CN207919746U CN201820117340.6U CN201820117340U CN207919746U CN 207919746 U CN207919746 U CN 207919746U CN 201820117340 U CN201820117340 U CN 201820117340U CN 207919746 U CN207919746 U CN 207919746U
Authority
CN
China
Prior art keywords
prefabricated
column
ductility
strength
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820117340.6U
Other languages
Chinese (zh)
Inventor
邓明科
马福栋
叶旺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xian University of Architecture and Technology
Original Assignee
Xian University of Architecture and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xian University of Architecture and Technology filed Critical Xian University of Architecture and Technology
Priority to CN201820117340.6U priority Critical patent/CN207919746U/en
Application granted granted Critical
Publication of CN207919746U publication Critical patent/CN207919746U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Rod-Shaped Construction Members (AREA)

Abstract

本实用新型提供了一种高强高延性混凝土装配式框架预制节点,预制高强高延性混凝土梁柱节点的四端、预制钢筋混凝土柱两端、预制钢筋混凝土梁两端均有预留纵筋,预留纵筋端部设有锚固板,预制钢筋混凝土梁和预制高强高延性混凝土梁柱节点的梁上部梁纵筋及梁箍筋均裸露,预制钢筋混凝土柱和预制高强高延性混凝土梁柱节点的柱底端中部均有预留芯柱。由于高强高延性混凝土有较高的抗拉强度和拉伸应变硬化的特点,因此可以减少甚至免去预留箍筋的使用,避免梁钢筋弯锚,解决节点区钢筋拥挤的问题。节点梁柱纵筋在节点核心区不断开,避免在应力复杂的节点核心区进行钢筋连接,转而在弯矩较小的柱反弯点处连接,大幅提高结构的整体性和抗震性能。

The utility model provides a prefabricated joint of a high-strength and high-ductility concrete assembled frame. The four ends of the prefabricated high-strength and high-ductility concrete beam-column joint, the two ends of the prefabricated reinforced concrete column, and the two ends of the prefabricated reinforced concrete beam all have reserved longitudinal bars. The end of the longitudinal reinforcement is provided with an anchor plate, and the upper beam longitudinal reinforcement and beam stirrup of the prefabricated reinforced concrete beam and the prefabricated high-strength and high-ductility concrete beam-column joint are exposed, and the prefabricated reinforced concrete column and the prefabricated high-strength There is a reserved core column in the middle of the bottom end of the column. Due to the high tensile strength and tensile strain hardening characteristics of high-strength and high-ductility concrete, the use of reserved stirrups can be reduced or even eliminated, avoiding the bending and anchoring of beam reinforcement, and solving the problem of reinforcement congestion in the joint area. The joint beam-column longitudinal reinforcement is not disconnected in the joint core area, avoiding the connection of steel bars in the joint core area with complex stress, and instead connecting at the column inflection point with small bending moment, which greatly improves the integrity and seismic performance of the structure.

Description

一种高强高延性混凝土装配式框架预制节点A high-strength and high-ductility concrete prefabricated frame prefabricated joint

技术领域technical field

本实用新型属于装配式混及连接方法凝土结构技术领域,具体涉及一种高强高延性混凝土装配式框架预制节点。The utility model belongs to the technical field of concrete structures of prefabricated concrete structures and connection methods, and in particular relates to a prefabricated node of a high-strength and high-ductility concrete prefabricated frame.

背景技术Background technique

在预制混凝土结构中框架结构形式是最常用的结构形式之一。由于其构件相对于盒子结构、预制装配式大板结构或预制装配式剪力墙结构要轻,预制混凝框架结构在构件的运输上更具有优势。并且装配式框架结构是高层框架结构体系之一,在国外已有预制混凝土框架结构在高层中的工程应用。Frame structure is one of the most commonly used structural forms in precast concrete structures. Because its components are lighter than box structures, prefabricated slab structures or prefabricated shear wall structures, prefabricated concrete frame structures have more advantages in the transportation of components. And the prefabricated frame structure is one of the high-rise frame structure systems, and there have been engineering applications of prefabricated concrete frame structures in high-rise buildings abroad.

在梁柱节点处进行预制梁和柱的连接是装配式框架结构中常用的连接方式,但现场后浇混凝土难以保证浇筑质量,而且在强烈地震作用下,框架梁柱节点核心区产生较大的剪力,致使节点核心区剪切刚度明显下降并产生严重损伤,各次大地震的震害调查发现:在整体倒塌的建筑物中,预制梁、柱构件破坏较轻,而主要的倒塌原因是框架结构内各个构件间的连接破坏。由于预制构件在工厂预制能很好的保证预制构件的质量,因此,将框架节点在工厂预制是保证节点区混凝土浇筑质量的有效方式。The connection of prefabricated beams and columns at the beam-column joints is a commonly used connection method in prefabricated frame structures, but it is difficult to guarantee the pouring quality of post-cast concrete on site, and under the action of strong earthquakes, the core area of the frame beam-column joints generates a large shear force , resulting in a significant decrease in the shear stiffness of the joint core area and serious damage. The earthquake damage investigations of various major earthquakes found that: in buildings that collapsed as a whole, the prefabricated beams and columns were less damaged, and the main cause of the collapse was the frame structure. The connection between the various components in the interior is damaged. Since the prefabricated components in the factory can well guarantee the quality of the prefabricated components, prefabricating the frame joints in the factory is an effective way to ensure the quality of concrete pouring in the joint area.

将节点区进行预制,需要在梁柱受力较小的地方进行连接,并且应该保证后浇混凝土的质量。目前,我国的装配式框架结构主要采用套筒灌浆连接钢筋,然后在节点核心区后浇普通混凝土,主要存在以下几个问题:(1)由于装配式构件体积大、质量重、连接构造复杂,再加上中国的建筑行业劳动力水平较低,加大了精细化程度要求较高的装配式建筑施工的难度;(2)套筒灌浆连接和约束桨锚连接均存在对中困难,操作复杂等缺点,施工中钢筋一旦冲突或误差较大将无法进行安装,影响工期,造成浪费;(3)向套筒中灌浆时,对套筒内部的状态难以确定,灌浆的质量难以检验和把握,因此,存在一定的安全隐患;(4)由于混凝土本身的脆性,在地震作用难以保证节点区的抗震性能。To prefabricate the joint area, it is necessary to connect the beams and columns where the stress is small, and the quality of the post-cast concrete should be guaranteed. At present, China's prefabricated frame structure mainly uses sleeve grouting to connect steel bars, and then pours ordinary concrete in the core area of the joints. There are mainly the following problems: (1) Due to the large volume, heavy weight and complex connection structure of prefabricated components, In addition, the labor force level in China's construction industry is low, which increases the difficulty of prefabricated building construction that requires a high degree of refinement; (2) Both the sleeve grouting connection and the restraint paddle-anchor connection are difficult to center and the operation is complicated. Disadvantages: Once the steel bars collide or have large errors during construction, the installation will not be possible, which will affect the construction period and cause waste; (3) When grouting into the sleeve, it is difficult to determine the state inside the sleeve, and the quality of grouting is difficult to inspect and grasp. Therefore, There are certain potential safety hazards; (4) Due to the brittleness of concrete itself, it is difficult to guarantee the seismic performance of the joint area under earthquake action.

实用新型内容Utility model content

本实用新型的目的是克服现有技术中存在的上述技术问题,提供一种施工简便,安全可靠的高强高延性混凝土装配式框架预制节点。The purpose of the utility model is to overcome the above-mentioned technical problems existing in the prior art, and to provide a prefabricated joint of a high-strength and high-ductility concrete assembly frame that is easy to construct, safe and reliable.

本实用新型提供的技术方案如下:The technical scheme provided by the utility model is as follows:

一种高强高延性混凝土装配式框架预制节点,包括预制钢筋混凝土柱、预制高强高延性混凝土梁柱节点和预制钢筋混凝土梁,所述预制高强高延性混凝土梁柱节点的四端、预制钢筋混凝土柱两端、预制钢筋混凝土梁两端均有预留纵筋,所述预留纵筋端部设有锚固板,所述预制钢筋混凝土梁和预制高强高延性混凝土梁柱节点的梁上部梁纵筋及梁箍筋均裸露,所述预制钢筋混凝土柱和预制高强高延性混凝土梁柱节点的柱底端中部均有预留芯柱;A high-strength and high-ductility concrete prefabricated frame prefabricated joint, including prefabricated reinforced concrete columns, prefabricated high-strength and high-ductility concrete beam-column joints and prefabricated reinforced concrete beams, the four ends of the prefabricated high-strength and high-ductility concrete beam-column joints, prefabricated reinforced concrete columns Both ends of the prefabricated reinforced concrete beam have reserved longitudinal reinforcement, the end of the reserved longitudinal reinforcement is provided with an anchor plate, the prefabricated reinforced concrete beam and the beam upper beam longitudinal reinforcement of the prefabricated high-strength and high-ductility concrete beam-column joint and beam stirrups are exposed, and the prefabricated reinforced concrete columns and the prefabricated high-strength high-ductility concrete beam-column joints have reserved core columns in the middle of the column bottom;

所述预制高强高延性混凝土梁柱节点和预制钢筋混凝土梁通过预留纵筋在搭接段搭接,预制钢筋混凝土梁上部与楼板一块现浇混凝土,所述预制高强高延性混凝土梁柱节点通过预制芯柱支撑在下部预制钢筋混凝土柱上,两者通过预留纵筋在搭接段搭接,上部预制钢筋混凝土柱通过预制芯柱支撑在预制高强高延性混凝土梁柱节点上,两者通过预留纵筋在搭接段搭接,所述两端预留纵筋搭接处均设有螺旋箍筋,搭接段均后浇高强高延性混凝土。The prefabricated high-strength and high-ductility concrete beam-column joints and the prefabricated reinforced concrete beams are overlapped at the overlapping section through reserved longitudinal bars, and the upper part of the prefabricated reinforced concrete beams and the floor slab are cast-in-place concrete, and the prefabricated high-strength and high-ductility concrete beam-column joints pass through The prefabricated core column is supported on the lower prefabricated reinforced concrete column, and the two are lapped at the overlapping section through the reserved longitudinal reinforcement. The reserved longitudinal reinforcement is overlapped at the overlapping section, and the overlapping sections of the reserved longitudinal reinforcement at both ends are provided with spiral stirrups, and high-strength and high-ductility concrete is post-cast at the overlapping section.

所述搭接段预留纵筋外侧设有预留箍筋。A reserved stirrup is provided outside the reserved longitudinal reinforcement of the overlapping section.

所述预制高强高延性混凝土梁柱节点包括高强高延性混凝土预制柱端和高强高延性混凝土预制梁端,所述高强高延性混凝土预制柱端高度H为0~2倍的柱宽,所述高强高延性混凝土预制梁端长度L为0~2倍的梁高。The prefabricated high-strength and high-ductility concrete beam-column joints include high-strength and high-ductility concrete precast column ends and high-strength and high-ductility concrete precast beam ends, the height H of the high-strength and high-ductility concrete precast column ends is 0 to 2 times the column width, and the high-strength and high-ductility concrete precast column ends are 0 to 2 times the column width. The length L of the high ductile concrete prefabricated beam end is 0~2 times the beam height.

所述预留芯柱为预制钢筋混凝土柱截面的1/2-2/3。The reserved core column is 1/2-2/3 of the section of the prefabricated reinforced concrete column.

所述预留纵筋在搭接段搭接长度为8~15倍的预留纵筋直径。The overlapping length of the reserved longitudinal reinforcement in the overlapping section is 8 to 15 times the diameter of the reserved longitudinal reinforcement.

所述螺旋箍筋直径为4~8mm,箍筋间距为20~30mm,环向直径为2~4倍的预留纵筋直径。The diameter of the spiral stirrup is 4-8mm, the spacing of the stirrup is 20-30mm, and the circumferential diameter is 2-4 times the diameter of the reserved longitudinal reinforcement.

所述锚固板为圆形或方形钢板,厚度为10~20mm,直径或边长为预留纵筋的2~3倍。The anchoring plate is a round or square steel plate with a thickness of 10-20 mm and a diameter or side length of 2-3 times that of the reserved longitudinal reinforcement.

本实用新型的有益效果是:The beneficial effects of the utility model are:

(1)节点核心区和梁柱端部采用高强高延性混凝土进行预制,能够保证节点区良好的受力和抗震性能。(1) The core area of the joint and the ends of beams and columns are prefabricated with high-strength and high-ductility concrete, which can ensure good mechanical and seismic performance of the joint area.

(2)将装配式框架结构中构件的连接转移到梁柱受力较小的位置,能够保证构件连接的可靠性。(2) Transferring the connection of components in the prefabricated frame structure to the position where the beam and column are less stressed can ensure the reliability of component connection.

(3)利用高强高延性混凝土超高的强度和粘结性能能大幅度缩短钢筋的搭接长度,新旧混凝土连接可靠。(3) Utilizing the ultra-high strength and bonding performance of high-strength and high-ductility concrete can greatly shorten the lap length of steel bars, and the connection between old and new concrete is reliable.

(4)高强高延性混凝土具有较高的抗拉强度和拉伸应变硬化的特点,因此,可以减少甚至免去箍筋的使用,避免梁钢筋弯锚,解决节点区钢筋拥挤的问题。(4) High-strength and high-ductility concrete has the characteristics of high tensile strength and tensile strain hardening. Therefore, the use of stirrups can be reduced or even eliminated, avoiding the bending and anchoring of beam reinforcement, and solving the problem of reinforcement congestion in the joint area.

(5)高强高延性混凝土具有超高强度、高延性的特点,构件抗震性能提高,可以在高烈度区使用。(5) High-strength and high-ductility concrete has the characteristics of ultra-high strength and high ductility, and the seismic performance of components is improved, so it can be used in high-intensity areas.

(6)该节点柱纵筋在节点核心区不断开,避免了在应力复杂的节点核心区进行钢筋连接,转而在弯矩较小的柱反弯点处连接,大幅提高结构的整体性和抗震性能。(6) The longitudinal reinforcement of the node column is not disconnected in the core area of the node, avoiding the connection of steel bars in the core area of the node with complex stress, and instead connecting at the inflection point of the column with a small bending moment, which greatly improves the integrity and stability of the structure. Anti-seismic performance.

(7)该种高强高延性混凝土装配式框架节点及其连接方式由于不使用套筒,因此,工厂制作方便,现象便于安装,减少工序,无需专业人员质量容易控制,符合我国现状。(7) Since this kind of high-strength and high-ductility concrete assembled frame joint and its connection method do not use sleeves, it is easy to manufacture in the factory, the phenomenon is easy to install, the process is reduced, and the quality is easy to control without professionals, which is in line with the current situation in our country.

下面将结合附图做进一步详细说明。Further details will be described below in conjunction with the accompanying drawings.

附图说明Description of drawings

图1是本实用新型预制梁柱构件拼装图;Fig. 1 is the assembling drawing of prefabricated beam-column member of the present utility model;

图2是本实用新型预制梁柱构件后浇高强高延性混凝土连接完成图。Fig. 2 is a diagram of the completed connection of post-cast high-strength and high-ductility concrete for prefabricated beam-column members of the present invention.

图中:1、预制钢筋混凝土柱;2、预制高强高延性混凝土梁柱节点;3、预制钢筋混凝土梁;4、预留纵筋;5、梁上部梁纵筋;6、梁箍筋;7、螺旋箍筋;8、锚固板;9、预制芯柱;10、预留箍筋。In the figure: 1. Prefabricated reinforced concrete columns; 2. Prefabricated high-strength and high-ductility concrete beam-column joints; 3. Prefabricated reinforced concrete beams; 4. Reserved longitudinal reinforcement; , Spiral stirrups; 8. Anchor plates; 9. Prefabricated core columns; 10. Reserved stirrups.

具体实施方式Detailed ways

实施例1:Example 1:

本实施例提供了一种高强高延性混凝土装配式框架预制节点,包括预制钢筋混凝土柱1、预制高强高延性混凝土梁柱节点2和预制钢筋混凝土梁3,所述预制高强高延性混凝土梁柱节点2的四端、预制钢筋混凝土柱1两端、预制钢筋混凝土梁3两端均有预留纵筋4,所述预留纵筋4端部设有锚固板8,所述预制钢筋混凝土梁3和预制高强高延性混凝土梁柱节点2的梁上部梁纵筋5及梁箍筋6均裸露,所述预制钢筋混凝土柱1和预制高强高延性混凝土梁柱节点2的柱底端中部均有预留芯柱;This embodiment provides a high-strength and high-ductility concrete assembled frame prefabricated node, including a prefabricated reinforced concrete column 1, a prefabricated high-strength and high-ductility concrete beam-column node 2 and a prefabricated reinforced concrete beam 3, and the prefabricated high-strength and high-ductility concrete beam-column node 2, the two ends of the prefabricated reinforced concrete column 1, and the two ends of the prefabricated reinforced concrete beam 3 have reserved longitudinal reinforcement 4, and the ends of the reserved longitudinal reinforcement 4 are provided with anchor plates 8, and the prefabricated reinforced concrete beam 3 The upper beam longitudinal bars 5 and beam stirrups 6 of the prefabricated high-strength and high-ductility concrete beam-column joint 2 are all exposed, and the prefabricated reinforced concrete column 1 and the prefabricated high-strength high-ductility concrete beam-column joint 2 have prefabricated high-strength and high-ductility concrete beam-column joints. stay stem;

所述预制高强高延性混凝土梁柱节点2和预制钢筋混凝土梁3通过预留纵筋4在搭接段搭接,预制钢筋混凝土梁3上部与楼板一块现浇混凝土,所述预制高强高延性混凝土梁柱节点2通过预制芯柱9支撑在下部预制钢筋混凝土柱1上,两者通过预留纵筋4在搭接段搭接,上部预制钢筋混凝土柱1通过预制芯柱9支撑在预制高强高延性混凝土梁柱节点2上,两者通过预留纵筋4在搭接段搭接,所述两端预留纵筋4搭接处均设有螺旋箍筋7,搭接段均后浇高强高延性混凝土。The prefabricated high-strength and high-ductility concrete beam-column node 2 and the prefabricated reinforced concrete beam 3 are lapped at the overlapping section through the reserved longitudinal reinforcement 4, and the upper part of the prefabricated reinforced concrete beam 3 is cast-in-situ concrete with the floor slab, and the prefabricated high-strength and high-ductility concrete The beam-column node 2 is supported on the lower prefabricated reinforced concrete column 1 through the prefabricated core column 9, and the two are lapped at the lap section through the reserved longitudinal reinforcement 4, and the upper prefabricated reinforced concrete column 1 is supported on the prefabricated high-strength high-strength column through the prefabricated core column 9. On the ductile concrete beam-column joint 2, the two are overlapped at the overlapping section through the reserved longitudinal reinforcement 4, and the overlapping joints of the reserved longitudinal reinforcement 4 at both ends are provided with spiral stirrups 7, and the overlapping sections are post-cast with high strength High ductility concrete.

其中,高强高延性混凝土的组分为水泥、粉煤灰、硅灰、砂、PVA纤维、钢纤维和水,其中,按质量百分比计,水泥:粉煤灰:硅灰:砂:水=1:0-0.3:0.1-0.4:0.76:0.22-0.32;以水泥、粉煤灰、硅灰、砂和水混合均匀后的总体积为基数,PE纤维的体积掺量为1%-1.5%,钢纤维的体积掺量为0.5%-2%。Among them, the components of high-strength and high-ductility concrete are cement, fly ash, silica fume, sand, PVA fiber, steel fiber and water, wherein, in terms of mass percentage, cement: fly ash: silica fume: sand: water = 1 : 0-0.3: 0.1-0.4: 0.76: 0.22-0.32; based on the total volume of cement, fly ash, silica fume, sand and water mixed uniformly, the volume content of PE fiber is 1%-1.5%, The volume content of steel fiber is 0.5%-2%.

由于高强高延性混凝土具有较高的抗拉强度和拉伸应变硬化的特点,因此,可以减少甚至免去预留箍筋10的使用,避免梁钢筋弯锚,解决节点区钢筋拥挤的问题。Since the high-strength and high-ductility concrete has the characteristics of high tensile strength and tensile strain hardening, the use of reserved stirrups 10 can be reduced or even eliminated, avoiding the bending and anchoring of beam reinforcement, and solving the problem of reinforcement congestion in the joint area.

如图1所示,预制梁柱构件包括预制钢筋混凝土柱1、预制高强高延性混凝土梁柱节点2和预制钢筋混凝土梁3。预制高强高延性混凝土梁柱节点2采用高强高延性混凝土进行预制,节点梁柱纵筋在节点核心区不断开,避免了在应力复杂的节点核心区进行钢筋连接,转而在弯矩较小的柱反弯点处连接,大幅提高结构的整体性和抗震性能。As shown in FIG. 1 , the prefabricated beam-column components include prefabricated reinforced concrete columns 1 , prefabricated high-strength and high-ductility concrete beam-column nodes 2 and prefabricated reinforced concrete beams 3 . The prefabricated high-strength and high-ductility concrete beam-column joint 2 is prefabricated with high-strength and high-ductility concrete. The longitudinal reinforcement of the beam-column joint is not disconnected in the core area of the joint, which avoids the connection of steel bars in the core area of the joint with complex stress. The connection at the bending point greatly improves the integrity and seismic performance of the structure.

由于不使用套筒,因此,工厂制作方便,现象便于安装,减少工序,无需专业人员质量容易控制,符合我国现状。Because the sleeve is not used, the factory is easy to make, the phenomenon is easy to install, the process is reduced, and the quality is easy to control without professionals, which is in line with the current situation in our country.

实施例2:Example 2:

在实施例1的基础上,本实施例提供了一种如图2所示的高强高延性混凝土装配式框架预制节点,所述搭接段预留纵筋4外侧设有预留箍筋10。On the basis of Embodiment 1, this embodiment provides a high-strength and high-ductility concrete fabricated frame prefabricated node as shown in FIG. 2 , and a reserved stirrup 10 is provided outside the reserved longitudinal reinforcement 4 of the overlap section.

高强高延性混凝土可以减少甚至免去预留箍筋10的使用,但也可少量使用,一方面可避免梁钢筋弯锚,解决节点区钢筋拥挤的问题,另一方面增加节点的连接可靠性。High-strength and high-ductility concrete can reduce or even eliminate the use of reserved stirrups 10, but it can also be used in small quantities. On the one hand, it can avoid the bending and anchoring of beam reinforcement, solve the problem of reinforcement congestion in the joint area, and on the other hand, increase the connection reliability of the joint.

在本实施例中,预制高强高延性混凝土梁柱节点2包括高强高延性混凝土预制柱端和高强高延性混凝土预制梁端,所述高强高延性混凝土预制柱端高度H为0~2倍的柱宽,所述高强高延性混凝土预制梁端长度L为0~2倍的梁高。In this embodiment, the prefabricated high-strength and high-ductility concrete beam-column joint 2 includes high-strength and high-ductility concrete precast column ends and high-strength and high-ductility concrete precast beam ends, and the height H of the high-strength and high-ductility concrete precast column ends is 0 to 2 times that of the column width, the length L of the end of the high-strength and high-ductility concrete prefabricated beam is 0 to 2 times the beam height.

预留芯柱为预制钢筋混凝土柱1截面的1/2-2/3。预留纵筋4在搭接段搭接长度为8~15倍的预留纵筋4直径。螺旋箍筋7直径为4~8mm,箍筋间距为20~30mm,环向直径为2~4倍的预留纵筋4直径。锚固板8为圆形或方形钢板,厚度为10~20mm,直径或边长为预留纵筋4的2~3倍。The reserved core column is 1/2-2/3 of the section of the prefabricated reinforced concrete column 1. The overlapping length of the reserved longitudinal reinforcement 4 in the overlapping section is 8 to 15 times the diameter of the reserved longitudinal reinforcement 4 . The diameter of the spiral stirrup 7 is 4-8 mm, the distance between the stirrups is 20-30 mm, and the circumferential diameter is 2-4 times the diameter of the reserved longitudinal reinforcement 4 . The anchor plate 8 is a round or square steel plate with a thickness of 10-20mm, and its diameter or side length is 2-3 times that of the reserved longitudinal reinforcement 4.

装配施工步骤:步骤1)预制高强高延性混凝土梁柱节点2通过预制芯柱9支撑在下部预制钢筋混凝土柱1上,再通过预留纵筋4在搭接段搭接,在搭接处缠绕螺旋箍筋7,然后浇高强高延性混凝土,将高强高延性混凝土梁柱节点和下部预制钢筋混凝土柱1连接;Assembly construction steps: Step 1) Prefabricated high-strength and high-ductility concrete beam-column node 2 is supported on the lower prefabricated reinforced concrete column 1 through the prefabricated core column 9, and then the reserved longitudinal reinforcement 4 is lapped at the lap joint and wound at the lap joint Spiral stirrups 7, then pour high-strength and high-ductility concrete, and connect the high-strength and high-ductility concrete beam-column node with the lower prefabricated reinforced concrete column 1;

步骤2)将预制钢筋混凝土梁3吊装至预定位置,通过预留纵筋4在搭接段搭接,在搭接处缠绕螺旋箍筋7,绑扎搭接段预留纵筋4外侧的预留箍筋10,然后浇高强高延性混凝土,将高强高延性混凝土梁柱节点和左右预制钢筋混凝土连接。Step 2) Hoist the prefabricated reinforced concrete beam 3 to the predetermined position, overlap the overlapping section through the reserved longitudinal reinforcement 4, wind the spiral stirrup 7 at the overlapping section, and bind the reserved longitudinal reinforcement 4 outside the overlapping section Stirrups 10, then pour high-strength and high-ductility concrete, and connect the high-strength and high-ductility concrete beam-column nodes with the left and right prefabricated reinforced concrete.

其中,所述水泥为P.O. 52.5R硅酸盐水泥;所述粉煤灰为Ⅰ级粉煤灰;所述硅灰的烧失量小于6%、二氧化硅含量大于85%、比表面积大于15000 m2/kg;所述砂的最大粒径为1.26mm;所述PE纤维的长度为6~12mm、直径为20µm以上、抗拉强度为3000MPa以上、弹性模量为85GPa以上;所述钢纤维钢纤维为带钩镀铜钢纤维,直径0.22 mm,长度13mm,抗拉强度2800MPa。Wherein, the cement is PO 52.5R Portland cement; the fly ash is Class I fly ash; the loss on ignition of the silica fume is less than 6%, the silica content is greater than 85%, and the specific surface area is greater than 15,000 m 2 /kg; the maximum particle size of the sand is 1.26mm; the length of the PE fiber is 6-12mm, the diameter is more than 20µm, the tensile strength is more than 3000MPa, and the modulus of elasticity is more than 85GPa; the steel fiber The steel fibers are copper-plated steel fibers with hooks, with a diameter of 0.22 mm, a length of 13 mm, and a tensile strength of 2800 MPa.

高强高延性混凝土超高的强度和粘结性能能大幅度缩短钢筋的搭接长度,新旧混凝土连接可靠。高强高延性混凝土具有超高强度、高延性的特点,构件抗震性能提高,可以在高烈度区使用。The ultra-high strength and bonding performance of high-strength and high-ductility concrete can greatly shorten the lap length of steel bars, and the connection between old and new concrete is reliable. High-strength and high-ductility concrete has the characteristics of ultra-high strength and high ductility, and the seismic performance of components is improved, so it can be used in high-intensity areas.

实施例3:Example 3:

参考图1、图2,本实施例的高强高延性混凝土装配式框架节点中,预制钢筋混凝土柱1的截面尺寸为长500mm宽500mm,预制钢筋混凝土梁3的截面尺寸为宽300mm长600mm;预留纵筋4在搭接段搭接长度8mm;螺旋箍筋7直径为5mm,箍筋间距为25mm,环向直径为3倍的预留纵筋4直径;锚固板8为圆形,厚度为15mm,直径或边长为预留纵筋4的3倍;高强高延性混凝土预制柱端高度H为1倍的柱宽,高强高延性混凝土预制梁端长度L为1倍的梁高。Referring to Fig. 1 and Fig. 2, in the high-strength and high-ductility concrete assembly frame joint of the present embodiment, the cross-sectional dimension of the prefabricated reinforced concrete column 1 is 500 mm long and 500 mm wide, and the cross-sectional dimension of the prefabricated reinforced concrete beam 3 is 300 mm wide and 600 mm long; The overlapping length of the longitudinal reinforcement 4 in the overlapping section is 8 mm; the diameter of the spiral stirrup 7 is 5 mm, the spacing between the stirrups is 25 mm, and the circumferential diameter is 3 times the diameter of the reserved longitudinal reinforcement 4; the anchor plate 8 is circular and has a thickness of 15mm, the diameter or side length is three times of the reserved longitudinal reinforcement 4; the height H of the high-strength and high-ductility concrete precast column end is 1 times the column width, and the length L of the high-strength and high-ductility concrete precast beam end is 1 times the beam height.

实施例4:Example 4:

在实施例1的基础上,本实施例提供了一种高强高延性混凝土装配式框架连接方法,使用高强高延性混凝土装配式框架预制节点,包括以下步骤:On the basis of Example 1, this example provides a high-strength and high-ductility concrete prefabricated frame connection method, using high-strength and high-ductility concrete prefabricated frame prefabricated nodes, including the following steps:

步骤1)预制高强高延性混凝土梁柱节点2通过预制芯柱9支撑在下部预制钢筋混凝土柱1上,再通过预留纵筋4在搭接段搭接,在搭接处缠绕螺旋箍筋7,然后浇高强高延性混凝土,将高强高延性混凝土梁柱节点和下部预制钢筋混凝土柱1连接;Step 1) The prefabricated high-strength and high-ductility concrete beam-column node 2 is supported on the lower prefabricated reinforced concrete column 1 through the prefabricated core column 9, and then lapped at the lap joint through the reserved longitudinal reinforcement 4, and the spiral stirrup 7 is wound at the lap joint , and then pour high-strength and high-ductility concrete to connect the high-strength and high-ductility concrete beam-column node to the lower prefabricated reinforced concrete column 1;

步骤2)将预制钢筋混凝土梁3吊装至预定位置,通过预留纵筋4在搭接段搭接,在搭接处缠绕螺旋箍筋7,然后浇高强高延性混凝土,将高强高延性混凝土梁柱节点和左右预制钢筋混凝土连接;Step 2) Hoist the prefabricated reinforced concrete beam 3 to the predetermined position, overlap the overlapping section by reserving the longitudinal reinforcement 4, wind the spiral stirrup 7 at the overlapping section, and then pour high-strength and high-ductility concrete to place the high-strength and high-ductility concrete beam Column joints and left and right prefabricated reinforced concrete connections;

步骤3)待预制楼板吊装完成后,绑扎楼板钢筋,浇筑混凝土后浇层,形成叠合板。Step 3) After the hoisting of the prefabricated floor slab is completed, the steel bars of the floor slab are bound, the concrete is poured and then the layer is poured to form a laminated slab.

本实施例没有具体描述的部分都属于本技术领域的公知常识和公知技术,此处不再一一详细说明。The parts not specifically described in this embodiment belong to common knowledge and technologies in the technical field, and will not be described in detail here.

以上例举仅仅是对本实用新型的举例说明,并不构成对本实用新型的保护范围的限制,凡是与本实用新型相同或相似的设计均属于本实用新型的保护范围之内。The above examples are only illustrations of the utility model, and do not constitute a limitation to the protection scope of the utility model. All designs identical or similar to the utility model all belong to the protection scope of the utility model.

Claims (7)

1. a kind of prefabricated node of high-strength high concrete assembled frame of ductility, it is characterised in that:Including prefabricated reinforced concrete column (1), prefabricated high-strength high ductility concrete beam and column node(2)And precast reinforced concrete beam(3), the prefabricated high-strength high ductility is mixed Solidifying soil bean column node(2)Four ends, prefabricated reinforced concrete column(1)Both ends, precast reinforced concrete beam(3)Both ends have reserved Vertical muscle(4), the reserved vertical muscle(4)End is equipped with anchor plate(8), the precast reinforced concrete beam(3)With prefabricated high-strength height Ductility concrete beam and column node(2)Beam upper beam indulge muscle(5)And beam stirrup(6)It is exposed, the prefabricated reinforced concrete column (1)With prefabricated high-strength high ductility concrete beam and column node(2)Column center bottom have reserved stem;
The prefabricated high-strength high ductility concrete beam and column node(2)And precast reinforced concrete beam(3)Pass through reserved vertical muscle(4) Lap segment overlaps, precast reinforced concrete beam(3)Top and one piece of cast-in-place concrete of floor, the prefabricated high-strength high ductility coagulation Native bean column node(2)Pass through prefabricated core column(9)It is supported on lower part prefabricated reinforced concrete column(1)On, the two passes through reserved vertical muscle (4)It is overlapped in lap segment, top prefabricated reinforced concrete column(1)Pass through prefabricated core column(9)It is mixed to be supported on prefabricated high-strength high ductility Solidifying soil bean column node(2)On, the two passes through reserved vertical muscle(4)It is overlapped in lap segment, the reserved vertical muscle in the both ends(4)Lap-joint is equal Equipped with tie hoop(7), lap segment pours high-strength high ductility concrete afterwards.
2. the prefabricated node of the high-strength high concrete assembled frame of ductility of one kind according to claim 1, it is characterised in that:Institute State the reserved vertical muscle of lap segment(4)Outside is equipped with reserved stirrup(10).
3. the prefabricated node of the high-strength high concrete assembled frame of ductility of one kind according to claim 1, it is characterised in that:Institute State prefabricated high-strength high ductility concrete beam and column node(2)Including the high-strength high concrete prefabricated styletable of ductility and high-strength high ductility coagulation The prefabricated beam-ends of soil, the high-strength high concrete prefabricated styletable height H of ductility are that 0 ~ 2 times of column is wide, the high-strength high ductility coagulation The deck-molding that the prefabricated beam-ends length L of soil is 0 ~ 2 times.
4. the prefabricated node of the high-strength high concrete assembled frame of ductility of one kind according to claim 1, it is characterised in that:Institute It is prefabricated reinforced concrete column to state reserved stem(1)The 1/2-2/3 in section.
5. special according to a kind of prefabricated node of high-strength high concrete assembled frame of ductility of claim 1-4 any one of them Sign is:The reserved vertical muscle(4)The reserved vertical muscle for being 8 ~ 15 times in the lap segment lap of splice(4)Diameter.
6. special according to a kind of prefabricated node of high-strength high concrete assembled frame of ductility of claim 1-4 any one of them Sign is:The tie hoop(7)A diameter of 4 ~ 8mm, stirrup spacing are 20 ~ 30mm, circumferential a diameter of 2 ~ 4 times of reserved vertical muscle (4)Diameter.
7. special according to a kind of prefabricated node of high-strength high concrete assembled frame of ductility of claim 1-4 any one of them Sign is:The anchor plate(8)For round or square plate, thickness is 10 ~ 20mm, and diameter or the length of side are reserved vertical muscle(4)2 ~ 3 times.
CN201820117340.6U 2018-01-24 2018-01-24 A kind of prefabricated node of high-strength high concrete assembled frame of ductility Active CN207919746U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820117340.6U CN207919746U (en) 2018-01-24 2018-01-24 A kind of prefabricated node of high-strength high concrete assembled frame of ductility

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820117340.6U CN207919746U (en) 2018-01-24 2018-01-24 A kind of prefabricated node of high-strength high concrete assembled frame of ductility

Publications (1)

Publication Number Publication Date
CN207919746U true CN207919746U (en) 2018-09-28

Family

ID=63605099

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820117340.6U Active CN207919746U (en) 2018-01-24 2018-01-24 A kind of prefabricated node of high-strength high concrete assembled frame of ductility

Country Status (1)

Country Link
CN (1) CN207919746U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108035437A (en) * 2018-01-24 2018-05-15 西安建筑科技大学 A kind of prefabricated node of the high-strength high concrete assembled frame of ductility and connection method
CN109138151A (en) * 2018-09-30 2019-01-04 华南理工大学 A kind of assembled architecture full-dry method construction concrete frame structure
CN109403458A (en) * 2018-12-18 2019-03-01 有利华建材(惠州)有限公司 Novel pre-fabricated one
CN110106971A (en) * 2019-05-16 2019-08-09 长沙理工大学 Novel prefabricated assembly beam column system for enhancing structural earthquake resistance and collapse resistance
CN111395519A (en) * 2020-03-31 2020-07-10 同济大学建筑设计研究院(集团)有限公司 Construction method of assembled beam column

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108035437A (en) * 2018-01-24 2018-05-15 西安建筑科技大学 A kind of prefabricated node of the high-strength high concrete assembled frame of ductility and connection method
CN109138151A (en) * 2018-09-30 2019-01-04 华南理工大学 A kind of assembled architecture full-dry method construction concrete frame structure
CN109138151B (en) * 2018-09-30 2024-05-17 华南理工大学 Assembled building full-dry method construction concrete frame structure
CN109403458A (en) * 2018-12-18 2019-03-01 有利华建材(惠州)有限公司 Novel pre-fabricated one
CN110106971A (en) * 2019-05-16 2019-08-09 长沙理工大学 Novel prefabricated assembly beam column system for enhancing structural earthquake resistance and collapse resistance
CN111395519A (en) * 2020-03-31 2020-07-10 同济大学建筑设计研究院(集团)有限公司 Construction method of assembled beam column

Similar Documents

Publication Publication Date Title
CN108035437A (en) A kind of prefabricated node of the high-strength high concrete assembled frame of ductility and connection method
CN108035438A (en) A kind of concrete assembled frame structure system of high-strength high ductility and connection method
CN207919746U (en) A kind of prefabricated node of high-strength high concrete assembled frame of ductility
CN103104039B (en) Assembled framework beam-column joint adopting cover plate connection and construction method thereof
CN104988844B (en) Two times tensioning prestressing force assembled Wavelike steel webplate combination beam
CN204876059U (en) Prefabricated assembled shaped steel concrete frame structure system
CN108755964B (en) A partially prefabricated assembled steel-concrete mixed column and construction method
CN207919748U (en) A kind of high ductility concrete beam and column node of assembled
CN106968381B (en) Prefabricated precast shear wall and composite panel joints connected by combined grouting sleeves
CN104594561A (en) Prefabricated reinforced concrete column with high-performance concrete frame and construction method
CN104652705B (en) Prefabricated and assembly type steel reinforced concrete column with high-performance concrete frame and construction method
CN101457548A (en) Node for connecting round steel tube concrete column with reinforced concrete floor and method for making same
CN110130488A (en) A new prefabricated building node and its construction form
CN108265824A (en) A kind of high ductility concrete beam and column node of assembled and connection method
CN104947588B (en) Concrete-filled steel tube-composite girder cable-stayed bridge deck system and its construction method
CN104499568A (en) Square steel pipe fabricated column-prefabricated superposed beam integrally-fabricated frame and construction method
CN107476470A (en) Steel pipe built in assembled and GFRP pipe regeneration concrete compound shear walls and its construction method
CN207919747U (en) A kind of high-strength high concrete assembled frame structure system of ductility
CN108755963A (en) A kind of partial precast assembled steel reinforced concrete giant frame structure and construction method
CN108104284B (en) Wall panel connection structure and assembly method with steel arm of shear wall embedded in floor slab
CN108775083A (en) The assembly concrete frame structure and construction method connected outside precast beam plastic hinge region
CN108457422A (en) Precast prestressed beam, assembled composite frame structure and its installation method
CN107254937A (en) A kind of assembled power consumption girder connection of built-in X-shaped low-yield structural steel connecting member
CN111663681A (en) Assembled wall body connecting structure and construction method thereof
CN108775084B (en) Steel-concrete composite prefabricated beam and prefabricated column connection structure and construction method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant