CN110242002A - Floor heating assembly and installation method - Google Patents
Floor heating assembly and installation method Download PDFInfo
- Publication number
- CN110242002A CN110242002A CN201910353209.9A CN201910353209A CN110242002A CN 110242002 A CN110242002 A CN 110242002A CN 201910353209 A CN201910353209 A CN 201910353209A CN 110242002 A CN110242002 A CN 110242002A
- Authority
- CN
- China
- Prior art keywords
- stone
- plastic plate
- floor heating
- heating assembly
- insulation board
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010438 heat treatment Methods 0.000 title claims abstract description 62
- 238000000034 method Methods 0.000 title claims abstract description 21
- 238000009434 installation Methods 0.000 title claims abstract description 18
- 239000004033 plastic Substances 0.000 claims abstract description 99
- 229920003023 plastic Polymers 0.000 claims abstract description 99
- 238000009413 insulation Methods 0.000 claims abstract description 55
- 238000004321 preservation Methods 0.000 claims abstract description 18
- 230000003014 reinforcing effect Effects 0.000 claims description 26
- 210000001503 joint Anatomy 0.000 claims description 13
- 238000003032 molecular docking Methods 0.000 claims description 4
- 239000004698 Polyethylene Substances 0.000 claims description 3
- 239000004793 Polystyrene Substances 0.000 claims description 3
- 238000001125 extrusion Methods 0.000 claims description 3
- -1 polyethylene Polymers 0.000 claims description 3
- 229920000573 polyethylene Polymers 0.000 claims description 3
- 229920002223 polystyrene Polymers 0.000 claims description 3
- 239000004575 stone Substances 0.000 claims description 3
- 230000002035 prolonged effect Effects 0.000 claims 1
- 230000000694 effects Effects 0.000 abstract description 11
- 238000012423 maintenance Methods 0.000 abstract description 2
- 238000010586 diagram Methods 0.000 description 18
- 239000004568 cement Substances 0.000 description 9
- 239000002002 slurry Substances 0.000 description 4
- 238000005266 casting Methods 0.000 description 3
- 210000003205 muscle Anatomy 0.000 description 3
- 239000011083 cement mortar Substances 0.000 description 2
- 238000010276 construction Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000011900 installation process Methods 0.000 description 2
- 238000000429 assembly Methods 0.000 description 1
- 230000000712 assembly Effects 0.000 description 1
- 238000005034 decoration Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F15/00—Flooring
- E04F15/02—Flooring or floor layers composed of a number of similar elements
- E04F15/02044—Separate elements for fastening to an underlayer
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F15/00—Flooring
- E04F15/02—Flooring or floor layers composed of a number of similar elements
- E04F15/10—Flooring or floor layers composed of a number of similar elements of other materials, e.g. fibrous or chipped materials, organic plastics, magnesite tiles, hardboard, or with a top layer of other materials
- E04F15/105—Flooring or floor layers composed of a number of similar elements of other materials, e.g. fibrous or chipped materials, organic plastics, magnesite tiles, hardboard, or with a top layer of other materials of organic plastics with or without reinforcements or filling materials
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F15/00—Flooring
- E04F15/18—Separately-laid insulating layers; Other additional insulating measures; Floating floors
- E04F15/181—Insulating layers integrally formed with the flooring or the flooring elements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F15/00—Flooring
- E04F15/02—Flooring or floor layers composed of a number of similar elements
- E04F15/02044—Separate elements for fastening to an underlayer
- E04F2015/02105—Separate elements for fastening to an underlayer without load-supporting elongated furring elements between the flooring elements and the underlayer
- E04F2015/02127—Separate elements for fastening to an underlayer without load-supporting elongated furring elements between the flooring elements and the underlayer adjustable perpendicular to the underlayer
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F2290/00—Specially adapted covering, lining or flooring elements not otherwise provided for
- E04F2290/02—Specially adapted covering, lining or flooring elements not otherwise provided for for accommodating service installations or utility lines, e.g. heating conduits, electrical lines, lighting devices or service outlets
- E04F2290/023—Specially adapted covering, lining or flooring elements not otherwise provided for for accommodating service installations or utility lines, e.g. heating conduits, electrical lines, lighting devices or service outlets for heating
Abstract
The invention discloses a kind of floor heating assembly and installation methods.Floor heating assembly includes: supporting part, and supporting part includes the stone-plastic plate of hollow setting, and the first threaded hole perpendicular to stone-plastic plate is offered on stone-plastic plate;Foot is adjusted, adjusting foot includes adjusting screw rod, and the first end of adjusting screw rod is spirally connected from the back side of stone-plastic plate into the first threaded hole, and the second end of adjusting screw rod extends towards the direction far from stone-plastic plate;Heat preservation member, heat preservation member include insulation board, and the front of insulation board offers the mounting groove for being laid with hot insulated line, and the front of stone-plastic plate is arranged in the back side fitting of insulation board;Cover board, cover board fit in the front of insulation board.The installation method of floor heating assembly is for installing floor heating assembly.Floor heating assembly and installation method provided by the invention increase the heat insulation effect of floor heating pipeline plate over the ground, and the layer for reducing occupancy is high, reduces the self weight of floor heating assembly, and convenient for safeguarding or maintenance floor heating pipeline reduces security risk, improves levelling precision.
Description
Technical field
The present invention relates to building decoration technology field more particularly to a kind of floor heating assemblies and installation method.
Background technique
Low temperature floor heating radiant heating be it is a kind of interior is kept the temperature as radiator using interior of building ground, plus
The heating system of heat.
In the prior art, the ground of floor heating is installed generally first using cement mortar screeding, then in levelling cement mortar
Upper laying floor heating pipe line, cement slurry of then casting on floor heating pipeline is to realize cement slurry bedding residence heating coil line and make cement slurry
Self-leveling is levelling, finally the laying floor on the cement slurry after levelling.Inventor has found during realizing innovation and creation, existing
There is the ground heater laying method in technology to have the disadvantage that first, the cement thermal property of laying is poor, improves floor heating pipeline
Heat loss reduces the heat insulation effect of floor heating pipeline plate over the ground;Second, the height of about 80-110mm is improved on ground by the cement of laying
Degree, there are problems that occupy layer height it is larger, from great, difficulty of construction is big;Third, cement are filled between floor heating pipeline, floor heating
Pipeline is difficult to safeguard or be overhauled after installation, causes in floor heating use process there are some potential safety problems, the 4th, water
The levelling need of the mud artificial later period, which smooth out to ground, prevents floor heating pipeline from leaking outside, and increases labor intensity.
Therefore, it is necessary to solve above-mentioned technical problem.
Summary of the invention
The present invention provides a kind of floor heating assembly and installation method, to solve problems of the prior art, increases floor heating
Pipeline reduces the layer height of occupancy, reduces the self weight of floor heating assembly to the heat insulation effect on floor, convenient for safeguarding or maintenance floor heating pipe
Line reduces security risk, improves levelling precision.
The floor heating assembly of this busy offer, comprising: supporting part, the supporting part includes the stone-plastic plate of hollow setting, described
The first threaded hole perpendicular to the stone-plastic plate is offered on stone-plastic plate;Foot is adjusted, the adjusting foot includes adjusting screw rod, described
The first end of adjusting screw rod is spirally connected from the back side of the stone-plastic plate into first threaded hole, the second end of the adjusting screw rod
Extend towards the direction far from the stone-plastic plate;Heat preservation member, the heat preservation member include insulation board, and the front of the insulation board offers
For being laid with the mounting groove of hot insulated line, the front of the stone-plastic plate is arranged in the back side fitting of the insulation board;Cover board, it is described
Cover board fits in the front of the insulation board.
Optionally, the supporting part further includes the first supporting rib, and first supporting rib is mounted on the back of the stone-plastic plate
Face simultaneously extends along the length direction of the stone-plastic plate, and first threaded hole runs through first supporting rib, the adjusting foot
First end extended into first threaded hole from first supporting rib backwards to the side of the stone-plastic plate.
Optionally, the adjusting foot further includes clamping seat, offers the second threaded hole on the clamping seat, and described first
Support muscle is connected on the clamping seat, and the first end for adjusting foot extends into first threaded hole from second threaded hole
It is interior.
Optionally, the clamping seat includes sequentially connected first snap-gauge, the second snap-gauge and third snap-gauge, and described
One snap-gauge is oppositely arranged with the third snap-gauge, and first snap-gauge, second snap-gauge and the third snap-gauge limit
The clamping groove of bar shaped, first supporting rib are connected in the clamping groove, and second threaded hole is provided with second card
On plate.
Optionally, the front of the stone-plastic plate is equipped with reinforcing rib, and the reinforcing rib is parallel to first supporting rib.
Optionally, the quantity of the reinforcing rib is multiple, and multiple reinforcing ribs are arranged along the stone-plastic plate, institute
It states insulation board to be embedded between any two adjacent reinforcing ribs, the two sides difference being disposed opposite to each other on the insulation board
It is connected on two reinforcing ribs of arbitrary neighborhood correspondingly.
Optionally, the front of the insulation board is arranged on the reinforcing rib backwards to the surface co-planar of the stone-plastic plate.
Optionally, the insulation board is polyethylene insulation board or extrusion moulding type polystyrene heat insulating board.
Optionally, the stone-plastic plate further includes butt joint edge, is equipped with the second supporting rib on the butt joint edge, and described second
Support muscle is located at the stone-plastic plate back side;Screw thread half bore, institute are offered along the direction perpendicular to the stone-plastic plate on the butt joint edge
Screw thread half bore is stated along the direction perpendicular to the stone-plastic plate after second supporting rib, two stone-plastic plate docking, point
Not Wei Yu two screw thread half bore on two butt joint edges be butted into third screw thread compatible with the adjusting screw rod
Hole.
Based on the same inventive concept, the present invention also provides a kind of installation methods of floor heating assembly, for installing to take up an official post
Floor heating assembly described in meaning one, comprising the following steps: prepare supporting part, the supporting part includes the stone-plastic plate of hollow setting,
The first threaded hole perpendicular to the stone-plastic plate is offered on the stone-plastic plate;Installation and adjustment foot, described on the supporting part
Adjusting foot includes adjusting screw rod, and the first end of the adjusting screw rod is spirally connected from the back side of the stone-plastic plate into first threaded hole
Interior, the second end of the adjusting screw rod is extended towards the direction far from the stone-plastic plate;Heat preservation is installed on the supporting part
Part, the heat preservation member include insulation board, and the front of the insulation board offers the mounting groove for being laid with hot insulated line, the guarantor
The front of the stone-plastic plate is arranged in the back side fitting of warm plate;Cover board, the cover board fitting setting are installed in the heat preservation member
In the front of the insulation board.
Floor heating assembly and installation method provided by the invention, the stone-plastic plate of hollow setting can play effectively heat insulation effect
And self weight is smaller, the insulation board for installing floor heating pipeline can reduce thermal loss after being mounted on stone-plastic plate, be conducive to pair
Ground is kept the temperature, and floor heating assembly provided in this embodiment is not necessarily to cement of casting during the installation process, and the layer for reducing occupancy is high,
In actual application, when floor heating pipeline needs to overhaul or safeguard, by can macroscopic examination floor heating pipe under detachable cover plate
The application situation of line reduces security risk, time saving and energy saving, and the second end of adjusting screw rod can be connected on ground layer, leads to
It crosses to change and adjusts the depth that foot extends into the first threaded hole, change the distance between stone-plastic plate and ground layer, to stone-plastic plate
It is leveled.
Detailed description of the invention
It below will be by preferred embodiment in attached drawing the present invention is described in detail, to help the purpose of the present invention and excellent is understood
Point, in which:
Fig. 1 is the first structure diagram for the floor heating assembly that alternative embodiment of the present invention provides.
Fig. 2 is the second structural schematic diagram of the floor heating assembly that alternative embodiment of the present invention provides.
The structural schematic diagram of insulation board is installed on the supporting part that Fig. 3 provides for alternative embodiment of the present invention.
Fig. 4 is the spliced supporting part structural schematic diagram that alternative embodiment of the present invention provides.
Fig. 5 is the positive structural schematic diagram for the supporting part for being equipped with adjusting foot that alternative embodiment of the present invention provides.
Fig. 6 is the structural schematic diagram at the back side for the supporting part for being equipped with adjusting foot that alternative embodiment of the present invention provides.
Fig. 7 is the structural schematic diagram of the side for the supporting part for being equipped with adjusting foot that alternative embodiment of the present invention provides.
Fig. 8 is the structural schematic diagram for the stone-plastic plate that alternative embodiment of the present invention provides.
Fig. 9 is the structural schematic diagram for the adjusting foot that alternative embodiment of the present invention provides.
Figure 10 is the flow chart of the installation method for the floor heating assembly that alternative embodiment of the present invention provides.
Specific embodiment
It mentions in the present specification or up, down, left, right, before and after, front, the back side, top, the bottom that may mention etc.
Positional terms are defined relative to each construction shown in the drawings, and word "inner" and "outside" refer respectively to direction or remote
From the direction of geometric center of specific component, they are opposite concepts, and it is therefore possible to can different location, difference according to locating for it
Use state and correspondingly changed.So also these or other positional terms should not be construed to restricted use
Language.
Fig. 1 is the first structure diagram for the floor heating assembly that alternative embodiment of the present invention provides, and Fig. 2 is the optional reality of the present invention
Second structural schematic diagram of the floor heating assembly of example offer is provided, is equipped on the supporting part that Fig. 3 provides for alternative embodiment of the present invention
The structural schematic diagram of insulation board, Fig. 4 are the spliced supporting part structural schematic diagram that alternative embodiment of the present invention provides, and Fig. 5 is
What alternative embodiment of the present invention provided is equipped with the positive structural schematic diagram for adjusting the supporting part of foot, and Fig. 6 is that the present invention is optional
What embodiment provided is equipped with the structural schematic diagram for adjusting the back side of supporting part of foot, and Fig. 7 provides for alternative embodiment of the present invention
The structural schematic diagram for adjusting the side of supporting part of foot is installed, Fig. 8 is the stone-plastic plate that provides of alternative embodiment of the present invention
Structural schematic diagram, Fig. 9 are the structural schematic diagram for the adjusting foot that alternative embodiment of the present invention provides.As shown in Figures 1 to 9, this hair
It is bright to provide a kind of floor heating assembly, including supporting part, adjusting foot 2, heat preservation member 3 and cover board 4.
Referring to Fig. 1 to Fig. 9, the supporting part includes the stone-plastic plate 11 of hollow setting, is opened on the stone-plastic plate 11
Equipped with the first threaded hole 14 perpendicular to the stone-plastic plate 11;The adjusting foot 2 includes adjusting screw rod 21, the adjusting screw rod 21
First end be spirally connected from the back side of the stone-plastic plate 11 into first threaded hole 14, the second end court of the adjusting screw rod 21
Direction far from the stone-plastic plate 11 extends;The heat preservation member 3 includes insulation board 31, and the front of the insulation board 31 opens up useful
In the mounting groove 32 for being laid with hot insulated line, the front of the stone-plastic plate 11 is arranged in the back side fitting of the insulation board 31;It is described
Cover board 4 fits in the front of the insulation board 31, can block to what insulation board 31 played, prevents floor heating pipeline from leaking outside,
Reduce labor intensity.
Floor heating assembly provided by the invention, the stone-plastic plate 11 of hollow setting can play effectively heat insulation effect and self weight compared with
Small, the insulation board 31 for installing floor heating pipeline can reduce thermal loss after being mounted on stone-plastic plate 11, be conducive to ground
It is kept the temperature, floor heating assembly provided in this embodiment is not necessarily to cement of casting during the installation process, and the layer for reducing occupancy is high, in reality
In the application process of border, when floor heating pipeline needs to overhaul or safeguard, by cover board 4 disassembly is lower can macroscopic examination floor heating pipeline
Application situation reduces security risk, time saving and energy saving, and the second end of adjusting screw rod 21 can be connected on ground layer, passes through
Change adjusting foot 2 and extend into the depth in the first threaded hole 14, changes the distance between stone-plastic plate 11 and ground layer, stone is moulded
Plate 11 is leveled.
Optionally, the supporting part further includes the first supporting rib 12, and first supporting rib 12 is mounted on the stone-plastic plate
11 back side simultaneously extends along the length direction of the stone-plastic plate 11, and first threaded hole 14 runs through first supporting rib
12, side of the first end for adjusting foot 2 from first supporting rib 12 backwards to the stone-plastic plate 11 extends into described the
In one threaded hole 14.The first supporting rib 12 in the present embodiment can effectively increase the structural strength of stone-plastic plate 11, improve stone
The structural stability of mould plate 11.Preferably, the quantity of first supporting rib 12 can be multiple, multiple first supporting ribs
12 are arranged along the back side of the stone-plastic plate 11.
Preferably, stating adjusting foot 2 further includes clamping seat 22, the second threaded hole 23 is offered on the clamping seat 22, it is described
First supporting rib 12 is connected on the clamping seat 22, and the first end for adjusting foot 2 is extended into from second threaded hole 23
In first threaded hole 14.Clamping seat 22 provided in this embodiment effectively can be supported and be determined to the first supporting rib 12
Position, prevents the first supporting rib 12 from sliding under self gravitation effect, plays the role of efficiently locating to stone-plastic plate 11.
Further, at least two first threaded holes 14 are offered on the first supporting rib 12 and stone-plastic plate 11, two first
Threaded hole 14 is arranged along the length direction of the first supporting rib 12, is spirally connected correspondingly at least two first threaded holes 14
After at least two adjust foot 2, the depth in the first threaded hole 14 can be located at by adjusting the first end of at least a adjusting screw rod 21
Degree carries out quickly accurate leveling to stone-plastic plate 11, and increases the structural stability of stone-plastic plate 11.
As one, optionally implementation process, the clamping seat 22 include sequentially connected first snap-gauge 24, the second snap-gauge
25 and third snap-gauge 26, first snap-gauge 24 be oppositely arranged with the third snap-gauge 26, it is first snap-gauge 24, described
Second snap-gauge 25 and the third snap-gauge 26 limit the clamping groove of bar shaped, and first supporting rib 12 is connected to the card
In access slot, second threaded hole 23 is provided on second snap-gauge 25.First supporting rib 12 is directly connected to the card of bar shaped
Time saving and energy saving in access slot, adjusting screw rod 21 re-extends after being fed through second threaded hole 23 into the first threaded hole 14, increases
First supporting rib 12 is mounted on the structural stability on clamping seat 22.
On the basis of the above embodiments, the second end of the adjusting screw rod 21 is equipped with positioning base, the adjusting spiral shell
Bar 21 is connected on the ground layer by the positioning base.Positioning base provided in this embodiment can effectively increase
Contact area between adjusting screw rod 21 and ground layer improves the structural stability for adjusting foot 2.
Optionally, the front of the stone-plastic plate 11 is equipped with reinforcing rib 13, and the reinforcing rib 13 is parallel to described first
Support muscle 12.Reinforcing rib 13 provided in this embodiment can further increase the structural strength of stone-plastic plate 11.
As one, optionally implementation process, first threaded hole 14 penetrate through the reinforcing rib 13, can increase adjusting
The adjusting depth of screw rod 21.Herein, Hexagon hole can be offered on the end face of the first end of adjusting screw rod 21, passed through
Hexagonal rod enters the first threaded hole 14 backwards to the side of the stone-plastic plate 11 from reinforcing rib 13 and extends in Hexagon hole,
The outer wall of hexagonal rod and the inner wall of Hexagon hole abut against, and rotating hexagon bar can change adjusting screw rod 21 and extend into first
Depth in threaded hole 14 simplifies adjustment process.
Optionally, in first supporting rib 12 and the reinforcing rib 13, at least one hollow setting is simultaneously integrally formed
On the stone-plastic plate 11.Hollow structure can strengthen heat preservation, the anti-acoustic capability of stone-plastic plate 11 with a step, advantageously reduce simultaneously
The overall weight of stone-plastic plate 11.
As an optionally implementation process, the quantity of the reinforcing rib 13 be it is multiple, multiple reinforcing ribs 13 along
The stone-plastic plate 11 is arranged, and the insulation board 31 is embedded between any two adjacent reinforcing ribs 13, the guarantor
Two sides being disposed opposite to each other on warm plate 31 are connected to correspondingly respectively on two reinforcing ribs 13 of arbitrary neighborhood.This
The reinforcing rib 13 that embodiment provides can play steadily support and limit effect to insulation board 31.
Preferably, the front of the insulation board 31 is set with the surface co-planar on the reinforcing rib 13 backwards to the stone-plastic plate 11
It sets.The present embodiment can be fitted on insulation board 31 and stone-plastic plate 11 with the positive planarization of insulation board 31, cover board 4 to be increased
It is bonded effect.
Preferably, the insulation board 31 is polyethylene insulation board 31 or extrusion moulding type polystyrene heat insulating board
31, with the good technical effect of light weight, heat insulation effect.
Further, the stone-plastic plate 11 further includes butt joint edge 15, and the second supporting rib 17 is equipped on the butt joint edge 15,
Second supporting rib 17 is located at 11 back side of stone-plastic plate;Along the direction perpendicular to the stone-plastic plate 11 on the butt joint edge 15
Screw thread half bore 16 is offered, the screw thread half bore 16 runs through second supporting rib along the direction perpendicular to the stone-plastic plate 11
17, after two stone-plastic plates 11 dock, two be located on two butt joint edges 15 the screw thread half bore 16 is docked
At third threaded hole compatible with the adjusting screw rod 21.Second supporting rib 17 provided in this embodiment can be to stone-plastic plate 11
Butt joint edge 15 play effectively support effect, prevent 11 run-off the straight of stone-plastic plate, increase the structural stability of stone-plastic plate 11.
Optionally, butt joint edge 15 is parallel to the extending direction of first supporting rib 12, to increase the stable structure of the first supporting rib 12
Property;And by the adjusting screw rod 21 that is spirally connected in third threaded hole, the edge of the stone-plastic plate 11 after two docking can be carried out high
Degree is adjusted.
Figure 10 is the flow chart of the installation method for the floor heating assembly that alternative embodiment of the present invention provides.
As shown in Figure 10, the present invention also provides a kind of installation methods of floor heating assembly, for installing any of the above one
The floor heating assembly, comprising the following steps: S1: prepare supporting part, the supporting part includes the stone-plastic plate 11 of hollow setting, institute
State the first threaded hole 14 offered on stone-plastic plate 11 perpendicular to the stone-plastic plate 11;S2: the installation and adjustment on the supporting part
Foot 2, the adjusting foot 2 include adjusting screw rod 21, and the first end of the adjusting screw rod 21 is spirally connected from the back side of the stone-plastic plate 11
Into in first threaded hole 14, the second end of the adjusting screw rod 21 is extended towards the direction far from the stone-plastic plate 11;
S3: installing heat preservation member 3 on the supporting part, and the heat preservation member 3 includes insulation board 31, and the front of the insulation board 31 offers
For being laid with the mounting groove 32 of hot insulated line, the front of the stone-plastic plate 11 is arranged in the back side fitting of the insulation board 31;S4:
Cover board 4 is installed in the heat preservation member 3, the cover board 4 is bonded the front that the insulation board 31 is arranged in.
Finally, it should be noted that the above embodiments are merely illustrative of the technical solutions of the present invention, rather than its limitations;Although
Present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that: it still may be used
To modify the technical solutions described in the foregoing embodiments or equivalent replacement of some of the technical features;
And these are modified or replaceed, the range for technical solution of various embodiments of the present invention that it does not separate the essence of the corresponding technical solution.
Claims (10)
1. a kind of floor heating assembly characterized by comprising
Supporting part, the supporting part include the stone-plastic plate of hollow setting, are offered on the stone-plastic plate perpendicular to the stone-plastic plate
The first threaded hole;
Foot is adjusted, the adjusting foot includes adjusting screw rod, and the first end of the adjusting screw rod is spirally connected from the back side of the stone-plastic plate
Into in first threaded hole, the second end of the adjusting screw rod extends towards the direction far from the stone-plastic plate;
Heat preservation member, the heat preservation member include insulation board, and the front of the insulation board offers the installation for being laid with hot insulated line
The front of the stone-plastic plate is arranged in slot, the back side fitting of the insulation board;
Cover board, the cover board fit in the front of the insulation board.
2. floor heating assembly according to claim 1, which is characterized in that the supporting part further includes the first supporting rib, described
First supporting rib is mounted on the back side of the stone-plastic plate and extends along the length direction of the stone-plastic plate, first threaded hole
Through first supporting rib, side of the first end for adjusting foot from first supporting rib backwards to the stone-plastic plate is prolonged
It puts in first threaded hole.
3. floor heating assembly according to claim 2, which is characterized in that the adjusting foot further includes clamping seat, the clamping
The second threaded hole is offered on seat, first supporting rib is connected on the clamping seat, and the first end of the adjusting foot is from institute
The second threaded hole is stated to extend into first threaded hole.
4. floor heating assembly according to claim 3, which is characterized in that the clamping seat includes sequentially connected first card
Plate, the second snap-gauge and third snap-gauge, first snap-gauge are oppositely arranged with the third snap-gauge, first snap-gauge, described
Second snap-gauge and the third snap-gauge limit the clamping groove of bar shaped, and first supporting rib is connected in the clamping groove,
Second threaded hole is provided on second snap-gauge.
5. floor heating assembly according to claim 4, which is characterized in that the front of the stone-plastic plate is equipped with reinforcing rib, institute
It states reinforcing rib and is parallel to first supporting rib.
6. floor heating assembly according to claim 5, which is characterized in that the quantity of the reinforcing rib be it is multiple, it is multiple described
Reinforcing rib is arranged along the stone-plastic plate, and the insulation board is embedded between any two adjacent reinforcing ribs, institute
Two sides being disposed opposite to each other on insulation board are stated to be connected to correspondingly respectively on two reinforcing ribs of arbitrary neighborhood.
7. floor heating assembly according to claim 6, which is characterized in that the insulation board front with carried on the back on the reinforcing rib
It is arranged to the surface co-planar of the stone-plastic plate.
8. floor heating assembly described in -7 any one according to claim 1, which is characterized in that the insulation board is polyethylene
Insulation board or extrusion moulding type polystyrene heat insulating board.
9. floor heating assembly according to claim 8, which is characterized in that the stone-plastic plate further includes butt joint edge, the docking
Second supporting rib is installed, second supporting rib is located at the stone-plastic plate back side on side;Along perpendicular to institute on the butt joint edge
The direction for stating stone-plastic plate offers screw thread half bore, and the screw thread half bore runs through described second along the direction perpendicular to the stone-plastic plate
Supporting rib, after two stone-plastic plate docking, two be located on two butt joint edges the screw thread half bore is butted into
Third threaded hole compatible with the adjusting screw rod.
10. a kind of installation method of floor heating assembly, special for installing floor heating assembly described in any one of claim 1-9
Sign is, comprising the following steps:
Prepare supporting part, the supporting part includes the stone-plastic plate of hollow setting, is offered on the stone-plastic plate perpendicular to the stone
First threaded hole of mould plate;
The installation and adjustment foot on the supporting part, the adjusting foot includes adjusting screw rod, and the first end of the adjusting screw rod is from institute
The back side for stating stone-plastic plate is spirally connected into first threaded hole, and the second end of the adjusting screw rod is towards the side far from the stone-plastic plate
To be extended;
Heat preservation member is installed on the supporting part, the heat preservation member includes insulation board, and the front of the insulation board, which offers, to be used for
It is laid with the mounting groove of hot insulated line, the front of the stone-plastic plate is arranged in the back side fitting of the insulation board;
Cover board is installed in the heat preservation member, the front of the insulation board is arranged in the cover board fitting.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910353209.9A CN110242002A (en) | 2019-04-29 | 2019-04-29 | Floor heating assembly and installation method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910353209.9A CN110242002A (en) | 2019-04-29 | 2019-04-29 | Floor heating assembly and installation method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110242002A true CN110242002A (en) | 2019-09-17 |
Family
ID=67883462
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910353209.9A Pending CN110242002A (en) | 2019-04-29 | 2019-04-29 | Floor heating assembly and installation method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110242002A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111350352A (en) * | 2020-04-01 | 2020-06-30 | 上海圣奎新型建材有限公司 | Ground heat-preservation sound-insulation system of large-span building and construction method thereof |
CN112082193A (en) * | 2020-09-27 | 2020-12-15 | 浙江亚厦装饰股份有限公司 | Floor heating pipe pipeline collection module structure and connecting and mounting method thereof |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103673030A (en) * | 2012-09-19 | 2014-03-26 | 苏州佳士美塑胶机械科技有限公司 | Assembled floor heating structure |
CN205224522U (en) * | 2015-12-07 | 2016-05-11 | 黄庆升 | Spontaneous heating floor |
CN108104417A (en) * | 2017-12-30 | 2018-06-01 | 浙江亚厦装饰股份有限公司 | Base's leveling component and leveling method |
CN108317578A (en) * | 2017-12-30 | 2018-07-24 | 浙江亚厦装饰股份有限公司 | Ground heating system and installation method |
CN208563865U (en) * | 2018-05-25 | 2019-03-01 | 深圳市君盈建筑科技有限公司 | A kind of dry-type floor system of integrally heating coil and water pipe |
CN210857851U (en) * | 2019-04-29 | 2020-06-26 | 浙江亚厦装饰股份有限公司 | Floor heating assembly |
-
2019
- 2019-04-29 CN CN201910353209.9A patent/CN110242002A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103673030A (en) * | 2012-09-19 | 2014-03-26 | 苏州佳士美塑胶机械科技有限公司 | Assembled floor heating structure |
CN205224522U (en) * | 2015-12-07 | 2016-05-11 | 黄庆升 | Spontaneous heating floor |
CN108104417A (en) * | 2017-12-30 | 2018-06-01 | 浙江亚厦装饰股份有限公司 | Base's leveling component and leveling method |
CN108317578A (en) * | 2017-12-30 | 2018-07-24 | 浙江亚厦装饰股份有限公司 | Ground heating system and installation method |
CN208563865U (en) * | 2018-05-25 | 2019-03-01 | 深圳市君盈建筑科技有限公司 | A kind of dry-type floor system of integrally heating coil and water pipe |
CN210857851U (en) * | 2019-04-29 | 2020-06-26 | 浙江亚厦装饰股份有限公司 | Floor heating assembly |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111350352A (en) * | 2020-04-01 | 2020-06-30 | 上海圣奎新型建材有限公司 | Ground heat-preservation sound-insulation system of large-span building and construction method thereof |
CN112082193A (en) * | 2020-09-27 | 2020-12-15 | 浙江亚厦装饰股份有限公司 | Floor heating pipe pipeline collection module structure and connecting and mounting method thereof |
CN112082193B (en) * | 2020-09-27 | 2024-04-12 | 浙江亚厦装饰股份有限公司 | Floor heating pipe pipeline collecting module structure and connection installation method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110242002A (en) | Floor heating assembly and installation method | |
CN211257672U (en) | Integral chassis system of overhead floor of toilet | |
CN207988409U (en) | Basic ground assembly | |
CN208884916U (en) | Equipment room step paving structure | |
CN108104401A (en) | Basic ground assembly and installation method | |
CN110242003A (en) | Load-bearing floor heating assembly and installation method | |
CN207974446U (en) | Floor is aerial to be laid with component | |
CN210798156U (en) | Bearing floor heating assembly | |
CN210857851U (en) | Floor heating assembly | |
CN207988413U (en) | Ground leveling component | |
CN207974443U (en) | Base's leveling component | |
CN209369241U (en) | A kind of mounting structure of backing plate, raised flooring and raised flooring | |
CN207974444U (en) | Levelling foot and leveling component | |
CN211341589U (en) | Leveling strip | |
CN214531699U (en) | Assembled built on stilts underfloor heating module system | |
US20070295827A1 (en) | Floor with radiant heat and method of construction | |
CN210857868U (en) | Ground heating base plate | |
KR101703306B1 (en) | Floor structure for reducing noise and construction method of thereof | |
CN208235877U (en) | The aerial leveling component in ground | |
CN208310105U (en) | A kind of adjustable bathroom of mounting height | |
CN110259039A (en) | Level insulation board assembly | |
CN113530143A (en) | Dry floor heating and construction method | |
CN209780132U (en) | Laying structure of assembled ceramic tile | |
CN208844879U (en) | A kind of modular is aerial freely to adjust pedestal | |
CN211899414U (en) | Leveling support module and leveling support plate assembly |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |