CN110242003A - Load-bearing floor heating assembly and installation method - Google Patents
Load-bearing floor heating assembly and installation method Download PDFInfo
- Publication number
- CN110242003A CN110242003A CN201910353230.9A CN201910353230A CN110242003A CN 110242003 A CN110242003 A CN 110242003A CN 201910353230 A CN201910353230 A CN 201910353230A CN 110242003 A CN110242003 A CN 110242003A
- Authority
- CN
- China
- Prior art keywords
- stone
- plastic plate
- floor heating
- load
- heating assembly
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010438 heat treatment Methods 0.000 title claims abstract description 71
- 238000000034 method Methods 0.000 title claims abstract description 22
- 238000009434 installation Methods 0.000 title claims abstract description 19
- 239000004033 plastic Substances 0.000 claims abstract description 117
- 229920003023 plastic Polymers 0.000 claims abstract description 117
- 238000009413 insulation Methods 0.000 claims abstract description 46
- 230000003014 reinforcing effect Effects 0.000 claims abstract description 43
- 210000001503 joint Anatomy 0.000 claims description 13
- 238000001125 extrusion Methods 0.000 claims description 6
- 210000003205 muscle Anatomy 0.000 claims description 5
- 239000004698 Polyethylene Substances 0.000 claims description 3
- 239000004793 Polystyrene Substances 0.000 claims description 3
- 238000003032 molecular docking Methods 0.000 claims description 3
- -1 polyethylene Polymers 0.000 claims description 3
- 229920000573 polyethylene Polymers 0.000 claims description 3
- 229920002223 polystyrene Polymers 0.000 claims description 3
- 238000004321 preservation Methods 0.000 claims description 3
- 230000002787 reinforcement Effects 0.000 claims 2
- 230000000694 effects Effects 0.000 abstract description 10
- 238000010276 construction Methods 0.000 abstract description 4
- 239000004568 cement Substances 0.000 description 10
- 238000010586 diagram Methods 0.000 description 8
- 239000002002 slurry Substances 0.000 description 4
- 238000005266 casting Methods 0.000 description 3
- 239000011083 cement mortar Substances 0.000 description 3
- 239000004575 stone Substances 0.000 description 3
- 238000000429 assembly Methods 0.000 description 2
- 230000000712 assembly Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 241000272165 Charadriidae Species 0.000 description 1
- 238000005034 decoration Methods 0.000 description 1
- 230000006641 stabilisation Effects 0.000 description 1
- 238000011105 stabilization Methods 0.000 description 1
- 230000002277 temperature effect Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F15/00—Flooring
- E04F15/02—Flooring or floor layers composed of a number of similar elements
- E04F15/02044—Separate elements for fastening to an underlayer
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F15/00—Flooring
- E04F15/02—Flooring or floor layers composed of a number of similar elements
- E04F15/10—Flooring or floor layers composed of a number of similar elements of other materials, e.g. fibrous or chipped materials, organic plastics, magnesite tiles, hardboard, or with a top layer of other materials
- E04F15/105—Flooring or floor layers composed of a number of similar elements of other materials, e.g. fibrous or chipped materials, organic plastics, magnesite tiles, hardboard, or with a top layer of other materials of organic plastics with or without reinforcements or filling materials
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F15/00—Flooring
- E04F15/18—Separately-laid insulating layers; Other additional insulating measures; Floating floors
- E04F15/181—Insulating layers integrally formed with the flooring or the flooring elements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F15/00—Flooring
- E04F15/02—Flooring or floor layers composed of a number of similar elements
- E04F15/02044—Separate elements for fastening to an underlayer
- E04F2015/02105—Separate elements for fastening to an underlayer without load-supporting elongated furring elements between the flooring elements and the underlayer
- E04F2015/02127—Separate elements for fastening to an underlayer without load-supporting elongated furring elements between the flooring elements and the underlayer adjustable perpendicular to the underlayer
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F2290/00—Specially adapted covering, lining or flooring elements not otherwise provided for
- E04F2290/02—Specially adapted covering, lining or flooring elements not otherwise provided for for accommodating service installations or utility lines, e.g. heating conduits, electrical lines, lighting devices or service outlets
- E04F2290/023—Specially adapted covering, lining or flooring elements not otherwise provided for for accommodating service installations or utility lines, e.g. heating conduits, electrical lines, lighting devices or service outlets for heating
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Floor Finish (AREA)
Abstract
The invention discloses a kind of load-bearing floor heating assembly and installation methods.Load-bearing floor heating assembly, comprising: the stone-plastic plate of hollow setting, the back side of stone-plastic plate are provided with the first supporting rib, and the first supporting rib is extended along the length direction of stone-plastic plate, and the front of stone-plastic plate is provided with reinforcing rib, and reinforcing rib is perpendicular to the first supporting rib;Insulation board, insulation board are laid on the front of stone-plastic plate, and insulation board is laid on the front of stone-plastic plate, offer the mounting groove for floor heating pipe line to be arranged backwards to the side of stone-plastic plate on insulation board, and mounting groove is along being parallel to the direction of stone-plastic plate through reinforcing rib.The installation method of load-bearing floor heating assembly is for installing load-bearing floor heating assembly.Load-bearing floor heating assembly and installation method provided by the invention reduce the heat loss of floor heating pipeline on the basis of stablizing support floor heating pipeline, the heat insulation effect for increasing floor heating pipeline plate over the ground, the layer for reducing occupancy is high, reduces self weight, difficulty of construction is reduced, installation difficulty is reduced.
Description
Technical field
The present invention relates to building decoration technology field more particularly to a kind of load-bearing floor heating assemblies and installation method.
Background technique
Low temperature floor heating radiant heating be it is a kind of interior is kept the temperature as radiator using interior of building ground, plus
The heating system of heat.
In the prior art, the weight of floor heating pipeline is larger, and it is poor that there are stability by the way of built on stilts installation floor heating pipeline
The problem of, the ground for being equipped with floor heating pipeline is generally first laid with cement mortar, and floor heating pipe line is then laid in cement mortar, leads to
The intensity stabilization support floor heating pipeline having after solidifying by cement mortar is crossed, cement slurry of then casting on floor heating pipeline is with reality
Existing cement slurry bedding residence heating coil line simultaneously keeps cement slurry Self-leveling levelling, finally the laying floor on the cement slurry after levelling.Hair
Bright people has found that there is also certain problems by the levelling rear support floor heating pipe of cement during realizing innovation and creation: first,
The cement thermal property of laying is poor, improves the heat loss of floor heating pipeline, reduces the heat insulation effect of floor heating pipeline plate over the ground;The
Two, the height of about 80-110mm is improved on ground by the cement of laying, exist occupy layer height it is larger, from great, difficulty of construction is big
Problem;Third, cement are filled between floor heating pipeline, and floor heating pipeline is difficult to safeguard or be overhauled after installation, lead to ground
There are some potential safety problemss in warm use process.
Therefore, it is necessary to solve above-mentioned technical problem.
Summary of the invention
The present invention provides a kind of load-bearing floor heating assembly and installation method, to solve problems of the prior art, steady
Surely on the basis of supporting floor heating pipeline, the heat loss of floor heating pipeline is reduced, increases the heat insulation effect of floor heating pipeline plate over the ground, is reduced
The layer of occupancy is high, reduces self weight, reduces difficulty of construction, reduces installation difficulty.
Load-bearing floor heating assembly provided by the invention, comprising: the back side fitting of the stone-plastic plate of hollow setting, the stone-plastic plate is set
It is equipped with the first supporting rib, first supporting rib is extended along the length direction of the stone-plastic plate, and the stone-plastic plate is just
Face paste conjunction is provided with reinforcing rib, and the reinforcing rib is perpendicular to first supporting rib;Insulation board, the insulation board are laid on described
The front of stone-plastic plate, the side on the insulation board backwards to the stone-plastic plate offer the mounting groove for floor heating pipe line to be arranged,
The mounting groove runs through the reinforcing rib along the direction for being parallel to the stone-plastic plate.
Optionally, the stone-plastic plate and first supporting rib, reinforcing rib one extrusion molding.
Optionally, the quantity of the reinforcing rib is multiple, and multiple reinforcing ribs are arranged along the front of the stone-plastic plate
Setting, the insulation board are arranged between the adjacent reinforcing rib of any two, two sides being disposed opposite to each other in the heat preservation
Face is connected to correspondingly respectively on the side wall on two reinforcing ribs.
Optionally, the reinforcing rib and the hollow setting of first supporting rib.
Optionally, the load-bearing floor heating assembly further includes adjusting foot, and the adjusting foot includes adjusting screw rod, the stone-plastic plate
The first threaded hole perpendicular to the stone-plastic plate is offered, the first end of the adjusting screw rod is spirally connected from the back side of the stone-plastic plate
Into in first threaded hole, the second end of the adjusting screw rod extends towards the direction far from the stone-plastic plate.
Optionally, the adjusting foot further includes clamping seat, offers on the clamping seat and is adapted with the adjusting screw rod
The second threaded hole, first supporting rib is connected on the clamping seat, and the first end of the adjusting screw rod is fed through described
It is screwed onto after second threaded hole in first threaded hole.
Optionally, the quantity for adjusting foot is multiple, offers multiple institutes on first supporting rib along its length
The first threaded hole is stated, multiple adjusting feet are screwed onto correspondingly in multiple first threaded holes.
Optionally, the insulation board is polyethylene insulation board or extrusion moulding type polystyrene heat insulating board.
Optionally, the stone-plastic plate further includes butt joint edge, is equipped with the second supporting rib on the butt joint edge, and described second
Support muscle is located at the stone-plastic plate back side;Screw thread half bore, institute are offered along the direction perpendicular to the stone-plastic plate on the butt joint edge
Screw thread half bore is stated along the direction perpendicular to the stone-plastic plate after second supporting rib, two stone-plastic plate docking, point
Not Wei Yu two screw thread half bore on two butt joint edges be butted into third screw thread compatible with the adjusting screw rod
Hole.
Based on the same inventive concept, the present invention also provides a kind of installation method of load-bearing floor heating assembly, for install with
Load-bearing floor heating assembly described in upper any one, comprising the following steps: prepare stone-plastic plate, the hollow setting of stone-plastic plate is described
The back side of stone-plastic plate is provided with the first supporting rib, and first supporting rib is extended along the length direction of the stone-plastic plate,
The front of the stone-plastic plate is provided with reinforcing rib, and the reinforcing rib is perpendicular to first supporting rib;Insulation board is mounted on institute
Stone-plastic plate is stated, the insulation board is laid on the front of the stone-plastic plate, and the insulation board is laid on the front of the stone-plastic plate, institute
It states the side on insulation board backwards to the stone-plastic plate and offers mounting groove for floor heating pipe line to be arranged, the mounting groove is along parallel
Run through the reinforcing rib in the direction of the stone-plastic plate.
Load-bearing floor heating assembly and installation method provided by the invention, the stone-plastic plate of hollow setting, which can play, effectively to be kept the temperature
Effect and be conducive to reduce self weight, the insulation board for installing floor heating pipeline can be reduced after being mounted on stone-plastic plate heat damage
It loses, is conducive to keep the temperature ground, the reinforcing rib and the first supporting rib being vertically set on stone-plastic plate can effectively increase
The structural strength of stone-plastic plate can increase the structural stability of the stone-plastic plate of aerial setting, on this basis, the installation of floor heating pipeline
In the process without cement of casting, the layer for reducing occupancy is high, and in actual application, floor heating pipeline needs to overhaul or safeguard
When, both safety will can have been reduced with the application situation of macroscopic examination floor heating pipeline under the disassembly of the floor being covered on insulation board
Hidden danger, it is time saving and energy saving.
Detailed description of the invention
It below will be by preferred embodiment in attached drawing the present invention is described in detail, to help the purpose of the present invention and excellent is understood
Point, in which:
Fig. 1 is the structural schematic diagram for the load-bearing floor heating assembly that alternative embodiment of the present invention provides.
Fig. 2 is the assembling figure for the stone-plastic plate for being equipped with adjusting foot that alternative embodiment of the present invention provides.
Fig. 3 is the structure schematic diagram at the back side for the stone-plastic plate for being equipped with adjusting foot that alternative embodiment of the present invention provides.
Fig. 4 is the structural schematic diagram at the back side for the stone-plastic plate for being equipped with adjusting foot that alternative embodiment of the present invention provides.
Fig. 5 is the structural schematic diagram of the optional stone-plastic plate for being equipped with insulation board for implementing to provide of the present invention.
Fig. 6 is the partial enlarged view of A in Fig. 5.
Fig. 7 is the flow chart of the installation method for the load-bearing floor heating assembly that alternative embodiment of the present invention provides.
Specific embodiment
It mentions in the present specification or up, down, left, right, before and after, front, the back side, top, the bottom that may mention etc.
Positional terms are defined relative to each construction shown in the drawings, and word "inner" and "outside" refer respectively to direction or remote
From the direction of geometric center of specific component, they are opposite concepts, and it is therefore possible to can different location, difference according to locating for it
Use state and correspondingly changed.So also these or other positional terms should not be construed to restricted use
Language.
Fig. 1 is the structural schematic diagram for the load-bearing floor heating assembly that alternative embodiment of the present invention provides, and Fig. 2 is the optional reality of the present invention
The assembling figure for adjusting the stone-plastic plate of foot that is equipped with of example offer is applied, Fig. 3 is equipped with adjusting for what alternative embodiment of the present invention provided
The structure schematic diagram at the back side of the stone-plastic plate of foot, Fig. 4 are the stone-plastic plate for being equipped with adjusting foot that alternative embodiment of the present invention provides
The structural schematic diagram at the back side, Fig. 5 are the structural schematic diagram of the optional stone-plastic plate for being equipped with insulation board for implementing to provide of the present invention, figure
6 be the partial enlarged view of A in Fig. 5.As shown in Figures 1 to 6, the present invention provides a kind of load-bearing floor heating assemblies, comprising: hollow to set
The stone-plastic plate 1 and insulation board 2 set.
Referring to Fig. 1 to Fig. 6, the back side of the stone-plastic plate 1, which is bonded, is provided with the first supporting rib 11, and described first
Muscle 11 to be supportted to be extended along the length direction of the stone-plastic plate 1, the front fitting of the stone-plastic plate 1 is provided with reinforcing rib 12,
The reinforcing rib 12 is perpendicular to first supporting rib 11;The insulation board 2 is laid on the front of the stone-plastic plate 1, the guarantor
Side on warm plate 2 backwards to the stone-plastic plate 1 offers the mounting groove 21 for floor heating pipe line to be arranged, and the mounting groove 21 is along flat
Row runs through the reinforcing rib 12 in the direction of the stone-plastic plate 1.
Load-bearing floor heating assembly provided by the invention, the stone-plastic plate 1 of hollow setting can play effectively heat insulation effect and have
Conducive to self weight is reduced, the insulation board 2 for installing floor heating pipeline can reduce thermal loss after being mounted on stone-plastic plate 1, favorably
It is kept the temperature in ground, the reinforcing rib 12 and the first supporting rib 11 being vertically set on stone-plastic plate 1 can effectively increase stone
The structural strength of mould plate 1 can increase the structural stability of the stone-plastic plate 1 of aerial setting, on this basis, the installation of floor heating pipeline
In the process without cement of casting, the layer for reducing occupancy is high, and in actual application, floor heating pipeline needs to overhaul or safeguard
When, by the floor being covered on insulation board 2 disassembly it is lower can macroscopic examination floor heating pipeline application situation, it is hidden to reduce safety
Suffer from, it is time saving and energy saving.
Optionally, the stone-plastic plate 1 and first supporting rib 11, the integrated extrusion molding of reinforcing rib 12, it is possible to reduce raw
The difficulty of production simplifies production technology.
As an optionally implementation process, the quantity of the reinforcing rib 12 be it is multiple, multiple reinforcing ribs 12 along
The front of the stone-plastic plate 1 is arranged, and the insulation board 2 is arranged between the adjacent reinforcing rib 12 of any two, institute
Two sides being disposed opposite to each other in heat preservation are stated to be connected to correspondingly respectively on the side wall on two reinforcing ribs 12.This reality
The reinforcing rib 12 for applying example offer can play steadily support and limit effect to insulation board 2.
Preferably, the reinforcing rib 12 and the hollow setting of first supporting rib 11.The present embodiment can be further
The structural strength of reinforcing rib 12 and the first supporting rib 11 is reduced, while improving heat insulation effect.
As an optionally implementation process, the load-bearing floor heating assembly further includes adjusting foot 3, and the adjusting foot 3 includes
Adjusting screw rod 31, the stone-plastic plate 1 offer the first threaded hole 16 perpendicular to the stone-plastic plate 1, the adjusting screw rod 31
First end is spirally connected from the back side of the stone-plastic plate 1 into first threaded hole 16, and the second end of the adjusting screw rod 31 is towards remote
Direction from the stone-plastic plate 1 extends.The second end of adjusting screw rod 31 in the present embodiment can be connected on ground layer, be led to
It crosses to change and adjusts the depth that foot 3 extends into the first threaded hole 16, change the distance between stone-plastic plate 1 and ground layer, to stone
Mould plate 1 is leveled, time saving and energy saving.
As one, optionally implementation process, first threaded hole 16 penetrate through the reinforcing rib 12, can increase adjusting
The adjusting depth of screw rod 31.Herein, Hexagon hole can be offered on the end face of the first end of adjusting screw rod 31, passed through
Hexagonal rod enters the first threaded hole 16 backwards to the side of the stone-plastic plate 1 from reinforcing rib 12 and extends in Hexagon hole, and six
The outer wall of side shape bar and the inner wall of Hexagon hole abut against, and rotating hexagon bar can change adjusting screw rod 31 and extend into the first spiral shell
Depth in pit 16 simplifies adjustment process.
Preferably, the adjusting foot 3 further includes clamping seat 32, offered and the adjusting screw rod 31 on the clamping seat 32
Compatible second threaded hole, first supporting rib 11 are connected on the clamping seat 32, and the first of the adjusting screw rod 31
End is screwed onto first threaded hole 16 after being fed through second threaded hole.Clamping seat 32 provided in this embodiment can be right
First supporting rib 11 is effectively supported and is positioned, and prevents the first supporting rib 11 from sliding under self gravitation effect, is moulded to stone
Plate 1 plays the role of efficiently locating.
As an optionally implementation process, the clamping seat 32 include sequentially connected first snap-gauge, the second snap-gauge, with
And third snap-gauge, first snap-gauge are oppositely arranged with the third snap-gauge, first snap-gauge, second snap-gauge and
The third snap-gauge limits the clamping groove of bar shaped, and first supporting rib 11 is connected in the clamping groove, second spiral shell
Pit is provided on second snap-gauge.First supporting rib 11 is directly connected in the clamping groove of bar shaped, time saving and energy saving, adjusts spiral shell
Bar 31 re-extends after being fed through second threaded hole into the first threaded hole 16, increases the first supporting rib 11 and is mounted on clamping
Structural stability on seat 32.
On the basis of the above embodiments, the quantity for adjusting foot 3 is multiple, along length on first supporting rib 11
Direction offers multiple first threaded holes 16, and multiple adjusting feet 3 are screwed onto multiple first spiral shells correspondingly
In pit 16.The depth in the first threaded hole 16 can be located at by adjusting the first end of multiple adjusting screw rods 31, to stone-plastic plate 1
Quickly accurate leveling is carried out, and increases the structural stability of stone-plastic plate 1.
On the basis of the above embodiments, the second end of the adjusting screw rod 31 is equipped with positioning base, the adjusting spiral shell
Bar 31 is connected on the ground layer by the positioning base.Positioning base provided in this embodiment can effectively increase
Contact area between adjusting screw rod 31 and ground layer improves the structural stability for adjusting foot 3.
Optionally, the insulation board 2 is polyethylene insulation board 2 or extrusion moulding type polystyrene heat insulating board 2, tool
The technical effect for having light weight, heat insulation effect good.
Preferably, the stone-plastic plate 1 further includes butt joint edge 13, the second supporting rib 14, institute are installed on the butt joint edge 13
It states the second supporting rib 14 and is located at 1 back side of stone-plastic plate;It is opened up on the butt joint edge 13 along the direction perpendicular to the stone-plastic plate 1
There is screw thread half bore, the screw thread half bore runs through second supporting rib 14 along the direction perpendicular to the stone-plastic plate 1, described in two
After stone-plastic plate 1 docks, two screw thread half bore being located on two butt joint edges 13 are butted into and the adjusting spiral shell
The compatible third threaded hole of bar 31.Second supporting rib 14 provided in this embodiment can the butt joint edge 13 to stone-plastic plate 1 play
Effectively support effect prevents 1 run-off the straight of stone-plastic plate, increases the structural stability of stone-plastic plate 1.Optionally, butt joint edge 13
It is parallel to the extending direction of first supporting rib 11, to increase the structural stability of the first supporting rib 11;And by third
Be spirally connected adjusting screw rod 31 in threaded hole, can carry out height adjustment to the edge of the stone-plastic plate 1 after two docking.
Fig. 7 is the flow chart of the installation method for the load-bearing floor heating assembly that alternative embodiment of the present invention provides.
As shown in fig. 7, based on the same inventive concept, the present invention also provides a kind of installation method of load-bearing floor heating assembly,
For load-bearing floor heating assembly described in installing any of the above one, comprising the following steps: S1: preparing stone-plastic plate 1, the stone-plastic plate
1 hollow setting, the back side of the stone-plastic plate 1 are provided with the first supporting rib 11, and first supporting rib 11 is along the stone-plastic plate 1
Length direction be extended, the front of the stone-plastic plate 1 is provided with reinforcing rib 12, and the reinforcing rib 12 is perpendicular to described first
Supporting rib 11;S2: insulation board 2 is mounted on the stone-plastic plate 1, the insulation board 2 is laid on the front of the stone-plastic plate 1, institute
The front that insulation board 2 is laid on the stone-plastic plate 1 is stated, offers and is used for backwards to the side of the stone-plastic plate 1 on the insulation board 2
The mounting groove 21 of floor heating pipe line is set, and the mounting groove 21 runs through the reinforcing rib 12 along the direction for being parallel to the stone-plastic plate 1.
Finally, it should be noted that the above embodiments are merely illustrative of the technical solutions of the present invention, rather than its limitations;Although
Present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that: it still may be used
To modify the technical solutions described in the foregoing embodiments or equivalent replacement of some of the technical features;
And these are modified or replaceed, the range for technical solution of various embodiments of the present invention that it does not separate the essence of the corresponding technical solution.
Claims (10)
1. a kind of load-bearing floor heating assembly characterized by comprising
The back side fitting of the stone-plastic plate of hollow setting, the stone-plastic plate is provided with the first supporting rib, first supporting rib along
The length direction of the stone-plastic plate is extended, and the front fitting of the stone-plastic plate is provided with reinforcing rib, and the reinforcing rib is vertical
In first supporting rib;
Insulation board, the insulation board are laid on the front of the stone-plastic plate, backwards to the side of the stone-plastic plate on the insulation board
The mounting groove for floor heating pipe line to be arranged is offered, the mounting groove runs through the reinforcement along the direction for being parallel to the stone-plastic plate
Muscle.
2. load-bearing floor heating assembly according to claim 1, which is characterized in that the stone-plastic plate and first supporting rib,
Reinforcing rib one extrusion molding.
3. load-bearing floor heating assembly according to claim 2, which is characterized in that the quantity of the reinforcing rib be it is multiple, it is multiple
The reinforcing rib is arranged along the front of the stone-plastic plate, and the adjacent reinforcement of any two is arranged in the insulation board
Between muscle, two sides being disposed opposite to each other in the heat preservation are connected to the side wall on two reinforcing ribs correspondingly respectively
On.
4. load-bearing floor heating assembly according to claim 3, which is characterized in that the reinforcing rib and first supporting rib are equal
Hollow setting.
5. load-bearing floor heating assembly according to claim 4, which is characterized in that the load-bearing floor heating assembly further includes adjusting
Foot, the adjusting foot includes adjusting screw rod, and the stone-plastic plate offers the first threaded hole perpendicular to the stone-plastic plate, the tune
The first end of section screw rod is spirally connected from the back side of the stone-plastic plate into first threaded hole, the second end court of the adjusting screw rod
Direction far from the stone-plastic plate extends.
6. load-bearing floor heating assembly according to claim 5, which is characterized in that the adjusting foot further includes clamping seat, described
The second threaded hole compatible with the adjusting screw rod is offered on clamping seat, first supporting rib is connected to the clamping seat
On, the first end of the adjusting screw rod is screwed onto first threaded hole after being fed through second threaded hole.
7. load-bearing floor heating assembly according to claim 6, which is characterized in that it is described adjust foot quantity be it is multiple, it is described
Multiple first threaded holes are offered on first supporting rib along its length, multiple adjusting feet are screwed onto correspondingly
In multiple first threaded holes.
8. load-bearing floor heating assembly according to claim 7, which is characterized in that the insulation board is polyethylene insulation board
Or extrusion moulding type polystyrene heat insulating board.
9. load-bearing floor heating assembly according to any one of claims 1 to 8, which is characterized in that the stone-plastic plate further includes pair
Edge fit is equipped with the second supporting rib on the butt joint edge, and second supporting rib is located at the stone-plastic plate back side;The butt joint edge
Upper edge offers screw thread half bore perpendicular to the direction of the stone-plastic plate, and the screw thread half bore is along the direction perpendicular to the stone-plastic plate
Through second supporting rib, after two stone-plastic plates docking, two spiral shells being located on two butt joint edges
Line half bore is butted into third threaded hole compatible with the adjusting screw rod.
10. a kind of installation method of load-bearing floor heating assembly, total for installing load-bearing floor heating described in any one of claim 1-9
At, which comprises the following steps:
Preparing stone-plastic plate, the hollow setting of stone-plastic plate, the back side of the stone-plastic plate is provided with the first supporting rib, and described first
It supports muscle to be extended along the length direction of the stone-plastic plate, the front of the stone-plastic plate is provided with reinforcing rib, the reinforcing rib
Perpendicular to first supporting rib;
Insulation board is mounted on the stone-plastic plate, the insulation board is laid on the front of the stone-plastic plate, and the insulation board is laid with
Side on the front of the stone-plastic plate, the insulation board backwards to the stone-plastic plate offers the peace for floor heating pipe line to be arranged
Tankage, the mounting groove run through the reinforcing rib along the direction for being parallel to the stone-plastic plate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910353230.9A CN110242003A (en) | 2019-04-29 | 2019-04-29 | Load-bearing floor heating assembly and installation method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910353230.9A CN110242003A (en) | 2019-04-29 | 2019-04-29 | Load-bearing floor heating assembly and installation method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110242003A true CN110242003A (en) | 2019-09-17 |
Family
ID=67883513
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910353230.9A Pending CN110242003A (en) | 2019-04-29 | 2019-04-29 | Load-bearing floor heating assembly and installation method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110242003A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112082193A (en) * | 2020-09-27 | 2020-12-15 | 浙江亚厦装饰股份有限公司 | Floor heating pipe pipeline collection module structure and connecting and mounting method thereof |
CN112443123A (en) * | 2020-11-24 | 2021-03-05 | 浙江亚厦装饰股份有限公司 | Warm up bearing substrate structure |
CN113356514A (en) * | 2021-05-27 | 2021-09-07 | 国住人居工程顾问有限公司 | Assembled floor system that suits to age |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN206408901U (en) * | 2016-12-26 | 2017-08-15 | 浙江亚厦装饰股份有限公司 | A kind of novel ground heater connecting structure of heat insulation board |
CN206636123U (en) * | 2017-03-22 | 2017-11-14 | 安徽以诺木塑板材科技有限公司 | A kind of anti-machining deformation PVC stone plastic floors |
CN108317578A (en) * | 2017-12-30 | 2018-07-24 | 浙江亚厦装饰股份有限公司 | Ground heating system and installation method |
CN208563865U (en) * | 2018-05-25 | 2019-03-01 | 深圳市君盈建筑科技有限公司 | A kind of dry-type floor system of integrally heating coil and water pipe |
CN210798156U (en) * | 2019-04-29 | 2020-06-19 | 浙江亚厦装饰股份有限公司 | Bearing floor heating assembly |
-
2019
- 2019-04-29 CN CN201910353230.9A patent/CN110242003A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN206408901U (en) * | 2016-12-26 | 2017-08-15 | 浙江亚厦装饰股份有限公司 | A kind of novel ground heater connecting structure of heat insulation board |
CN206636123U (en) * | 2017-03-22 | 2017-11-14 | 安徽以诺木塑板材科技有限公司 | A kind of anti-machining deformation PVC stone plastic floors |
CN108317578A (en) * | 2017-12-30 | 2018-07-24 | 浙江亚厦装饰股份有限公司 | Ground heating system and installation method |
CN208563865U (en) * | 2018-05-25 | 2019-03-01 | 深圳市君盈建筑科技有限公司 | A kind of dry-type floor system of integrally heating coil and water pipe |
CN210798156U (en) * | 2019-04-29 | 2020-06-19 | 浙江亚厦装饰股份有限公司 | Bearing floor heating assembly |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112082193A (en) * | 2020-09-27 | 2020-12-15 | 浙江亚厦装饰股份有限公司 | Floor heating pipe pipeline collection module structure and connecting and mounting method thereof |
CN112082193B (en) * | 2020-09-27 | 2024-04-12 | 浙江亚厦装饰股份有限公司 | Floor heating pipe pipeline collecting module structure and connection installation method thereof |
CN112443123A (en) * | 2020-11-24 | 2021-03-05 | 浙江亚厦装饰股份有限公司 | Warm up bearing substrate structure |
CN113356514A (en) * | 2021-05-27 | 2021-09-07 | 国住人居工程顾问有限公司 | Assembled floor system that suits to age |
CN113356514B (en) * | 2021-05-27 | 2023-03-14 | 国住人居工程顾问有限公司 | Assembled is fit for ageing floor system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110242003A (en) | Load-bearing floor heating assembly and installation method | |
CN211257672U (en) | Integral chassis system of overhead floor of toilet | |
CN208884916U (en) | Equipment room step paving structure | |
CN108612284A (en) | Aerial steelframe and its installation method | |
CN110242002A (en) | Floor heating assembly and installation method | |
CN210857868U (en) | Ground heating base plate | |
CN108104417A (en) | Base's leveling component and leveling method | |
CN207974446U (en) | Floor is aerial to be laid with component | |
CN110952749A (en) | Keel frame type overhead floor | |
CN207974443U (en) | Base's leveling component | |
CN210798156U (en) | Bearing floor heating assembly | |
CN103470038B (en) | Concrete one-step forming process of building appearance moulding and main structure | |
CN207988413U (en) | Ground leveling component | |
CN207974444U (en) | Levelling foot and leveling component | |
CN210857851U (en) | Floor heating assembly | |
CN216340631U (en) | Modular passing-through stone structure | |
CN208844879U (en) | A kind of modular is aerial freely to adjust pedestal | |
CN210342560U (en) | Dry-type worker method aerial decoration subassembly | |
CN207003743U (en) | Vertical curtain wall outside a kind of lightweight | |
CN208235877U (en) | The aerial leveling component in ground | |
CN209990082U (en) | Liftable overhead floor support | |
CN209339514U (en) | Adjustable flat lower margin | |
CN211899414U (en) | Leveling support module and leveling support plate assembly | |
CN218028693U (en) | Heat-insulating bearing overhead integrated floor heating plate | |
CN216380408U (en) | Assembled floor heating adjusting foot |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |