.
Description of the drawings
The utility model is further illustrated with case study on implementation below in conjunction with the accompanying drawings.
Fig. 1 is the principle schematic diagram of the utility model.
In figure, 1. left underwater binders, 2. left sides block water box, 3. outer casings, casing in 4., 5. pile foundation faces, 6. binder pre-buried steels Muscle, 7. right sides block water box, 8. right underwater binders.
Specific implementation mode
A kind of bridge support stake and the connection structure of underwater binder include:Left underwater binder 1, a left side block water box 2, outer casing 3, interior casing 4, pile foundation face 5, binder embedded bar 6, the right side blocks water box 7, right underwater binder 8;A kind of bridge support stake and underwater system There are one circular outer casings 3 for the connection structure of beam;The arranged on left and right sides of the outer casing 3 is connected separately with block water box 2 and the right side Block water box 7;3 inside of outer casing is configured with casing 4 in a circle;4 bottom of interior casing is upwards configured with binding in advance Good bridge pile foundation embedded bar;The bridge pile foundation embedded bar is higher by pile foundation face 5;The interior casing 4 and outer casing 3 The underwater binder 1 in a left side of the left and right lifting configured with advance coagulation forming, right underwater binder 8;The left underwater binder 1, right underwater system 8 mutual corresponding endface of beam is exposed respectively binder embedded bar 6;On the underwater binder 1 in the left side, right underwater binder 8 Binder embedded bar 6 is interconnected and fixed with bridge pile foundation embedded bar.
The outer casing 3 and the left box 2 that blocks water, the right box 7 that blocks water play the role of water proof, block water.
Constructing tie beam technological process is:Outer casing 3 divides into → and left side box 2, the right side 7 installations of the box → cast-in-situ bored pile that blocks water that blocks water applies Work → placement pile foundation embedded bar and interior 4 → underwater concreting of casing → pile crown cut and detect → interior casing 4, outer casing Block water box 2, the right side of 3 progress U-shaped opening cuttings → left side blocks water the underwater binder 1 in 7 dismounting of box → left side, the right underwater transport of binder 8, placement (binder prefabricated construction process is seen in synchronous construction part) → sealing drains interior casing 4, water → binder embedded bar 6 in outer casing 3 Installation binding → variable cross-section pours → and interior casing 4, outer casing 3 remove.

Claims (3)

1. a kind of connection structure of the stake of bridge support and underwater binder, including:Left underwater binder (1), a left side block water box (2), outer casing (3), interior casing (4), pile foundation face (5), binder embedded bar (6), the right side block water box (7), right underwater binder (8);A kind of bridge Holding in the palm the connection structure of stake and underwater binder, there are one circular outer casings (3);The arranged on left and right sides of the outer casing (3) connects respectively It is connected to that a left side blocks water box (2) and the right side blocks water box (7);Configured with casing (4) in a circle inside the outer casing (3);The interior shield Cylinder (4) bottom is upwards configured with the bridge pile foundation embedded bar bound in advance;The bridge pile foundation embedded bar is higher by stake Basal plane (5);The underwater binder (1) in the left and right left side lifted configured with advance coagulation forming of the interior casing (4) and outer casing (3), Right underwater binder (8);The left underwater binder (1), right underwater binder (8) mutual corresponding endface is exposed respectively has binder pre- Bury reinforcing bar (6).
2. the connection structure of a kind of stake of bridge support and underwater binder according to claim 1, it is characterized in that:The outer shield Cylinder (3) and a left side box (2), the right side box (7) that blocks water that blocks water play the role of water proof, block water.
3. the connection structure of a kind of stake of bridge support and underwater binder according to claim 1, it is characterized in that:The left water Binder embedded bar (6) on lower binder (1), right underwater binder (8) is interconnected and fixed with bridge pile foundation embedded bar.
CN201820391378.2U 2018-03-21 2018-03-21 A kind of connection structure of the stake of bridge support and underwater binder Active CN208072390U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820391378.2U CN208072390U (en) 2018-03-21 2018-03-21 A kind of connection structure of the stake of bridge support and underwater binder

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820391378.2U CN208072390U (en) 2018-03-21 2018-03-21 A kind of connection structure of the stake of bridge support and underwater binder

Publications (1)

Publication Number Publication Date
CN208072390U true CN208072390U (en) 2018-11-09

Family

ID=64046530

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820391378.2U Active CN208072390U (en) 2018-03-21 2018-03-21 A kind of connection structure of the stake of bridge support and underwater binder

Country Status (1)

Country Link
CN (1) CN208072390U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111778861A (en) * 2020-07-10 2020-10-16 浙江交工金筑交通建设有限公司 Underwater tie beam prefabrication installation construction method
CN112030746A (en) * 2020-04-22 2020-12-04 中铁广州工程局集团桥梁工程有限公司 Method for dismantling water retaining steel cofferdam in advance in bridge construction
CN113073663A (en) * 2021-04-07 2021-07-06 中交路桥建设有限公司 Water stopping structure and method for underwater installation of steel pipe pile

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112030746A (en) * 2020-04-22 2020-12-04 中铁广州工程局集团桥梁工程有限公司 Method for dismantling water retaining steel cofferdam in advance in bridge construction
CN112030746B (en) * 2020-04-22 2021-10-15 中铁广州工程局集团桥梁工程有限公司 Method for dismantling water retaining steel cofferdam in advance in bridge construction
CN111778861A (en) * 2020-07-10 2020-10-16 浙江交工金筑交通建设有限公司 Underwater tie beam prefabrication installation construction method
CN113073663A (en) * 2021-04-07 2021-07-06 中交路桥建设有限公司 Water stopping structure and method for underwater installation of steel pipe pile

Similar Documents

Publication Publication Date Title
CN208072390U (en) A kind of connection structure of the stake of bridge support and underwater binder
CN105862930B (en) A kind of protection structure to creating existing tunnel below underground engineering
CN110056092B (en) Connecting structure of bolting-inserting type upper and lower prefabricated shear walls and superimposed sheet and construction method
CN203429641U (en) Single-side supporting formwork reinforcing structure system for building construction
CN106012960A (en) Assembly type long piled wharf upper structure system and construction method thereof
CN110552372A (en) Superposed cable working well top plate structure and construction method thereof
CN103374923A (en) Method for prefabricating and mounting underwater pier
CN108590680A (en) A kind of construction method that launching shaft foundation pit vertical section pours
CN210713517U (en) Assembled superposed beam structure
CN103132465B (en) Underground box culvert constructing method closely attached to pile foundation bearing platform
CN103122642A (en) Construction method of vertical post support change
CN110552706A (en) Permanent-temporary combined shield hoisting hole sealing structure and method
CN105019645A (en) Template system for building concrete structure at earth-taking opening in top-down construction method, and construction method
CN102121313B (en) Rebar planting-free formwork erecting method for masonry construction and device thereof
CN207934054U (en) A kind of prefabricated assembled raft foundation
CN107023078A (en) Assemble cast-in-place combined type superposed box mesh-beam floor system and construction method
CN110847239A (en) Assembled large reinforced concrete prefabricated inspection well and construction method thereof
CN107740437B (en) Pipe gallery pre-buried steel side waterstop and steel plate for sealing water reinforcing construction process
CN110205943A (en) The construction method of prefabricated freely-supported small box girder end floor beam
CN205224014U (en) Precast underground continuous wall of pre -buried steel sheet
CN211900603U (en) Face combination shield structure hole of hoist enclosed construction forever
CN201915635U (en) Form erecting device free of bar planting for brickwork construction
CN206359993U (en) Stud structure for main transformer fire wall
CN217000063U (en) Modular drainage inspection shaft
CN105297758A (en) Prestressed square pile and steel latticed column integrated stand column

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant